ABC_STORES_CASE_FLOW_RACKING_INSTALLATIONS_Special_Specifications_5.28.2024 (1).pdf
PDF 49 KB Posted
- Attached to
- ABC Stores Case Flow Racking Installations
- Solicitation number
- SRC0000022351
- Issued by
- Alabama
About this file
This document contains the Updated Specifications for the ABC Stores Case Flow Racking Installations project in the East Central and Southwest regions of Alabama. The project involves the installation of a cash flow racking system at four ABC Stores locations: Store 246 in Birmingham, Store 236 in Birmingham, Store 249 in Robertsdale, and Store 132 in Orange Beach. ABC Stores will supply the necessary racking components, while the supplier is responsible for providing labor, tools, equipment, travel, and the removal of all related debris. No dumpster or porta-potty services will be provided by the ABC Board.
The pricing terms, set-asides, incumbents, funding requirements and sources, and other salient information are not specified in this document. The document focuses on the scope of work, store locations, and the responsibilities of the supplier in completing the installation services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPDATED SPECIFICATIONS 5.28.2024
ABC STORES CASE FLOW RACKING INSTALLATIONS
SPECIAL SPECIFICATIONS
AWARD: BY REGION (EAST CENTRAL/SOUTHWEST)
Installation of Cash Flow Racking system per specifications for ABC Stores:
East Central Store 246 220 West Oxmoor Road, Birmingham, AL 35209 Store 236 5100 East Lake Blvd, Birmingham, AL 35217
South West Store 249 Robertsdale, AL exact location TBD Store 132 Orange Beach, AL exact location TBD
ABC will supply the following racking components needed for installation:
Uprights, crossbeams, roller beds, roller bed hangers, upright spacers, bolts and nuts for upright spacers.
Note: The ABC Board will not supply any dumpster or porta-potty services.
Supplier to provide, labor, tools, and equipment needed to complete this service.
Supplier is responsible for all travel and the removal of all related debris.
File details come from the government source that posted it. Updated .