This addendum document is issued by LJA Engineering, Inc. on behalf of the City of Griffin for Bid #26-002 (Elle's Way Project) and modifies the original bidding documents dated August 2025. The addendum addresses twenty contractor questions regarding project specifications and requirements, including clarifications on culvert specifications, foundation materials, concrete specifications, geotechnical requirements, and installation procedures. Key project components include the installation of a 12-inch DIP line with steel encasement, an aluminum single radius arch culvert with Contech Steel Express foundation forms, concrete work with 4,000 psi specifications, and associated backfill and compaction work. The arch culvert package will be supplied by the City of Griffin and will arrive in four loads, complete with all bolts and brackets. A geotechnical representative from Greencastle Engineering will be onsite to observe stone installation and compaction before express forms are placed. The Notice to Proceed (NTP) is expected within 60 days of contract award. Supporting submittal documents from Contech regarding the Steel Express foundation forms, arch culvert details, concrete footings, and installation procedures are provided with this addendum.
The contractor is responsible for providing fill material, concrete placement (4,000 psi), stone materials (surge and #57 stone per bid items), and all labor for excavation, installation, and compaction. The City has purchased express forms with pre-installed rebar and the arch culvert package, with the contractor obligated to provide concrete, labor, and supplemental materials. No staging or laydown areas have been designated, and no engineer's budget has been disclosed. The Geotechnical Report prepared by Greencastle Engineering is included in the contract documents to inform contractors of subsurface conditions and recompaction requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26_002 NOIA.docx | DOCX document | |
| Advertisement for Bidders.pdf | ||
| Contech_Steel Express.pdf | ||
| Contech_Elle_s Way.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF GRIFFIN
ELLE’S WAY
BID # 26-002
FROM: LJA ENGINEERING, INC.
350 AIRPORT ROAD
GRIFFIN, GA 30224
TO: ALL BIDDERS OF RECORD
RE: Addendum No. 1, dated October 2, 2025
This Addendum forms a part of the Contract Documents and modifies the original Bidding
Documents dated August 2025.
This Addendum consists of four (4) pages, Contech plan set titled “STEEL EXPRESS” consisting of four (4) pages, and Contech plan set titled “ELLES WAY” consisting of 12 pages.
CONTRACT DOCUMENTS AND SPECIFICATIONS
Add. 1.1 Contractor Question: Can Contech supply us the spec sheets for the culvert purchased by the City of Griffin?
Response: Submittal provided with addendum.
Add. 1.2 Contractor Question: Has the City also purchased the foundation material? Does the purchase include the rebar?
Response: The City purchased the express forms which have the rebar installed.
The contractor place the forms and supply the 4,000 psi concrete. The concrete quantity is in the bid tab and the foundation submittal is provided with the addendum.
Add. 1.3 Contractor Question: Please provide the process for the setting of foundation material.
Response: Excavate same as a form-in-place installation and utilize the stone on the bid tab (surge and #57). Depth to be determined during excavation by the geotech representative.
Add. 1.4 Contractor Question: Please provide the Geo Technical Report.
Response: The Geotechnical Report, provided by Greencastle Engineering, is included in Book 2 as shown in the Table of Contents.
Add. 1.5 Contractor Question: The detail shows 24” concrete encasement of the new 12”
DIP line. The profile shows 24” casing encasement with spacers (also in bid items).
Which are we to perform?
Response: Steel encasement per bid tab.
Add. 1.6 Contractor Question: Is fill material available for the project?
Response: No, the contractor must provide the fill material.
Add. 1.7 Contractor Question: Is the owner supplying the foundation kit for the Arch
Culvert?
Response: Yes. The contractor must provide the required concrete.
Add. 1.8 Contractor Question: Where are the staging areas? Can we fence off the staging areas?
Response: No staging/laydown area has been designated.
Add. 1.9 Contractor Question: Can we get the installation and material submittal from
Contech for the arch culvert?
Add. 1.10 Contractor Question: Can we get a copy of the geotechnical report?
Add. 1.11 Contractor Question: What is the engineers budget?
Response: No engineer’s budget is available.
Add. 1.12 Contractor Question: On the plans it shows recompacting existing soil; is there a
Geotech document to back up that area to see what the contractor will be dealing with?
Add. 1.13 Contractor Question: When is the NTP expected to start?
Response: Expected to start within 60 days of award.
Add. 1.14 Contractor Question: Are there details available for the Aluminum Single Radius
Arch, the Contech Steel Express Foundation Form, or the weight of the Arch package? How many loads will it come in?
Response: Submittal provided with addendum. A total of four (4) loads.
Add. 1.15 Contractor Question: What are the details for the concrete underneath Aluminum
Arch?
Add. 1.16 Contractor Question: Can you provide more detail on the concrete footings for the arch culvert?
Add. 1.17 Contractor Question: Is there a bolt detail or pattern that needs to be followed for the concrete footings?
Response: No bolts are required; there is a groove, and the concrete fills in around the arch.
Add. 1.18 Contractor Question: Will all the necessary bolts for the arch culvert be furnished by the City of Griffin?
Response: The arch package is complete, including all bolts, brackets, etc.
Add. 1.19 Contractor Question: What material is required for the backfill of the arch culvert?
Response: There is a GAB line item for filling around the arch; approximately 4 feet on each side and over the top.
Add. 1.20 Contractor Question: Where is line item 10 for #57 stone to be used?
Response: Under the express foundations for the arch. A geotech representative will be onsite to observe the installation and compaction of the stone before the express forms are placed.