This is an Advertisement for Bids issued by the State of Colorado Department of Public Safety for a Design/Bid/Build construction project to replace an existing Office of Public Safety Communications shelter at Kenosha Pass. The project involves removal of the current shelter and construction of a new foundation, with the contractor responsible for picking up a prefabricated shelter in Golden, Colorado and transporting it to the Kenosha Pass site. The estimated project cost is $258,400. The mandatory pre-bid conference and site tour is scheduled for November 19, 2026 at 2:00 PM MT, with requests for clarifications due by November 30, 2026 at 4:00 PM MT. Electronic bid submittals are due December 3, 2026 by 10:00 AM MT and must be submitted through the Vendor Self Service platform. The public bid opening will be conducted virtually via Google Meet on the same date as bid submittal. Award intent notification is anticipated for January 14, 2027, with contract approval anticipated for February 19, 2027 and construction start anticipated for May 10, 2027 and completion by October 1, 2027. Minimum bidder requirements include no prior termination by the State for non-performance, operation under the same name for five years, demonstrated experience on at least two similar projects exceeding $250,000 each, and demonstrated bonding capability of $250,000 for the individual project.

Colorado labor must perform at least 80% of the work as required by state statute. A bid bond or proposal guaranty in the amount of not less than 5% of the total bid is required, and payment and performance bonds not less than 50% of the contract value are required upon award. The project is subject to Colorado prevailing wage requirements and the Buy Clean Colorado Act, which requires Environmental Product Declarations for eligible materials including asphalt, cement, concrete, glass, post-tension steel, reinforcing steel, structural steel, and wood elements. Preference is given to Colorado resident bidders and Colorado labor. The State retains all rights to reject any or all proposals and assumes no responsibility for bidder costs. All submittals become the property of the State of Colorado and will not be returned.

View the file

Other files

File Type Posted
W-9 - March 2024.pdf PDF
Bid Package_Kenosha Pass Shelter.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OSA-AFB-1 pg. 1

REV 7/2025

ADVERTISEMENT FOR BIDS

Design / Bid / Build

State of Colorado Department of Public Safety

Notice Number: 1

Project Number: EAM2403 Project Title: Replace Shelter – Kenosha Pass Estimated Project Cost: $258,400

NOTICES

1. For all projects with a total dollar value above $150,000 Notice of Final Settlement is required by C.R.S. §38-26-107(1). Final Settlement, if required, will be advertised in the same location as the original solicitation.

2. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.

3. All respondents accept the conditions of this AFB, including but not limited to, the following:

a. All submittals shall become the property of the State of Colorado and will not be returned.

b. Late submittals shall not be evaluated.

c. The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.

d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.

4. The respondent has reviewed Appendix F and by responding has agreed that the terms and conditions of the sample Contractor’s Design/Bid/Build (D/B/B) Agreement (SC-6.21) and General Terms and Conditions of the Contractor’s Design/Bid/Build Agreement (SC- 6.23) are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the bid closes.

5. Per C.R.S. §24-92-115 unless prohibited by applicable federal law, contract for any public project in the amount of one million dollars or more, that does not receive federal money, in the amount of one million dollars or more shall require the general contractor to which the contract is awarded to submit, at

OSA-AFB-1 pg. 2 the time the mechanical, electrical, or plumbing subcontractor is put under contract, documentation that Identifies the contractors or subcontractors that will be used for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical, and plumbing work required on the project and certifies that all firms identified participate in apprenticeship programs registered with the United States department of labor’s employment and training administration or state apprenticeship councils recognized by the United States department of labor and have a proven record of graduating a minimum of 15% of its apprentices for at least three of the past five years.

6. Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include, in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.

7. Per C.R.S. §24-92-Part 2, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the State prevailing wage rate, of the regular, holiday, and overtime wages paid and the general prevailing payments on behalf of employees to lawful welfare, pension, vacation, apprentice training, and educational funds in the State, for each employee needed to execute the contract. Payments to the funds must constitute an ordinary business expense deduction for federal income tax purposes by contractors and subcontractors. Contractors are required to pay their employees at weekly intervals and shall comply with the enforcement provisions of C.R.S. §24-92-209. Contractors awarded a project of this size will be required to utilize the LCPTracker cloud-based labor compliance and certified payroll application.

8. Preference shall be given to Colorado resident bidders and for Colorado labor, as provided by law.

9. Per C.R.S. §24-105-201 If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid.

OSA-AFB-1 pg. 3

PROJECT OVERVIEW

Introduction

The State of Colorado is soliciting bids from qualified contractors for the replacement of the existing Office of Public Safety Communications (OPSC) shelter at the Kenosha Pass site.

The project includes the removal of the existing shelter and construction of a new foundation to accommodate the replacement shelter. OPSC has already purchased a prefabricated shelter, which the contractor will be responsible for pick up in Golden Colorado, and transporting to the Kenosha Pass site.

All work shall be completed in accordance with the construction drawings and specifications provided for this project. Please refer to these documents for additional project details and requirements

Scope of Services

Reference Architect / Engineer drawings and/or specifications included in the posting attachments.

The scope of services will include full Construction Contracting Services for the project specified during the process of construction and warranty period to the State as per the Advertisement for Bid. Specific tasks to be performed by the Contractor include those generally performed by the construction community where the Contractor is the prime vendor to the State. Bidders shall reference the drawings, specifications, and supporting documents in the Appendices for an understanding of the entire scope of the project.

Per C.R.S. §38-26-106, if a contract amounts to $150,000 or more, the awarded contractor shall provide payment and performance bonds not less than 50% of the value of the contract. The costs associated with this bond are to be included in the contractor’s bid.

MINIMUM REQUIREMENTS

Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested bidders should be prepared to show evidence of the following to be considered as qualified, as a minimum:

1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.

2. The bidding contractor must have been in the same business, under the same name for the last five (5) years.

OSA-AFB-1 pg. 4

3. Demonstrated specific contracting experience in projects of similar scope and complexity for at least two (2) projects each in excess of $ 0.00, utilizing the expertise present in their Colorado Office; and

4. Demonstrated bonding capability up to $ 0.00 for an individual project coincidentally with current and anticipated workloads; provide letter from surety that affirms this capacity.

5. Attended and signed in at the Mandatory Pre-Bid Conference

Firms meeting the minimum requirements may obtain the bidding documents on the website accompanying this advertisement.

https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4 website

MANDATORY PRE-BID CONFERENCE AND SITE TOUR

A mandatory Pre-Bid Meeting will be held at:

Online: cdps_edo_bids@state.co.us Room:

Date/Time

SCHEDULE

The following is a tentative schedule of events for the Bid Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.

Advertisement for Bids Issued Mandatory Pre-Bid Conference and Site Tour Request for Clarifications Due Final Addendum Issued (anticipated) Bid Submittals Due (date and Time) Public Bid Opening

11/12/26 11/19/26 2pm MT 11/30/26 4pm MT

Award Intent Notification (anticipated) 01/14/27 Contracting 02/19/27 Contract Approval (anticipated) 02/19/27 Anticipated Construction Start 5/10/27 Anticipated Construction Finish 10/1/27

The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4 website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.

*Please refrain from using any note taking software during bid opening.

OSA-AFB-1 pg. 5

QUESTIONS, CLARIFICATIONS AND ADDENDA

Owner initiated changes to this AFB will be issued under numerically sequenced addenda.

Owner initiated changes to this AFB will be posted in the form of addenda on https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4 .

Questions and requests for clarifications regarding this project shall be submitted before the deadline listed in the above Schedule.

Communication regarding the project during the procurement, outside of the this submission process or scheduled procurement milestones is not permitted.

POINT OF CONTACT/CLARIFICATION

Name: Purchasing Agency: Department of Public Safety Email Address: cdps_edo_bids@state.co.us Phone: N/A

BIDDING

Bids shall be submitted on the required bid form as indicated on the Information For Bidders document (SBP-6.12) in Appendix A.

An electronic copy of the sealed bid submittal is due 12/3/26 and shall be received no later than 10:00 AM (MT), and shall be submitted/accepted via Submit bids through Vendor Self Service (VSS) at https://prd.co.cgiadvantage.com/PRDVSS1X1/Advantage4 , as described in the Information for Bidders (SBP-6.12) in Appendix A.

_____ (__) hard copies of the sealed bid submittal are due [Insert date] and shall be received no later than _______ AM/PM (MD/ST), and shall be submitted/accepted via [Insert submission method], as described in the Information for Bidders (SBP-6.12)

Bid Forms and Appendices to be included with bid submittal:

Bid Form (SBP-6.13) Bid Bond (SBP-6.14) Bid Alternates (SBP-6.131) Unit Pricing (SBP-6.133)

Late bid submittals will be rejected without consideration. The State of Colorado assume no responsibility for costs related to the preparation of bid submittals.

BID OPENING

OSA-AFB-1 pg. 6

Opening of the bid submittals will be a virtual public bid opening via Google Meet Meeting platform.

Virtual public bid opening will take place at the date and time identified in Schedule

APPENDICES:

Appendix A: Information for Bidders (SBP-6.12) Appendix B: Bid Form (SBP-6.13) Appendix B1: Bid Alternates (SBP-6.131) (if Applicable) Appendix B2: Unit Pricing (SBP-6.133) (if Applicable) Appendix B3: Bid Bond (SBP-6.14) Appendix C: Sample: Direct Labor Burden Calculation (SBP-6.18) Appendix D: Applicable Prevailing Wage and Apprenticeship and Fringe

Rates Appendix E: Sample: Apprenticeship Utilization Certifications (SBP-2.1) Appendix F: Sample: SC6.21 and SC6.23 Design/Bid/Build Contractor’s

Agreement and General Conditions of the Contract)

File details come from the government source that posted it. Updated .