ACIRoofingPriceSchedules Atlantic Coast FY21- Locked.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Advance Contract Initiative (ACI) for Emergency Temporary Roof Repairs Atlantic Coast - Unrestricted
- Solicitation number
- W9128F21R0015
About this file
This document contains a price schedule and solicitation for the Advance Contract Initiative for Emergency Temporary Roof Repairs Atlantic Coast contract opportunity. The solicitation will award one $45 million single award task order contract for the installation of emergency temporary roofing in the continental United States. The primary region covered is Connecticut to Maine, with the secondary region of Texas to Alabama. The indefinite delivery contract has a term of seven years including a five year base and two year option. Bids are due by March 2, 2021 from both large and small businesses registered in the System for Award Management. The price schedule includes negotiated line items for planning, work order processing, installation of plastic sheeting on shingle and metal roofs, structural panel and rafter installation, debris clearance, and small roof repairs across seven program years in the Northeast, Southeast, and Gulf Coast regions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation W9128F21R0015 Atlantic Coast Unrestricted FY21.pdf | ||
| Fact Sheet ACI Emergency Temporary Roofing.pdf | ||
| Past Performance Questionaire (PPQ).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Northeast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-21-R-0015
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| NORTHEAST REGION |
| Connecticut, Deleware, District of Columbia, Maine, Massachusetts, New Hampshire, New Jersey, New Yort, Pennsylvania, Rhode Island, Virginia |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1100 | Northeast Region Year 1 | ||||
| 1101 | Planning Effort | Negotiated Line Item | |||
| 1102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 1 | $ 25,000.00 |
| 2100 | Northeast Region Year 2 | ||||
| 2101 | Planning Effort | Negotiated Line Item | |||
| 2102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 2 | $ 25,000.00 |
| 3100 | Northeast Region Year 3 | ||||
| 3101 | Planning Effort | Negotiated Line Item | |||
| 3102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 3 | $ 25,000.00 |
| 4100 | Northeast Region Year 4 | ||||
| 4101 | Planning Effort | Negotiated Line Item | |||
| 4102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 4 | $ 25,000.00 |
| 5100 | Northeast Region Year 5 | ||||
| 5101 | Planning Effort | Negotiated Line Item | |||
| 5102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 5 | $ 25,000.00 |
| 6100 | Northeast Region Year 6 | ||||
| 6101 | Planning Effort | Negotiated Line Item | |||
| 6102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 6 | $ 25,000.00 |
| 7100 | Northeast Region Year 7 | ||||
| 7101 | Planning Effort | Negotiated Line Item | |||
| 7102 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7103 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7104 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7105 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7106 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7107 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7108 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7109 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Northeast Region Year 7 | $ 25,000.00 |
Southeast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-21-R-0015
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| SOUTHEAST REGION |
| Florida, Georgia, North Carolina, South Carolina |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1200 | Southeast Region Year 1 | ||||
| 1201 | Planning Effort | Negotiated Line Item | |||
| 1202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 1 | $ 25,000.00 |
| 2200 | Southeast Region Year 2 | ||||
| 2201 | Planning Effort | Negotiated Line Item | |||
| 2202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 2 | $ 25,000.00 |
| 3200 | Southeast Region Year 3 | ||||
| 3201 | Planning Effort | Negotiated Line Item | |||
| 3202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 3 | $ 25,000.00 |
| 4200 | Southeast Region Year 4 | ||||
| 4201 | Planning Effort | Negotiated Line Item | |||
| 4202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 4 | $ 25,000.00 |
| 5200 | Southeast Region Year 5 | ||||
| 5201 | Planning Effort | Negotiated Line Item | |||
| 5202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 5 | $ 25,000.00 |
| 6200 | Southeast Region Year 6 | ||||
| 6201 | Planning Effort | Negotiated Line Item | |||
| 6202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 6 | $ 25,000.00 |
| 7200 | Southeast Region Year 7 | ||||
| 7201 | Planning Effort | Negotiated Line Item | |||
| 7202 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7203 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7204 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7205 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7206 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7207 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7208 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7209 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Southeast Region Year 7 | $ 25,000.00 |
Gulf Coast
SECTION 001100 - ACI TEMP ROOFING PRICE SCHEDULE
W9128F-21-R-0015
TOTAL FOR ALL SEVEN (7) YEARS $ 175,000.00
Contractor Name: _______________________________________________________________
| GULF COAST REGION |
| Alabama, Louisiana, Mississippi, Texas |
NOTE: Quantities (Qty) are based on estimated repairs of 2,000 homes and these quantities are being utilized for bid comparison only
Line Item Description Unit of Issue Unit Price Qty Total
| 1300 | Gulf Region Year 1 | ||||
| 1301 | Planning Effort | Negotiated Line Item | |||
| 1302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 1303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 1304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 1305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 1306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 1307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 1308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 1309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 1 | $ 25,000.00 |
| 2300 | Gulf Region Year 2 | ||||
| 2301 | Planning Effort | Negotiated Line Item | |||
| 2302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 2303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 2304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 2305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 2306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 2307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 2308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 2309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 2 | $ 25,000.00 |
| 3300 | Gulf Region Year 3 | ||||
| 3301 | Planning Effort | Negotiated Line Item | |||
| 3302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 3303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 3304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 3305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 3306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 3307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 3308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 3309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 3 | $ 25,000.00 |
| 4300 | Gulf Region Year 4 | ||||
| 4301 | Planning Effort | Negotiated Line Item | |||
| 4302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 4303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 4304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 4305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 4306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 4307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 4308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 4309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 4 | $ 25,000.00 |
| 5300 | Gulf Region Year 5 | ||||
| 5301 | Planning Effort | Negotiated Line Item | |||
| 5302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 5303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 5304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 5305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 5306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 5307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 5308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 5309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 5 | $ 25,000.00 |
| 6300 | Gulf Region Year 6 | ||||
| 6301 | Planning Effort | Negotiated Line Item | |||
| 6302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 6303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 6304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 6305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 6306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 6307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 6308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 6309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 6 | $ 25,000.00 |
| 7300 | Gulf Region Year 7 | ||||
| 7301 | Planning Effort | Negotiated Line Item | |||
| 7302 | Work Order Processing | EA | $ 125.00 | 200 | $ 25,000.00 |
| 7303 | Install Government Furnished Plastic Sheeting Shingle Roof | SF | 2,500,000 | $ - 0 | |
| 7304 | Install Government Furnished Plastic Sheeting Metal Roof | SF | 240,000 | $ - 0 | |
| 7305 | Furnish and Install Structural Panels | SF | 44,000 | $ - 0 | |
| 7306 | Furnish and Install Rafters | LF | 11,250 | $ - 0 | |
| 7307 | Minor Debris Clearance | EA | 350 | $ - 0 | |
| 7308 | Major Debris Clearance | EA | 50 | $ - 0 | |
| 7309 | Small Roof Repair | EA | 140 | $ - 0 | |
| TOTAL Gulf Region Year 7 | $ 25,000.00 |