Addendum_#02-Change_of_Deadline_to_match_Pkg.JPG

JPG image 37 KB Posted

Attached to
South 301 W Water/Wastewater Pipeline
Solicitation number
ITB 2023-03
Issued by
Pasco County, Florida

About this file

This document is an Addendum (#02) related to a contract opportunity for the City of Zephyrhills, Florida, concerning a water and wastewater pipeline project. The addendum appears to modify the deadline for the project, though specific details about the deadline change are not visible in the provided image. The original project scope involves constructing approximately 6,000 linear feet of 6-inch PVC force main along Gall Boulevard and Tucker Road, with approximately 4,600 feet to be installed using horizontal directional drilling and the remainder using open-cut methods.

The project will connect to an existing 6-inch force main on Tucker Road and does not include the installation of new residential, commercial, or industrial services. No specific pricing, funding sources, or contract term details are evident from the image or accompanying description. The addendum suggests there may have been changes to the original project timeline, but without more context, the precise nature of the deadline modification cannot be definitively stated.

View the file

Other files

File Type Posted
BID-DOCUMENTS-051-301_W-WW_PIPELINES-PLANS-SIGNED.pdf PDF
Specs_110923.pdf PDF
ITB_2023-03_South_301_W_WW_Pkg.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .