Addendum 1 17129.pdf

PDF 1 MB Posted

Attached to
Egeler CF - Fire Alarm Project 472/17129. RMP
Solicitation number
RFQ-171-180000000915-4
Issued by
Michigan

About this file

This document is Addendum No. 1 for the Egeler Fire Alarm Replacement Project, issued by Tower Pinkster for the Michigan Department of Corrections at the Egeler Correctional Facility in Jackson, Michigan. The addendum modifies the original bidding documents, extending the bid date to October 24, 2018 at 2:00 pm, with a request for information (RFI) cut-off on October 17, 2018 at 5:00 pm. The project involves a comprehensive fire alarm system replacement across multiple cell blocks (1, 2, and 3), including removing existing fire alarm systems, installing new fire alarm control panels, connecting to existing systems, and implementing advanced features like VESDA (Very Early Smoke Detection Apparatus) systems.

The addendum specifies several key technical requirements, including installing 24-port network switches in specific locations, connecting fire alarm control panels between buildings using fiber optic connections, integrating elevators into the new fire alarm system, and providing attic stock for the Starnet 2 system upgrade. The contractor will be responsible for all cutting, patching, and maintaining fire ratings, and must coordinate with prison security throughout the installation. The project has a contract time of 280 calendar days, with construction to start in the Southern Regional Buildings first, and specific requirements for connecting various building systems and installing notification devices at precise mounting heights.

View the file

Other files

File Type Posted
DCSpec 17129.pdf PDF
LEIN Request 17129.pdf PDF
Advertisement 17129.pdf PDF
PreBid Sign In Sheet.pdf PDF
Addendum 2 17129.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 1

DATE OF ISSUANCE:

PROJECT:

OWNER:

ARCHITECT’S PROJECT NO.:

ORIGINAL CONTRACT DATE:

October 4, 2018

Egeler Fire Alarm Project File No. 472/17129.RMP, Index No. 11484 3855 Cooper Street Jackson, MI 49201

Department of Corrections

17-554

September 13, 2018

SCOPE OF WORK

This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the Bid Form. Failure to do so may result in disqualification of the Bid.

DOCUMENTS INCLUDED IN THIS ADDENDUM

This Addendum includes 12 pages of text and the following documents:

• Specification Sections: None

• Drawings: E111, E112, E113, E114, E115, E116, E117, E118, E119

• Sign in Sheet: Three

CHANGES TO PREVIOULSY ISSUED ADDENDA

None.

CHANGES TO BIDDING REQUIREMENTS

ADD-1 Item No. B-1 - Bid Date

Refer to previously issued documents. The bid day will be extended to October 24, 2018 at 2:00 pm. RFI cut off will be October 17, 2018 at 5:00 pm.

ADD-1 Item No. C-1 - Bureau of Fire Services

Refer to previously issued documents. The contractor shall carry costs associated with submitting the plans to the Bureau of Fire Services. The fire alarm sub shall submit their shop drawings for approval.

Nurturing curiosity through design since 1953 • towerpinkster.com

©2018 Tower Pinkster Titus Associates, Inc.

10.4.2018 Addendum No. 1 // Egeler Fire Alarm Project // 17-554 2

CHANGES TO CONTRACT CONDITIONS

ADD-1 Item No. C-2 - Construction Duration

Refer to previously issued documents. Contract time will be 280 Calendar Days.

ADD-1 Item No. C-3 - Construction Time Refer to previously issued documents. Construction shall start in the Southern Regional Buildings first. The following buildings shall be completed prior to starting in the Egeler Buildings, Cells Blocks 4, 5, 6 and 7, Buildings 13, 17, 18 and 19.

ADD-1 Item No. C-4 - Cell Block 7 Working Areas

This item has been removed from this Addendum

ADD-1 Item No. C-5 - Southern Regional Buildings

Refer to previously issued documents. The Southern Regional Buildings do not require an escort. The following buildings are Southern Regional buildings. Cells Blocks 4, 5, 6 and 7, Buildings 13, 17, 18 and 19.

CHANGES TO SPECIFICATIONS

ADD-1 Item No. S-1 - Cool Dome Network Switch

Add 24 port network switch in the Cool Dome, Administration 140, and Food service 141. Install in existing rack and power thru existing UPS. Provide appropriate SFP module for SM fiber. Connect to existing camera network thru existing spare fiber utilized by PELS network. Provide necessary jumpers and fiber to connect between the PELS and camera network. Network Switches shall be Cisco C2960X series.

ADD-1 Item No. S-2 - Southern Regional Connection to Egeler Connection between the FACP located in Building 13 and Building 140 shall be connected with fiber using a

Dual High Speed RS485 Data Transceiver on each end. Use Comnet Series FDX2HSDM transceiver. Utilize the existing camera network.

ADD-1 Item No. S-3 - Elevator Integration

The elevators need to be connected to the new fire alarm control system. Provide Otis as a sub-contractor to ensure the integration of the fire alarm and existing elevators.

Provide the following items for attic stock for the Starnet 2 system upgrade. Price shall be included in deductive alternate price.

• Provide (2) Spare monitors.

• Provide (2) Work Stations

10.4.2018 Addendum No. 1 // Egeler Fire Alarm Project // 17-554 3

• Provide (4) Ultralink

• Provide (4) Input Expansion Boards

• Provide (2) Output Expansion Boards

• Provide (1) Laptop for ISC

• Provide (1) ISC cut simulator tool.

CHANGES TO DRAWINGS

ADD-1 Item No. D-1 - Cell Blocks 1, 2 and 3 Horn Strobe Locations

Refer to reissued drawings E111, E112, E113, E114, E115, E116, E117, E118 and E119. Revise horn/strobe locations as shown on revised drawings.

END OF ADDENDUM.

1 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 70 68 66 65

2 9

INMATE INMATE INMATEINMATE INMATE INMATE INMATE INMATE SHOWER INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILET INMATE TOILETINMATE INMATE INMATE

BARRIER

FREE

BARRIER

FREE

TOILET SHOWER

FIRE

ESCAPE

FIRE

ESCAPE

F

1 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 70 68 66 65

2 9

INMATE INMATE INMATEINMATE INMATE INMATE INMATE INMATE SHOWER INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILET INMATE TOILETINMATE INMATE INMATE

BARRIER

FREE

BARRIER

FREE

TOILET SHOWER

FIRE

ESCAPE

FIRE

ESCAPE

SD

V

SD

FF

F

V

V V

F

OSY OSY

WF WF

OSY WF

OSY OSY

WF WF

OSY WF

FACP

A1

A1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

F O

R R

E F

E R

E N

C E

O N

L Y

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SEPTEMBER 13, 2018

EGELER FIRE

ALARM

PROJECT

Jackson, Michigan

CELL BLOCK 1

BASEMENT AND

FIRST FLOOR

FIRE ALARM

PLANS

17-554.00

E 111

JU

N

E

4, S E

P T

E M

B E

R

3, 9.

R

M P

1/16" = 1'-0"

CELL BLOCK 1 FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 1 FIRST FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 1 BASEMENT FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 1 BASEMENT DEMOLITION PLAN

WMC

EGELER CORRECTIONAL FACILITY - NORTH

MDP

MAINT.

UNIT C

KEY PLAN

SCALE: NO SCALE

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED

AND NOT REPLACED.

2 REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL DEVICES AND

ASSOCIATED WIRING. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS AND

QUANTITY OF DEVICES.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING, MATCH

EXISTING WALL MATERIAL FOR ALL PATCHING. WHEN JUNCTION BOXES

PROVIDE WITH STAINLESS STEEL COVER PLATE WITH SECURITY TYPE

SCREWS.

4 ALL CONDUITS SHALL HAVE COMPRESSION TYPE FITTINGS WITH 2-HOLE

STRAPS 3' ON CENTER AND 12" FROM EVERY JUNCTION BOX WITH SECURITY

SCREWS AND FITTING. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.

PROVIDE ALL NEW CONDUIT FOR THE FIRE ALARM SYSTEM.

5 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

6 ALL FIRE ALARM CABLING IN EXPOSED OCCUPIED AREAS SHALL BE IN

CONDUIT.

7 PROVIDE 120V CIRCUIT FROM NEAREST LIFE SAFETY PANEL FOR ALL FIRE

ALARM NAC PANELS. CIRCUITS SHALL BE DEDICATED. CONTRACTOR TO FIELD

VERIFY EXACT LOCATION.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE

INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING.

DETECTOR SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF

SMOKE. PROVIDE ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE

INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING

AS MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE

ALARM SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING

REQUIRED FOR A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND

OTHER OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 PROVIDE VESDA SYSTEM INCLUDING ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION. PROVIDED ENGINEERED DRAWINGS INDICATING

ALL SAMPLING POINTS, TEST POINTS AND NUMBER OF PANELS.

GENERAL ELECTRICAL DEMOLITION NOTES

1 FIXTURES, DEVICES AND EQUIPMENT SHOWN DASHED ARE TO BE REMOVED.

FIXTURES, DEVICES AND EQUIPMENT SHOWN LIGHTLY OR WITH AN "E" ARE

EXISTING TO REMAIN UNDISTURBED.

2 REMOVE ALL LIGHT FIXTURES, DEVICES, WIRING AND CONDUIT FROM WALL

AND CEILINGS TO BE DEMOLISHED. COORDINATE WITH ARCHITECHTURAL.

REMOVE ABANDONED CONDUIT AND WIRING BACK TO SOURCE. RE-LABEL

CIRCUIT BREAKER AS A SPARE.

3 TEMPORARILY SUPPORT EXISTING CEILING DEVICES TO REMAIN IN EXISTING

CEILINGS TO BE REPLACED. REINSTALL DEVICES INTO NEW CEILING.

4 CONTRACTORS SHALL BE RESPONSIBLE FOR PROJECT PHASING.

TEMPORARY POWER, EGRESS LIGHTING, EXIT SIGNAGE, PULL STATIONS AND

BATTERY BACKUP LIGHTING SHALL BE PROVIDED AS REQUIRED WHILE

BUILDING IS OCCUPIED BETWEEN PHASES OF CONSTRUCTION.

ISSUED FOR DATE

ADDENDUM 1 10-03-2018

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 73 72 71 70 69 68 67 66 65

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 73 72 71 70 69 68 67 66 65

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

V

V

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 73 72 71 70 69 68 67 66 65

2 9 10 12

INMATE INMATE INMATEINMATE INMATE INMATE INMATE INMATE TOILET INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 73 72 71 70 69 68 67 66 65

2 9 10 12

INMATE INMATE INMATEINMATE INMATE INMATE INMATE INMATE TOILET INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

V

V

F F F F F

FFFFF

A1

A1

A1

A1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

F O

R R

E F

E R

E N

C E

O N

L Y

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SEPTEMBER 13, 2018

EGELER FIRE

ALARM

PROJECT

Jackson, Michigan

CELL BLOCK 1

SECOND AND

THIRD FLOOR

FIRE ALARM

PLANS

17-554.00

E 112

JU

N

E

4, S E

P T

E M

B E

R

3, 9.

R

M P

WMC

EGELER CORRECTIONAL FACILITY - NORTH

MDP

MAINT.

UNIT C

KEY PLAN

SCALE: NO SCALE

1/16" = 1'-0"

CELL BLOCK 1 THIRD FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 1 THIRD FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 1 SECOND FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 1 SECOND FLOOR FIRE ALARM PLAN

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED

AND NOT REPLACED.

2 REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL DEVICES AND

ASSOCIATED WIRING. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS AND

QUANTITY OF DEVICES.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING, MATCH

EXISTING WALL MATERIAL FOR ALL PATCHING. WHEN JUNCTION BOXES

PROVIDE WITH STAINLESS STEEL COVER PLATE WITH SECURITY TYPE

SCREWS.

4 ALL CONDUITS SHALL HAVE COMPRESSION TYPE FITTINGS WITH 2-HOLE

STRAPS 3' ON CENTER AND 12" FROM EVERY JUNCTION BOX WITH SECURITY

SCREWS AND FITTING. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.

PROVIDE ALL NEW CONDUIT FOR THE FIRE ALARM SYSTEM.

5 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

6 ALL FIRE ALARM CABLING IN EXPOSED OCCUPIED AREAS SHALL BE IN

CONDUIT.

7 PROVIDE 120V CIRCUIT FROM NEAREST LIFE SAFETY PANEL FOR ALL FIRE

ALARM NAC PANELS. CIRCUITS SHALL BE DEDICATED. CONTRACTOR TO FIELD

VERIFY EXACT LOCATION.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE

INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING.

DETECTOR SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF

SMOKE. PROVIDE ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE

INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING

AS MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE

ALARM SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING

REQUIRED FOR A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND

OTHER OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 PROVIDE VESDA SYSTEM INCLUDING ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION. PROVIDED ENGINEERED DRAWINGS INDICATING

ALL SAMPLING POINTS, TEST POINTS AND NUMBER OF PANELS.

GENERAL ELECTRICAL DEMOLITION NOTES

1 FIXTURES, DEVICES AND EQUIPMENT SHOWN DASHED ARE TO BE REMOVED.

FIXTURES, DEVICES AND EQUIPMENT SHOWN LIGHTLY OR WITH AN "E" ARE

EXISTING TO REMAIN UNDISTURBED.

2 REMOVE ALL LIGHT FIXTURES, DEVICES, WIRING AND CONDUIT FROM WALL

AND CEILINGS TO BE DEMOLISHED. COORDINATE WITH ARCHITECHTURAL.

REMOVE ABANDONED CONDUIT AND WIRING BACK TO SOURCE. RE-LABEL

CIRCUIT BREAKER AS A SPARE.

3 TEMPORARILY SUPPORT EXISTING CEILING DEVICES TO REMAIN IN EXISTING

CEILINGS TO BE REPLACED. REINSTALL DEVICES INTO NEW CEILING.

4 CONTRACTORS SHALL BE RESPONSIBLE FOR PROJECT PHASING.

TEMPORARY POWER, EGRESS LIGHTING, EXIT SIGNAGE, PULL STATIONS AND

BATTERY BACKUP LIGHTING SHALL BE PROVIDED AS REQUIRED WHILE

BUILDING IS OCCUPIED BETWEEN PHASES OF CONSTRUCTION.

ISSUED FOR DATE

ADDENDUM 1 10-03-2018

MOUNTED 10 FEET ABOVE FINISHED FIRST FLOOR

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 73 72 71 70 69 68 67 66 65

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

GUARD STATION

DD

DD

DD

DD

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 73 72 71 70 69 68 67 66 65

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

GUARD STATION

DD

DD

DD

DD

V

V

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 73 72 71 70 69 68 67 66 65

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38

76 75 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 3974 73 72 71 70 69 68 67 66 65

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

V

V

F F F F F

FFFFF

TEST

POINT

TYPICAL DETECTION HOLE

VESDA VLI PANEL

TEST

POINT

TEST

POINT

101010

A1

A1

A1

A1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

F O

R R

E F

E R

E N

C E

O N

L Y

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SEPTEMBER 13, 2018

EGELER FIRE

ALARM

PROJECT

Jackson, Michigan

CELL BLOCK 1

FOURTH AND

FIFTH FLOOR

FIRE ALARM

PLANS

17-554.00

E 113

JU

N

E

4, S E

P T

E M

B E

R

3, 9.

R

M P

WMC

EGELER CORRECTIONAL FACILITY - NORTH

MDP

MAINT.

UNIT C

KEY PLAN

SCALE: NO SCALE

1/16" = 1'-0"

CELL BLOCK 1 FIFTH FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 1 FIFTH FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 1 FOURTH FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 1 FOURTH FLOOR FIRE ALARM PLAN

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED

AND NOT REPLACED.

2 REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL DEVICES AND

ASSOCIATED WIRING. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS AND

QUANTITY OF DEVICES.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING, MATCH

EXISTING WALL MATERIAL FOR ALL PATCHING. WHEN JUNCTION BOXES

PROVIDE WITH STAINLESS STEEL COVER PLATE WITH SECURITY TYPE

SCREWS.

4 ALL CONDUITS SHALL HAVE COMPRESSION TYPE FITTINGS WITH 2-HOLE

STRAPS 3' ON CENTER AND 12" FROM EVERY JUNCTION BOX WITH SECURITY

SCREWS AND FITTING. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.

PROVIDE ALL NEW CONDUIT FOR THE FIRE ALARM SYSTEM.

5 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

6 ALL FIRE ALARM CABLING IN EXPOSED OCCUPIED AREAS SHALL BE IN

CONDUIT.

7 PROVIDE 120V CIRCUIT FROM NEAREST LIFE SAFETY PANEL FOR ALL FIRE

ALARM NAC PANELS. CIRCUITS SHALL BE DEDICATED. CONTRACTOR TO FIELD

VERIFY EXACT LOCATION.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE

INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING.

DETECTOR SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF

SMOKE. PROVIDE ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE

INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING

AS MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE

ALARM SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING

REQUIRED FOR A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND

OTHER OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 PROVIDE VESDA SYSTEM INCLUDING ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION. PROVIDED ENGINEERED DRAWINGS INDICATING

ALL SAMPLING POINTS, TEST POINTS AND NUMBER OF PANELS.

GENERAL ELECTRICAL DEMOLITION NOTES

1 FIXTURES, DEVICES AND EQUIPMENT SHOWN DASHED ARE TO BE REMOVED.

FIXTURES, DEVICES AND EQUIPMENT SHOWN LIGHTLY OR WITH AN "E" ARE

EXISTING TO REMAIN UNDISTURBED.

2 REMOVE ALL LIGHT FIXTURES, DEVICES, WIRING AND CONDUIT FROM WALL

AND CEILINGS TO BE DEMOLISHED. COORDINATE WITH ARCHITECHTURAL.

REMOVE ABANDONED CONDUIT AND WIRING BACK TO SOURCE. RE-LABEL

CIRCUIT BREAKER AS A SPARE.

3 TEMPORARILY SUPPORT EXISTING CEILING DEVICES TO REMAIN IN EXISTING

CEILINGS TO BE REPLACED. REINSTALL DEVICES INTO NEW CEILING.

4 CONTRACTORS SHALL BE RESPONSIBLE FOR PROJECT PHASING.

TEMPORARY POWER, EGRESS LIGHTING, EXIT SIGNAGE, PULL STATIONS AND

BATTERY BACKUP LIGHTING SHALL BE PROVIDED AS REQUIRED WHILE

BUILDING IS OCCUPIED BETWEEN PHASES OF CONSTRUCTION.

ISSUED FOR DATE

ADDENDUM 1 10-03-2018

MOUNTED 25-30 FEET ABOVE FINISHED FIRST FLOOR

1 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

65 64 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3663 62 61 60 59

2 9

INMATE INMATE INMATEINMATE INMATE INMATE INMATE INMATE SHOWER INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILET INMATE INMATEINMATE INMATE INMATE

BARRIER

FREE

BARRIER

FREE

TOILET SHOWER

FIRE

ESCAPE

FIRE

ESCAPE

F

1 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

65 64 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3663 62 61 60 59

2 9

INMATE INMATE INMATEINMATE INMATE INMATE INMATE INMATE SHOWER INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILET INMATE INMATEINMATE INMATE INMATE

BARRIER

FREE

BARRIER

FREE

TOILET SHOWER

FIRE

ESCAPE

FIRE

ESCAPE

F F

SD

V

V

F

DD

DD

DD

DD

WF

OSY

WF

OSY

WF

OSY

FAA

FACP

A1

A1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

F O

R R

E F

E R

E N

C E

O N

L Y

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SEPTEMBER 13, 2018

EGELER FIRE

ALARM

PROJECT

Jackson, Michigan

CELL BLOCK 2

BASEMENT AND

FIRST FLOOR

FIRE ALARM

PLANS

17-554.00

E 114

JU

N

E

4, S E

P T

E M

B E

R

3, 9.

R

M P

WMC

EGELER CORRECTIONAL FACILITY - NORTH

MDP

MAINT.

UNIT C

KEY PLAN

SCALE: NO SCALE

1/16" = 1'-0"

CELL BLOCK 2 FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 2 FIRST FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 2 BASEMENT DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 2 BASEMENT FIRE ALARM PLAN

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED

AND NOT REPLACED.

2 REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL DEVICES AND

ASSOCIATED WIRING. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS AND

QUANTITY OF DEVICES.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING, MATCH

EXISTING WALL MATERIAL FOR ALL PATCHING. WHEN JUNCTION BOXES

PROVIDE WITH STAINLESS STEEL COVER PLATE WITH SECURITY TYPE

SCREWS.

4 ALL CONDUITS SHALL HAVE COMPRESSION TYPE FITTINGS WITH 2-HOLE

STRAPS 3' ON CENTER AND 12" FROM EVERY JUNCTION BOX WITH SECURITY

SCREWS AND FITTING. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.

PROVIDE ALL NEW CONDUIT FOR THE FIRE ALARM SYSTEM.

5 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

6 ALL FIRE ALARM CABLING IN EXPOSED OCCUPIED AREAS SHALL BE IN

CONDUIT.

7 PROVIDE 120V CIRCUIT FROM NEAREST LIFE SAFETY PANEL FOR ALL FIRE

ALARM NAC PANELS. CIRCUITS SHALL BE DEDICATED. CONTRACTOR TO FIELD

VERIFY EXACT LOCATION.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE

INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING.

DETECTOR SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF

SMOKE. PROVIDE ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE

INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING

AS MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE

ALARM SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING

REQUIRED FOR A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND

OTHER OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 PROVIDE VESDA SYSTEM INCLUDING ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION. PROVIDED ENGINEERED DRAWINGS INDICATING

ALL SAMPLING POINTS, TEST POINTS AND NUMBER OF PANELS.

GENERAL ELECTRICAL DEMOLITION NOTES

1 FIXTURES, DEVICES AND EQUIPMENT SHOWN DASHED ARE TO BE REMOVED.

FIXTURES, DEVICES AND EQUIPMENT SHOWN LIGHTLY OR WITH AN "E" ARE

EXISTING TO REMAIN UNDISTURBED.

2 REMOVE ALL LIGHT FIXTURES, DEVICES, WIRING AND CONDUIT FROM WALL

AND CEILINGS TO BE DEMOLISHED. COORDINATE WITH ARCHITECHTURAL.

REMOVE ABANDONED CONDUIT AND WIRING BACK TO SOURCE. RE-LABEL

CIRCUIT BREAKER AS A SPARE.

3 TEMPORARILY SUPPORT EXISTING CEILING DEVICES TO REMAIN IN EXISTING

CEILINGS TO BE REPLACED. REINSTALL DEVICES INTO NEW CEILING.

4 CONTRACTORS SHALL BE RESPONSIBLE FOR PROJECT PHASING.

TEMPORARY POWER, EGRESS LIGHTING, EXIT SIGNAGE, PULL STATIONS AND

BATTERY BACKUP LIGHTING SHALL BE PROVIDED AS REQUIRED WHILE

BUILDING IS OCCUPIED BETWEEN PHASES OF CONSTRUCTION.

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3669 68 67 66 65 64 63 62

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

INMATE

FIRE

ESCAPE

FIRE

ESCAPE

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3669 68 67 66 65 64 63 62

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

INMATE

FIRE

ESCAPE

FIRE

ESCAPE

V

V

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

70 69 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3668 67 66 65 64 63 62 61 60 59

2 9 10 12

INMATE INMATE INMATEINMATE INMATE INMATE INMATE INMATE TOILET INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

70 69 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3668 67 66 65 64 63 62 61 60 59

2 9 10 12

INMATE INMATE INMATEINMATE INMATE INMATE INMATE INMATE TOILET INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

FIRE

ESCAPE

FIRE

ESCAPE

V

V

F F F F F

FFFFF

A1

A1

A1

A1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

F O

R R

E F

E R

E N

C E

O N

L Y

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SEPTEMBER 13, 2018

EGELER FIRE

ALARM

PROJECT

Jackson, Michigan

CELL BLOCK 2

SECOND AND

THIRD FLOOR

FIRE ALARM

PLANS

17-554.00

E 115

JU

N

E

4, S E

P T

E M

B E

R

3, 9.

R

M P

WMC

EGELER CORRECTIONAL FACILITY - NORTH

MDP

MAINT.

UNIT C

KEY PLAN

SCALE: NO SCALE

1/16" = 1'-0"

CELL BLOCK 2 THIRD FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 2 THIRD FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 2 SECOND FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 2 SECOND FLOOR FIRE ALARM PLAN

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED

AND NOT REPLACED.

2 REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL DEVICES AND

ASSOCIATED WIRING. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS AND

QUANTITY OF DEVICES.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING, MATCH

EXISTING WALL MATERIAL FOR ALL PATCHING. WHEN JUNCTION BOXES

PROVIDE WITH STAINLESS STEEL COVER PLATE WITH SECURITY TYPE

SCREWS.

4 ALL CONDUITS SHALL HAVE COMPRESSION TYPE FITTINGS WITH 2-HOLE

STRAPS 3' ON CENTER AND 12" FROM EVERY JUNCTION BOX WITH SECURITY

SCREWS AND FITTING. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.

PROVIDE ALL NEW CONDUIT FOR THE FIRE ALARM SYSTEM.

5 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

6 ALL FIRE ALARM CABLING IN EXPOSED OCCUPIED AREAS SHALL BE IN

CONDUIT.

7 PROVIDE 120V CIRCUIT FROM NEAREST LIFE SAFETY PANEL FOR ALL FIRE

ALARM NAC PANELS. CIRCUITS SHALL BE DEDICATED. CONTRACTOR TO FIELD

VERIFY EXACT LOCATION.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE

INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING.

DETECTOR SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF

SMOKE. PROVIDE ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE

INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING

AS MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE

ALARM SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING

REQUIRED FOR A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND

OTHER OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 PROVIDE VESDA SYSTEM INCLUDING ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION. PROVIDED ENGINEERED DRAWINGS INDICATING

ALL SAMPLING POINTS, TEST POINTS AND NUMBER OF PANELS.

GENERAL ELECTRICAL DEMOLITION NOTES

1 FIXTURES, DEVICES AND EQUIPMENT SHOWN DASHED ARE TO BE REMOVED.

FIXTURES, DEVICES AND EQUIPMENT SHOWN LIGHTLY OR WITH AN "E" ARE

EXISTING TO REMAIN UNDISTURBED.

2 REMOVE ALL LIGHT FIXTURES, DEVICES, WIRING AND CONDUIT FROM WALL

AND CEILINGS TO BE DEMOLISHED. COORDINATE WITH ARCHITECHTURAL.

REMOVE ABANDONED CONDUIT AND WIRING BACK TO SOURCE. RE-LABEL

CIRCUIT BREAKER AS A SPARE.

3 TEMPORARILY SUPPORT EXISTING CEILING DEVICES TO REMAIN IN EXISTING

CEILINGS TO BE REPLACED. REINSTALL DEVICES INTO NEW CEILING.

4 CONTRACTORS SHALL BE RESPONSIBLE FOR PROJECT PHASING.

TEMPORARY POWER, EGRESS LIGHTING, EXIT SIGNAGE, PULL STATIONS AND

BATTERY BACKUP LIGHTING SHALL BE PROVIDED AS REQUIRED WHILE

BUILDING IS OCCUPIED BETWEEN PHASES OF CONSTRUCTION.

ISSUED FOR DATE

ADDENDUM 1 10-03-2018

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3669 68 67 66 65 64 63 62

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

INMATE

FIRE

ESCAPE

FIRE

ESCAPE

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3669 68 67 66 65 64 63 62

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

INMATE

FIRE

ESCAPE

FIRE

ESCAPE

DD

DD

DD

DD

V

V

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3669 68 67 66 65 64 63 62

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

INMATE

FIRE

ESCAPE

FIRE

ESCAPE

1 3 4 5 6 7 8 11 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 3669 68 67 66 65 64 63 62

2 9 10 12

TOILET INMATE INMATEINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE TOILETINMATE INMATE INMATE INMATE INMATE INMATE INMATE INMATE

INMATE INMATE INMATE INMATE

INMATE

FIRE

ESCAPE

FIRE

ESCAPE

V

V

F F F F F

FFFFF

VESDA VLI PANEL

TYPICAL DETECTION HOLE

TEST

POINT

TEST

POINT

TEST

POINT

A1

A1

A1

A1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

F O

R R

E F

E R

E N

C E

O N

L Y

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SEPTEMBER 13, 2018

EGELER FIRE

ALARM

PROJECT

Jackson, Michigan

CELL BLOCK 2

FOURTH AND

FIFTH FLOOR

FIRE ALARM

PLANS

17-554.00

E 116

JU

N

E

4, S E

P T

E M

B E

R

3, 9.

R

M P

WMC

EGELER CORRECTIONAL FACILITY - NORTH

MDP

MAINT.

UNIT C

KEY PLAN

SCALE: NO SCALE

1/16" = 1'-0"

CELL BLOCK 2 FIFTH FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 2 FIFTH FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 2 FOURTH FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 2 FOURTH FLOOR FIRE ALARM PLAN

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED

AND NOT REPLACED.

2 REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL DEVICES AND

ASSOCIATED WIRING. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS AND

QUANTITY OF DEVICES.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING, MATCH

EXISTING WALL MATERIAL FOR ALL PATCHING. WHEN JUNCTION BOXES

PROVIDE WITH STAINLESS STEEL COVER PLATE WITH SECURITY TYPE

SCREWS.

4 ALL CONDUITS SHALL HAVE COMPRESSION TYPE FITTINGS WITH 2-HOLE

STRAPS 3' ON CENTER AND 12" FROM EVERY JUNCTION BOX WITH SECURITY

SCREWS AND FITTING. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.

PROVIDE ALL NEW CONDUIT FOR THE FIRE ALARM SYSTEM.

5 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

6 ALL FIRE ALARM CABLING IN EXPOSED OCCUPIED AREAS SHALL BE IN

CONDUIT.

7 PROVIDE 120V CIRCUIT FROM NEAREST LIFE SAFETY PANEL FOR ALL FIRE

ALARM NAC PANELS. CIRCUITS SHALL BE DEDICATED. CONTRACTOR TO FIELD

VERIFY EXACT LOCATION.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE

INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING.

DETECTOR SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF

SMOKE. PROVIDE ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE

INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING

AS MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE

ALARM SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING

REQUIRED FOR A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND

OTHER OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 PROVIDE VESDA SYSTEM INCLUDING ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION. PROVIDED ENGINEERED DRAWINGS INDICATING

ALL SAMPLING POINTS, TEST POINTS AND NUMBER OF PANELS.

GENERAL ELECTRICAL DEMOLITION NOTES

1 FIXTURES, DEVICES AND EQUIPMENT SHOWN DASHED ARE TO BE REMOVED.

FIXTURES, DEVICES AND EQUIPMENT SHOWN LIGHTLY OR WITH AN "E" ARE

EXISTING TO REMAIN UNDISTURBED.

2 REMOVE ALL LIGHT FIXTURES, DEVICES, WIRING AND CONDUIT FROM WALL

AND CEILINGS TO BE DEMOLISHED. COORDINATE WITH ARCHITECHTURAL.

REMOVE ABANDONED CONDUIT AND WIRING BACK TO SOURCE. RE-LABEL

CIRCUIT BREAKER AS A SPARE.

3 TEMPORARILY SUPPORT EXISTING CEILING DEVICES TO REMAIN IN EXISTING

CEILINGS TO BE REPLACED. REINSTALL DEVICES INTO NEW CEILING.

4 CONTRACTORS SHALL BE RESPONSIBLE FOR PROJECT PHASING.

TEMPORARY POWER, EGRESS LIGHTING, EXIT SIGNAGE, PULL STATIONS AND

BATTERY BACKUP LIGHTING SHALL BE PROVIDED AS REQUIRED WHILE

BUILDING IS OCCUPIED BETWEEN PHASES OF CONSTRUCTION.

ISSUED FOR DATE

ADDENDUM 1 10-03-2018

1345678121314151617181920212223242526272829303132333435363738

76756463626160595857565554535251504948474645444342414039 7470686665

INMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATESHOWERINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATE

INMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATETOILETINMATETOILET INMATEINMATEINMATE

BARRIER

FREE

BARRIER

FREE

TOILETSHOWER

FIRE

ESCAPE

FIRE

ESCAPE

F

1345678121314151617181920212223242526272829303132333435363738

76756463626160595857565554535251504948474645444342414039 7470686665

INMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATESHOWERINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATE

INMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATEINMATETOILETINMATETOILET INMATEINMATEINMATE

BARRIER

FREE

BARRIER

FREE

TOILETSHOWER

FIRE

ESCAPE

FIRE

ESCAPE

SD V

F

SD

F

V

V

F

V

WF WF

OSY OSY

DD

DD

DD

DD

WF

OSY

FAA

FACP

A1

A1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

F O

R R

E F

E R

E N

C E

O N

L Y

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

SEPTEMBER 13, 2018

EGELER FIRE

ALARM

PROJECT

Jackson, Michigan

CELL BLOCK 3

BASEMENT AND

FIRST FLOOR

FIRE ALARM

PLANS

17-554.00

E 117

JU

N

E

4, S E

P T

E M

B E

R

3, 9.

R

M P

WMC

EGELER CORRECTIONAL FACILITY - NORTH

MDP

MAINT.

UNIT C

KEY PLAN

SCALE: NO SCALE

1/16" = 1'-0"

CELL BLOCK 3 FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

CELL BLOCK 3 FIRST FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 3 BASEMENT FIRE ALARM PLAN

1/16" = 1'-0"

CELL BLOCK 3 BASEMENT DEMOLITION PLAN

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED

AND NOT REPLACED.

2 REMOVE EXISTING FIRE ALARM SYSTEM INCLUDING ALL DEVICES AND

ASSOCIATED WIRING. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS AND

QUANTITY OF DEVICES.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING, MATCH

EXISTING WALL MATERIAL FOR ALL PATCHING. WHEN JUNCTION BOXES

PROVIDE WITH STAINLESS STEEL COVER PLATE WITH SECURITY TYPE

SCREWS.

4 ALL CONDUITS SHALL HAVE COMPRESSION TYPE FITTINGS WITH 2-HOLE

STRAPS 3' ON CENTER AND 12" FROM EVERY JUNCTION BOX WITH SECURITY

SCREWS AND FITTING. ALL JUNCTION BOXES SHALL HAVE NO KNOCK OUTS.

PROVIDE ALL NEW CONDUIT FOR THE FIRE ALARM SYSTEM.

5 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

6 ALL FIRE ALARM CABLING IN EXPOSED OCCUPIED AREAS SHALL BE IN

CONDUIT.

7 PROVIDE 120V CIRCUIT FROM NEAREST LIFE SAFETY PANEL FOR ALL FIRE

ALARM NAC PANELS. CIRCUITS SHALL BE DEDICATED. CONTRACTOR TO FIELD

VERIFY EXACT LOCATION.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE

INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING.

DETECTOR SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF

SMOKE. PROVIDE ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE

INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .