Addenda__1_-_Q_A_10A2714.pdf
PDF 113 KB Posted
- Attached to
- Certified SB, including MB, SB-PW, or a DVBE Only** IFPQ Backflow Assembly Replacement in San Joaquin County
- Solicitation number
- 10A2714
- Issued by
- San Joaquin County, San Joaquin City, California
About this file
This is Addendum No. 1 issued by the California Department of Transportation (Caltrans) for Invitation for Price Quote #10A2714 regarding Backflow Assembly Replacement Services in San Joaquin County, dated December 23, 2024. The addendum addresses a single question about contractor licensing requirements for the project, which involves the decommissioning, removal, and disposal of one 6" and one 8" backflow prevention assembly system, as well as furnishing, installing, and commissioning new replacement systems.
The addendum specifically clarifies that a C-36 (Plumbing Contractor) license is required and that a C-34 (Pipeline Contractor) license would not be acceptable as an alternative. All other terms and conditions from the original IFPQ remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFPQ_Solicitation_Package_10A2714.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA------- CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM., Governor
DEPARTMENT OF TRANSPORTATION
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS MS-65
1727 - 30TH STREET
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6086
TTY - 711
INTERNET http://caltrans-dpac.ca.gov
Making Conservation a California Way of Life.
December 23, 2024
ADDENDUM No. 1 Invitation for Price Quote # 10A2714
Backflow Assembly Replacement Services in San Joaquin County
NOTICE TO ALL PROSPECTIVE BIDDERS:
Addendum No. 1 is being issued for the above referenced IFPQ. Bids for this work shall be with the full understanding of this Addendum.
THE FOLLOWING REPRESENT QUESTIONS SUBMITTED AND DEPARTMENT OF -
TRANSPORTATION ANSWERS:
Question 1: I noticed on the specs package that a C-36 (Plumbing Contractor) license is listed in the minimum requirements and was wondering if a C-34 (Pipeline Contractor) license would also be acceptable.
Answer 1: No.
NOTE: All other terms and conditions set forth in the IFPQ shall remain in full force and effect.
Sincerely, Angel Cervantes Jr Contract Analyst
DEPARTMENT OF TRANSPORTATION
File details come from the government source that posted it. Updated .