ADDENDA 2 OSCI ROOF AND RECYCLE.pdf

PDF 44 MB Posted

Attached to
ITB - Purchase of Ferric Chloride Solution
Solicitation number
S-X34350-00003019
Issued by
Washington County, Oregon

About this file

This is Addendum #2 to an Invitation to Bid issued by the Oregon Department of Corrections for the Oregon State Correctional Institute (OSCI) roofing, painting, and building recycling project (S-29100-00003020). The addendum modifies the original bid specifications and project timeline by extending the Substantial Completion Date from 120 to 150 calendar days after Notice to Proceed and the Final Completion Date from 150 to 180 calendar days after Notice to Proceed. The addendum includes technical clarifications and additional specifications for work on the Recycle Building and Paint Shop, including installation of "z" closures with butyl sealant to prevent water infiltration, vent detail requirements, wall transitions with metal furring, stainless steel crickets at mechanical curbs, and curbs around existing exhaust that must be 12 inches above finish roof height. Additional photographs from the May 11, 2022 Mandatory Pre-Bid Meeting are referenced as attachments. The addendum constitutes a material change to the ITB and requires authorized signature and return by the Bid Closing Date and Time, with failure to sign potentially resulting in bid rejection.

The addendum includes a PBS Asbestos Bulk Report documenting laboratory analysis of samples taken from the Recycle Building roof, including built-up roofing material and gray/black sealant. All tested layers—consisting of fibrous tar, fibrous material, and loose tar material—returned results of "No Asbestos Detected," confirming the absence of asbestos in eight layers of roofing material and sealant samples analyzed under Lab Cor27365.000-9001 and Lab Cor27365.000-9002. No pricing information, budget amounts, set-asides, incumbent vendor details, or funding sources are disclosed in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oregon Kate Brown, Governor

Department of Corrections Purchasing Section

3601 State Street, Suite 280 Salem, OR 97301-5780

(503) 983-0969 Craig.L.Heilman@doc.state.or.us

5/16/2022

ADDENDUM #2

For S-29100-00003020

OSCI ROOFS; PAINT & RECYCLE BLDGS

Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications.

This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.

This addendum shall be added to and become part of the original Invitation to Bid.

1. Change Substantial Completion Date from 120 to 150 Calendar Days after Notice to Proceed.

2. Change Final Completion Date from 150 to 180 Calendar Days after Notice to Proceed.

3. See attached PBS Asbestos Bulk Report.

4. Recycle Building: To prevent water infiltration from adjacent lean-to exterior structure, Add 1-inch tall “z” closure at head of panel set in butyl sealant, sealed to standing seams of panels. New head flashing over top of “z’s”. See Z Closure Detail attachment.

5. Paint Shop: Vent detail attached. Provide similar, in accordance with manufacturer’s standard installation details.

6. Paint Shop: Transition to adjacent wall, and fur out approximately 3 inches from vertical face with manufacturer’s standard wall metal detail. Maintain access to electrical elbow.

7. Paint Shop: Curbs around existing exhaust shall be 12-inches above finish roof height. Stainless steel crickets at (2) mechanical curbs.

8. Additional pictures from 5.11.22 Mandatory Pre-Bid Meeting attached.

This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.

Company Name: __________________________________________________________

Authorized Signature: ______________________________________________________

Date:_______________________________________

OSCI_Oregon State Correctional Institute

Oregon Department of Corrections

Bulk Sample Inventory

Code Material Location Lab Results

Recycle building roof; black roofing material Lab Cor27365.000-9001 Built-up Roofing

Analysis:Description:Layer:

Layer 01 No Asbestos Detectedfibrous tar, black

Layer 02 No Asbestos Detectedfibrous tar, black

Layer 03 No Asbestos Detectedfibrous material, tan

Layer 04 No Asbestos Detectedfibrous tar, black

Layer 05 No Asbestos Detectedfibrous tar, black

Layer 06 No Asbestos Detectedfibrous tar, black

Layer 07 No Asbestos Detectedfibrous tar, black

Layer 08 No Asbestos Detectedloose tar material, black

Recycle building roof; gray/black sealant Lab Cor27365.000-9002 Sealant

Analysis:Description:Layer:

Layer 01 <1% Chrysotilethick coating, silver

Layer 02 <1% Chrysotilefibrous tar, black

Paint shop roof; gray caulking at roof vent Lab Cor27365.000-9003 Caulk

Analysis:Description:Layer:

Layer 01 No Asbestos Detectedrubbery material, gray

Layer 02 No Asbestos Detectedcoating, silver

Layer 03 <1% Chrysotiletar material, black

Paint shop roof; black roofing material Lab Cor27365.000-9004 Built-up Roofing

Analysis:Description:Layer:

Layer 01 No Asbestos Detectedfibrous tar, black

Layer 02 No Asbestos Detectedfibrous tar, black

Layer 03 No Asbestos Detectedfibrous tar, black

Unit #19; wall, black caulking, on flashing Lab Cor27365.000-9005 Caulk

Analysis:Description:Layer:

Layer 01 No Asbestos Detectedtar material, black with coating, gray

Layer 02 No Asbestos Detectedrubbery material, black

Unit #19; black/gray caulk Lab Cor27365.000-9006 Caulk

Analysis:Description:Layer:

Layer 1 4% Chrysotilethick tar material, black with coating, green/gray

2. 1

April 2022

Project No.: 27365.000 Phase No.: 0001

HALSTEAR

Highlight

HALSTEAR

Highlight

HALSTEAR

Highlight

HALSTEAR

Highlight

HALSTEAR

Line

HALSTEAR

Line

Project Name:

PBS Engineering and EnvironmentalClient:

Job Number: 220978

4412 S Corbett Avenue Portland, OR 97239

Address:

Project No.: 27365.000 Phase 0001

PO Number:

Sub Project:

Enclosed please find results for samples submitted to our laboratory. A list of samples and analyses follows:

Phone: (503) 224-5055 www.labcorpdx.com

4321 South Corbett Ave., Ste A Portland, OR 97239

Lab/Cor Portland, Inc.

Report Number: 220978R01

Report Date: 4/1/2022

Reference No.:

PLM - Visual Estimate Extended Final Report

Lab/Cor Sample # Client Sample # and Description Analysis Analysis Notes Date Received:

220978 - S1 27365.000-9001 - PLM - Visual Estimate Extended

3/30/2022

220978 - S2 27365.000-9002 - PLM - Visual Estimate Extended

3/30/2022

220978 - S3 27365.000-9003 - PLM - Visual Estimate Extended

3/30/2022

220978 - S4 27365.000-9004 - PLM - Visual Estimate Extended

3/30/2022

220978 - S5 27365.000-9005 - PLM - Visual Estimate Extended

3/30/2022

220978 - S6 27365.000-9006 - PLM - Visual Estimate Extended

3/30/2022

Project Name:

PBS Engineering and EnvironmentalClient:

Job Number: 220978

Phone: (503) 224-5055 www.labcorpdx.com

4321 South Corbett Ave., Ste A Portland, OR 97239

Lab/Cor Portland, Inc.

Report Number: 220978R01 Report Date: 4/1/2022

PLM - Visual Estimate Extended Final Report

PLM - Visual Estimate Extended

The submitted sample(s) were analyzed according to the EPA 600/R-93/116: Method for the Determination of Asbestos in Bulk Building Materials and EPA - 40CFR App. E to Subpart E of Part 763. The sample(s) were analyzed with a digital microscope in order to determine homogeneity, the presence of fibers, and make a preliminary estimate of any asbestos fibers present in the sample. The sample(s), and any observed layers, were then homogenized through techniques appropriate to that material and prepared for analysis by polarized light microscopy (PLM).

Three slide mount preparations were made from random subsamples of the homogenized material. This material was then mounted in the suitable refractive index liquid needed to perform a full optical characterization of the observed fibers. When necessary, dilute HCl, instead of RI liquids, were used to remove cementitious binders to facilitate analysis. The entirety of the slide mount preparations were then analyzed by PLM. Any observed fibers were reported and their optical characteristics recorded according to the EPA 600-R-93-116 method.

Disclaimer This report, and the data contained therein, cannot be used to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S. Government. The results found in this report are based only on the submitted sample(s).

LabCor has no control over sampling procedures. This report is only valid when signed by an analyst.

NAD is No Asbestos Detected. Asbestos consists of the six following minerals: chrysotile, amosite, crocidolite, anthophyllite, actinolite, and tremolite.

Additional gravimetric, point-count or TEM analysis may be recommended for samples testing at < or = 1% asbestos, or those with material binders that prevent the detection of small diameter fibers.

The following estimate of error for this method by visual estimation of asbestos percent are as follows:

1% asbestos: >0-3% error, 5% asbestos: 1-9% error, 10% asbestos: 5-15% error, 20% asbestos: 10-30% error.

Sincerely, Mia Gaines

Analyst

BULK SAMPLE ASBESTOS ANALYSIS

Job Number: 220978

Project Name:

Project Number: 27365.000 Phase 0001

Project Notes:

P.O. No: n/a

Report Date: 04/01/2022

PBS Engineering and EnvironmentalClient:

4412 S Corbett Avenue Portland, OR 97239

Report Number: 220978R01

Phone: (503) 224-5055 www.labcorpdx.com

4321 South Corbett Ave., Ste A Portland, OR 97239

Lab/Cor Portland, Inc.

Client Sample ID: 27365.000-9001 Sample ID: S1 Date Analyzed: 04/01/2022

Analyst: Mia GainesClient Sample Description:

Asbestos Mineral Fibers Layer Percent: Chrysotile Amosite Crocidolite

Percent Asbestos:

- - -%8fibrous tar, black

Layer 01

NAD

- - -%8fibrous tar, black

Layer 02

NAD

- - -%20fibrous material, tan

Layer 03

NAD

- - -%8fibrous tar, black

Layer 04

NAD

- - -%8fibrous tar, black

Layer 05

NAD

- - -%8fibrous tar, black

Layer 06

NAD

- - -%10fibrous tar, black

Layer 07

NAD

- - -%30loose tar material, black

Layer 08

NAD

Cellulose

Mineral Wool Synthetic

Fibrous Glass

Other Fibers

MatrixOther

8 % - - - - - 92 %Layer 01

6 % - - - - - 94 %Layer 02

40 % - 60 % - - - 0 %Layer 03

10 % - 5 % - - - 85 %Layer 04

8 % - 4 % - - - 88 %Layer 05

6 % 20 % 2 % - - - 72 %Layer 06

8 % 20 % - - - - 72 %Layer 07

12 % - 1 % - - - 87 %Layer 08

Client Sample ID: 27365.000-9002 Sample ID: S2 Date Analyzed: 04/01/2022

Analyst: Mia GainesClient Sample Description:

Asbestos Mineral Fibers Layer Percent: Chrysotile Amosite Crocidolite

Percent

Asbestos:

Trace - -%60thick coating, silver

Layer 01

< 1 %

Trace - -%40fibrous tar, black

Layer 02

< 1 %

Cellulose

Mineral Wool Synthetic

Fibrous Glass

Other Fibers

MatrixOther

- - - - - - 100 %Layer 01

10 % - - - - - 90 %Layer 02

Project Name:

Project Number: 27365.000 Phase 0001

P.O. No: n/a

Report Date: 04/01/2022

PBS Engineering and EnvironmentalClient:

4412 S Corbett Avenue Portland, OR 97239

Report Number: 220978R01

Phone: (503) 224-5055 www.labcorpdx.com

4321 South Corbett Ave., Ste A Portland, OR 97239

Lab/Cor Portland, Inc.

Asbestos and Environmental Analysis

Project Notes:

Client Sample ID: 27365.000-9003 Sample ID: S3 Date Analyzed: 04/01/2022

Analyst: Mia GainesClient Sample Description:

Asbestos Mineral Fibers Layer Percent: Chrysotile Amosite Crocidolite

Percent Asbestos:

- - -%70rubbery material, gray

Layer 01

NAD

- - -%5coating, silver

Layer 02

NAD

Trace - -%25tar material, black

Layer 03

< 1 %

Cellulose

Mineral Wool Synthetic

Fibrous Glass

Other Fibers

MatrixOther

- - - - - - 100 %Layer 01

- - - 3 % - - 97 %Layer 02

- - - - - - 100 %Layer 03

Client Sample ID: 27365.000-9004 Sample ID: S4 Date Analyzed: 04/01/2022

Analyst: Mia GainesClient Sample Description:

Asbestos Mineral Fibers Layer Percent: Chrysotile Amosite Crocidolite

Percent Asbestos:

- - -%35fibrous tar, black

Layer 01

NAD

- - -%35fibrous tar, black

Layer 02

NAD

- - -%30fibrous tar, black

Layer 03

NAD

Cellulose

Mineral Wool Synthetic

Fibrous Glass

Other Fibers

MatrixOther

6 % - - - - - 94 %Layer 01

8 % 4 % - - - - 88 %Layer 02

12 % - - - - - 88 %Layer 03

Client Sample ID: 27365.000-9005 Sample ID: S5 Date Analyzed: 04/01/2022

Analyst: Mia GainesClient Sample Description:

Asbestos Mineral Fibers Layer Percent: Chrysotile Amosite Crocidolite

Percent Asbestos:

- - -%20tar material, black with coating, gray

Layer 01

NAD

- - -%80rubbery material, black

Layer 02

NAD

Cellulose

Mineral Wool Synthetic

Fibrous Glass

Other Fibers

MatrixOther

3 % - - - - - 97 %Layer 01

- - - 4 % - - 96 %Layer 02

Project Name:

Project Number: 27365.000 Phase 0001

P.O. No: n/a

Report Date: 04/01/2022

PBS Engineering and EnvironmentalClient:

4412 S Corbett Avenue Portland, OR 97239

Report Number: 220978R01

Phone: (503) 224-5055 www.labcorpdx.com

4321 South Corbett Ave., Ste A Portland, OR 97239

Lab/Cor Portland, Inc.

Asbestos and Environmental Analysis

Project Notes:

Client Sample ID: 27365.000-9006 Sample ID: S6 Date Analyzed: 04/01/2022

Analyst: Mia GainesClient Sample Description:

Asbestos Mineral Fibers Layer Percent: Chrysotile Amosite Crocidolite

Percent Asbestos:

4 % - -%100thick tar material, black with coating, green/gray

Homogeneous

4 %

Cellulose

Mineral Wool Synthetic

Fibrous Glass

Other Fibers

MatrixOther

1 % - - - - - 95 %

This laboratory participates in the National Voluntary Laboratory Accreditation Program (NVLAP). Testing method is per EPA 600/R-93/116:

Method for the Determination of Asbestos in Bulk Building Materials and EPA - 40CFR App. E to Subpart E of Part 763, PLM. This report and the data contained therein cannot be used to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the U.S.

Government.

• "NAD" is No Asbestos Detected.

• Asbestos consists of the following minerals: chrysotile, amosite, crocidolite, tremolite, actinolite, anthophyllite.

• Material binders, such as those found in vinyl floor tiles, may prevent the detection of small diameter asbestos fibers. A gravimetric preparation and point-count is recommended for such samples.

• Quantitative analysis by PLM point count or TEM may be recommended for samples testing at < or = to 1% asbestos.

• The following estimate of error for this method by visual estimation of asbestos percent are as follows:

1% asbestos: >0-3% error, 5% asbestos: 1-9% error, 10% asbestos: 5-15% error, 20% asbestos: 10-30% error.

• This report pertains only to the samples listed on the report. Report considered valid only when signed by analyst.

Reviewed by:

Mia Gaines

Analyst

ADDENDA 2 S-29100-00003020
5/16/2022
ADDENDUM #2
Paint 5.11.22 Reduced
IMG_0464
IMG_0466
IMG_0674
Paint Shop Vent Detail
PBSAsbestosBulkRpt 27365.000 P0001 S9001-9006
PBSAsbestosBulkRpt 27365.000 P0001 S9001-9006
220978R01_20220401_Final-PLMVisEx
220978_coc
PHOTOGRAPHS
IMG_0457
IMG_0458
IMG_0459
IMG_0460
IMG_0461
IMG_0463
IMG_0464
IMG_0465
IMG_0466
Recycle 5.11.22 Reduced
IMG_0457
IMG_0458
IMG_0459
IMG_0460
IMG_0461
IMG_0463

Z Closure Detail

File details come from the government source that posted it. Updated .