Abstract of Bids-KO.pdf

PDF 540 KB Posted

Attached to
ST. LOUIS, ILLINOIS, FLOOD PROTECTION PROJECT, BID PACKAGE 14B
Solicitation number
W912P924B0016
Issued by

About this file

This document is an Abstract of Bids for Solicitation No. W912P924B0016 for the ST. LOUIS, ILLINOIS, FLOOD PROTECTION PROJECT, BID PACKAGE 14B.

The solicitation is a 100% HUBZone set-aside with bids due on 25 October 2024 and a public bid opening on the same date. The contract includes various construction tasks such as mobilization/demobilization, environmental protection, traffic control, seeding/mulching, filter blanket installation, and scupper drain work. Six bids were received, with pricing ranging from $4,516,655.40 to $9,448,382.16. The government estimate was $6,473,094.18. The contract is being awarded by the Department of the Army Corps of Engineers Engineering District St Louis.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: W912P924B0016 Date Issued: 25 April 2024 Amendments: 0001 - 0010 Set-Aside: 100% HUBZone Set Aside Bids Due: 25 October 2024 10:00am CST Public Bid Opening: 25 October 2024 2:00pm CST

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

Bid received by due date/time? Yes Yes Yes Yes Yes Yes Amendments Acknowledged? Yes Yes Yes Yes Yes Yes Bid Security (Type and amount) Yes Yes Yes Yes Yes Yes HUBZone? Yes Yes Yes Yes Yes Yes Grand Total Prices $4,516,655.40 $6,473,484.38 $7,725,750.00 $6,299,400.00 $5,999,804.00 $9,448,382.16 $7,779,395.55

CLIN Description Quantity U/M Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount Unit Price Extended Amount

0001 Mobilization/ Demobilization 1 JB $137,300.00 $137,300.00 $178,416.00 $178,416.00 $528,825.00 $528,825.00 $215,780.00 $215,780.00 $450,000.00 $450,000.00 $401,147.41 $401,147.41 $500,000.00 $500,000.00 0002 Construction Staking 1 JB $9,900.00 $9,900.00 $85,536.00 $85,536.00 $50,500.00 $50,500.00 $86,315.00 $86,315.00 $26,000.00 $26,000.00 $87,863.17 $87,863.17 $78,745.00 $78,745.00 0003 Environmental Protection 1 JB $57,400.00 $57,400.00 $55,161.00 $55,161.00 $89,500.00 $89,500.00 $55,490.00 $55,490.00 $12,000.00 $12,000.00 $73,642.14 $73,642.14 $38,800.00 $38,800.00 0004 Traffic Control 1 JB $212,000.00 $212,000.00 $109,161.00 $109,161.00 $72,500.00 $72,500.00 $117,140.00 $117,140.00 $93,000.00 $93,000.00 $161,281.09 $161,281.09 $43,500.00 $43,500.00 0005 Seeding, Mulching, and Site Restoration 1 JB $71,000.00 $71,000.00 $60,561.00 $60,561.00 $76,511.10 $76,511.10 $61,700.00 $61,700.00 $200,000.00 $200,000.00 $139,002.16 $139,002.16 $42,700.00 $42,700.00 0006 Stripping, Clearing, and Grubbing 1 JB $90,000.00 $90,000.00 $87,561.00 $87,561.00 $175,900.00 $175,900.00 $92,480.00 $92,480.00 $31,000.00 $31,000.00 $151,318.74 $151,318.74 $103,500.00 $103,500.00 0007 Dewatering 1 JB $91,000.00 $91,000.00 $20,000.00 $20,000.00 $1.00 $1.00 $0.00 $0.00 $30,000.00 $30,000.00 $92,574.76 $92,574.76 $40,500.00 $40,500.00 0008 Above Grade Piezometers 2 EA $30,400.00 $60,800.00 $35,683.20 $71,366.40 $7,500.00 $15,000.00 $37,000.00 $74,000.00 $30,000.00 $60,000.00 $67,055.12 $134,110.24 $28,500.00 $57,000.00 0009 Abandon Existing Piezometer 1 EA $1,800.00 $1,800.00 $13,046.40 $13,046.40 $1,750.00 $1,750.00 $7,400.00 $7,400.00 $7,500.00 $7,500.00 $55,121.50 $55,121.50 $6,500.00 $6,500.00

Filter Blanket - Bottom Stage Filter (1' Thick Layer) 17,400 CY

$47.70 $829,980.00 $58.77 $1,022,598.00 $74.25 $1,291,950.00 $55.05 $957,870.00 $53.50 $930,900.00 $69.21 $1,204,254.00 $94.75 $1,648,650.00

Filter Blanket - Top Stage Filter (6" Thick Layer) 8,385 CY

$47.70 $399,964.50 $62.66 $525,404.10 $74.25 $622,586.25 $56.60 $474,591.00 $43.50 $364,747.50 $70.79 $593,574.15 $95.25 $798,671.25

Filter Blanket - Middle Stage Filter (1.5' Thick Layer) 24,737 CY

$47.70 $1,179,954.90 $76.94 $1,903,264.78 $71.45 $1,767,458.65 $64.30 $1,590,589.10 $74.50 $1,842,906.50 $149.50 $3,698,181.50 $94.50 $2,337,646.50 0013 Filter Blanket - Rip Rap (RR3) 885 CY $64.00 $56,640.00 $116.90 $103,456.50 $162.00 $143,370.00 $122.70 $108,589.50 $100.00 $88,500.00 $168.07 $148,741.95 $88.00 $77,880.00 0014 Filter Blanket - Random Fill 65,168 CY $19.50 $1,270,776.00 $33.05 $2,153,802.40 $43.50 $2,834,808.00 $36.80 $2,398,182.40 $27.50 $1,792,120.00 $34.39 $2,241,127.52 $29.60 $1,928,972.80 0015 Scupper Drain Connection and Removal 1 JB $6,200.00 $6,200.00 $27,216.00 $27,216.00 $6,750.00 $6,750.00 $8,880.00 $8,880.00 $26,000.00 $26,000.00 $59,723.24 $59,723.24 $20,100.00 $20,100.00 0016 Scupper Drain - 12" RCP Class IV Wall B Pipe 270 LF $110.00 $29,700.00 $146.36 $39,517.20 $115.00 $31,050.00 $140.00 $37,800.00 $59.00 $15,930.00 $321.47 $86,796.90 $95.00 $25,650.00 0017 Scupper Drain - 12" RCP Flared End Section 1 EA $4,250.00 $4,250.00 $3,979.80 $3,979.80 $2,500.00 $2,500.00 $795.00 $795.00 $2,000.00 $2,000.00 $56,090.09 $56,090.09 $11,200.00 $11,200.00 0018 Scupper Drain - Random Fill 340 CY $23.50 $7,990.00 $39.52 $13,436.80 $43.50 $14,790.00 $34.70 $11,798.00 $80.00 $27,200.00 $187.74 $63,831.60 $57.00 $19,380.00

$4,516,655.40 $6,473,484.38 $7,725,750.00 $6,299,400.00 $5,999,804.00 $9,448,382.16 $7,779,395.55 Bid Total 6,473,094.18$

43% 71% 39% 33% 109% 72%

Unit prices x quantity don’t = extended amounts

Offeror 6

SIS CONSTRUCTION SERVICES LLC

UEI: CUQSL1MVK233

CAGE: 9YE08

East St. Louis Design Deficiency Bid Package 14B Bid Abstract - Construction

TOTAL BASE SCHEDULE

Offeror 5

GENESIS 360 LLC

UEI: QTHJNU6HZ7B6

CAGE: 7GPY3

BASE SCHEDULE

Government Estimate

Offeror 1

BETTER BY DESIGN LLC

UEI: JH2MYKP1MM24

CAGE: 5H8U0

Offeror 4

MAGRUDER CONSTRUCTION CO INC

UEI: LMH6DPYYPM15

CAGE: 0JHC5

Offeror 3

RANDY KINDER EXCAVATING INC

UEI: XMKUEVF3NMB5

CAGE: 0E9B3

Offeror 2

ASPEN CONSTRUCTION COMPANY

UEI: KF2JBQMCZJL9

CAGE: 1M0L4

Contracting Officer Tracy Tenholder

2024-10-25T12:43:18-0500
Tracy N. Tenholder

File details come from the government source that posted it. Updated .