Ad for GPR_Consolidated.pdf

PDF 113 KB Posted

Attached to
2025 LMIG Road Improvements
Solicitation number
PE-66213-NONST-2025-000000014
Issued by
Jasper County, Georgia

About this file

This is an Advertisement for Bids from the City of Hoschton, Georgia for roadway improvements in The Village Subdivision. The project involves comprehensive roadway infrastructure work, including approximately 3,080 square yards of graded aggregate base course, 255 tons of 9.5 mm Asphalt Superpave, 339 tons of asphalt patching, 155 cubic yards of foundational backfill material, 60 square yards of 4-inch concrete sidewalk, 70 linear feet of concrete curb and gutter, and 70 linear feet of 24-inch thermoplastic pavement striping. The bid submission deadline is 2:00 p.m. on Tuesday, May 27, 2025, at Hoschton City Hall, with a project completion time of sixty (60) consecutive calendar days from the written "Notice to Proceed".

Bidders are required to submit a Bid Bond with their proposal, and contract documents, specifications, and construction drawings can be obtained by contacting Jessica James of Engineering Management, Inc. at 303 Swanson Drive in Lawrenceville, GA, via email at jjames@eminc.biz, phone at (770) 962-1387, or fax at (770) 962-8010. The project scope includes additional elements such as adjusting structures to grade, shoulder reconstruction, and implementing traffic and erosion control measures, indicating a comprehensive approach to infrastructure improvement in the Hoschton area.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR BIDS

City of Hoschton, Georgia The Village Subdivision Roadway Improvements

Bids will be received at City of Hoschton, City Hall, 61 City Square, Hoschton Georgia, 30548 until 2:00 p.m. on Tuesday, May 27, 2025.

The Project consists of, but is not limited to the following major elements:

Approximately 3,080 SY of 6-inch Graded Aggregate Base Course, 255 Tons of 9.5 mm Asphalt Superpave, 339 Tons of Asphalt Patching, 155 CY of Foundational Backfill Material, 60 SY of 4-inch Concrete Sidewalk, 70 L.F. of Concrete Curb and Gutter, 70 L.F. of 24-inch Thermoplastic Pavement Striping, Adjusting Structures to Grade, Shoulder Reconstruction, Traffic and Erosion Control Measures.

Time of completion for all work associated with this project shall be sixty (60) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. A Bid Bond will be required with proposal submission.

Copies of Contract Documents, Specifications, and Construction Drawings may be obtained by contacting Jessica James of Engineering Management, Inc. at 303 Swanson Drive Lawrenceville, GA 30043, or Email jjames@eminc.biz, or Phone (770) 962-1387 or Fax (770) 962-8010.