Abstract of Bids W912DR24B0002 Mid Chesapeake Bay Barren Phase 2.pdf
PDF 457 KB Posted
- Solicitation number
- W912DR24B0002
About this file
This document is an Abstract of Bids for the Mid Chesapeake Bay Ecosystem Restoration Barren Island Phase 2 project, solicitation number W912DR24B0002. The project is being managed by the U.S. Army Corps of Engineers, Baltimore District.
The abstract provides bid information for the various line items in the solicitation, including mobilization/demobilization, surveys, construction of bird islands, stone/geotextile placement, dredging, and other site work. The government estimate for the total base bid amount is $26,585,257.18. Two bidders, Coastal Design & Construction, Inc. and Seacoast Construction Inc., submitted bids with total estimated amounts of $29,293,430.00 and $24,306,456.00, respectively. Bid security requirements and acknowledgement of amendments are also noted. The abstract covers both the base bid items as well as optional bid items related to stone sill containment, cross dike construction, and additional dredging.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3. DATE OPENED PAGE
26-Jun-24 1 of 2
4. ISSUING OFFICE Name and title of Certifying Official (Type) Nicole Brookes - Contracting Officer
I CERTIFY that I have opened, read, and recorded on this abstract all offers Signature Date Signed: 27-Jun-24 received in response to this solicitation.
5. PROJECT TITLE
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F.)
A. HIRED LABOR
B. REASONABLE CONTRACT B. Bid Security (Type and Amount) B. Bid Security (Type and Amount)
(Without Profit)
X C. REASONABLE CONTRACT C. Amendment Acknowledged
(Including Profit)
7A. 7B. 7C. D. E. F. E. F. E. F.
ITEM DESCRIPTION OF OFFERED ITEM EST. UNIT UNIT ESTIMATED UNIT ESTIMATED UNIT ESTIMATED
No. QUANTITY PRICE AMOUNT IGE PRICE AMOUNT PRICE AMOUNT
All costs in connection with mobilization and demobilization for Phase 2 of the MDBY project
JOB 8,385,391.36$ 8,910,800.00$ 8,400,000.00$
Pre-Placement Survey and Sections, complete as shown on the drawings and specified.
JOB 1,033,508.00$ 250,000.00$ 789,007.00$
0003 Bird Islands JOB 0003a All costs in connection with 1200 lb stone 16926 Ton 206.19 3,489,971.94$ $138.00 2,335,780.00$ $120.00 2,031,120.00$ 0003b All costs in connection with the R6 18866 Ton 180.19 3,399,464.54$ $127.00 2,395,982.00$ $135.00 2,546,910.00$ 0003c All costs in connection with Quarry Run 13796 Ton 146.59 2,022,355.64$ $110.00 1,517,560.00$ $110.00 1,517,560.00$ 0003d All costs in connection with geotextile 32097 SY 25.26 810,770.22$ $22.00 706,134.00$ $32.00 1,027,104.00$ 0003e All costs in connection with ACB 9444 SY 193.68 1,829,113.92$ $485.00 4,580,340.00$ $180.00 1,699,920.00$
0003f All costs in connection with the dredging and placing of Sand Fill
194930 CY 17.34 3,380,086.20$ $22.70 4,424,911.00$ $19.00 3,703,670.00$
0003g All costs in connection with Capping Material 11153 CY 115.86 1,292,186.58$ $291.00 3,245,523.00$ $145.00 1,617,185.00$ 0003h All costs in connection with #10 stone 4242 CY 209.74 889,717.08$ $200.00 848,400.00$ $190.00 805,980.00$ 0003i All costs in connection with Oyster Reef Structures 30 EA 1128.71 33,861.30$ $1,000.00 30,000.00$ $3,200.00 96,000.00$
0003j All costs in connection with Oyster Reef Danger Signs
12 EA 1569.20 18,830.40$ $4,000.00 48,000.00$ $6,000.00 72,000.00$
TOTAL ESTIMATED BASE BID AMOUNT 26,585,257.18$ 29,293,430.00$ 24,306,456.00$
0004 Stone Sill Contaiment Filter
0004a All costs in connection with the placement of Quarry Stone Sta 326+00 to Sta 310+00
7064 Ton $146.60 1,035,582.40$ $160.00 1,130,240.00$ $110.00 777,040.00$
0004b All costs in connection with the placement of geotextile from Sta 326+00 to 310+00
7111 SY 25.26 179,623.86$ $22.00 156,442.00$ $25.00 177,775.00$
0004c All costs in connection with the placement of Quarry Stone Sta 310+00 to Sta 306+00
1753 Ton 146.61 257,007.33$ $160.00 280,480.00$ $125.00 219,125.00$
0004d All costs in connection with the placement of geotextile from Sta 310+00 to 306+00
1778 SY 25.26 44,912.28$ $22.00 39,116.00$ $25.00 44,450.00$
0004e All costs in connection with the placement of Quarry Stone Sta 306+00 to 302+00
1732 SY 146.62 253,945.84$ $160.00 277,120.00$ $145.00 251,140.00$
0004f All costs in connection with the placement of geotextile from Sta 306+00 to 302+00
1778 SY 25.26 44,912.28$ $22.00 39,116.00$ $25.00 44,450.00$
C. Amendment Acknowledged
COASTAL DESIGN & CONSTRUCTION, INC.
PO BOX 650,
GLOUCESTER, VA 23061
CAGE: 0FD67
No. 2
BALTIMORE, MD 21201
ABSTRACT OF OFFERS - CONSTRUCTION 2. DATE ISSUED1. SOLICITATION NUMBER
Contracting Officer: Nicole Brookes
Yes
Bid Bond $3M
W912DR24B0002
Mid Chesapeake Bay Barren Island Restoration Project Phase 2 Dorchester County, Maryland
No. 1
BALTIMORE DISTRICT, CORPS OF ENIGNEERS
2 HOPKINS PLAZA
9. OFFERS
20%/$3M
SEACOAST CONSTRUCTION INC.
132 CLYDE ST 1C
WEST SAYVILLE, NY 11796
CAGE: 9MFE8
Yes
6. NUMBER OF AMENDMENTS ISSUED: Two (2)
0004g All costs in connection with the placement of Quarry Stone Sta 302+00 (SW) to 250+50 (Modified)
2314 Ton 146.60 339,232.40$ $160.00 370,240.00$ $128.00 296,192.00$
0004h All costs in connection with the placement of geotextile from Sta 302+00 (SW) to 250+50 (Modified)
3333 SY 25.26 84,191.58$ $22.00 73,326.00$ $25.00 83,325.00$
0004i All costs in connection with the placement of Quarry Stone from Sta 401+50 to 403+00 (SE)
695 Ton 146.64 101,914.80$ $160.00 111,200.00$ $129.00 89,655.00$
0004j All costs in connection with the placement of geotextile from Sta 401+50 to 403+00 (SE)
667 SY 25.28 16,861.76$ $22.00 14,674.00$ $25.00 16,675.00$
0005 Southwest Interior Perimeter Dike
0005a All costs in connection with the placement and filling of geotextile tube from 1135+07 to 1118+00
1707 LF 299.52$ 511,280.64$ $1,499.00 2,558,793.00$ $470.00 802,290.00$
0005b All costs in connection with the placement and filling of geotextile tube from 1118+00 to 1112+50
550 LF 299.49$ 164,719.50$ $1,422.00 782,100.00$ $470.00 258,500.00$
0005c All costs in connection with the placement and filling of geotextile tube from 1112+50 to 1106+00
650 LF 299.52$ 194,688.00$ $1,422.00 924,300.00$ $470.00 305,500.00$
0005d All costs in connection with the placement and filling of geotextile tube from 1106+00 to 1100+00
600 LF 299.54$ 179,724.00$ $1,422.00 853,200.00$ $470.00 282,000.00$
0006 Cross Dike Containment
0006i All costs in connection with the construction of the cross dike sand fill at Sta 4300+00 to 4306+65
2391 CY 17.51$ 41,866.41$ $85.00 203,235.00$ $85.00 203,235.00$
0006j All costs in connection with the construction of the cross dike geotextile tube at Sta 4300+00 to 4306+65
665 LF 299.52$ 199,180.80$ $1,422.00 945,630.00$ $460.00 305,900.00$
0006k All costs in connection with the construction of the cross dike quarry run at Sta 4300+00 to 4306+65
488 Ton 146.76$ 71,618.88$ $200.00 97,600.00$ $250.00 122,000.00$
0006l All costs in connection with the construction of the cross dike R6 at Sta 4300+00 to 4306+65
469 Ton 180.38$ 84,598.22$ $220.00 103,180.00$ $145.00 68,005.00$
0006m All costs in connection with the construction of the cross dike geotextile tube at Sta 4400+00 to 4408+58
858 LF 279.59$ 239,888.22$ $1,422.00 1,220,076.00$ $460.00 394,680.00$
0006n All costs in connection with the construction of the cross dike quarry run at Sta 4400+00 to 4408+58
488 Ton 146.76$ 71,618.88$ $250.00 122,000.00$ $250.00 122,000.00$
All costs in connection with the design, construction, and maintenance of the spillway
1 EA 734,055.30$ 734,055.30$ $872,820.00 872,820.00$ $250,000.00 250,000.00$
0008 Northeast Sill (NE)
0008a All costs in connection with foundation removal and replacement of the extension of the NE sill
33056 CY 26.83$ 886,892.48$ $96.50 3,189,904.00$ $18.00 595,008.00$
0008b All costs in connection with the placement of 2600 POUND Armor Stone
17564 TN 206.20$ 3,621,696.80$ $179.00 3,143,956.00$ $136.00 2,388,704.00$
0008c All costs in connection with the placement of Quarry Stone
7701 TN 146.60$ 1,128,966.60$ $150.00 1,155,150.00$ $110.00 847,110.00$
0008d All costs in connection with the placement of #10 stone
3337 CY 209.72$ 699,835.64$ $216.00 720,792.00$ $185.00 617,345.00$
0008e All costs in connection with the placement of geotextile
13,225 SY 25.26$ 333,987.72$ $38.00 502,436.00$ $20.00 264,440.00$
0009 Channel Dredging
0009a All costs in connection with dredging the Honga & Tar Bay Channel, from station 10+000 to station 18+000
122,000 CY 50.96$ 6,217,120.00$ $15.05 1,836,100.00$ $14.00 1,708,000.00$
0009b All costs in connection with dredging the Honga & Tar Bay Channel, from station 18+000 to station 24+635 is
61,000 CY 18.43$ 1,124,230.00$ $15.05 918,050.00$ $14.00 854,000.00$
0009c All costs in connection with dredging the Honga & Tar Bay Channel, from station 8+000 to station 10+000
35,000 CY 17.70$ 619,500.00$ $15.05 526,750.00$ $14.00 490,000.00$
0009d All costs in connection with dredging the Honga & Tar Bay Channel, from station 6+500 to station 8+000
31,000 CY 18.49$ 573,190.00$ $15.05 466,550.00$ $21.00 651,000.00$
0009e All costs in connection with dredging the Honga & Tar Bay Channel, from station 4+000 to station 6,500
39,000 CY 20.92$ 815,880.00$ $15.05 586,950.00$ $24.00 936,000.00$
0009f All costs in connection with dredging the Honga & Tar Bay Channel, from station 0+000 to station 4+000
47,000 CY 29.38$ 1,380,860.00$ $15.05 707,350.00$ $24.00 1,128,000.00$
TOTAL ESTIMATED OPTIONAL AND BASE
BID AMOUNT
48,838,839.80$ 54,222,306.00$ 39,900,000.00$
NSN 7540-01-150-0981 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. Prescribed by GSA-FAR(48 CER)53.236-1 OPTIONAL FORM 1419 (11-88)