ACC-RSA FRAM II Industry Days 08072025 SAM Version.pptx
PPTX presentation 7 MB Posted
- Attached to
- Fort Rucker Aviation Maintenance II Industry Day
- Solicitation number
- Not on record
About this file
This is an Industry Day briefing presentation for the Fort Rucker Aviation Maintenance II (FRAM II) contract opportunity. The FRAM II program will provide aircraft maintenance and logistics support services for flight training at Fort Rucker, Alabama, supporting the US Army Aviation Center of Excellence (AVCOE), US Air Force operations, and the Army Aeromedical Research Laboratory across 5 airfields, 14 stage fields, 67 remote training sites, and various specialized facilities including a Combined Phase Maintenance facility and FAA repair station.
The current FRAM I contract is valued at $5.45 billion over 10 years (expires January 15, 2028) and maintains a diverse fleet including UH-72A, UH-60M/MED, AH-64E, and CH-47F aircraft with performance standards requiring 100% Daily Mission Performance and 98-105% Monthly/Surge Mission Performance. FRAM II will incorporate significant changes including the removal of UH-72A fleet requirements as they transition to the Flight School Next (FSN) contract over four years, addition of the new MV75 (FLRAA) aircraft fleet, potential relocation of aircraft fleets between facilities, and modified performance standards including 98% Monthly/Surge Mission Performance and 75% Aircraft Readiness Rate. The solicitation timeline includes a tentative draft RFP release in Q2 2026, final RFP in Q3 2026, and contract award in Q3 2027, with the contract anticipated as either Fixed Price Incentive Fee or Firm Fixed Price under full and open competition for a single awardee with NAICS code 488190.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ACC-RSA FRAM II Industry Days 07282025.pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Controlled by:
Controlled by:
CUI Category:
POC: nathanael.d.bryant.civ@army.mil Fort Rucker Aviation Maintenance (FRAM II) Mrs. Jennifer Murphy FRAM II, Contracting Officer U.S. Army Contracting Command
– Redstone Arsenal Version Number 1 As of 10 JUN 2025
CUI
Agenda & Disclaimer Agenda FRAM II Mission & Partners FRAM I - Current Effort FRAM II - Future Effort Solicitation
Disclaimer:
The remarks today of Government officials involved should not be considered a guarantee of the Government’s course of action in proceeding with any requirement Any information shared today is subject to change at any time without notice
FRAM II Mission & Partners Mission:
Provide quality aircraft maintenance and logistics support services to provide AVCOE all requested aircraft, every day, to support flight training requirements at Fort Rucker, Alabama.
Partners:
Training and Doctrine Command (TRADOC) – Owner of the Army’s Training Requirements Aviation Center of Excellence (AVCOE) – Responsible for development and execution of Pilot Training for the US Army United States Air Force (USAF) - Responsible for development and execution of Pilot Training for the USAF AMCOM Combined Logistics Command (ACLC) – Provide Oversight and Surveillance of the Contract
FRAM II Covered Area
FRAM I – Current Effort Requirement:
PWS: Supports Phase 1 and Phase 2 Pilot Training Performance Standards:
Daily Mission Performance (DMP): 100% Monthly/Surge Mission Performance (MSMP): 98% - 105% Aircraft Fleet Bank Time: 45% - 55% Quality Assurance Surveillance Plan (QASP): 80% minimum pass rate Reject Rates: 3% - 8% Depending on Aircraft and Option Year NAICS: 488190, Other Support Activities for Air Transportation PSC: J015, Maintenance / Repair / Rebuild of Equipment – Aircraft and Airframe Single Awardee Total Contract Value including Options: $5.45B Performance Period: One base year with 9 yearly options for a total of 10 years of performance Expires: 15 January 2028 Contract Type: Fixed Price Incentive Fee
FRAM 1– Current Effort Aircraft Maintenance and Logistics support for flight training at 5 Airfields, 14 Stage Fields, 67 Remote Training Sites, 1 FARP – Weapons Arming and Refueling Operation, 1 FAA Repair Station, and a Combined Phase Maintenance facility
Support Operations: SSA Warehouse, Aircraft Recovery, Aviation Maintenance Support Shops (AMSS Backshops), ALSE/NVG support, MEDEVAC Support, Aircraft Paint Facility As of 25 Jan 24
1st AVN BDE 110th AVN BDE
AVCOE
1-223rd AVN REGT
Cairns AAF
UH-72A (171)
UH-60 MED (8)
(Daleville, AL) Shell AHP
UH-72A (55)
(Enterprise, AL) Knox AHP
CH-47F (44)
(Fort Rucker)
1-14th AVN REGT 1-212th AVN REGT
Hanchey AHP
AH-64E (113)
Combined Phase (UH60-AH64) (Fort Rucker) Lowe AHP
UH-60M (121)
AC Paint Facility
(Fort Rucker) Main Post Area Molinelli Range
Main Post AMSS Backshop Facility SSA Warehouse Engine Test Cell (Fort Rucker) Molinelli FARP Refuel and Arming (10 Pads)
(Fort Rucker)
FRAM II – Future Effort Requirement:
PWS: Supports Phase 1 and Phase 2 Pilot Training Incorporate the removal of the UH-72 fleet requirement for Phase 1 Training Performance Standards:
Daily Mission Performance (DMP): 100% Monthly/Surge Mission Performance (MSMP): 98% Aircraft Fleet Bank Time: 50% Quality Assurance Surveillance Plan (QASP): 80% - 88% minimum pass rate Aircraft Readiness Rate: 75% Fully Mission Capable NAICS: 488190, Other Support Activities for Air Transportation PSC: J015, Maintenance / Repair / Rebuild of Equipment – Aircraft and Airframe Source Selection Information:
Full & Open Competition Performance Period: One base year with 9 yearly options for a total of 10 years of performance Contract Type: Considering either Fixed Price Incentive Fee or Firm Fixed Price
FRAM II– Future Effort As of 25 Jan 24
FSN
CAIRNS
AAF
Student Load Year FRAM II / FSN 1 75% / 25% 2 50% / 50% 3 25% / 75% 4 0% / 100%
FSN
SHELL
AHP
Student Load Year FRAM II / FSN 1 75% / 25% 2 50% / 50% 3 25% / 75% 4 0% / 100%
KNOX
AHP
No Projected Changes to Fleet or Location
AH64E (113) move to Lowe/UH60M (121) to Hanchey (Date TBD) Addition of MV75 (FLRAA) Fleet at Hanchey Consolidated Phase Maintenance (CPM) UH60/AH64 phases moved back to individual fleet basefield (Lowe/Hanchey) (Date TBD)
HANCHEY
Lowe
FRAM II
FRAM
FRAM II
Key Takeaways:
UH72A Fleets at Cairns/Shell reduce over four years in concert with phase-in of Flight School Next (FSN) contract Integration of MV75 aircraft creates potential movement of CPM (UH60/AH64), UH60M fleet, and AH64E fleet from current locations
Current Future UH72A BWS (55) transition from FRAM II contract to 100% FSN contract through FY31 UH-60L MED (8) remains at Cairns
UH72A IERW (171) transition from FRAM II contract to 100% FSN contract through FY31 CH47F (44) remains at Knox AHP
UH60M (121) move to Hanchey / AH64E move to Lowe (Date TBD) Lowe Maintenance Facility construction beginning 2029
FRAM II – Solicitation
Solicitations are not currently available
Formal Solicitations will be announced separately
Tentative Draft RFP release date 2nd quarter 2026
Tentative RFP release date 3rd quarter 2026
Tentative Award date 3rd quarter 2027 image4.png image5.png image10.png image17.png image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image23.png image24.jpeg image25.jpeg image26.jpeg image27.png image28.png image29.jpeg image30.jpeg image31.png image32.emf image11.png image12.jpeg image13.jpeg image14.png image15.png image16.png image36.png image33.jpeg image34.png image35.jpeg image1.jpeg image2.png image3.png image6.jpeg