NVDTS RFI Questionnaire 2026Nov09.docx
DOCX document 56 KB Posted
- Attached to
- Night Vision Devise (NVD) Test Set (NVDTS)
- Solicitation number
- Not on record
- Issued by
-
Department of the Army
About this file
This is a Request for Information (RFI) questionnaire issued by the U.S. Army's Product Director Test, Maintenance, and Diagnostic Equipment (PD TMDE) to conduct market research on the commercial availability and technical feasibility of a Night Vision Device Test Set (NVDTS) conforming to Purchase Description TEMOD-26-01 (Version 1.4). The RFI explicitly states it is not a formal solicitation and does not obligate the Government to acquire any products or services; all budgetary estimates and pricing data provided by vendors are strictly non-binding and will not be held against vendors in future competitive solicitations.
The NVDTS must serve as a multi-spectral, automated electro-optical diagnostic station deployed at field and depot maintenance activities to evaluate image intensifier tubes, thermal weapon sights, fused optical assemblies (e.g., ENVG-B), and heads-up digital architectures (e.g., IVAS). Vendors must classify their compliance using standardized status definitions: COTS - Fully Compliant, COTS - Objective Met, Near-Term Roadmap (3-6 months), Requires Development (exceeding 6 months), or Not Supported. Key hardware requirements include an off-axis parabolic collimator, motorized target wheel, differential blackbody thermal source, low-light stimulus source, scientific digital image capture, modular eyepiece relay modules, MIL-STD-1553 and Gigabit Ethernet data bus capabilities, and a self-contained light-tight chamber. The system must meet specific environmental testing standards per MIL-STD-810H (operating temperature, storage, humidity, altitude, vibration, shock, water resistance, fungus resistance, and dust protection), support automated calibration via Army ACE suite or AN/GSM-440 within 5-9 hours, and deliver comprehensive measurement capabilities for power dynamics, photometrics, optical integrity, thermal verification, and digital fusion parameters. Software requirements mandate DISA STIG hardening, Software Bill of Materials compliance, cryptographic session logging, and data rights clarity under DFARS provisions, with the Government expecting Unlimited Rights for Government-funded development. Vendors must address obsolescence management, provide detailed calibration standards, and identify cost-driving or over-constrained requirements in the trade space analysis. Responses are due within 30-45 days of issuance by 17:00 CST, submitted electronically to the Army Contracting Command - Detroit Arsenal. The RFI includes sections on corporate information, past performance, production scalability, lead times, bid sample availability, hardware subsystems, measurement capabilities, calibration requirements, software security, development roadmaps, and rough order of magnitude cost estimates, though no formal submission deadline date is filled in within the document itself.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Night Vision Device Test Set Purchase Description v 1.4.docx | DOCX document | |
| NVDTS RFI Industry Cover Letter 2026Nov09.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
Commercial-Off-The-Shelf (COTS) Night Vision Device Test Set (NVDTS)
Section 1: Administrative Notice and Survey Instructions
1.1 Purpose and Scope
The United States Army, Product Director Test, Maintenance, and Diagnostic Equipment (PD TMDE), is conducting market research to determine the commercial availability, technical readiness, and budgetary benchmarks for a Night Vision Device Test Set (NVDTS) conforming to Purchase Description TEMOD-26-01 (Version 1.4).
The intended NVDTS will serve as a multi-spectral, automated electro-optical diagnostic station deployed at field and depot maintenance activities. It evaluates image intensifier () tubes, thermal weapon sights, fused optical assemblies (e.g., ENVG-B), and heads-up digital architectures (e.g., IVAS).
1.2 Document Maturity, Trade Space, and Evolution Notice
IMPORTANT NOTICE REGARDING PURCHASE DESCRIPTION STATUS:
Responding vendors should note that the referenced Purchase Description (TEMOD-26-01, Version 1.4) represents an initial working draft developed specifically to assess commercial-off-the-shelf (COTS) or Non-Developmental Item (NDI) availability, evaluate the technical feasibility and reasonability of the parameters, and define the trade space between threshold requirements and objective enhancements.
The Government explicitly intends to refine, update, and mature this specification prior to issuing any formal solicitation. Updates will incorporate industry responses to this RFI, ongoing dialogue with requirements developers, and technical exchanges with Army night vision device (NVD) subject matter experts (SMEs). Vendors are strongly encouraged to identify requirements that appear overly restrictive, cost-prohibitive, technically mismatched with commercial best practices, or in need of clarification, and to propose viable commercial alternatives within the trade space in Section 9 of this survey.
1.3 Non-Binding Budgetary Estimate Disclaimer
NOTICE TO RESPONDING VENDORS:
This document is issued solely for market research, program planning, and technical assessment purposes in accordance with FAR Part 10. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or an obligation on the part of the Government to acquire any products or services.
All budgetary estimates, pricing data, Rough Order of Magnitude (ROM) costs, and production lead times provided by the vendor are understood to be strictly non-binding. Responding vendors will not be held to the provided cost figures in any future competitive solicitation. The Government will not reimburse any costs associated with preparing or submitting responses to this survey.
1.4 Vendor Response Classifications
For each technical parameter and functional requirement throughout this questionnaire, vendors are requested to categorize their compliance using the following standardized status definitions:
· COTS - Fully Compliant (COTS): The requirement is fully satisfied by a mature, production-line Commercial-Off-The-Shelf or Non-Developmental Item (NDI) available today.
· COTS - Objective Met (COTS-OBJ): The system currently meets or exceeds the enhanced "Objective" requirement as specified in the Purchase Description.
· Near-Term Roadmap (Roadmap): The capability is fully architected and actively in development, with standard commercial availability expected within three (3) to six (6) months of response date.
· Requires Development (DEV): The requirement is technically feasible but requires non-recurring engineering (NRE), hardware/software modifications, or custom development exceeding six (6) months.
· Not Supported (N/S): The current commercial baseline does not meet this requirement, and there are no immediate plans to develop or integrate this capability.
Section 2: Vendor, Corporate, Regulatory, & Past Performance Overview
2.1 Corporate Information & Regulatory Compliance
| Administrative Field |
| Vendor Response |
Company Name
Commercial and Government Entity (CAGE) Code
Unique Entity Identifier (UEI / DUNS)
Corporate Address
Primary Technical Point of Contact (Name, Title, Email, Phone)
Primary Contracts/Business POC (Name, Title, Email, Phone)
| Business Size Standard (NAICS: e.g., 334515 / 334511) |
| [ ] Large Business |
[ ] Small Business [ ] Other (Specify)
Manufacturing Facility Location(s)
| NDAA Section 889 Compliance(Does your product contain any components or semiconductors from covered foreign entities?) |
| [ ] Fully Compliant |
[ ] Exceptions Noted Below
Export Control Classification:
• ITAR / USML Category (e.g., Cat XII)
• EAR / ECCN Number (e.g., 6A002, 6A003, EAR99)
2.2 Past Performance & Military Fielding Track Record
Please summarize your organization's track record in supplying electro-optical, night vision, or thermal test benches to the U.S. Armed Forces, allied defense ministries (NATO), or major defense prime contractors:
| Customer / Program Name |
| System Nomenclature / Description |
| Quantities Delivered |
| Operational Environment (Depot, Field, Lab, Flight Line) |
| Period of Performance |
| Commercial (Defined as COTS) Y/N |
Section 3: Production Scalability, Lead Times, & Bid Sample Readiness
3.1 Manufacturing Scalability & Delivery Lead Times
3.1.1 Current Manufacturing Maturity:
· Is the proposed test set currently in active series production? If yes, what is your current annual/monthly production rate?
· What is the Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) of your core system?
3.1.2 Order Fulfillment Lead Times:
Please provide estimated delivery lead times (weeks or months from receipt of order) based on the following potential procurement tranches:
· Initial Bid / First Article Test (FAT) Units (1–5 systems): ____________ weeks
· Low-Rate Initial Production (10–25 systems): ____________ weeks
· Full-Rate Production (50–100+ systems): ____________ weeks
3.1.3 Supply Chain Fragility & Long-Lead Components:
Identify any single-source, high-lead-time sub-assemblies (e.g., custom large-aperture off-axis parabolic mirrors, scientific sCMOS focal plane arrays, blackbody thermoelectric controllers).
3.2 Bid Sample & Technical Demonstration Readiness
In accordance with Section 6.1.1 of the Purchase Description, bid samples and technical demonstrations will be required for technical evaluation prior to contract award.
· Does your company currently possess a functional, mature test set that can be made available as a Bid Sample or for a hands-on Government demonstration at Redstone Arsenal, AL?
[ ] Yes, available immediately [ ] Available within 30–60 days ARO [ ] Requires custom assembly (>60 days) [ ] No
· What specific accommodations, facilities, or power connections would be required to execute an on-site demonstration of your system's baseline and thermal test capabilities?
Section 4: Hardware Subsystems, SWaP, & Environmental Compliance
4.1 Optical Stimulus Bench & Mechanical Hardware Compliance
Please indicate compliance with the baseline hardware requirements established in Section 3.0 and Table 3.0 of the Purchase Description:
| Paragraph / Subsystem |
| Technical Requirement Baseline |
| Vendor Status (COTS / COTS-OBJ / Roadmap / DEV / N/S) |
| Vendor Technical Justification & Notes |
| 3.0.1 Optical Bench Collimator |
| Off-Axis Parabolic (OAP) Collimator: Clear Aperture (152.4 mm), Focal Length (762 mm), Broadband Coating ( reflectivity from 0.4 µm to 14 µm), Wavefront Error at 632.8 nm. |
| 3.0.2 Motorized Target Wheel |
| Precision Dual-Substrate Wheel: Chrome-on-Glass/Quartz (Vis/NIR) and micro-etched metal (IR). Targets: USAF 1951, Dot-Matrix Grid, Slanted Knife-Edge, 0.19 mm pinhole, crosshairs. |
| 3.0.3 Differential Blackbody |
| Dual-Plate Thermoelectric Source: to range; resolution; temporal stability; Emissivity (MWIR/LWIR); Micro-Kelvin RTD control. |
| 3.0.4 Low-Light Stimulus Source |
| NIST-Traceable Vis/NIR: Stable equivalent via temp-compensated LED matrix; Continuous attenuation from to ; Silicon photodiode feed-forward loop. |
| 3.0.5 Digital Image Capture |
| Scientific Sensor: Native resolution (); Dual-mode ( full-res, localized ROI); Temporal read noise with cooling to ; 16-bit A/D depth. |
| 3.0.6 Eyepiece Relay Modules |
| Modular relays: Module A (ENVG-B form factor telecentric lens, distortion , 7 mm exit pupil match); Module B (IVAS wide-field telecentric lens, dynamic FOV). |
| 3.0.7 Data Bus & RF Suite |
| Hardware links: MIL-STD-1553, Gigabit Ethernet, HDMI, Camera Link. RF Emulation: SDR module supporting Intra-Soldier Wireless (ISW) & UWB. Integrated RF/optical light-tight dark chamber. |
| 3.0.8 Electrical DAQ & Power |
| Programmable rails: 2.0 to 3.8 VDC (-level regulation); DAQ sampling low-side shunt logging; 20 MHz master TTL sync clock generator. |
| 3.1 Modularity & Tooling |
| Modular sleds/brackets exchangeable in via standard TK-17/G hand tools (Threshold); Tool-less exchange in (Objective). |
| 3.2 Control Computer & Storage |
| COTS CPU cores (); ECC DDR5 RAM; TPM 2.0 hardware soldered; NVMe SSD in tool-less removable drive bay; Zero unshielded wireless. |
| 3.3 Light-Tight Chamber |
| Self-contained bench permitting full testing in ambient bay lighting (300 to 1,000 lux) without requiring a darkroom. |
| 6.6 Power Conditioning |
| 90–264 VAC, 47–63 Hz universal input; Hot-swappable internal battery ( run-time); MIL-STD-461G CE102/RE102 EMI compliant. |
| 6.7 / 6.8 SWaP & Enclosure |
| Enclosure dimensions ; Bare weight (Threshold) / (Objective). Loaded MIL-STD-810H transit case . |
4.2 Environmental Testing & Ruggedization Matrix
Please indicate the current verification maturity of your test set against the specific environmental profiles mandated in Section 6.9 of the Purchase Description:
| Environmental Stress Area |
| Baseline Requirement Profile (MIL-STD-810H) |
| Compliance Verification Status (Empirically Tested / Modeled / Requires Qual / N/S) |
| Test Report Details, Waivers, or Operational Constraints |
| Operating Temperature |
| to (Method 501.7 / 502.7, Proc. II) |
| Storage Temperature |
| to (Method 501.7 / 502.7, Proc. I) |
| Cyclic Relative Humidity |
| Induced & Natural Cycles B2 (Method 507.6, Proc. Ia/Ib) |
| Operational Altitude |
| Up to 15,000 ft (Method 500.6, Proc. II) |
| Rapid Decompression / Transit Altitude |
| Up to 40,000 ft (Method 500.6, Proc. I) |
| Random & Sinusoidal Vibration |
| Transportation profile & Loose Cargo (Method 514.8, Proc. I/II) |
| Mechanical Shock & Drop |
| Functional Shock (Proc. I), 26-Drop Transit Case (Proc. IV), Bench Handling (Proc. VI) |
| Water Resistance / Drip |
| Drip test while operating (Method 506.6, Proc. III) |
| Transit Immersion (Objective) |
| 1-meter water immersion in transit case (Method 512.6, Proc. I) |
| Fungus Resistance |
| Non-nutrient materials certification (Method 508.8) |
| Blowing Sand & Dust (Objective) |
| Blowing sand & dust protection (Method 510.7, Proc. I/II) |
Section 5: Measurement Capabilities & Test Program Sets (TPS)
5.1 Electro-Optical & Radiometric Diagnostic Coverage
Please assess your test station's native ability to perform automated, objective algorithmic evaluations without operator bias:
| Measurement Domain |
| Parameter Baseline (Purchase Description Section 4.0) |
| Vendor Status (COTS / COTS-OBJ / Roadmap / DEV / N/S) |
| Achieved Measurement Accuracy / Range |
| Power Dynamics |
| Vin (2.0–3.8 VDC), steady-state draw (5–25 mA), auto-gating transient surge (15–50 mA), oscillator frequency (5–250 kHz). |
| Photometrics |
| System Gain ( to Threshold; up to Objective); SNR (5.0 to 45.0); EBI ( to ). |
| Optical Integrity |
| Spatial Resolution (28 to 81 lp/mm Threshold; 96 lp/mm Objective); Spot defects ( to ); Distortion ( to ); Halo ( to ). |
| Optical Alignment |
| Optical Collimation (Dipvergence/Convergence accuracy); Field of View ( to ). |
| Basic Thermal Verification |
| Power verification (0–5 A); Polarity check (White-Hot/Black-Hot); Boresight verification (). |
| Advanced Thermal (Objective) |
| Automated MRTD ( to ); NETD (10 to 250 mK); NUC residual spatial variance; MTF ( to ); Pixel defect mapping (). |
| Digital & Fusion (Objective) |
| End-to-end display latency (1.0 to 45.0 ms, accuracy); RTA latency; Frame jitter; Multi-band boresight ( to IR); AR overlay mapping ( FOV). |
5.2 Unit Under Test (UUT) TPS Availability Matrix
Indicate current software, mechanical adapter, and harness readiness across specific inventory configurations:
| Device Classification |
| Device Nomenclature & Series |
| Baseline Technical Manuals |
| Current Support Status (COTS / Near-Term / DEV / N/S) |
| Interface Adapter Readiness (Mechanical & Electrical) |
| Standalone Tubes |
| MX-10130, MX-10160, MX-11769 |
| Component Specifications |
| Aviation / Ground Goggles |
| AN/AVS-6, AN/AVS-9, AN/PVS-7, AN/PVS-14, AN/PVS-15, AN/PVS-31A/D |
| TM 11-5855-263-23&P |
TM 11-5855-306-23&P
TM 9-5855-1916-13&P
| Weapon Sights & Clip-Ons |
| AN/PVS-4, AN/PVS-10, AN/PVS-26, AN/PVS-30, AN/PAS-13, AN/PAS-35, FWS-I |
| TM 11-5855-316-23&P |
TM 11-5855-343-23&P
| Specialized & Driver Sights |
| AN/TVS-5, AN/UAS-11, AN/VAS-5 |
| TMDE Specifications |
| Fusion & Digital Systems |
| AN/PSQ-20 (Family), AN/PSQ-36, AN/PSQ-42 (ENVG-B), IVAS |
| TM 11-5855-347-20&P |
IWS Architecture
Section 6: Test Set Calibration Requirements & Support Equipment Paragraph 5.2.3 and 6.13 mandate that the NVDTS be calibratable via the Army Automated Calibration Equipment (ACE) suite or AN/GSM-440 within a maximum calibration budget of 5 to 9 hours.
6.1 Recommended Calibration Standards Architecture
Provide a detailed list of all external test, measurement, and diagnostic equipment (TMDE) and optical transfer standards that your company deems mandatory or recommended to perform full periodic calibration of the test set:
| Calibrated Subsystem |
| Vendor-Recommended Calibration Equipment (Make, Model, Part Number) |
| Recommended Calibration Interval |
| Traceability Standard (e.g., NIST, Primary Lab) |
| Can Army PMEL / TMDE Perform Organically? (Yes / No) |
Optical Collimator & Wavefront Alignment
Differential Blackbody Engine (Temperature & Emissivity)
Low-Light Photometric Light Source (Luminance & Color Temp)
Scientific Camera & Eyepiece Relay Distortion
Programmable DC Power Rails & Current DAQ
6.2 Calibration Execution & Interfacing
· Can your test set execute an automated self-calibration routine interfacing with standard Army laboratory equipment (e.g., AN/GSM-440 / AN/USM-440) via software hooks?
· Does calibration require proprietary variable component replacement, factory return-to-depot, or can it be executed entirely via software calibration coefficients saved to onboard non-volatile memory?
· What is your demonstrated Mean Time To Calibrate (MTTC) for:
Fully Automated Routine: ____________ hours Full Manual Procedure: ____________ hours
Section 7: Software, Cybersecurity, Data Rights, & Obsolescence (DMSMS)
7.1 Operating System Hardening & Cybersecurity Baseline
· What operating system hosts your test executive (e.g., Windows 11 Enterprise LTSC, Red Hat Enterprise Linux)?
· Has this platform been hardened against DISA Security Technical Implementation Guides (STIGs)? List any open STIG finding categories (CAT I, CAT II).
· Does your system currently hold a formal Authority to Operate (ATO) on a DoD network (e.g., eMASS package number, sponsoring service, Impact Level IL4/IL5)?
· Can you furnish a comprehensive Software Bill of Materials (SBOM) compliant with NTIA/DoD mandates identifying all commercial, open-source, and proprietary libraries?
7.2 Database Logging & Mission-Priority Fallback
· Does your software architecture automatically log the mandatory metadata schema (Table 5.4.1), including cryptographic SHA-256 session and media signing?
· Describe how your software manages storage degradation when local partition capacity reaches , , and capacity (e.g., selective pruning of passing raw media while strictly preserving numeric test logs).
7.3 Diminishing Manufacturing Sources & Material Shortages (DMSMS) / Obsolescence
· What is the guaranteed commercial production and support lifecycle of your core hardware platform (e.g., minimum 5, 7, or 10 years)?
· How does your company monitor and manage component obsolescence (e.g., commercial image sensors, motorized stage controllers, embedded single-board computers)?
· What is your standard policy regarding End-of-Life (EOL) notifications to Government customers, and how are redesigns managed when commercial components become unavailable?
7.4 Data Rights, Technical Data Packages (TDP), & Intellectual Property Strategy In accordance with DFARS 252.227-7013, DFARS 252.227-7014, and Purchase Description Paragraph 6.17, the Government requires clarity regarding intellectual property assertions, software delivery formats, and rights structures across both COTS elements and newly developed modules.
7.4.1 Government-Funded Development Rights (DFARS 252.227-7014(b)(1)):
If the Government funds 100% of the Non-Recurring Engineering (NRE) or development costs for a new Test Program Set (TPS), Interface Test Adapter (ITA) hardware, diagnostic algorithm, or custom harness:
· Do you agree that the Government will receive Unlimited Rights (unrestricted rights to use, modify, reproduce, perform, display, release, or disclose the software, test routines, and hardware documentation in whole or in part, in any manner and for any purpose whatsoever, and to have or authorize others to do so)?
[ ] Fully Agree without Reservation [ ] Agree to Government Purpose Rights (GPR) Only [ ] Exception Noted Below
If Exception Noted, provide detailed commercial/legal rationale:
7.4.2 Mixed Funding / Baseline Adaptation Rights:
If a proposed TPS or module leverages existing proprietary commercial libraries but requires Government funds to integrate or complete:
· Will your company deliver the developed integration code and resulting TPS configurations with at least Government Purpose Rights (GPR), enabling the Army to maintain, rehost, or compete support of the TPS at organic depots (e.g., Tobyhanna Army Depot) or via third-party service contractors?
[ ] Yes [ ] No [ ] Conditional (Explain)
7.4.3 Deliverables & Uncompiled Source Code:
To avoid operational obsolescence and long-term vendor lock-in, will your company deliver the following items upon completion of contract development:
· Fully documented, uncompiled TPS source files, test scripts, and diagnostic sequencing routines?
[ ] Yes [ ] No
· Open Application Programming Interface (API) specifications and software execution hooks?
[ ] Yes [ ] No
· The complete Test Program Set Development Environment (TPSDE) tools and compiler licenses required for Government engineers to modify or author new TPSs organically?
[ ] Yes [ ] No
· Level 3 Technical Data Packages (TDP) (compliant with MIL-STD-31000) for all mechanical mounting sleds, optical alignment hoods, and passive electrical cabling?
[ ] Yes [ ] No
7.4.4 Data Rights Assertions Matrix:
Please identify any commercial or proprietary software elements that will remain subject to Commercial/Restricted Rights and require recurring license fees:
| Item / Software Module / Component |
| Basis for Assertion (e.g., Exclusively Private Expense) |
| Asserted Rights Category (Commercial / Restricted / SBIR) |
| Impact on Government Maintenance or Organic Depots |
| Example: Core Test Executive Engine |
| Developed exclusively at private corporate expense |
| Commercial Proprietary |
| Requires annual runtime license per station |
Section 8: Development Roadmap & Non-Recurring Engineering (NRE) For all hardware, measurement, or software items classified as "Near-Term Roadmap (3–6 Months)" or "Requires Development (DEV)", vendors are requested to complete the breakdown below:
| Requirement Reference |
| Specific Gap / Feature Requiring Development |
| Proposed Engineering Approach |
| Estimated Effort (Person-Months) |
| Target Delivery Timeline (Months ARO) |
| Key Technical or Supply Chain Risks |
| Example: 3.0.6 |
| Custom Module B (IVAS Waveguide Relay) |
| Optical design optimization for 80° FOV telecentricity |
| 4 Person-Months |
| 5 Months |
| Optical glass lead times |
Section 9: Technical Trade Space, Cost Drivers, & Industry Feedback The Government recognizes that certain technical combinations in working draft TEMOD-26-01 (v1.4) may drive substantial Non-Recurring Engineering (NRE), inflate per-unit recurring costs, or increase system weight. Responding vendors are requested to highlight requirements that appear over-constrained and propose commercial alternatives.
| Purchase Description Reference |
| Over-Constrained or Cost-Driving Requirement Parameter |
| Technical / Commercial Impact (Cost, Schedule, Weight, or Reliability Driver) |
| Vendor-Recommended Alternative Specification |
| Operational Trade-Off / Justification |
| Example: Table 3.0 (Digital Camera) |
| ≥24 MP at ≥120 fps full frame & ≥2,500 fps ROI |
| Requires ultra-specialized scientific camera (+$60k/unit, high heat/SWaP) |
| 12 MP sensor at 60 fps full-frame / 1,000 fps ROI |
| Sufficient for MTF, distortion, and RTA tracking with major cost savings |
| Example: Para 6.7.2.1 |
| Bare weight ≤ 55 lbs with 30-inch focal length OAP |
| Forces exotic carbon-fiber or titanium optical bench structures |
| Allow bare weight up to 65 lbs or modular two-person bench split |
| Significantly lowers manufacturing cost while maintaining portability |
Section 10: Rough Order of Magnitude (ROM) Budgetary Cost Structure
REMINDER: All financial figures provided in this section are strictly non-binding, rough-order-of-magnitude estimates utilized exclusively for Government life-cycle budget forecasting.
10.1 Hardware Procurement ROM (Per-Unit Basis)
| System Element |
| Item Description |
| ROM Unit Cost ($ USD) |
| Pricing Basis / Remarks (e.g., tiered volume discounts) |
| Base NVDTS Unit |
| Ruggedized chassis, core processor, collimator bench, light engines, camera, and standard transit case (Meeting all Section 3.0 Threshold requirements). |
| $ |
| Objective Capabilities |
| Integrated SDR RF Transceiver Hub, High-Speed camera mode (), tool-less modular rails. |
| $ |
| Standard Accessory Kit |
| Power cables, standard optical adaptors, standard electronic break-out leads. |
| $ |
| Individual UUT Sleds & Harnesses |
| Typical cost per unique mechanical bracket and electrical harness (provide estimated average range). |
| $ |
| Range: $_________ to $_________ |
| Transfer Calibration Standards Kit |
| Recommended set of specialized transfer fixtures/standards required for field calibration. |
| $ |
10.2 Software Licensing, Development, & Data Rights ROM
| Item Description |
| Licensing / Rights Structure (Perpetual / Annual / Seat / Unlimited) |
| ROM Cost ($ USD) |
| Notes / Escalation Terms |
| Base Test Executive Operating License |
| COTS Runtime Engine (Perpetual or Annual per station). |
| $ |
| Existing Off-the-Shelf TPS Licensing |
| If applicable for mature UUTs (AN/PVS-14, AN/AVS-6, etc.). |
| $ |
| Cost per existing TPS |
| Annual Software Maintenance & Cyber Updates |
| Annual recurring support, STIG patches, vulnerability remediation. |
| $ |
| Annual maintenance fee |
| New TPS Development NRE (Unlimited Rights) |
| Fully burdened rate for custom TPS development where Government retains Unlimited Rights. |
| $ |
| Rate per hour: $ |
Average TPS cost: $
| TPS Development Environment (TPSDE) |
| Authoring tool licenses for organic Army engineering use. |
| $ |
| Per seat / perpetual |
| Level 3 TDP & Mechanical Data Package |
| Complete manufacturing drawings for mechanical sleds/cables. |
| $ |
| One-time data rights fee |
10.3 Training & Support Services
| Support Category |
| Scope / Duration |
| ROM Cost ($ USD) |
| Location (Vendor Facility vs On-Site Government Base) |
| Operator Training Course |
| Standard train-the-maintainer syllabus (e.g., 3-day course for up to 8 soldiers). |
| $ |
| Calibration / Depot Maintenance Course |
| Advanced technical training for PMEL/TMDE laboratory specialists. |
| $ |
| First-Year On-Site Integration Support |
| Dedicated field engineering support during system fielding and trial operations. |
| $ |
Section 11: Submission Instructions & Points of Contact Please submit responses in electronic format (.pdf, .docx, or .xlsx) by [Insert Date: 30–45 Days from Issuance] at 17:00 CST.
Submissions To: Product Director TMDE Test Equipment Modernization Program Point of Contact: [Contracting Officer / Contract Specialist]
IMPORTANT PROPRIETARY MARKINGS NOTICE:
Responding vendors are responsible for clearly identifying and marking all proprietary, business-confidential, and competition-sensitive information on each applicable page or data item. The Government will protect properly marked proprietary submissions from unauthorized disclosure in accordance with FAR 3.104 and 18 U.S.C. § 1905.
File details come from the government source that posted it. Updated .