This document is an Addendum to the Request for Proposals (RFP) for the 2024 Moving project for Fisher Elementary School and Pierce Middle School in Wayne County, Michigan. The scope of work includes moving services such as providing additional storage pods, moving and storing kitchen equipment, moving and stacking book room boxes, moving a kiln, and minor cleaning and shelving work. The bid due date is unchanged at 11:00 AM on Tuesday, January 9, 2024. There are also additional moving services required for Royal Oak Schools that bidders must agree to provide at the same hourly rates.
Pricing terms require bidders to include an allowance amount in their bids. The contract will be awarded to a single mover who will provide the requested services. No other salient pricing or funding information is provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined bid document 2024 Moving BW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 Project: 2024 Moving – Fisher Elementary School and Pierce Middle School
Bid Due date: 11:00AM Tuesday, January 9, 2024 (UNCHANGED) This Addendum is issued as modifications to the RFP previously issued to provide clarifications to the scope of work. This Addendum supersedes the original RFP. This along with the RFP becomes the bid documents.
FISHER
1. 1st pod will be dropped in March. It will be located on the west side of the school. Include the cost of a second pod in your bid to be delivered May 1st. On move day mover to empty the pod(s) into a semi-truck and remove the pods from the site.
2. Note: all classroom student chairs will be tagged as we are keeping them.
3. In the kitchen area move all mobile equipment out. This equipment can be stored in the gym. Provide floor protection. Note we can have the kitchen equipment in the gym - no other storage.
4. Mover to gently stack the “book room” boxes no higher than 4 high on pallets and wrap. These can be left in the corridor.
5. Include moving of the kiln in your bid. The owner will disconnect the kiln electrically.
6. Be sure to include the allowance in your bid.
7. Include some minor cleaning out of the boiler room.
8. Include removing and re-installing the shelving in the gym storage room and book room.
PIERCE
1. Movers do not need to remove circulation desk in the media center.
2. The move back date is August 23rd.
3. Be sure to include the allowance in your bid.
4. Include removal of mobile eq from the kitchen to be stored in the gym.
5. Include all necessary floor protection in the gym. NOTE: this is a new floor.
ADDITIONAL SCOPE:
There is a small amount of work for Royal Oak Schools - clearing out of the main office and kitchen at one school and one kitchen at another elementary school. With this bid, you agree to allow Royal Oak Schools to use your hourly rates.
END