Addendum 01 HR Building Patial Roof Replaceme.pdf

PDF 118 KB Posted

Attached to
HR Building Partial Roof
Solicitation number
PE-53900-RFQ-2024-000000023
Issued by
Brooks County, Georgia

About this file

This document is an Addendum to the contract for the Georgia Southern University HR Building Partial Roof Replacement project, State Project Number 0239-24022A. The addendum provides questions and answers related to the project, including whether an alternative roofing material can be substituted, whether asbestos testing is required, how asbestos remediation would be handled if discovered, and details on the existing roof system composition and removal requirements. The project is located in Statesboro, Georgia, within Bulloch County.

The key details indicate that the contractor will be responsible for removing the existing spray foam and modified bitumen roof system and installing new insulation and TPO roofing as specified in the design documents. The contractor will not be required to remove the existing OSB sheathing if the spray foam can be easily removed, and the parapet walls must be prepared as necessary to install the base flashings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WM Building Envelope Consultants, LLC

Columbia/Charleston wmbeconsultants.com Page 1

Columbia Area Office Charleston Area Office

1611 Chapin Road 226 N. Live Oak Drive

Chapin, SC 29036 Moncks Corner, SC 29461

(803) 260-4532 (843) 499-2756

(803) 422-7493 (352) 397-8208 wmbeconsultants.com

Addendum No. 1

Date Issued: April 30, 2024

Project: Georgia Southern University – HR Building

Partial Roof Replacement

983 Forest Drive, Statesboro, GA 30458

State Project Number: 0239-24022A

WMBE Project Number: 2022-238

Attachments: 1. Questions and Answers

This addendum modifies the Contract Documents as stated herein and shown on any accompanying drawings or attachments and is part of the Contract Documents.

Bidder shall acknowledge receipt of all addenda issued in the space provided on the Bid Form. Failure to acknowledge addenda may result in the bidders bid being rejected as non-responsive.

This addendum consists of 2 pages including attachments.

1. Changes to Bidding Requirements:

a. N/A

2. Changes to Specifications:

a. N/A

3. Changes to Drawings:

a. N/A

End of Addendum No. 1

WM Building Envelope Consultants, LLC

Columbia/Charleston wmbeconsultants.com Page 1

Columbia Area Office Charleston Area Office

1611 Chapin Road 226 N. Live Oak Dr

Chapin, SC 29036 Moncks Corner, SC 29461

(803) 260-4532 (843) 499-2756

(803) 422-7493 (352) 397-8208 wmbeconsultants.com

Questions and Answers

Georgia Southern University – HR Building Partial Roof Replacement

Project # 0239-24022A

1. Will WM consider IKO TPO as a substitution in lieu of Manufacturer’s listed in the specifications?

a. No.

2. Is asbestos testing required to be performed by the Contractor?

a. No.

3. If asbestos is discovered during the project, will the Contractor be compensated for removing?

a. Yes.

4. Can you share the existing core data?

a. The existing roof system consists of sprayed in place polyurethane foam (approximately

1”), over OSB sheathing (approximately 1/2"), over single ply membrane, over OSB sheathing.

5. Is the Contractor required to remove the existing roof system down to the bottom layer of OSB?

a. The Contractor can leave both layers of OSB in place if spray foam can be removed from the top layer of OSB. The Contractor can remove the top layer of OSB and the membrane if spray foam is not easily removed from the top layer of OSB.

6. Is the sprayed in place polyurethane foam system required to be removed from the parapet walls?

a. The parapet walls are required to be prepared as necessary for the installation of the base flashings.

2022-238.Addendum No. 1
2022-238. Questions & Answers

File details come from the government source that posted it. Updated .