Addend_2_RFP_HSD Architectural Services.pdf

PDF 352 KB Posted

Attached to
RFP - Architectural Services
Solicitation number
S-P34002-00018239
Issued by
Washington County, Oregon

About this file

Summary

This Addendum #2 to RFP #2026-Arch 01 issued by Hillsboro School District on November 10, 2026, modifies the district's request for proposals from qualified architectural firms to provide services for general building construction projects funded by an approximately $430 million bond measure. The addendum clarifies that the proposal due date remains November 23, 2026 at 2:00 p.m. PST and confirms that proposers should reflect their firm's strengths in meeting RFP requirements. The district will consider teams of architects for multiple aspects of bond programs, and site improvement scopes such as playground surfacing, ADA accessibility upgrades, tennis courts, and field improvements may require architectural services on a project-by-project basis. The addendum specifies that the cover letter and proposal cover page are excluded from the 20-page proposal limit, as are required Attachments B through F. Sub-consultants will not be part of the proposal, interview, or selection process; however, firms may discuss strategies for attracting and building teams with COBID and local experience. The contract term is four years with one one-year renewal option, with individual project assignments and compensation negotiated between the district and selected firms.

The attached HSD 2026 Bond Program Schedule outlines approximately 500 scopes of work across more than 40 projects scheduled for 2027 through 2031, with total construction budgets of $267.287 million distributed across six program areas: buildings and systems, safety and security, technology and cybersecurity, Career and College Pathways, extracurriculars, and other projects including kitchen remodels and equipment installation. The district clarifies that required services will encompass architectural, civil, structural, mechanical, plumbing, electrical, landscape, and technology disciplines, plus specialized consultants such as acoustics, food service, and theatrical systems. Equipment purchases such as bus fleet acquisitions and chromebook procurement are explicitly excluded from architectural firms' scope. The district emphasizes that architects and engineers must provide all required code minimums and maintain responsibility matrices, delegated design documentation, and deferred submittal trackers throughout design phases for coordination with the owner's representative and contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hillsboro School District

4901 SE Witch Hazel Rd.

Hillsboro, OR 97129

Hillsboro School District Architectural Services - RFP # 2026 - Arch 01

ADDENDUM #2

November 10, 2026

This Addendum is issued to the above referenced project to make the following changes, additions, deletions, and/or clarifications.

It is essential that prospective firms note the contents of this addendum and the Owner be made aware the addendum has been received. Therefore, please acknowledge receipt of this addendum on "Attachment B" in your proposal submitted to Hillsboro School District.

This Addendum consists of 3 page(s) plus attachments noted herein.

GENERAL

1. Note that the Proposal Due Date has NOT CHANGED as a result of this addendum. Proposals are Due No later than 2:00 pm November 23rd, 2026.

2. Attached is the HSD 2026 Bond Program Schedule. This has been included to demonstrate the Bond list of potential projects by year and the approximate construction budgets. Not all the projects will require architectural services. This document is intended to help proposers better understand the scope as firms prepare their proposals.

CHANGES TO PRIOR ADDENDA

1. None.

CHANGES TO PROPOSAL FORMAT, CONTENT, AND SUBMISSION

1. None.

QUESTIONS/CLARIFICATIONS/REQUESTS

1. Question: If there are specific scope programs a firm would like to pursue, how would the district like the firm to identify the correlating scope?

Answer: The proposal should reflect the strengths of the firm's ability to meet the requirements set forth in the RFP.

2. Question: Will the district consider a team of architects to perform multiple aspects of the bond programs?

Answer: Yes.

3. Question: Will these types of site improvements (Playground surfacing, ADA accessibility upgrades, Tennis courts, Field Improvements, Track improvements) be managed by one of the Architectural Firms selected through this process?

If yes, do you expect Architecture firms to manage these scopes of work with a team of subs who will perform the work?

Or should non-Architectural firms submit proposals for this RFP to act as “Prime Consultants” in the pool of firms to specifically manage the non-architectural site-specific bond work?

Answer: Some of these scopes my require architectural services and will be determined on a project by project basis. (NOTE: This answer has been modified from Addendum #1 answer)

4. Question: Section 3.1(d) states that cover letters are excluded from the 20-page proposal limit. Please confirm whether a separate proposal cover/title page is also excluded from the 20-page limit. Or if you want the letter itself to be the Cover page.

Answer: The cover is excluded from the page limit. And may be the same or a different page from the cover letter.

5. Question: Section 3.1(d) excludes “reports, resumes, cover letters, and similar attachments” from the 20-page limit, while Sections 3.1(b) and 3.2 require completed Attachments B-F. Please confirm that required Attachments B-F are excluded from the 20-page proposal limit.

Answer: Confirmed that Attachments B-F are excluded.

6. Question: Who is on the selection committee?

Answer: The selection team is made up of members of the Bond Management Team..

7. Question: Will you be providing a draft schedule for the projects?

Answer: See attached HSD 2026 Bond Program Schedule with approximate construction budgets by site. Some but not all projects will require architectural services.

8. Question: Sub-Consultant Selection: On Page 2, Section 1 states that "sub-consultants are not part of the selection process. “These selections will be made during Contract negotiations with review and approval of the Owner". However, on Page 7, the Interview Evaluation Criteria includes "Proposed Key Staff and Staff Experience; Staff Capacity, Subcontracting.” Could the District clarify whether proposers are expected to identify or propose specific sub-consulting firms during the proposal or interview stages?

Answer: Sub-consultants will not be part of the proposal, interview, or selection. Firms can speak to how they will attract/build teams, including COBID and local experience.

9. Question: Proposal Page Limit: Do the mandatory forms (Attachments B, C, D, E, and F) count toward the 20-page proposal limit?

Answer: These items are excluded from the page limit of the proposal.

10. Question: RFP Pg 3. “Other needed Projects” lists “bus purchases” as a scope item. Please confirm the architecture firm’s expected role and responsibilities pertaining to this item.

Answer: Equipment purchases will not be a part of architecture firms scope.

11. Question: Confirming that FF&E is provided by the owner and coordinated by the Project Manager / Architect for installation.

Answer: Confirmed.

12. Question: Confirm if proposals are to be bound or stapled.

Answer: Bound.

13. Question: Attachment G, Pg 1 Anticipated Scope: Confirm civil, structural, mechanical, plumbing, electrical, landscape, and technology plus specialized consultants are not considered architectural disciplines. Those listed would be engineering or other disciplines determined to be required on a project-to-project basis.

Answer: Bond scopes will require services from a variety of disciplines. These include architectural, civil, structural, mechanical, plumbing, electrical, landscape, and technology, as well as specialized consultants such as acoustics, food service or theatrical systems.

14. Question: Should firms identify interest in specific types of project assignments based on experience and capacity?

Answer: The proposal should reflect the strengths of the firm's ability to meet the requirements set forth in the RFP.

15. Question: Does the District have a specific COBID participation goal? How does the District intend to evaluate COBID participation?

Answer: The district will be setting aspirational goals for COBID and local participation. No specific goals have been established at this time. See answer to Question 8.

16. Question: Can the District share an anticipated overall bond program schedule, including projected project start dates and major design and construction milestones?

Answer: See answer to Question 7.

17. Question: Request for contract revisions

Answer: Contract changes will be reviewed by Hillsboro School District once firms are selected.

CLARIFICATIONS

Architect Additional clarifications:

• It is the responsibility of the architect and/or engineer to provide all required code minimums.

• A responsibility matrix that articulates the line of demarcation between architect and contractor responsibility.

• A delegated design & deferred submittal tracker, coordinated with the responsibility matrix, should be provided and maintained throughout design for use by the owner's rep and contractor to coordinate.

END OF ADDENDUM

Attachments are all bound following this page

HILLSBORO BOND PROGRAM SCHEDULE

Site Project/Scope Year Approximate Construction

Budget

2027 PROJECTS $79,002,000

2027 $15,040,000 2027 $100,000 2027 $10,100,000 2027 $100,000 2027 $2,600,000 2027 $1,100,000 2027 $4,845,000 2027 $5,955,000 2027 $13,353,000 2027 $14,400,000 2027 $105,000 2027 $3,304,000 2027 $8,000,000

2028 PROJECTS $90,864,000

District-Wide Chromebooks, Laptops, & Desktop - MIDDLE 2028 $3,200,000 Transportation Main Transportation - Bus Fleet 2028 $2,000,000 Administration Center Administration Center Improvements 2028 $6,700,000

2028 $15,416,000

Hare Field Stadium Hare Field Stadium Improvements 2028 $1,956,000

2028 $1,800,000

2028 $5,400,000

2028 $11,630,000

Multiple Sites Summer 1 Priority Scopes District-Wide AEDs and supplies District-Wide Chromebooks, Laptops, & Desktop - ELEMENTARY District-Wide Public-safety vehicles Transportation Main Transportation equipment Facilities and Support Services Facilities fleet District-Wide District Core IT Infrastructure Multiple Sites District Network Improvements Multiple Sites Security Systems Multiple Sites District PA and Classroom AV Multiple Sites Fencing and Gates Multiple Sites Doors, Locks and Secure Entrances District Print Shop District Print Shop

Century High Century High

Facilities and Support Services Facilities Improvements

District-Wide District CTE Safety and Learning Spaces

Minter Bridge Elementary Minter Bridge Elementary

Administration Center Flooring Replacement Administration Center HVAC - Equipment Upgrades Facilities Warehouse - Test Kitchen Nutrition Services - Kitchen Remodel

Century High Auditorium - ADA Seating Century High Auditorium - AV Technology Upgrades Century High Auditorium - Full Stage Reconstruction Century High Clock System Upgrades Century High Building Structure failure corrections Century High Fields - Bathroom additions Century High Fields - Bleachers addition Century High Fields - Turf & Lights Century High Gyms - Bleachers renovations - ADA compliance Century High HVAC - Controls upgrades Century High HVAC - Equipment Upgrades Century High Lighting upgrades Century High Nutrition Services - Kitchen Remodel Century High Physical Security - Doors/Locks Century High Physical Security - Fencing Additions Century High Roofing improvements Century High Sound System replacement Century High Tennis Courts - Resurfacing Century High Title IX - Hitting Facility

Hare Field Stadium Bathrooms - ADA Improvements Hare Field Stadium Bathrooms - Renovations Hare Field Stadium Building Structure failure corrections Hare Field Stadium HVAC - Equipment Upgrades Hare Field Stadium Lighting upgrades Hare Field Stadium Track resurfacing Hare Field Stadium Physical Security - Doors/Locks Hare Field Stadium Roofing improvements Hare Field Stadium Sound System replacement

Facilities and Support Services Generator addition Facilities and Support Services Nutrition Services - Kitchen Remodel Facilities and Support Services Nutrition Services - Kitchen Remodel

District-Wide Advanced Computing CTE Labs District-Wide CTE MS Classroom Renovations District-Wide CTE Safety Improvements

Minter Bridge Elementary Bathrooms - ADA Improvements Minter Bridge Elementary Bathrooms - Renovations

2028 $500,000 2028 $6,000,000

2028 $200,000

2028 $100,000 2028 $300,000 2028 $1,500,000 2028 $10,000 2028 $500,000 2028 $300,000 2028 $40,000 2028 $5,000,000 2028 $500,000 2028 $3,200,000 2028 $1,200,000 2028 $1,000,000 2028 $300,000 2028 $100,000 2028 $31,000 2028 $1,000,000 2028 $35,000 2028 $100,000 2028 $200,000

2028 $20,000 2028 $100,000 2028 $200,000 2028 $100,000 2028 $36,000 2028 $1,100,000 2028 $100,000 2028 $200,000 2028 $100,000

2028 $300,000 2028 $1,000,000 2028 $500,000

2028 $400,000 2028 $4,800,000 2028 $200,000

2028 $30,000 2028 $50,000

Site Project/Scope Year Approximate Construction

Budget Minter Bridge Elementary Fire Panel replacement Minter Bridge Elementary Flooring Replacement Minter Bridge Elementary HVAC - Controls upgrades Minter Bridge Elementary HVAC - Equipment Upgrades Minter Bridge Elementary Lighting upgrades Minter Bridge Elementary Nutrition Services - Kitchen Remodel Minter Bridge Elementary Physical Security - Doors/Locks Minter Bridge Elementary Physical Security - Fencing Additions Minter Bridge Elementary Windows upgrades

Lenox Elementary Power Distribution upgrade Lenox Elementary Lighting upgrades Lenox Elementary Clock System Upgrades Lenox Elementary Playground - Equipment and surfacing improvements Lenox Elementary Nutrition Services - Kitchen Remodel Lenox Elementary Devices

Evergreen Middle Gyms - Bleachers renovations - ADA compliance Evergreen Middle Tennis Courts - Resurfacing Evergreen Middle Lighting upgrades Evergreen Middle Nutrition Services - Equipment Repairs/Replacement Evergreen Middle Physical Security - Doors/Locks Evergreen Middle Plumbing - Total Re-pipe Evergreen Middle Windows upgrades

Jackson Elementary Accordion Walls Replacement Replacement Jackson Elementary Fire Panel replacement Jackson Elementary HVAC - Equipment Upgrades Jackson Elementary Lighting upgrades Jackson Elementary Nutrition Services - Kitchen Remodel Jackson Elementary Roofing improvements Jackson Elementary Windows upgrades

Ladd Acres Elementary Accordion Walls Replacement Ladd Acres Elementary Bathrooms - ADA Improvements Ladd Acres Elementary Bathrooms - Renovations Ladd Acres Elementary Clock System Upgrades Ladd Acres Elementary Lighting upgrades Ladd Acres Elementary Nutrition Services - Kitchen Remodel Ladd Acres Elementary Physical Security - Doors/Locks Ladd Acres Elementary Roofing improvements Ladd Acres Elementary Windows upgrades

Glencoe High Auditorium - ADA Seating Glencoe High Auditorium - AV Technology Upgrades Glencoe High Auditorium - Full Stage Reconstruction Glencoe High Bathrooms - ADA Improvements Glencoe High Clock System Upgrades Glencoe High Fields - Bathroom additions Glencoe High Fields - Bleachers addition Glencoe High Fields - Scoreboard replacements Glencoe High Generator addition Glencoe High Generator addition Glencoe High Generator addition Glencoe High Generator addition Glencoe High HVAC - Equipment Upgrades Glencoe High Lighting upgrades Glencoe High Nutrition Services - Kitchen Remodel Glencoe High Physical Security - Doors/Locks Glencoe High Physical Security - Fencing Additions Glencoe High Playground - Equipment and surfacing improvements Glencoe High Power Distribution upgrade Glencoe High Roofing improvements Glencoe High Title IX - Bball/Sball dugouts

2028 $300,000 2028 $40,000 2028 $300,000 2028 $9,700,000 2028 $200,000 2028 $500,000 2028 $100,000 2028 $10,000 2028 $400,000

2028 $300,000 2028 $200,000 2028 $10,000 2028 $800,000 2028 $300,000 2028 $400,000

2028 $300,000 2028 $20,000 2028 $500,000 2028 $100,000 2028 $100,000 2028 $1,500,000 2028 $20,000

2028 $15,000 2028 $225,000 2028 $3,000,000 2028 $230,000 2028 $300,000 2028 $1,100,000 2028 $300,000

2028 $30,000 2028 $35,000 2028 $100,000 2028 $10,000 2028 $200,000 2028 $400,000 2028 $100,000 2028 $5,200,000 2028 $300,000

2028 $100,000 2028 $300,000 2028 $1,500,000 2028 $100,000 2028 $2,000 2028 $200,000 2028 $200,000 2028 $100,000 2028 $500,000 2028 $500,000 2028 $300,000 2028 $600,000 2028 $600,000 2028 $500,000 2028 $1,300,000 2028 $100,000 2028 $35,000 2028 $100,000 2028 $3,100,000 2028 $6,000,000 2028 $300,000

Lenox Elementary Lenox Elementary 2028 $2,010,000

2028 $2,540,000

2028 $5,170,000

2028 $6,300,000

2028 $17,837,000

Evergreen Middle Evergreen Middle

Jackson Elementary Jackson Elementary

Ladd Acres Elementary Ladd Acres Elementary

Glencoe High Glencoe High

Site Project/Scope Year Approximate Construction

Budget Glencoe High Title IX - Hitting Facility Glencoe High Track resurfacing Glencoe High Windows upgrades

Brown Middle Bathrooms - ADA Improvements Brown Middle Bathrooms - Renovations Brown Middle Flooring Replacement Brown Middle HVAC - Equipment Upgrades Brown Middle Lighting upgrades Brown Middle Nutrition Services - Kitchen Remodel Brown Middle Physical Security - Doors/Locks Brown Middle Remediation Brown Middle Remediation Brown Middle Windows upgrades

Eastwood Elementary Bathrooms - ADA Improvements Eastwood Elementary Bathrooms - Renovations Eastwood Elementary Clock System Upgrades Eastwood Elementary Fire Panel replacement Eastwood Elementary HVAC - Equipment Upgrades Eastwood Elementary Lighting upgrades Eastwood Elementary Nutrition Services - Kitchen Remodel Eastwood Elementary Windows upgrades

Hillsboro High Auditorium - ADA Seating Hillsboro High Auditorium - AV Technology Upgrades Hillsboro High Auditorium - Full Stage Reconstruction Hillsboro High Clock System Upgrades Hillsboro High CTE/CCP Classroom Enhancements Hillsboro High EV Bay Installation Hillsboro High Fields - Bathroom additions Hillsboro High Gyms - Bleachers renovations - ADA compliance Hillsboro High Gyms - Scoreboard Hillsboro High HVAC - Controls upgrades Hillsboro High HVAC - Equipment Upgrades Hillsboro High Lighting upgrades Hillsboro High Nutrition Services - Kitchen Remodel Hillsboro High Physical Security - Doors/Locks Hillsboro High Physical Security - Fencing Additions Hillsboro High Remediation: Fume Exhaust Hoods Hillsboro High Roofing improvements Hillsboro High Sound System replacement Hillsboro High Tennis Courts - additions Hillsboro High Title IX - Hitting Facility

Butternut Creek Elementary Accordion Walls Replacement Butternut Creek Elementary Flooring Replacement Butternut Creek Elementary Clock System Upgrades Butternut Creek Elementary Lighting upgrades Butternut Creek Elementary Nutrition Services - Kitchen Remodel

Indian Hills Elementary Clock System Upgrades Indian Hills Elementary Nutrition Services - Kitchen Remodel Indian Hills Elementary Accordion Walls Replacement Indian Hills Elementary Lighting upgrades Indian Hills Elementary Windows upgrades Indian Hills Elementary Flooring Replacement

Mooberry Elementary Accordion Walls Replacement

2028 $200,000 2028 $700,000 2028 $500,000

2028 $100,000 2028 $100,000 2028 $300,000 2028 $1,100,000 2028 $400,000 2028 $1,000,000 2028 $100,000 2028 $10,000 2028 $45,000 2028 $1,000,000

2028 $40,000 2028 $100,000 2028 $10,000 2028 $300,000 2028 $3,000,000 2028 $200,000 2028 $500,000 2028 $400,000

2029 $100,000 2029 $300,000 2029 $1,500,000 2029 $5,000 2029 $400,000 2029 $100,000 2029 $200,000 2029 $400,000 2029 $20,000 2029 $300,000 2029 $2,100,000 2029 $600,000 2029 $200,000 2029 $100,000 2029 $38,000 2029 $48,000 2029 $6,000,000 2029 $35,000 2029 $100,000 2029 $200,000 2029 $27,000 2029 $42,000 2029 $10,000 2029 $200,000 2029 $800,000 2029 $10,000 2029 $700,000 2029 $30,000 2029 $200,000 2029 $400,000 2029 $40,000

2029 $40,000

Brown Middle Brown Middle

Eastwood Elementary Eastwood Elementary

TSSF TSSF Diesel Service Technology Bay

District-Wide Chromebooks, Laptops, & Desktop - HS Transportation Main Transportation Fleet Hillsboro High Hillsboro High

Butternut Creek Elementary Butternut Creek Elementary

Indian Hills Elementary Indian Hills Elementary

Mooberry Elementary Mooberry Elementary

2028 $4,155,000

2028 $4,550,000

2028 $200,000

2029 PROJECTS $42,317,000

2029 $6,300,000 2029 $2,000,000 2029 $12,746,000

$1,079,000

$1,380,000

2029 $5,850,000

Site Project/Scope Year Approximate Construction

Budget Mooberry Elementary Clock System Upgrades Mooberry Elementary Fire Panel replacement Mooberry Elementary Lighting upgrades Mooberry Elementary Nutrition Services - Kitchen Remodel Mooberry Elementary Physical Security - Doors/Locks Mooberry Elementary Roofing improvements

Reedville Elementary Clock System Upgrades Reedville Elementary Fire Panel replacement Reedville Elementary HVAC - Controls upgrades Reedville Elementary HVAC - Equipment Upgrades Reedville Elementary Lighting upgrades

Rosedale Elementary Clock System Upgrades Rosedale Elementary HVAC - Controls upgrades Rosedale Elementary Lighting upgrades

Rosedale Elementary Physical Security - Playground fence expansion, electrical panel enclosure, 2 rail - low profile

Rosedale Elementary Playground - Equipment and surfacing improvements

West Union Elementary Clock System Upgrades West Union Elementary Fire Panel replacement West Union Elementary Flooring Replacement West Union Elementary Lighting upgrades West Union Elementary Nutrition Services - Kitchen Remodel West Union Elementary Physical Security - Doors/Locks West Union Elementary Power Distribution upgrade West Union Elementary Remediation

Poynter Middle Accordion Walls Replacement Poynter Middle Bathrooms - Renovations Poynter Middle Clock System Upgrades Poynter Middle HVAC - Equipment Upgrades Poynter Middle Lighting upgrades Poynter Middle Nutrition Services - Kitchen Remodel Poynter Middle Physical Security - Doors/Locks Poynter Middle Physical Security - Fencing Additions Poynter Middle Remediation Poynter Middle Security Systems - Partition Replacement

South Meadows Middle Lighting upgrades South Meadows Middle Clock System Upgrades South Meadows Middle Nutrition Services - Kitchen Remodel

Peter Boscow Roofing improvements

Liberty High Auditorium - ADA Seating Liberty High Auditorium - AV Technology Upgrades Liberty High Auditorium - Full Stage Reconstruction Liberty High Clock System Upgrades Liberty High Playground - Equipment and surfacing improvements Liberty High Fire Science Apparatus Housing & Classroom Liberty High Gyms - Bleachers addition Liberty High Hoop House Upgrades Liberty High Lighting upgrades Liberty High Media Commuications Studio Upgrades Liberty High Nutrition Services - Kitchen Remodel Liberty High Physical Security - Doors/Locks Liberty High Roofing improvements Liberty High Tennis Courts - Resurfacing

2029 $10,000 2029 $300,000 2029 $200,000 2029 $500,000 2029 $100,000 2029 $4,700,000

2029 $10,000 2029 $205,000 2029 $140,000 2029 $37,000 2029 $100,000

2029 $2,000 2029 $1,100,000 2029 $300,000

2029 $36,000

2029 $800,000

2029 $8,000 2029 $400,000 2029 $100,000 2029 $200,000 2029 $800,000 2029 $100,000 2029 $300,000 2029 $3,000

2029 $5,000 2029 $100,000 2029 $4,000 2029 $6,200,000 2029 $320,000 2029 $300,000 2029 $122,000 2029 $30,000 2029 $20,000 2029 $20,000

2029 $600,000 2029 $2,000 2029 $200,000

2029 $400,000

2030 $100,000 2030 $300,000 2030 $1,500,000 2030 $6,000 2030 $100,000 2030 $2,500,000 2030 $800,000 2030 $15,000 2030 $1,100,000 2030 $100,000 2030 $800,000 2030 $100,000 2030 $3,400,000 2030 $45,000

Reedville Elementary Reedville Elementary

Rosedale Elementary Rosedale Elementary

West Union Elementary West Union Elementary

Poynter Middle Poynter Middle

South Meadows Middle South Meadows Middle

Peter Boscow Peter Boscow

District-Wide Chromebooks, Laptops, & Desktop - ADMIN Transportation Main Transportation Fleet Liberty High Liberty High

2029 $492,000

2029 $2,238,000

2029 $1,911,000

2029 $7,121,000

2029 $800,000

2029 $400,000

2030 PROJECTS $40,955,000

2030 $1,000,000 2030 $2,000,000 2030 $11,466,000

Site Project/Scope Year Approximate Construction

Budget Liberty High Title IX - Bball/Sball bathrooms Liberty High Title IX - Hitting Facility

Farmington View Elementary Clock System Upgrades Farmington View Elementary Fire Panel replacement Farmington View Elementary Lighting upgrades Farmington View Elementary Nutrition Services - Kitchen Remodel Farmington View Elementary Remediation: Boiler

Farmington View Elementary Roofing improvements: Possible Restoration / Need to conduct an Infrared Scan to confirm

Imlay Elementary Lighting upgrades Imlay Elementary Playground - Equipment and surfacing improvements Imlay Elementary Clock System Upgrades

McKinney Elementary Fire Panel replacement McKinney Elementary Lighting upgrades McKinney Elementary Nutrition Services - Kitchen Remodel McKinney Elementary Windows upgrades

North Plains Elementary Fencing Addition North Plains Elementary Fire Panel replacement North Plains Elementary Lighting upgrades North Plains Elementary Nutrition Services - Kitchen Remodel North Plains Elementary Remediation

W L Henry Elementary Accordion Walls Replacement W L Henry Elementary Clock System Upgrades W L Henry Elementary Fire Panel replacement W L Henry Elementary Flooring Replacement W L Henry Elementary Lighting upgrades W L Henry Elementary Physical Security - Doors/Locks W L Henry Elementary Remediation W L Henry Elementary Roofing improvements W L Henry Elementary Windows upgrades

Lincoln Street Elementary Playground - Equipment and surfacing improvements Lincoln Street Elementary Lighting upgrades Lincoln Street Elementary HVAC - Equipment Upgrades Lincoln Street Elementary Clock System Upgrades Lincoln Street Elementary Roofing improvements

Quatama Elementary Clock System Upgrades Quatama Elementary Lighting upgrades Quatama Elementary Playground - Equipment and surfacing improvements

Quatama Elementary Roofing improvements - Possible Restoration / Need to conduct an Infrared Scan to confirm

Orenco Elementary Lighting upgrades Orenco Elementary Playground - Equipment and surfacing improvements Orenco Elementary Roofing improvements

Patterson Elementary Playground - Equipment and surfacing improvements Patterson Elementary Lighting upgrades Patterson Elementary Roofing improvements

Oak Street Campus Roofing improvements: Replace Oak Street Campus Clock System Upgrades Oak Street Campus Lighting upgrades

Free Orchards Elementary Roofing improvements Free Orchards Elementary Clock System Upgrades

2030 $100,000 2030 $500,000

2030 $10,000 2030 $210,000 2030 $46,000 2030 $500,000 2030 $20,000

2030 $700,000

2030 $300,000 2030 $200,000 2030 $4,000

2030 $300,000 2030 $200,000 2030 $500,000 2030 $400,000

2030 $10,000 2030 $300,000 2030 $200,000 2030 $200,000 2030 $20,000

2030 $43,000 2030 $2,000 2030 $400,000 2030 $100,000 2030 $300,000 2030 $100,000 2030 $100,000 2030 $4,600,000 2030 $500,000

2030 $400,000 2030 $1,000,000 2030 $3,000,000 2030 $10,000 2030 $900,000

2030 $4,000 2030 $300,000 2030 $800,000

2030 $3,200,000

2030 $300,000 2030 $700,000 2030 $800,000

2030 $400,000 2030 $300,000 2030 $900,000

2030 $3,100,000 2030 $10,000 2030 $100,000

2031 $1,000,000 2031 $10,000

Farmington View Elementary Farmington View Elementary

Imlay Elementary Imlay Elementary

McKinney Elementary McKinney Elementary

North Plains Elementary North Plains Elementary

W L Henry Elementary W. L. Henry Elementary

Lincoln Street Elementary Lincoln Street Elementary

Quatama Elementary Quatama Elementary

Orenco Elementary Orenco Elementary

Patterson Elementary Patterson Elementary

Oak Street Campus Oak Street Campus

Transportation Main Transportation Fleet Free Orchards Elementary Free Orchards Elementary

2030 $1,486,000

2030 $504,000

2030 $1,400,000

2030 $730,000

2030 $6,145,000

2030 $5,310,000

2030 $4,304,000

2030 $1,800,000

2030 $1,600,000

2030 $3,210,000

2031 PROJECTS $14,149,000

2031 $2,000,000 2031 $2,118,000

Site Project/Scope Year Approximate Construction

Budget Free Orchards Elementary Lighting upgrades Free Orchards Elementary Playground - Equipment and surfacing improvements Free Orchards Elementary Physical Security - Fencing Additions

Tobias Elementary HVAC - Controls upgrades Tobias Elementary HVAC - Equipment Upgrades Tobias Elementary Lighting upgrades Tobias Elementary Nutrition Services - Kitchen Remodel Tobias Elementary Physical Security - Doors/Locks Tobias Elementary Playground - Equipment and surfacing improvements

Witch Hazel Elementary Clock System Upgrades Witch Hazel Elementary Lighting upgrades Witch Hazel Elementary Playground - Equipment and surfacing improvements Witch Hazel Elementary Roofing improvements

Groner Elementary Clock System Upgrades Groner Elementary Devices Groner Elementary Lighting upgrades

Groner Elementary Network Access Points, Routers, Switches, Power Supplies, Frame Remodels, Network Sensors

Groner Elementary Nutrition Services - Kitchen Remodel Groner Elementary PA/AV/TEC Groner Elementary Physical Security - Doors/Locks Groner Elementary Physical Security - Fencing Additions Groner Elementary Playground - Equipment and surfacing improvements Groner Elementary Power Distribution upgrade Groner Elementary Roofing improvements

2031 $300,000 2031 $800,000 2031 $8,000

2031 $200,000 2031 $4,200,000 2031 $200,000 2031 $300,000 2031 $100,000 2031 $800,000

2031 $4,000 2031 $300,000 2031 $800,000 2031 $600,000

2031 $10,000 2031 $100,000 2031 $100,000

2031 $100,000

2031 $300,000 2031 $300,000 2031 $100,000 2031 $17,000 2031 $400,000 2031 $300,000 2031 $800,000

Tobias Elementary Tobias Elementary

Witch Hazel Elementary Witch Hazel Elementary

Groner Elementary Groner Elementary

2031 $5,800,000

2031 $1,704,000

2031 $2,527,000

$267,287,000

File details come from the government source that posted it. Updated .