This document is Addendum No. 2 for the St. Clair Local Development Finance Authority (LDFA) Elevated Storage Tank project located in St. Clair, Michigan, with engineering services provided by Fishbeck. The addendum, dated June 3, 2024, modifies the original bidding documents for a water utility infrastructure project and provides updates to multiple specification sections and drawing sheets. Key changes include adjusting the electrical feed location to come from the west side of the site instead of the east side, adding a 3P100A heavy-duty service entrance rated circuit breaker, incorporating DTE coordination notes, and updating the tank mixer supplier options to include PWM150 Water Mixer by PAX Water Technologies, GridBee Model GS-9 by IXOM/Watercare, and Certisafe Series C61 Model 2400 by Kasco Marine. Bids are due on June 20, 2024, at 11:00 a.m.

The addendum covers technical specifications for water utilities, including detailed requirements for ductile iron pipe, PVC pressure pipe, fittings, valves, hydrants, and other infrastructure components. The project involves precise installation standards, testing protocols, and disinfection procedures for the water main, with specific requirements for pipe placement, joint restraints, pressure testing, and bacteriological testing. The document provides comprehensive technical guidance for contractors, including specific manufacturer recommendations, material specifications, and installation methodologies, ensuring a standardized and high-quality approach to the elevated storage tank water utility infrastructure project.

View the file

Other files

File Type Posted
ADD01_2024_0522.pdf PDF
ADD03 water tower.pdf PDF
Water Tower_Bids and Construction_SPEC.pdf PDF
ADD04 water tower.pdf PDF
Water Tower_St Clair EST_Bids and Construction_PLANS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

St. Clair LDFA Elevated Storage Tank Project Number 231422

ADDENDUM

Z:\2023\231422\WORK\CONTRACTS\ECD\LDFA - ELEVATED STORAGE TANK\ADD02_2024_0603.DOCX

Addendum No. 2

Date: June 3, 2024

OWNER: City of St. Clair 547 North Carney Drive St. Clair, MI 48079

ENGINEER: Fishbeck 1515 Arboretum Drive, SE Grand Rapids, MI 49546

DRAWING REVISION NO.: A2

ISSUED HEREWITH:

SPECIFICATION SECTIONS: 33 10 00

SHEETS: C201, C301, C401, C402, E011, T103

BIDS DUE: June 20, 2024, 11:00 a.m.

This Addendum is issued to all Bid Set Holders, is a part of the Contract Documents, and modifies the previously issued Bidding Documents. Acknowledge receipt of this Addendum in the space provided on the Bid form; failure to do so may result in rejection of the Bid.

ITEM NO. 1: Water Main Fittings Section: 33 10 00 – Water Utilities (Reissued)

A. See changes to 2.1.C.2.

ITEM NO. 2: Adjust Electrical Feed Location Sheets: C201 – ELEVATED TANK SITE LAYOUT PLAN (Reissued)

C301 – ELEVATED TANK SITE GRADING PLAN (Reissued) C401 – ELEVATED TANK SITE UTILITY PLAN AND PROFILES – STORM SEWER (Reissued) C402 – ELEVATED TANK SITE UTILITY PLAN AND PROFILES – WATER MAIN (Reissued) E011 – ELECTRICAL SITE PLAN (Reissued) T103 – TANK DIAGRAMS AND SCHEDULES (Reissued)

A. Adjust electrical feed to come from the west side of the site instead of the east side.

B. Add 3P100A heavy-duty, service entrance rated, circuit breaker type, NEMA 3R rated disconnect.

C. Add DTE coordination notes.

ITEM NO. 3: Add Tank Mixer Supplier Section: 33 16 26 – Composite Tank (Not Reissued)

A. Replace Paragraph 2.6.W.1. with the following:

1. Manufacturers:

a. PWM150 Water Mixer by PAX Water Technologies, 1901 West Garden Road, Vineland NJ 08360.

b. GridBee Model GS-9 by IXOM/Watercare, 3225 Hwy 22, Dickinson, ND 58601.

c. Certisafe Series C61 Model 2400 by Kasco Marine, 800 Deere Road, Prescott, WI 54201

d. Or approved equal.

END OF ADDENDUM

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 1

Water Utilities

Section 33 10 00

SECTION 33 10 00 – WATER UTILITIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the furnishing and installation of a water distribution system.

1.3 REFERENCES

A. Except as herein specified or as indicated on the Drawings, the work of this Section shall comply with the following:

1. ASTM Standard Specifications:

a. A48 - Grey Iron Castings.

b. A126 - Grey Iron Castings for Valves, Flanges, and Pipe Fittings.

c. A167 - Standardized Specification for Stainless and Heat-Resistant Chromium-Nickel Steel Plate, Sheet, and Strip.

d. A240 - Heat-Resisting Chromium and Chromium-Nickel Stainless Steel Plate, Sheet and Strip for

Pressure Vessels.

e. B62 - Composition Bronze or Ounce Metal Castings.

f. B88 - Seamless Copper Tube.

g. C478 - Precast Concrete Manhole Sections.

h. C923 -Standard Specification for Resilient Connectors Between Reinforced Concrete manhole

Structures, Pipes, and Laterals.

i. D429 - Rubber Property-Adhesion to Rigid Substrates.

j. D449 - Asphalt Used in Dampproofing and Waterproofing.

k. D1248 - Polyethylene Plastics Molding and Extrusion Materials.

l. D1784 - Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated

Poly (Vinyl Chloride) (CPVC) Compounds.

m. D1785 - Standardized Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedule 40, 80 and 120.

n. D2657 – Standard Practice for Heat Fusion Joining of Polyolefin Pipe.

o. D3035 - Polyethylene (PE) Plastic Pipe (DR-PR) Based on Controlled Outside Diameter.

p. D3139 - Standard Specification for Joints for Plastic Pressure Pipes using Flexible Elastomeric

Seals.

q. F477 - Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe.

r. F2164 - Standard Practice for Field Leak Testing of Polyethylene (PE) Pressure Piping Systems

Using Hydrostatic Pressure.

2. ANSI/AWWA:

a. C104/A21.4 - Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water.

b. C105/A21.5 - Polyethylene Encasement for Ductile-Iron Piping for Water and Other Liquids.

c. C110/A21.10 - Ductile-Iron and Gray-Iron Fittings, 3-inch through 48-inch, for Water and Other

Liquids.

d. C111/A21.11 - Rubber-Gasket Joints for Ductile-Iron and Gray-Iron Pressure Pipe and Fittings.

e. C116/A21.16 – Protective Fusion-Bonded Coatings for the Interior and Exterior Surfaces of

Ductile-Iron and Gray-Iron Fittings.

f. C150/A21.50 - Thickness Design of Ductile-Iron Pipe.

g. C151/A21.51 - Ductile-Iron Pipe, Centrifugally Cast in Metal Molds or Sand-Lined Molds for Water or Other Liquids.

h. C153/A21.53 - Ductile-Iron Compact Fittings, 3-inch through 24-inch (76 mm through 610 mm), and 54-inch through 64-inch (1,400 mm through 1,600 mm) for Water Service.

i. C301 - Prestressed Concrete Pressure Pipe, Steel-Cylinder Type, For Water and Other Liquids.

j. C304 - Design of Prestressed Concrete Cylinder Pipe.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 2

Water Utilities

Section 33 10 00

3. AWWA Standards/Manuals:

a. C502 - Dry-Barrel Fire Hydrants.

b. C504 - Rubber-Seated Butterfly Valves.

c. C506 - Backflow Prevention Devices - Reduced Pressure Principle and Double Check Valve Type.

d. C511 - Reduced Pressure Principle Backflow Prevention Assembly.

e. C512 - Standard for Air Release, Air/Vacuum and Combination Air Valves for Waterworks.

f. C515 - Reduced Wall, Resilient Seated Gate Valves for Water Supply Service.

g. C550 - Standard for Protective Epoxy Interior Coating for Valves and Hydrants.

h. C600 - Installation of Ductile-Iron Water Mains and Their Appurtenances.

i. C605 - Underground Installation of Polyvinyl Chloride (PVC) Pressure Pipe and Fittings for Water.

j. C651 - Disinfecting Water Mains.

k. C700 - Cold Water Meters - Displacement Type, Bronze Main Case.

l. C701 - Cold Water Meters - Turbine Type for Customer Services.

m. C702 - Cold Water Meters - Compound Type.

n. C706 - Direct-Reading, Remote-Registration Systems for Cold Water Meters.

o. C800 - Underground Service Line Valves and Fittings.

p. C900 - Polyvinyl Chloride (PVC) Pressure Pipe, 4-inch through 12-inch, for Water.

q. C905 - Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters 14-inch through

36-inch

r. C906 - Standard for Polyethylene (PE) Pressure Pipe and Fittings, 4-inch through 63-inch for

Water Distribution.

s. M23 - PVC Pipe - Design and Installation.

4. DIPRA - Ductile Iron Pipe Research Association.

5. NFPA – National Fire Protection Association.

6. National Sanitation Foundation (NSF) Standards:

a. 14 – Plastic Piping System Components and Related Materials.

b. 60 - Drinking Water Treatment Chemicals.

c. 61 - Drinking Water System Components.

1.4 DEFINITIONS

A. Abbreviations:

1. DI - Ductile iron.

2. PVC - Polyvinyl chloride.

1.5 SUBMITTALS

A. Action Submittals:

1. Product Data:

a. Pipe.

b. Gaskets.

c. Hydrants.

d. Valves.

e. Thrust control materials.

f. Corporation stops.

g. Curb box.

h. Curb stop.

i. Backflow preventor.

j. Water meter.

2. Tapping Materials and Methods: Required Information:

a. Dimensions.

b. Details of construction and installation.

c. Name of Manufacturer.

d. Model.

3. Procedures: For flushing, pressure testing and chlorinating. Required Information:

a. Equipment.

b. Methods.

B. Informational Submittals: Submit Manufacturer's sworn and notarized statements that the materials furnished comply with this Specification.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 3

Water Utilities

Section 33 10 00

1.6 QUALITY ASSURANCE

A. Installation Personnel Qualifications:

1. Trained and experienced in the installation of the materials.

2. Knowledgeable of the design and the reviewed Shop Drawings.

B. Water Distribution System: Pressure and leak tests.

C. Water Quality: Bacteriological tests.

1.7 PROJECT CONDITIONS

A. Scheduling of Water Shutoffs:

1. Approval required.

2. Standby service may be required by utility agency.

3. Required Notice:

a. Fire Department: 48 hours.

b. Affected Customers: 48 hours.

c. If local regulations require more notice, the local regulations shall prevail.

4. Operation of Existing Valves: By Owner's employees only, unless Owner authorizes Contractor.

B. Contamination of Existing Lines:

1. Prevent.

2. Be responsible for all costs of chlorinating and flushing contaminated lines.

PART 2 - PRODUCTS

2.1 PIPE AND FITTING MATERIALS

A. Ductile Iron Pipe:

1. ANSI/AWWA C150/A21.50 and C151/A21.51.

2. Class: 54.

3. Cement Mortar Lining:

a. ANSI/AWWA C104/A21.4.

b. Double thickness.

4. Meet the requirements of ANSI/NSF Standard 61 and the certification must be stamped on the exterior wall of the pipe.

5. Joints:

a. ANSI/AWWA C111/A21.11.

b. Push-on.

1) Tyton or Super Belltite with serrated brass wedges.

a) 6-Inch Through 12-Inch: 2 wedges per joint.

b) 16-Inch and Larger: 4 wedges per joint.

c. Restrained:

1) 6-Inch Through 24-Inch:

a) U.S. Pipe: TR Flex Restrained Joint; Field Lok gasket.

b) American: Flex-Ring Restrained Joint; Fast Grip gasket.

c) Clow: Super-Lock Restrained Joint.

d) Griffin Pipe: Snap-lok restrained joint.

e) Mechanical joint restraint with Megalugs by Ebaa Iron Sales; or equal.

2) For pipe sizes greater than 24-inch, joints requiring restraint shall be by manufactured restrained joint pipe.

d. Lubricant: Provide in accordance with Manufacturer’s recommendation.

6. Polyethylene Encasement: ANSI/AWWA C105/A21.5.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 4

Water Utilities

Section 33 10 00

B. Polyvinyl Chloride (PVC) Pressure Pipe 4-Inch to 12-Inch:

1. ANSI/AWWA C900 DR-14.

2. Cell classification PVC-12454-B, ASTM D1784.

3. Joints:

a. Push On:

1) Wall thickness in accordance with ASTM D3139.

2) Bell: Integral wall section with elastomeric ring in accordance with ASTM F477.

b. Restrained:

1) Series 1600HV by Ebaa Iron Sales.

2) Series 1350/1390 by Uni-flange Corporation.

3) C900 Certa-Lok.

4) Manufactured and marked for use on PVC.

c. Fusible:

1) For directional drilling operations.

4. Outside diameter shall be same as ductile iron.

5. Shall meet NSF Standard Nos. 61 and 14.

6. Pipe shall be stamped “NSF-pw” on exterior pipe wall.

7. Lubricant: Provide in accordance with Manufacturer’s recommendation.

C. Fittings:

1. All fittings shall be restrained to pipe.

2. Ductile Iron Fittings:

a. 6-Inch Through 24-Inch:

1) ANSI/AWWA C153/A21.53, compact fittings.

2) Mechanical joints.

3) 350 psi pressure rating.

4) Lining:

a) Standard thickness, cement mortar lining in accordance with ANSI/AWWA C104/A21.4.

b) Fusion bonded epoxy in accordance with ANSI/AWWA C116/A21.16, nominal 6-8 Mils.

b. 30-Inch Through 48-Inch:

1) ANSI/AWWA C110/A21.10.

2) Manufactured restrained joint.

3) Ductile iron glands.

4) 250 psi pressure rating (minimum).

5) Lining:

a) Standard thickness, cement mortar lining in accordance with AWWA C104.

b) Fusion bonded epoxy in accordance with ANSI/AWWA C116/A21.16, nominal 6-8

Mils.

c. Joint Restraint for Ductile Iron Fittings to Ductile Iron Pipe:

1) 6-Inch Through 24-Inch Pipe:

a) Mechanical joints with Megalugs by Ebaa Iron Sales; or equal.

b) Push-on joint with stainless steel gripper gasket.

c) Restrained joints, as indicated on Drawings, to match restrained joint pipe.

2) 30-Inch Through 48-Inch Pipe: Restrained joints.

d. Joint Restraint for Ductile Iron Fittings to PVC Pipe:

1) 4-Inch Through 12-Inch:

a) Series 1600HV by Ebaa Iron Sales.

b) Series 1350/1390 by Uni-flange Corporation.

c) Manufactured and marked for use on PVC.

2) 14-Inch Through 24-Inch pipe:

a) Series 2800 by Ebaa Iron Sales.

b) Series 1350/1390 by Uni-flange Corporation.

c) Manufactured and marked for use on PVC.

e. Polyethylene Encasement: ANSI/AWWA C105/A21.5.

D. Gaskets:

1. ANSI/AWWA C111/A21.11.

2. Styrene Butadiene (SBR).

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 5

Water Utilities

Section 33 10 00

2.2 MANUFACTURED UNITS

A. Valves:

1. Manufacturer: EJ Flowmaster or Mueller 2360 Series.

2. Resilient-Seated Gate Valve: AWWA C515:

a. Nonrising stem.

b. Wrench nut, 2-inch square.

c. Open left (counter clockwise).

d. Mechanical joint ends.

e. Stem Seal: Buna-N double O-rings.

f. Body and Bonnet: Ductile iron.

g. Wedge: ASTM D429 rubber coated cast or ductile iron.

h. Coating: AWWA C550 fusion-bonded epoxy.

i. Pressure Rating: 200 psi.

j. Stem: Manganese bronze.

3. Air and Vacuum Valve:

a. Valve shall be designed to release large quantities of air when the pump is turned on and shall close watertight when the pump liquid enters the valve. The valve shall also permit large quantities of air to enter when the pump is turned off.

b. The body, cover and throttling device shall be cast iron ASTM A48 Class 30. The float shall be stainless steel ASTM A240. The seat shall be HY-CAR rubber or Buna-N.

c. The discharge orifice shall be fitted with an adjustable throttling device to regulate the flow of air escaping to establish a pressure loading on the rising column of water to minimize shock to the pump and check valve upon closure of the air release valve.

d. The valve shall be equal to Apco Model 142WD. Crispin Model DID.

4. Backflow Preventors:

a. Reduced pressure principal backflow preventer.

b. AWWA C510.

c. Cla-Val Model RP-4; or equal.

d. UL, FM approved.

e. Maximum working pressure: 175 psi.

f. Flanged ends, 125 pounds ANSI B16.1.

g. Body: Cast iron ASTM A126.

h. Epoxy coating interior and exterior.

i. Stainless steel spring-loaded toggle lever check valve.

j. In-line differential relief valve to maintain 2 psi (minimum) lower pressure between valves and inlet pressure.

k. Two test cocks per valve.

l. Installation must be tested and certified by licensed plumber.

5. Pressure Reducing Valve:

a. Single-seated, hydraulically operated, pilot controlled, diaphragm type, globe valve.

b. AWWA.

c. OCV Model 127-3; or equal.

d. Automatically reduces higher inlet pressure to constant lower downstream pressure, regardless of changing flow or varying inlet pressure.

e. Operating Pressure: 75 to 150 psi.

f. Cast Iron Body: ASTM A126.

6. Valve Boxes:

a. Manufacturers and Models:

1) East Jordan Iron Works 8560 with No. 6 base.

2) Tyler Pipe, 6860 series with #6 base.

3) Mueller 10357 with No. 160 base.

b. 5-1/4-inch shaft.

c. Three section cast iron.

d. Cast iron lid marked "WATER".

e. Adjustable:

1) By means of threaded top and center sections.

2) Height: 51 inches to 60 inches.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 6

Water Utilities

Section 33 10 00

B. Manholes, Vaults and Chambers:

1. General:

a. Grade Rings: ASTM C478.

b. Joints:

1) 1-inch butyl gasket in flexible rope form.

2) E.Z. Stik, Butyl-Lok; or equal.

c. Steps:

1) Manufacturers: MA Industries, PS-1-PF; or equal.

2) PSI Polypropylene or MSU #360 ALU Poly.

d. Casting:

1) Manufacturer and Model: EJ, 1040Z.

e. Cover:

1) Manufactuer and Model: EJ, 1040 C.

2) Imprinted with two-inch (2”) recessed flushed letters “Department of Water Supply”.

f. Connection Between Manhole and Sewer:

1) Resilient Connector: ASTM C923 and ASTM A167.

2) 304 stainless steel bands.

3) KOR-N-SEAL by NPS, Inc.; or equal.

2. Exterior Seal: CANUSA Wrapic Seal Encapsulation System.

3. Valve Manholes and Air Release Chambers:

a. Precast Sections: ASTM C478.

b. Corporation Stops: Mueller, H-15000; Hays Co., 5200.

4. Valve Vaults:

a. Precast Sections: C 478.

b. Waterproofing Bituminous: ASTM D449.

c. Sump Pump: Hydro-matic, SV 25; or equal.

C. Hydrants:

1. Manufacturers and Models: East Jordan Iron Works, 5-BR 250.

2. AWWA C502.

3. Bury Length: 5.5 feet.

4. Outlet Nozzles:

a. Hose:

1) Number: 2.

2) Diameter: 2-1/2 inches.

3) Threads: NFPA.

4) Brass.

5) Fastened by mechanical means.

b. Pumper Nozzle A:

1) Number: 1.

2) Diameter: 3-3/4 inches.

3) Threads: Detroit standard.

4) Brass.

5) Fastened by mechanical means.

c. Pumper Nozzle B:

1) Number: 1.

2) Diameter: 5 inches.

3) Storz Nozzle.

4) Brass.

5) Fastened by mechanical means.

d. Caps:

1) Cast iron.

2) Chained to hydrant barrel.

3) Operating nut.

5. Main Valve:

a. 5-1/4 inches in diameter.

b. Main Valve: Rubber.

c. Valve Plates: Bronze.

d. Valve Seat: Brass or bronze.

e. Valve Facing: Rubber or leather.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 7

Water Utilities

Section 33 10 00

6. Inlet connection:

a. Side.

b. Diameter: 6 inches.

c. Mechanical joint.

7. Operating stem and mechanism:

a. Open left (counter clockwise).

b. Stem: Steel.

c. Operating Nut: 1-1/8-inch point to flat brass or bronze.

d. Stem Coupling: Breakable steel with stainless steel cotter pins.

e. Weathershield: Cast iron.

f. Protect opening between wrench nut and bonnet with an O-ring.

8. Drain Outlet: Tapped with bronze plug.

9. O-ring Seals: Buna-N.

10. Bolt, Studs and Nuts: Corrosion-resistant.

11. Color: Red.

12. Traffic flange.

2.3 WATER SERVICE MATERIALS

A. General:

1. General: AWWA C800.

2. Service Clamps:

a. Bronze, double strap, iron pipe thread, o-ring seal cemented in place.

b. Manufacturer: Mueller.

3. Corporation Stops:

a. Bronze, iron pipe thread by compression copper.

b. Manufacturers: McDonald 4701.

4. Curb Stops:

a. Bronze, compression copper by compression copper.

b. Minneapolis pattern.

c. Manufacturers: McDonald 6100.

5. Curb Boxes: 95 E.

B. Service Lines: Copper: B 88, Type K, soft-temper or CTS PE tubing, SDR-9 with a blue stripe.

C. Water Service Meter Connections (Indoors):

1. Copper: ASTM B88, Type K, L, hard drawn.

2. Copper Horns: Ford No. 3 or 4, Copperhorn; or equal.

3. Valves:

a. Inlet Ball Valve:

1) Ford B11; or equal.

2) Bronze body, tee head, stem.

3) O-rings: Buna-N.

4) Valve Seats: Buna-N.

5) Ball: Fluorocarbon-coated brass.

4. Couplings and Fittings: Brass 85-5-5-5 ( B 62), flared joints.

D. Residential Meter Pits:

1. Copper: ASTM B88 Type K, annealed and soft-temper.

2. Coppersetter: Ford Series 80; or equal.

3. Valves:

a. Inlet Ball Valve: Ford BA23; or equal:

1) Bronze body, tee head, stem.

2) O-Rings: Buna-N.

3) Valve Seat: Buna-N.

4) Ball: Fluorocarbon-coated brass.

5) Meter coupling nut.

4. Couplings and Fittings: Brass 85-5-5-5 ( B 62).

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 8

Water Utilities

Section 33 10 00

2.4 MISCELLANEOUS

A. Tracer Wire:

1. Number 12.

2. Blue insulation.

3. Splice Wrap: Scotch 2200, vinyl mastic pads.

4. Place on top of pipe.

5. Required with all plastic pipe.

B. Pipe Installation Tape:

1. Polyethylene material intended for buried use.

2. 6-inch width, 3.5 mils thick.

3. American Public Works Association on color code blue imprinted “Caution Water Main”.

4. Indentoline by Brady; Pro-Line; or equal.

5. Place 12 inches above pipe.

6. Required with all plastic pipe.

C. Go - No Go Mandrell:

1. Manufacturer: Cherne Industries, Inc.; or equal.

2. Gage Outside Diameter: Not less than 95% of base inside pipe diameter.

3. Minimum 9 fins.

4. Length:

a. 4-Inch through 15-Inch Fin Sets: 10-inch.

b. 18-Inch through 48-Inch Fin Sets: 24-inch.

5. Required for all plastic pipe installations.

PART 3 - EXECUTION

3.1 EARTHWORK

A. In accordance with Division 31 Section “Excavation and Fill for Utilities.”

3.2 LINE AND GRADE

A. Lay pipe to the grades and elevations indicated on the Drawings.

B. Where No Grades are Indicated:

1. Lay pipe with a minimum of 5 feet of cover below finish grade.

2. Lay pipe at constant uphill and downhill grades to and from air release valves.

3. Avoid high points except at air release valves.

3.3 INSTALLATION

A. General:

1. Except as herein provided or indicated on the Drawings, install in accordance with:

a. DI: AWWA C600.

b. PVC: AWWA M23.

2. Protect all materials before, during and after installation.

3. Install pipe, fittings and appurtenances in accordance with Manufacturer's recommendations except as indicated herein or on the Drawings.

4. Prevent entrance of foreign materials.

5. Restrain pipe, fittings, valves and couplings as required.

B. Placement of Pipe:

1. Bearing: Support entire length of pipe barrel evenly with extra excavation at joints.

2. Bell and Spigot: Clean and lubricate immediately prior to assembly.

3. Jointing:

a. Mechanical: Tighten evenly to 75 to 90-foot-pounds of torque.

b. Restrained: Manufacturer's recommended method.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 9

Water Utilities

Section 33 10 00

4. Cutting Pipe:

a. Power saw.

b. Ductile Iron and PVC Pipe: Taper cut end by grinding or filing back at least 1/8-inch on a

30 degree bevel.

5. Thoroughly clean gasket seating surfaces in the socket and on the plain end of the pipe to remove all coating rust and foreign material before use of conductive gasket.

C. Setting Valves and Valve Boxes:

1. Set plumb on 4 inches of compacted 3/8-inch (minimum) crushed stone.

2. Valve Boxes:

a. Shall not transmit shock to valve.

b. Plumb over operating nut.

c. Set cover to finished grade.

d. Witness.

3. Pressure Tap Sleeve and Valve:

a. Set at the direction of tapping Subcontractor.

b. Set and remove tapping machine.

D. Hydrants: Place “Out of Service” placards or labeled bags on pumper nozzle of all hydrants immediately after installation and on all disconnected existing hydrants. Remove after water main is placed in service.

E. Thrust Control:

1. Provide at all fittings.

2. Installation in Accordance With:

a. Shop Drawings reviewed by Engineer.

b. Manufacturer's instructions.

3. Restrain all pipe joints within given distance from each fitting (both directions):

Table 1 Length of Restrained Pipe Required

Pipe Diameter

22-1/2 Degree Bends and Less

45 Degree Bends

90 Degrees Bends, Plugs

Tee Run

Tee Branch

6-inch 5-foot 10-foot 20-foot 10-foot 10-foot 8-inch 5-foot 10-foot 25-foot 10-foot 20-foot 10-inch 5-foot 15-foot 35-foot 10-foot 25-foot 12-inch 10-foot 15-foot 40-foot 10-foot 30-foot 16-inch 10-foot 20-foot 50-foot 10-foot 40-foot

F. Service Leads:

1. Taps at 45 degrees above center.

2. Use double strap saddle for all taps on PVC pipe and for services on DIP over 1-1/2-inch.

3. Direct tap ductile iron pipe for 1/2-inch through 1-1/2-inch services only.

4. Alignment and Grade:

a. At right angles with street line.

b. Minimum depth: 5 feet of cover.

G. Polyethylene Encasement:

1. ANSI/AWWA C105/A21.5.

2. Method A (Polyethylene tube for each length of pipe, overlapped and taped at joint).

H. Placement of Tracer Wire or Pipe Identification Tape:

1. Bury 12 inches above water main.

2. Solder and wrap wire splices.

3. Splice pipe identification tape to ensure continuity of metal foil.

4. Bring wire or tape to surface in valve boxes or as directed by Engineer.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 10

Water Utilities

Section 33 10 00

3.4 RESIDENTIAL WATER CONNECTION

A. Preparation:

1. Comply with local plumbing code.

2. Obtain plumbing permit for each residence and pay all fees.

3. Organize and coordinate a date and time with each residence to receive a new connection. A list of names, addresses, and telephone numbers will be made available to Contractor.

4. Review area where water main will enter house and connect to existing plumbing. Organize and coordinate the temporary removal of all false walls.

B. Basement Penetration:

1. Core drill 3-inch maximum hole for 1-inch or 1-1/2-inch copper service. Hole to be minimum of 5 feet below exterior finished grade.

2. If basement wall is nonexistent or cannot be drilled, the copper may be fed into the house through the basement floor with mole tunneling equipment.

3. Seal void between hole and copper with Fosrock, Preco Plug, or equal.

4. Existing service lines from wells may not be used for new connections, unless approved by Engineer.

C. Connection of New Service Line:

1. Connect new shut off valve, copper horn, and meter within 3 feet of basement wall.

2. Continue 1-inch copper to existing house plumbing. Connect to maximum pipe size of system. Provide all copper and fittings necessary to make connection.

3. Install remote meter reader in a visible location on the exterior of the home, in a location approved by homeowner.

4. Flush water system until water clears, check all new plumbing for leaks.

5. Restore temporary removals or damages to the lawn, driveway, or building.

6. Have homeowner sign a letter of acceptance of the Work, in a form approved by Engineer.

3.5 TESTING AND DISINFECTION

A. Observation: By Engineer.

B. Notification:

1. Pressure Testing: Arrange with Engineer following successful pretesting.

2. Bacteriological Testing: Arrange with Engineer following successful pressure test.

C. Equipment and Manpower: Provide everything required for testing, disinfection and flushing.

D. Water:

1. To be provided by Owner.

2. Provide temporary connections from Municipal water system to the water main or for hauling water.

3. Provide backflow prevention device.

E. Pressure and Leak Tests for DI and PVC Pipe:

1. ANSI/AWWA C600.

2. Duration: 2 hours.

3. Pressure:

a. Maintain 150 pounds per square inch at the average elevation in water main segment being tested.

b. Do not exceed the pipe’s rated test pressure.

4. Water:

a. To be provided by Owner.

b. Contractor shall be responsible for providing temporary connections and backflow preventor from

Municipal water system for hauling water.

5. Make-Up Water: From measurable source.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 11

Water Utilities

Section 33 10 00

6. Maximum Allowable Leakage:

SxDxP0.5 L =

148,000 +0.0078 gal/hr/in of diameter for each closed valve tested against

L = Leakage in gallons per hour.

S = Length of pipe tested in feet; maximum value 2,000. When length of pipe tested exceeds 2,000 feet, the allowable leakage will be based on 2,000 feet.

D = Pipe diameter in inches.

P = Test pressure: 150 pounds per square inch.

7. Maximum Length of Pipe to be Tested: 2,000 feet, or nearest 2 valves if water on opposite side of valve is not in service.

8. Perform test against tapped cap or plug with a standpipe and not against existing valve if water on opposite side of valve is in service.

9. Repair leaks and repeat tests until acceptable results are achieved.

10. Pressure testing against existing valves not allowed.

F. Deflection Test for PVC Pipe:

1. Pull Go, No Go Gage Through Each Section:

a. Immediately after pressure testing of piping installed by directional drilling.

b. Pulled by 1 person with no mechanical advantage.

2. If Go, No Go Gage Will Not Pass:

a. Remove and replace section with new materials.

b. Undamaged pipe may be reused.

3. Vibratory rerounding device not permitted.

G. Disinfection:

1. In Accordance with AWWA C651:

a. Sodium hypochlorite.

b. Continuous-feed method.

c. Calcium hypochlorite granules not required.

d. Minimum residual 25 parts per million (ppm) initial concentration.

e. Minimum residual 10 ppm after 24 hours.

H. Flushing:

1. Water main Mainlines: In accordance with AWWA C651.

2. Water Services Into Buildings: In accordance with NFPA 24.

3. Water: Owner supplied.

4. Provide backflow preventor.

5. Velocity:

a. Water main Mainline: Minimum 3 feet per second in accordance with AWWA.

b. Water Services (Domestic and Fire Protection): Minimum 10 feet per second in accordance with

NFPA.

6. Duration:

a. Initial: Until entire volume of water in pipeline has been replaced.

b. Final: Until residual chlorine equals that of adjoining system.

7. Dispose of chlorine residual in accordance with applicable state and local requirements.

8. Disposal location to be inspected by Engineer. If there is any questions that the discharge will harm the environment, apply a reducing agent to the water to neutralize the chlorine to a 1 ppm residual.

I. Bacteriological Testing:

1. In accordance with AWWA C651 and state regulatory agency requirements.

2. Two consecutive bacteriologically safe samples must be taken at 24-hour intervals for each section of pipe tested.

3. Repeat disinfection if bacteriological test fails.

4. Collect Samples from each branch of pipe, and at a maximum spacing of 1,000 feet.

5. Engineer: Transport Samples to lab for testing.

6. Cost of initial and repeat bacteriological lab tests are the responsibility of Contractor.

Project Number 231422 – ADDENDUM NO. 2

33 10 00 – 12

Water Utilities

Section 33 10 00

J. Sequence:

1. Pressure test.

2. Flush.

3. Chlorinate.

4. Flush.

5. Wait 24 hours.

6. Bacteriological sample.

7. Wait 24 hours.

8. Bacteriological sample.

9. Place in service.

END OF SECTION 33 10 00

C201

BB

EH

PK

ELEVATED TANK

SITE LAYOUT PLAN

NOTES

SYMBOL LEGEND

BENCHMARKS

ELEVATED TANK ASPHALT DRIVEWAY SECTIONELEVATED TANK CONCRETE DRIVEWAY SECTION PROPOSED RIPRAP OVERFLOW CHANNEL

Reviewer

Designer

Drawn By

Hard copy is intended to be 24"x36" when plotted. Scale(s) indicated and graphic quality may not be accurate for any other size.

Manager

PROJECT NO.

SHEET NO.

© C o p y r i g h t 2023 A l l R i g h t s R e s e r v e d

PL

O

T

IN

FO

: Z

:\2

3\

\C

AD

\C D

\E

LE

VA

TE

D S

TO

R

AG

E

TA

N

K\

ST

C

LA

IR

L

D

FA

_S

TO

R

AG

E

TA

N K.

D W

G

L

AY

O U

T:

C

D

AT

E:

/3

/2

TI

M

E:

2:

:2

PM

U

SE

R : B

BE

LL

ES

TR

I

R E V I S I O N S

St . C la ir

LD

FA

St . C la ir

C ou nt y, M ic hi ga n

El ev at ed

S to ra ge

T an k

231422

DJB

5/16/2024 BIDS AND CONSTRUCTION

6/3/2024 A2 ADDENDUM NO. 2

C301

EH

PK

ELEVATED TANK

SITE GRADING PLAN

NOTES

SYMBOL LEGEND

BENCHMARKS

Reviewer

Designer

Drawn By

Hard copy is intended to be 24"x36" when plotted. Scale(s) indicated and graphic quality may not be accurate for any other size.

Manager

PROJECT NO.

SHEET NO.

© C o p y r i g h t 2023 A l l R i g h t s R e s e r v e d

PL

O

T

IN

FO

: Z

:\2

3\

\C

AD

\C D

\E

LE

VA

TE

D S

TO

R

AG

E

TA

N

K\

ST

C

LA

IR

L

D

FA

_S

TO

R

AG

E

TA

N K.

D

O U

T:

C

E:

/3

/2

E:

2:

:3

R : B

BE

LL

ES

TR

I

R E V I S I O N S

St . C la ir

LD

FA

St . C la ir

C ou nt y, M ic hi ga n

El ev at ed

S to ra ge

T an k

231422

DJB

C401

EH

PK

ELEVATED TANK

SITE UTILITY PLAN AND PROFILES - STORM SEWER

NOTES

SYMBOL LEGEND

BENCHMARKS

Reviewer

Designer

Drawn By

Hard copy is intended to be 24"x36" when plotted. Scale(s) indicated and graphic quality may not be accurate for any other size.

Manager

PROJECT NO.

SHEET NO.

© C o p y r i g h t 2023 A l l R i g h t s R e s e r v e d

PL

O

T

IN

FO

: Z

:\2

3\

\C

AD

\C D

\E

LE

VA

TE

D S

TO

R

AG

E

TA

N

K\

ST

C

LA

IR

L

D

FA

_S

TO

R

AG

E

TA

N K.

D

O U

T:

C

E:

/3

/2

E:

2:

:2

R : B

BE

LL

ES

TR

I

R E V I S I O N S

St . C la ir

LD

FA

St . C la ir

C ou nt y, M ic hi ga n

El ev at ed

S to ra ge

T an k

231422

DJB

C402

EH

PK

ELEVATED TANK

SITE UTILITY PLAN AND PROFILE - WATER MAIN

NOTES

SYMBOL LEGEND

BENCHMARKS

Reviewer

Designer

Drawn By

Hard copy is intended to be 24"x36" when plotted. Scale(s) indicated and graphic quality may not be accurate for any other size.

Manager

PROJECT NO.

SHEET NO.

© C o p y r i g h t 2023 A l l R i g h t s R e s e r v e d

PL

O

T

IN

FO

: Z

:\2

3\

\C

AD

\C D

\E

LE

VA

TE

D S

TO

R

AG

E

TA

N

K\

ST

C

LA

IR

L

D

FA

_S

TO

R

AG

E

TA

N K.

D

O U

T:

C

E:

/3

/2

E:

2:

:4

R : B

BE

LL

ES

TR

I

R E V I S I O N S

St . C la ir

LD

FA

St . C la ir

C ou nt y, M ic hi ga n

El ev at ed

S to ra ge

T an k

231422

DJB

5/16/2024 BIDS AND CONSTRUCTION

5/31/2024 A2 ADDENDUM NO. 2

Reviewer

Designer

Drawn By

Hard copy is intended to be 24"x36" when plotted. Scale(s) indicated and graphic quality may not be accurate for any other size.

Manager

PROJECT NO.

SHEET NO.

© C o p y r i g h t 2023 A l l R i g h t s R e s e r v e d

PL

O

T

IN

FO

: Z

:\2

3\

\C

AD

\C D

\E

LE

VA

TE

D S

TO

R

AG

E

TA

N

K\ E0

.D

O U

T:

E

E:

/3

/2

E:

:5 9:

A

R : B

M U

R

PH

Y

R E V I S I O N S

St . C la ir

LD

FA

St . C la ir

C ou nt y, M ic hi ga n

El ev at ed

S to ra ge

T an k

231422

DJB

5/16/2024 BIDS AND CONSTRUCTION

Reviewer

Designer

Drawn By

Hard copy is intended to be 24"x36" when plotted. Scale(s) indicated and graphic quality may not be accurate for any other size.

Manager

PROJECT NO.

SHEET NO.

© C o p y r i g h t 2023 A l l R i g h t s R e s e r v e d

PL

O

T

IN

FO

: Z

:\2

3\

\C

AD

\C D

\E

LE

VA

TE

D S

TO

R

AG

E

TA

N

K\ E0

.D

O U

T:

E

E:

/3

/2

E:

:5 9:

R : B

M U

R

PH

Y

R E V I S I O N S

St . C la ir

LD

FA

St . C la ir

C ou nt y, M ic hi ga n

El ev at ed

S to ra ge

T an k

231422

DJB

5/16/2024 BIDS AND CONSTRUCTION

ELEVATED TANK

ELECTRICAL SITE PLAN

NOTES

E011

BJM

BJM

JAC

KEY NOTES

1 DUCT BANK SECTION 6/3/2024 A2 ADDENDUM NO. 2

T103

BJM

BJM

JACReviewer

Designer

Drawn By

Hard copy is intended to be 24"x36" when plotted. Scale(s) indicated and graphic quality may not be accurate for any other size.

Manager

PROJECT NO.

SHEET NO.

© C o p y r i g h t 2023 A l l R i g h t s R e s e r v e d

PL

O

T

IN

FO

: Z

:\2

3\

\C

AD

\C D

\E

LE

VA

TE

D S

TO

R

AG

E

TA

N

K\ T1

.D

O U

T:

T

E:

/3

/2

E:

:5 9:

R : B

M U

R

PH

Y

R E V I S I O N S

St . C la ir

LD

FA

St . C la ir

C ou nt y, M ic hi ga n

El ev at ed

S to ra ge

T an k

231422

DJB

5/16/2024 BIDS AND CONSTRUCTION

TANK COLUMN LIGHTING SCHEMATICONE LINE DIAGRAM

TANK MIXER RISER DIAGRAM

PANELBOARD ID PANELBOARD DESCRIPTION

LPWST SINGLE PHASE PANELBOARD

TUB 1 OF 1 FILE NO: 231422

PROJECT: St Clair LDFA

DATE: April 19, 2024

CKT

NO

REV

NO

VOLT AMPS

DESCRIPTION

CKT BKR

F

CKT BKR

DESCRIPTION

VOLT AMPS REV

NO

CKT

NOLTG MTRS REC OTHER LTG MTRS REC OTHER

1 200 INTERIOR TANK LIGHTING 1P20 A 1P20 PLATFORM RECEPTACLES 360 2

3 50 EXTERIOR TANK LIGHTING 1P20 B 1P20 TANK RECEPTACLES 720 4

5 70 TANK COLUMN LIGHTING 1P20 A 1P20 CATHODIC PRO. PANEL 500 6

7 1000 CP-TANK 1P20 B 1P20 SPARE 8

9 1200 SECURITY GATE 1P20 A 1P20 OVERHEAD DOOR 1176 10

11 1000 HEAT TRACE (30mA GFIC) 1P20 B 1P20 HEAT TRACE (30mA GFIC) 1000 12

13 SPARE 1P20 A 1P30 TANK MIXER CONTROL PANEL 1800 14

15 SPARE 1P20 B 1P20 SPARE 16

17 SPARE 1P20 A 1P20 SPARE 18

19 SPARE 1P20 B 1P20 SPARE 20

21 SPARE 1P20 A 1P30 SPARE 22

23 SPARE 1P20 B 1P30 SPARE 24

25 A 26

27 B 28

29 A 30

SUBT 320 1,200 0 2,000 0 2,976 1,080 1,500 SUBT

LTG MTRS REC OTHER

PHASE

LOADS (VA)

VOLTAGE: 240 VOLTS

270 4,176 360 500 PHASE A A 5,306 CIRCUIT CAPACITY: 30 POLES

50 0 720 3,000 PHASE B B 3,770 MAIN LUGS ONLY: 2P100 AMPERES

320 4,176 1,080 3,500 LOAD (VA) 9,076 TOT LOAD (VA) MOUNTING: SURFACE

100% 100% Note 1 100% DEMAND FACTOR 9,076 TOT DIV LOAD (VA) AIC RATING: 10,000 AMPERES

320 4,176 1,080 3,500 DIVERSIFIED LOAD (VA) 37.8 TOT DIV AMPS NEUTRAL (%): 100

47.3 TOT DIV AMPS X 1.25 LOCATION: ELEVATED TANK

NOTES: 1. DEMAND FACTOR BASED ON NEC TABLE 220.13

2. SEE ONE LINE DIAGRAM FOR OVERCURRENT DEVICE SIZE AND FEEDER SIZE

3.

4. LPWST

5. rev: 4/3/2009 EDF-1

ACCESS CONTROL SYSTEM DOOR PREP DETAIL

ITEM NO. 1: Water Main Fittings
ITEM NO. 2: Adjust Electrical Feed Location
ITEM NO. 3: Add Tank Mixer Supplier
33 10 00 Water Utilities_ADD02
C201231422_C201
C301231422_C301
C401231422_C401
C401231422_C402
E011231422-E011
E011231422-E011
T103231422-T103
T103231422-T103

File details come from the government source that posted it. Updated .