Addendum 01 Herty Roof Replacement 0201_22036.pdf
PDF 124 KB Posted
- Attached to
- Herty Roof Replacement
- Solicitation number
- PE-53900-RFQ-2024-000000022
- Issued by
- Brooks County, Georgia
About this file
This document is an addendum for the Georgia Southern University - Herty Building Roof Replacement project, State Project Number 0201-22036. The addendum provides responses to submitted questions regarding acceptable handrail systems, condensation lines, sheet metal requirements, concrete deck repair measurement, fascia repair scope, flashing height requirements, and the required TPO membrane thickness. It also clarifies that new roof hatches are required, but downspouts do not need to be replaced to the existing PVC connection.
The project scope involves removing the existing mod-bit roofing and installing a new lightweight concrete deck with a fully adhered 115-mil TPO roofing system over R-25 insulation. The project is located in Statesboro, Georgia within Bulloch County. No changes were made to the bidding requirements, specifications, or drawings in this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Invitation to Bid Herty Roof Replacement.pdf | ||
| Bid Tabulation Herty Partial Roof replacement.pdf | ||
| Herty Building Roof Replacement Cover Sheet (.docx | DOCX document | |
| Herty Roof Replacement Cover Sheet.docx | DOCX document | |
| Addendum 2 Herty Building Roof Replacement In.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WM Building Envelope Consultants, LLC
Columbia/Charleston wmbeconsultants.com Page 1
Columbia Area Office Charleston Area Office
1611 Chapin Road 226 N. Live Oak Drive
Chapin, SC 29036 Moncks Corner, SC 29461
(803) 260-4532 (843) 499-2756
(803) 422-7493 (352) 397-8208 wmbeconsultants.com
Addendum No. 1
Date Issued: April 30, 2024
Project: Georgia Southern University – Herty Building
Roof Replacement
65 Georgia Avenue, Statesboro, GA 30458
State Project Number: 0201-22036
WMBE Project Number: 2021-263
Attachments: 1. Questions and Answers
This addendum modifies the Contract Documents as stated herein and shown on any accompanying drawings or attachments and is part of the Contract Documents.
Bidder shall acknowledge receipt of all addenda issued in the space provided on the Bid Form. Failure to acknowledge addenda may result in the bidders bid being rejected as non-responsive.
This addendum consists of 3 pages including attachments.
1. Changes to Bidding Requirements:
a. N/A
2. Changes to Specifications:
a. N/A
3. Changes to Drawings:
a. N/A
End of Addendum No. 1
Columbia/Charleston wmbeconsultants.com Page 1
Columbia Area Office Charleston Area Office
1611 Chapin Road 226 N. Live Oak Dr
Chapin, SC 29036 Moncks Corner, SC 29461
(803) 260-4532 (843) 499-2756
(803) 422-7493 (352) 397-8208 wmbeconsultants.com
Questions and Answers
Georgia Southern University – Herty Building Roof Replacement
Project # 0201-22036
1. Would GSU consider a weight-mounted handrail system as opposed to a deck-mounted handrail system?
Yes, a weighted handrail system is acceptable.
2. Where are the condensation lines and miro stands to be installed? It doesn’t appear there are any existing condensation lines visible on the existing roof areas.
No miro stands are required.
3. Is the sheet metal to be used in the new assembly aluminum or pre-finished steel? I realize that the eave metal is TPO clad and saw that you call out some 16GA steel plates in certain areas.
Aluminum or galvalume is acceptable. The 16GA plate can be galvanized.
4. Concrete deck repair unit price: What measurement of volume would you like to assume for the
100SF of area?
Please consider 1” in depth
5. Fascia repair unit price: Are we to replace all 5(ea) pieces of fascia/soffit and the 3(ea) pieces of crown in the LF unit price?
Yes, include all pieces for each linear foot.
6. Do you want a minimum flashing/curb height of 12” as stated on page 075423-6?
WM believes that most of the large mechanical curbs heights will be acceptable after spray foam is removed. 8” flashing heights are acceptable.
Columbia/Charleston wmbeconsultants.com Page 2
7. Please verify the scope of work for this job and the required TPO membrane Thickness. (Scope will be Fully adhered 115 Mil TPO over R-25 Roof Insulation? or 60 Mil TPO?)
Fully adhered 115 Mil TPO over R-25 insulation is required.
8. Are downspouts required to be replaced into column?
No downspouts are required to be replaced to the existing PVC connection.
9. Are new roof hatches required?
Yes, new roof hatches are required. hatches are required.
| 2021-263.Addendum No. 1 |
| 2021-263.Questions & Answers |