Abstract of Bids Pg 1 of 2 - Manchester 608-315.pdf
PDF 797 KB Posted
- Solicitation number
- 36C77625B0024
About this file
This is an Abstract of Offers for Construction document for a Department of Veterans Affairs project to construct a Specialty Care Building at Manchester VAMC in Manchester, NH (Project 608-915). The solicitation number is 36C7625B0024, with an issued date of 07/30/2025 and an opening date of 08/28/2025. Two offers were received from CVJV, LLC and Monument Construction Services, L, both with bid bonds of 20%/$3M.
The primary contract involves constructing the Specialty Care Building, with a base bid of $12,907,506.00. The document includes ten deduct items ranging from removing landscaping to omitting HVAC equipment and wiring, with each offeror providing different reduction amounts. The government estimate is marked as a "Reasonable Contract (Including Profit)" category, and eight amendments have been issued for this solicitation. The contracting officer is Joelle Mascarenas from the Program Contracting Activity Central (PCAC) located in Independence, OH.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Bids Pg 2 of 2 - Manchester 608-315.pdf | ||
| 36C77625B0024_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
D. UNIT
PRICE
E. ESTIMATED
AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT
(Without Profit)
C. REASONABLE CONTRACT
(Including Profit)
9. OFFERS
NO. 1 NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
7A.
ITEM
NO.
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER
2. DATE ISSUED
3. DATE OPENED
PAGE OF
PAGES
4. ISSUING OFFICE
5. PROJECT TITLE
6. NUMBER OF AMENDMENTS ISSUED
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
SIGNATURE
DATE SIGNED
7B. DESCRIPTION OF OFFERED ITEM
7C. EST. QUANTITY
D. UNIT
E. UNIT
PRICE
F. ESTIMATED AMOUNT
D. UNIT
PRICE
E. ESTIMATED AMOUNT
D. UNIT
PRICE
E. ESTIMATED AMOUNT
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F)
A. HIRED LABOR
B. REASONABLE CONTRACT (Without Profit) C. REASONABLE CONTRACT (Including Profit)
9. OFFERS
NO. 1
NO. 2
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR
B. BID SECURITY (Type and amount)
C. AMENDMENTS ACKNOWLEDGED
AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable NOTE: If more than two offers are received, continue on OF 1419A.
OPTIONAL FORM 1419 (11-88)
\\iaimain\apps1\Pam_Ward\Logos\Pointer.jpg
7A. ITEM NO.
4. ISSUING OFFICE: Department of Veterans Affairs Program Contracting Activity Central (PCAC) 6100 Oak Tree Blvd, Suite 490 Independence OH 44131
5. PROJECT TITLE: Construct Specialty Care Building Manchester VAMC, Manchester, NH Project 608-315
| 7A. ITEM NUMBER. LINE 1 OF 13: 0001 |
| 7A. ITEM NUMBER. LINE 2 OF 13: 0002 |
| 7A. ITEM NUMBER. LINE 3 OF 13: 0003 |
| 7A. ITEM NUMBER. LINE 4 OF 13: 0004 |
| 7A. ITEM NUMBER. LINE 5 OF 13: 0005 |
| 7A. ITEM NUMBER. LINE 6 OF 13: 0006 |
| 7A. ITEM NUMBER. LINE 7 OF 13: 0007 |
| 7A. ITEM NUMBER. LINE 8 OF 13: 0008 |
| 7A. ITEM NUMBER. LINE 7 OF 13: 0009 |
| 7A. ITEM NUMBER. LINE 10 OF 13: 0010 |
| 7A. ITEM NUMBER. LINE 11 OF 13: 0011 |
| 7A. ITEM NUMBER. LINE 12 OF 13: |
| 7A. ITEM NUMBER. LINE 13 OF 13: |
| 7B. DESCRIPTION OF OFFERED ITEM: Construct Specialty Care Building |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #1: Transformer |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #2: Omit Nurse Call system |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #3: Remove interior handrails |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #4: Replace decorative wall panels |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #5: Omit metal panel rainscreen |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #6: Remove landscaping |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #7: Lower High Roof Area |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #8: Remove HVAC eqt & wiring |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #9: Remove fixed safety rail |
| 7B. DESCRIPTION OF OFFERED ITEM: Deduct #10: Remove Pump room basement |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| 7B. DESCRIPTION OF OFFERED ITEM: |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: JB |
| D. UNIT: |
| D. UNIT: |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: 1.00000000 |
| 7C. ESTIMATED QUANTITY: |
| 7C. ESTIMATED QUANTITY: |
| E. UNIT PRICE: 12907506.00000000 |
| E. UNIT PRICE: 12903814.00000000 |
| E. UNIT PRICE: 12899815.00000000 |
| E. UNIT PRICE: 12868258.00000000 |
| E. UNIT PRICE: 12845494.00000000 |
| E. UNIT PRICE: 12802426.00000000 |
| E. UNIT PRICE: 12753206.00000000 |
| E. UNIT PRICE: 12703986.00000000 |
| E. UNIT PRICE: 12324992.00000000 |
| E. UNIT PRICE: 12305981.00000000 |
| E. UNIT PRICE: 12232582.00000000 |
| E. UNIT PRICE: |
| E. UNIT PRICE: |
| F. ESTIMATED AMOUNT: 12907506.00000000 |
| F. ESTIMATED AMOUNT: 12903814.00000000 |
| F. ESTIMATED AMOUNT: 12899815.00000000 |
| F. ESTIMATED AMOUNT: 12868258.00000000 |
| F. ESTIMATED AMOUNT: 12845494.00000000 |
| F. ESTIMATED AMOUNT: 12802426.00000000 |
| F. ESTIMATED AMOUNT: 12753206.00000000 |
| F. ESTIMATED AMOUNT: 12703986.00000000 |
| F. ESTIMATED AMOUNT: 12324992.00000000 |
| F. ESTIMATED AMOUNT: 12305981.00000000 |
| F. ESTIMATED AMOUNT: 12232582.00000000 |
| F. ESTIMATED AMOUNT: |
| F. ESTIMATED AMOUNT: |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: 15430000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -12000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -2000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -35000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -57000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -3000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -60000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -9000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -205000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -117000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: -143000.00000000 |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: |
| 9. OFFERS. NUMBER. 1. E. ESTIMATED AMOUNT: |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: 15430000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -12000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -2000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -35000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -57000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -3000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -60000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -9000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -205000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -117000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: -143000.00000000 |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: |
| 9. OFFERS. NUMBER. 1. D. UNIT PRICE: |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 15777000.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -8744.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: 0.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -55085.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -47216.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -23748.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -48090.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -17159.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -257064.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -35521.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: -175857.00000000 |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: |
| 9. OFFERS. NUMBER. 2. D. UNIT PRICE: |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 15777000.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -8744.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: 0.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -55085.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -47216.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -23748.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -48090.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -17159.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -257064.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -35521.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: -175857.00000000 |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: |
| 9. OFFERS. NUMBER. 2. E. ESTIMATED AMOUNT: |
| 6. NUMBER OF AMENDMENTS ISSUED: Eight (8) |
| 1. SOLICITATION NUMBER: 36C77625B0024 |
| PAGE OF: 1.00000000 |
| PAGES: 2.00000000 |
| NAME AND TITLE OF CERTIFYING OFFICIAL (Type): Contracting Officer Joelle Mascarenas |
| 9. OFFERS. NUMBER. 1. A. OFFEROR: CVJV, LLC |
| 9. OFFERS. NUMBER. 2. A. OFFEROR: Monument Construction Services, L |
| 9. OFFERS. NUMBER. 1. B. BID SECURITY (Type and amount): Bid Bond - 20%/$3M |
| 9. OFFERS. NUMBER. 2. B. BID SECURITY (Type and amount): Bid Bond - 20%/$3M |
| 9. OFFERS. NUMBER. 1. C. AMENDMENTS ACKNOWLEDGED: 1-8 |
| 9. OFFERS. NUMBER. 2. C. AMENDMENTS ACKNOWLEDGED: 1-8 |
| SIGNATURE: |
| SIGNATURE: |
| 3. DATE OPENED. Enter 2 digit month, 2 digit day and 4 digit year.: 2025-08-28 |
| 2. DATE ISSUED. Enter 2 digit month, 2 digit day and 4 digit year.: 2025-07-30 |
| Enter 2 digit month, 2 digit day and 4 digit year.: 2025-08-28 |
| 8. GOVERNMENT ESTIMATE |
(Check A, B or C and complete D, E, and F). A. HIRED LABOR: 0
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F). B. REASONABLE CONTRACT (Without Profit): 0
8. GOVERNMENT ESTIMATE
(Check A, B or C and complete D, E, and F). C. REASONABLE CONTRACT (Including Profit): 1
File details come from the government source that posted it. Updated .