Add No1QA DCF ITB 2425 034-2.pdf

PDF 146 KB Posted

Attached to
NEFSH Life Safety Fire Sprinkler and Mechanical Exhaust Work
Solicitation number
ITB-10888
Issued by
Baker County, Florida

About this file

This is Addendum No. 01 to DCF ITB 2425 034-2 issued by the Florida Department of Children and Families Program Office General Services for the Sprinkler and Mechanical - Life Safety Project #33020500. The response due date is December 16, 2024, and the addendum was issued on November 26, 2024. The document modifies the scope of work related to sprinkler system installation requirements.

The key modification in Section 3.4 removes the requirement for sprinkler installation between the original ceiling and drop ceiling, which had previously specified approximately 3 feet of space. Instead, due to different ceiling constructs in hallways and bedrooms, the contractor must now mount the sprinkler pipe in the attic and cover it with R13 insulation. The addendum maintains that the attic does not require a dry or wet sprinkler system due to construction type, and hangers will still be mounted to 3x3 3/8 back-to-back banjoist/truss or other ceiling structure.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 01 with Written Inquiry Responses

DCF ITB 2425 034-2

Sprinkler and Mechanical - Life Safety Project # 33020500 Program Office General Services

Solicitation Number: DCF ITB 2425 034-2 Solicitation Title: Sprinkler and Mechanical - Life Safety Project # 33020500 Response(s) Due Date: December 16, 2024 Addendum Number: 01 Addendum Date: November 26, 2024

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),

FLORIDA STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED

BY LAW WITHIN THE TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER

OF PROCEEDINGS UNDER CHAPTER 120, FLORIDA STATUTES.

DCF ITB 2425 034-2 is hereby amended as follows, all other terms and conditions of the solicitation remain in effect. All additions are highlighted in yellow, and words stricken are deletions:

Change No. 1 – Scope of Work

Section 3.4:

The attic does not require a dry or wet sprinkler system due to the construction type.

Hanger will be from the 3x3 3/8 back-to-back banjoist / truss or other ceiling structure.

New sprinkler will be installed between the original ceiling and the drop ceiling. There is approximately 3 feet in this location, field verify. Due to the different ceiling constructs of the hallways and bedrooms, the Contractor needs to mount the sprinkler pipe in the attic and cover the pipe with R13 insulation.