This document is an Abstract of Bids for the project "HUNTINGTON STATE BEACH - Replace Burned Comfort Station, Phase 3 Comfort Station #2" issued by the California Department of Parks and Recreation. The project requires furnishing all labor, materials, tools, and equipment necessary to construct a 766 SF comfort station with eight single-occupancy stalls and an internal maintenance access chase, as well as new water, storm drain, and sanitary sewer services, and hardscape work to match and tie into the existing site at Huntington State Beach in Orange County, California. The bid due date is 9/26/2024. A mandatory job showing is required. Questions and answers will be provided by addendum. The minimum DVBE participation percentage goal is 6%, and a 5% small business preference will be granted.
The project engineer's estimate range is $1,400,000 to $1,900,000. Three bids were received, with the low bid of $1,840,000 from CAL TEC Corp, the high bid of $2,600,000 from Red Castle Construction, Inc., and a bid of $2,628,614 from Blackstone Builders, Inc. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations under SB 854.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix_B_C24864011.pdf | ||
| Project_Manual_C24864011.pdf | ||
| Bid_Forms_C24864011.pdf | ||
| Drawings_C24864011.pdf | ||
| Appendix_A_C24864011.pdf | ||
| Job_Showing_Sign-in_C24864011.pdf | ||
| Addendum_1_C24864011.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 C24864011
Facilities & Development
Kelsey Henck 1 2 3
1. LS 1,840,000.00$ LS 2,247,493.00$ LS 2,600,000.00$
1,840,000.00$ 2,247,493.00$ 2,600,000.00$
Merrilee Byrnes
$1,400,000 to $1,900,000
Furnish all labor, materials, tools and equipment necessary to construct one 766 SF comfort station accommodating eight single-occupancy stalls and an internal maintenance access chase. New water, storm drain and sanitary sewer services are required and hardscape work is required to match and tie into existing site work at HUNTINGTON STATE BEACH in Orange County, California.
All work at HUNTINGTON STATE BEACH as described in the Project Manual.
HUNTINGTON STATE BEACH - Replace Burned Comfort Station, Phase 3 Comfort Station #2
CAL TEC Corp MLC Constructors, Inc. Red Castle Construction, Inc.
9/26/2024
Westminster, CA
852623
Corona, CA Chino Hills, CA
1068632 1110181
State of California - The Resources Agency
DEPARTMENT OF PARKS AND RECREATION
DPR 12 (Rev. 2/98)(Excel, Rev. 6/29/98)
ABSTRACT OF BIDS
PROJECT DESCRIPTION
ITEM
NO.
BASE BID LUMP SUM TOTAL
BIDDER BIDDER BIDDER
Contractor/ Bidder Firm
Name
Address (City & State)
License no.
Small Business Preference
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PROJECT :
ENGINEER ESTIMATE PROJECT MANAGER
PREPARER SIGNATURE
Page of
WITNESS SIGNATUREPREPARER NAME (type or print)
BID DATE
YES YESNO NO YES NO
2 2 C24864011
Facilities & Development
Kelsey Henck 4
1. LS 2,628,614.00$
2,628,614.00$
Merrilee Byrnes
$1,400,000 to $1,900,000
Furnish all labor, materials, tools and equipment necessary to construct one 766 SF comfort station accommodating eight single-occupancy stalls and an internal maintenance access chase. New water, storm drain and sanitary sewer services are required and hardscape work is required to match and tie into existing site work at HUNTINGTON STATE BEACH in Orange County, California.
All work at HUNTINGTON STATE BEACH as described in the Project Manual.
9/26/2024 832936
HUNTINGTON STATE BEACH - Replace Burned Comfort Station, Phase 3 Comfort Station #2
Blackstone Builders, Inc.
Corona, CA
State of California - The Resources Agency
DEPARTMENT OF PARKS AND RECREATION
DPR 12 (Rev. 2/98)(Excel, Rev. 6/29/98)
ABSTRACT OF BIDS
PROJECT DESCRIPTION
ITEM
NO.
BASE BID LUMP SUM TOTAL
BIDDER BIDDER BIDDER
Contractor/ Bidder Firm
Name
Address (City & State)
License no.
Small Business Preference
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PRICE TOTAL
UNIT
PROJECT :
ENGINEER ESTIMATE PROJECT MANAGER
PREPARER SIGNATURE
Page of
WITNESS SIGNATUREPREPARER NAME (type or print)
BID DATE
YES YESNO NO YES NO
File details come from the government source that posted it. Updated .