Add 2 with written inquiry responses.pdf

PDF 114 KB Posted

Attached to
PATIENT BATHROOM RENOVATIONS FLORIDA STATE HOSPITAL
Solicitation number
ITB-03626
Issued by
Gadsden County, Florida

About this file

This document is an Addendum to an Invitation to Bid (ITB) issued by the Florida Department of Children and Families (DCF) for the renovation of patient bathrooms at the Florida State Hospital located in Chattahoochee, Florida. The project scope includes new non-slip flooring, plumbing fixtures, ceilings, and painted walls in the communal patient bathrooms. The renovations must meet the requirements set forth by the Agency for Health Care Administration (AHCA). The solicitation number is DCF ITB 2223 070, and responses are due on February 16, 2023.

The addendum provides responses to written inquiries from a vendor, D&E General Contractors, regarding the bathroom drawings, requirement to remove the existing floor, and references to the relevant technical specification sheets in the contract documents. The contract opportunity is located in Leon County and the city of Tallahassee, Florida.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 2 with Written Inquiry Responses

DCF ITB 2223 070

Florida State Hospital Patient Bathroom Renovations General Services

Addendum with Written Inquiries (PMT-08-2122) Effective April 2022

Solicitation Number: DCF ITB 2223 070 Solicitation Title: Florida State Hospital Patient Bathroom Renovations Response(s) Due Date: February 16, 2023 Addendum Number: 02 Addendum Date: February 7, 2023

FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN SECTION 120.57(3),

FLORIDA STATUTES, OR FAILURE TO POST THE BOND OR OTHER SECURITY REQUIRED

BY LAW WITHIN THE TIME ALLOWED FOR FILING A BOND SHALL CONSTITUTE A WAIVER

OF PROCEEDINGS UNDER CHAPTER 120, FLORIDA STATUTES.

Addendum with Written Inquiries (PMT-08-2122) Effective April 2022

Response to Written Inquires:

Question # Vendor Name Solicitation

Section Question Department Response

1 D&E General Contractors

I need the bathroom drawing or all drawings that will receive the new epoxy flooring.

The project specifications are indicated in the drawings.

Refer to the Standard Contract 2, Exhibit L, Technical Requirements, Sheets A-0006-A401, A-0007-A402, and A-0008-A403.

2 D&E General Contractors will the existing floor need to be demoed and removed?

Yes. Refer to the Standard Contract 2, Exhibit L, Technical Requirements, Sheets A-0006-A401, A-0007- A402, and A-0008-A403; in addition to photos on Sheets A-0010-A701, A-0011-A702, A-0012-A703, & A-0013- A704.

File details come from the government source that posted it. Updated .