This is an Addendum 1 to a solicitation issued by the City of Havelock, North Carolina for trenchless gravity sewer line repair services. The project encompasses CIPP (Cured-In-Place Pipe) repair of two gravity sewer line sections: a 10-inch ductile iron pipe on Forest Hill Drive between manholes TH32 and TH33 (approximately 220 feet) requiring four fiberglass repair sleeves, and an 8-inch ductile iron pipe on Shepard Street between manholes P79 and P76 (approximately 300 feet) requiring two repair sleeves. The addendum clarifies that no boring operations are required for this project and that CIPP repair will involve only short lengths of resin-saturated liner to address infiltration points rather than full-pipe lining. Written questions were due September 16, 2026, with bids due October 7, 2026. A site visit is recommended but not mandatory. Performance is 45 calendar days from Notice to Proceed, with work to commence within 30 days of award and standard work hours of 8:00 AM to 5:00 PM, Monday through Friday, excluding City holidays.

The addendum addresses clarifying questions from prospective bidders regarding project scope and administration. No bid bond is required for this solicitation, and the City has not provided a project cost estimate. Bidders are advised that the City does not maintain a plan-holders list and that bid tabulations will be posted on DemandStar following award. Contractors must hold a North Carolina general contractor's license if the project cost exceeds $30,000, and out-of-state entities must maintain a Certificate of Authority to Transact Business in North Carolina. An executed E-Verify Affidavit is mandatory for bid responsiveness. The contractor must provide a one-year warranty on all materials and workmanship from the date equipment is placed back into service, with liquidated damages assessed at $300 per day for each day beyond the 45-day performance period. Bids remain valid for 75 days following opening.

View the file

Other files

File Type Posted
2026 Trenchless Gravity Sewer Line Repair bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Havelock, 2026 Trenchless Gravity Sewer Line Repair

Addendum 1

September 14, 2026

Questions Received

1. What are the approximate lengths, sizes, and types of the pipes installed on the project?

None.

2. Are there any portions of the project that will need to be Bored?

None

3. Are the crossings to be Jack & Bored or Directionally Bored?

4. What are the approximate lengths and diameters of the portions to be bored?

5. How much is the required bid bond for the project?

Not required.

6. How much is the cost estimate of the project?

No estimate is available.

7. Do you have any further details you wish to provide?

8. If possible, we would like to receive all future bid advertisements, PLAN-HOLDER LISTS, and BID TABULATIONS from your agency by email

The city does not maintain a plan-holders list. Bid tabulations are posted on DemandStar after awarded.

9. Can you confirm if there is any CIPP associated with this project?

The CIPP repair will require short lengths of the resin saturated liner to stop infiltration into the sewer line at distances stated in the scope of work, not lining the entirety of the pipe.