This document is a Construction Bid Addendum for the St. Louis Correctional Facility ADA Egress Infrastructure project, issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division. The addendum provides updates to the project scope, including changes to the sidewalk design, revisions to permit requirements, and modifications to the allowable working hours. The bid opening date is May 17, 2023, and the project has a 90-day substantial completion timeline from the pre-construction meeting or notice to proceed, with $500 per day liquidated damages after that. The project includes installing new concrete ramps and replacing concrete walks at several buildings, adding a concrete pad for parking, and extending an existing carport structure.
The addendum also includes details on the bid submission process, required forms, and preferences for Michigan-based businesses and products. The contractor is responsible for obtaining and paying for all required permits, as well as managing and supervising the work on-site. The owner will retain a professional to perform inspections and testing, but the contractor is responsible for full testing responsibilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 472_19534_SDW Drawings.pdf | ||
| 472_19534_SDW Specifications.pdf | ||
| Advertisment 472-19534.SDW - 2023.pdf | ||
| CAJ-1037 MDOC LEIN Request.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/16)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents.
Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
May 9, 2023
PROJECT NAME
St. Louis Correctional Facility ADA Egress Infrastructure
FILE NUMBER
472/19534.SDW
PROFESSIONAL
Richard Mann, Straub Pettitt Yaste Architects
PROJECT DIRECTOR
Susan Wheaton
BID OPENING DATE:
May 17, 2023
ADDENDUM ITEMS:
ITEM 1 -
Reissued herewith drawing sheet C3: change the width and thickness of the new sidewalk from the asphalt walk to the corner of the Education Building. Change the radius of the corners at the sidewalk crossing.
ITEM 2 –
Modify Section 00200, Information for Bidders, paragraph 2- Permits, approvals, licenses and fees: The project has been submitted to LARA BCC for plan review for the carport structure.
Modify Section 00800, Supplementary Conditions, paragraph 1- A permit may be required from LARA BCC for the carport structure.
ITEM 3 –
Add to Section 00750, Special Working Conditions: The Facility will accommodate working hours between 6:30 am and 5:00 pm. No traffic through the sallyport gate is permitted between 11:00 and 11:30 am.
ITEM 4 –
In two (2) separate files are pictures of the work areas.
ITEM 5 –
Immediately follow are the Pre-Bid Conference Agenda and the Attendance List.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: DATE
Richard Mann May 9, 2023 Straub Pettitt Yaste Architects
APPROVED BY:
Susan Wheaton PROJECT DIRECTOR DATE May 9, 2023
GRETCHEN WHITMER
GOVERNOR
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET
LANSING
MICHELLE LANGE
DIRECTOR
Mandatory Pre‐Bid Meeting Agenda
Revisions are in Bold Purple
Project: St Louis Correctional Facility – ADA Egress Ramps File No.: 472/19534.SDW Date: Thursday, May 4, 2023, 1:00 pm
A. Introductions
1. Owner’s Representatives – Susan Wheaton RA – DTMB‐DCD – Project Director Jason Poag – DTMB‐DCD – Field Representative Trever LeBarre – MDOC – Physical Plant Corey Daly – SLF – Physical Plant Matthew Haag – SLF – Admin Manager
2. PSC’s Representatives – Richard Mann – Straub Pettitt Yaste Architects
B. Sign‐in Sheet – Please sign for evidence of attendance.
Notice: An individual is only permitted to represent one bidder at a mandatory Pre‐Bid Conference.
Prevailing wages are being used on this project.
C. Addendum ‐ If a point or concern raised during this meeting is determined by the PSC/Owner to require a change to the bidding documents, an addendum will be issued.
D. Project description – St Louis Correctional Facility – ADA Egress Ramps:
Install new concrete ramps and replace concrete walks at several buildings throughout the facility.
Add concrete pad for parking and extend the existing galvanized steel carport structure over the new parking pad.
E. Project Schedule
1. Bid due date – Wednesday, May 17, 2023 at 2:00 pm (must be received on or before 2:00 pm in the office and on SIGMA to be Accepted).
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET
LANSING
Bids must be submitted electronically through the SIGMA website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService .
2. Questions must be received by 12:00 pm Wednesday, May 10, 2023, at 12:00 pm.
3. Anticipated Ad Board/Director Agenda May 26, 2023, for contract approval.
4. After the contract is executed
i. Pre‐Construction Meeting – Scheduled after contract is executed – tentatively late summer
2023.
ii. Progress Meetings – To be determined at Pre‐Construction Meeting.
5. Contract Time
1. A detailed schedule is required from the Contractor at the start of the work.
2. Time of substantial completion. 90 days from pre‐construction meeting or Notice to Proceed.
3. Liquidated Damages. $500.00/day after substantial and final completion.
F. Bid Contents: (DC, Mich SPEC)
1. Forms required for all bids:
a. Bid Summary Form (DMB‐401)
i. Submit Bid Summary Form with bidder information filled in and signed by an Officer of the Company with original signatures. A certified copy of a pertinent Board Resolution authorizing the individual to bind the corporation shall be attached.
ii. Fill base proposal amount.
iii. Check box for Qualified Disabled Veteran if applicable.
iv. Check box for any allowances (allowances should be included in base bid per specification section 01020) $10,000.00
v. Fill in alternates to base bid – 1 (The Contract will be awarded on the basis of the Base Proposal Sum…and deductive alternate in the order the Owner accepts them.
Specification section 01030)
vi. Acknowledge addenda received.
b. Bid Schedule ‐ Fill out form in Appendix I of specifications. (If unit prices are used)
c. Professional/Contractor Demographics, Statistics and Demographics form
Fill out form in Appendix I of specifications. (Note: is sent with Notice of Award)
d. Certification Regarding Debarment, Suspension, and Other Responsibility Matters form ‐ Fill out form in Appendix I of specifications. (Note: is sent with Notice of Award)
e. Bid Bond – A certified check payable to the State of Michigan or a satisfactory bid bond executed by the bidder and surety company in the amount equal to five percent (5%) of the base proposal. Fill out form in Appendix I of specifications. Bid bond is to be furnished on the Surety’s standard form.
STATE OF MICHIGAN
DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET
LANSING
G. Michigan Preferences
1. All contractors and suppliers are encouraged to use Michigan products and recycled and/or environmentally friendly products whenever possible where price, quality and performance are equal to, or superior to non‐Michigan products.
2. Certification of Michigan based business – Fill out form in Appendix I of specifications.
H. Permits –
1. The contractor is responsible for obtaining and paying for all permits required by LARA, or any other agency as required.
2. The Contractor is responsible for scheduling all inspections.
I. Contractor Supervision – The Contractor is responsible for managing and supervising the work and must be on site 100% of time.
J. Insurance Requirements – Must be submitted by contractor after notification of award of contract.
1. Workers’ Compensation and Employer’s Liability
2. Commercial General Liability
3. Commercial Automobile Liability
4. Excess Liability and any other designated in Supplementary conditions.
5. Builder’s Risk – Must be provided by the contractor per specification section 00700 part 3.4. State no longer provides.
K. Testing – The Owner will retain a professional/agency to perform inspections, tests, or approvals for those material required to meet quality control standards specified in the contract documents. However, the Contractor must assume full responsibility for testing, per Section 00700 part 5.2. Testing Allowances, if applicable are indicated in Section 01020.
L. Special Working Conditions – Working on State owned property. Working hours shall be between 6:30 AM and 5:00 PM, Monday through Friday.
Additional weekday hours or work on Saturdays or Sundays is not allowed unless written permission is granted from Corey Daly (SLF ‐ Facilities).
1. Security Clearance Request – Follow Agency Requirements ‐ LEIN and site‐specific training
M. Special Project Procedures– See Appendix III.
1. Soil Erosion and Sedimentation Control Project Procedures
2. Demolition/Remodeling Project Procedures
N. Questions / Walk the project.
5' -0
5'
-0
5'-0"±
1'-6"±
5'-0"±
3'-0"±
5' -0
'-0
5' -0
5'
-0
'-0
5'
-0
3'-0"±
C1
A
C3
F
C3
F
C1
B
C1
B
C1
A
C1
A
C1
C
C1
C
C1
C
C1
B
EXISTING FROST PORCH TO REMAIN
EXISTING FROST PORCH TO REMAIN
EXISTING FROST PORCH TO REMAIN
REMOVE EXISTING CONCRETE FLAGS
REPAIR BASE AS NEEDED
POUR NEW REINFORCED CONCRETE WALK
REMOVE EXISTING CONCRETE FLAGS
REPAIR BASE AS NEEDED
POUR NEW REINFORCED CONCRETE WALK
NOTE: AT EACH FROST PORCH LOCATION MAINTAIN
EXITTING. IF REQUIRED, PROVIDE A STEEL PLATE
COVER OVER FRESH CONCRETE
EXISTING FROST PORCH TO REMAIN
24'-0"±
7'-
5'
-0
C1
B
C1
A
C1
C
REMOVE EXISTING CONCRETE FLAGS
REPAIR BASE AS NEEDED
POUR NEW REINFORCED CONCRETE WALK
8'-0"±
5' -0
REMOVE EXISTING CONCRETE FLAGS
REPAIR BASE AS NEEDED
POUR NEW REINFORCED CONCRETE WALK
EXISTING FROST PORCH TO REMAIN
C1
C
C1
A
NOTE: AT EACH FROST PORCH LOCATION MAINTAIN
EXITTING. IF REQUIRED, PROVIDE A STEEL PLATE
COVER OVER FRESH CONCRETE
EDUCATION BUILDING
'-0
" C
O N
C R
ET
E
S
ID
EW
A
LK
C 1C
EXISTING ASPHALT PAVEMENT
R10'-0" R10'-0"
R10'-0
12'-0"
8" CONC. WALK
C
B S
IM
EXPANSION JOINT MATERIAL
BETWEEN ASPHALT AND CONCRETE
C
B S
IM
CONTROL JOINTS
EXPANSION JOINT
EXPANSION
JOINT
THIS AREA OF CONCRETE SIDEWALK
TO BE 8" THICK CONCRETE WITH 6x6 W2.1xW2.1 WWF
EXPANSION JOINT MATERIAL
MIN 4" GRANULAR BASE
COMPACTED TO 95%
SEALANT6X6 W2.1 X W2.1 WWF
EXISTING BUILDING WALL
EXISTING BUILDING FOUNDATION
5'-0"
3' -6
1/2"EXPANSION JOINT MATERIAL
#3 REBAR AT 18" O.C.
12" FROST PORCH
12" SIDEWALK
MASS POUR CONCRETE FROST
PORCH
CONCRETE WALK W/
6x6 W2.1 xW2.1 WWF
M
IN
CONCRETE CURB
COMPACTED SUBGRADE
COMPACTED BASE
GRADE II SAND
COMPACTED BASE
GRADE II SAND
2" STYROFOAM
COMPACTED SUBGRADE
EXISTING ASPHALT
#4 TOP AND BOTTOM
EXPN JOINT
EXPN JOINT
1/2"EXPANSION JOINT MATERIAL
EXISTING FOUNDATION WALL
EXISTING FOOTING
R 1 2
6"
1'-
P e t t i t t Y a s t e
S t r a u b
200S
LAWSON,C MICHIGAN
UITE
48017-1311
F A X248-658-7781 248-658-7777 P H O N E
C850 NORTH ROOKS ROAD
PL
UR
IB
U
E S
U N U
M
C I
R C
U M
S P
I C
E
S I
Q U
D
EP
A R
TM
EN
T O
F
TE
C H
N O
LO
G
Y , M
A N
A G
EM
EN
T A
N D
B U
D G
ET
ST
A
TE
O F
M
IC
H
IG
A N
A D
A M
P . L
A C
H , R
A , D
IR
EC
TO
R
ST
A
TE
F
A C
IL
IT
IE
S
A D
M
IN
IS
TR
A
TI
O N
D
ES
IG
N
A N
D C
O N
ST
R
U C
TI
O
N D
IV
IS
IO
N
C3
ADDENDUM #1 05/09/23
RELEASED FOR BIDS 04/18/23
DETAILS & PLANS-
EDUCATIONAL BUILDING
ST. LOUIS CORRECTIONAL
FACILITY
ADA EGRESS
INFRASTRUCTURE
FILE: 472/19534.SDW
ACCT: 472SLFMaintProj
SIDEWALK / BUILDING DETAIL
SCALE: 1" = 1'-0"C3
FEDUCATION BUILDING PLAN
SCALE: 1/8" = 1'-0"CO
FROST PORCH / WALK/ CURB DETAIL
SCALE: 1" = 1'-0"C2
E
AutoCAD SHX Text
8585 N. CROSWELL ROAD ST. LOUIS, MI 48880
State of Michigan Department of Corrections Project No. 1925
St. Louis Correctional Facility File No. 472/19534.SDW
ADA Egress Infrastructure
Addendum #1 Photos Page 1 of 5
Typical Housing Unit Entrance (Housing Unit 2)
Typical Housing Unit Entrance (Housing Unit 1)
Addendum #1 Photos Page 2 of 5
Typical Mechanical Room Entrance (Housing Unit 2)
Alternate Crack Joint Pattern (Housing Unit 1)
Addendum #1 Photos Page 3 of 5
Mechanical Room Entrance (Housing Unit 1)
Housing Unit 7 Entrance
Addendum #1 Photos Page 4 of 5
Housing Unit 7 – Exit Concrete Pad to be replaced
Yard at Housing Units 1 and 2
Addendum #1 Photos Page 5 of 5
Yard between Housing Units 1 and 2
Side Door at Food Service Building
Addendum #1 Photos Page 1 of 5
Health Care Entrance
Walk to Education Building
Addendum #1 Photos Page 2 of 5
Walk at side of Education Building
Corner of Maintenance Building
Addendum #1 Photos Page 3 of 5
Existing Carport Canopy
Addendum #1 Photos Page 4 of 5
Existing Carport Canopy
Addendum #1 Photos Page 5 of 5
Underside of Existing Carport Canopy
File details come from the government source that posted it. Updated .