This is an Addendum issued by the Minnesota Department of Transportation (MDOT) to clarify and modify the original bid documents for the New Lean-Tos project (Program No. F000561CON, File No. 591/16102.AGY). The addendum was issued on May 14, 2018, and requires bidders to acknowledge receipt of the modification on the bid summary. The project involves the provision of all labor, materials, equipment, services, and supervision necessary to complete the work as specified in the original bid documents, with modifications outlined in this addendum.
The primary change specified in this addendum concerns the disposition of existing on-site building materials. Regardless of their current condition, all existing on-site building materials shall become the property of the contractor and must be removed from the MDOT site in a timely manner. All costs associated with this requirement, including material removal and disposal, shall be included in the contractor's bid price and are considered part of the overall contract value. Bidders must incorporate this requirement into their pricing and acknowledge receipt of the addendum as a condition of bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DTMB-0415_FORM.pdf | ||
| BID_PLAN (Final).pdf | ||
| BID_SPEC (Final).pdf | ||
| Pre Bid Sign In Sheet 16102.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM
Program No.: F000561CON Addendum No.: 1 File No.: 591 / 16102.AGY Issue Date: 05/14/18 Project Name: New Lean-Tos
This addendum is issued to inform bidders of changes, clarifications, and additions to the drawings and/or specifications. Provide all labor, materials, equipment, services, and supervision as necessary to complete the work stated herein. All costs associated with the work in this addendum shall be included in the bid price and is considered part of the contract. All work shall be in accordance with the original bid documents and the information indicated below;
1. Design Plans & Specifications
Revise as follows:
All ex. on-site building materials--regardless of condition--shall become the property of the contractor and be removed from the MDOT site in a timely manner.