This document is a sources sought notice issued by the U.S. Coast Guard Surface Forces Logistics Center to identify potential sources for dry dock repair services for the USCGC ABBIE BURGESS. The notice seeks information to determine if commercial sources are available to satisfy repair requirements and comply with a 400 nautical mile geographic restriction from the cutter's homeport of Rockland, Maine. Repairs are to be conducted at the contractor's dry dock facility and include various items detailed in a preliminary specification such as hull plating inspection and preservation, appendage leak testing, tank cleaning and inspection, z-drive propulsion unit renewal, sea strainer overhaul, and deck covering renewal. The period of performance is anticipated to be from March 16, 2021 through June 20, 2021. Interested sources are requested to review attached documents for full repair details and submission instructions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| USCG ABBIE BURGESS DD FY21 - Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC ABBIE BURGESS (WLM 553)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2021
Developed By: Mark A Schmalstieg
(Draft-3, 3 September 2020)
USCGC ABBIE BURGESS (WLM-175) DRYDOCK AVAILABILITY FY2021
ii (Draft-3)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ............................................................................... xii Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics - TENDER ........................................................................................................... xv General Requirements WORK ITEM 1: Hull Plating (U/W Body), Inspect WORK ITEM 2: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 3: U/W Body, Preserve (100%) WORK ITEM 4: U/W Body, Preserve (Partial - Condition A) WORK ITEM 5: U/W Body, Preserve (Partial - Condition B) WORK ITEM 6: U/W Body, Preserve (Partial - Condition C) WORK ITEM 7: Hull Plating Freeboard, Preserve “100%” WORK ITEM 8: Hull and Structural Plating (General) -10.2-Pound Steel, Renew WORK ITEM 9: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew WORK ITEM 10: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew WORK ITEM 11: Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew WORK ITEM 12: Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew WORK ITEM 13: Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew WORK ITEM 14: Appendages (U/W), Leak Test WORK ITEM 15: Appendages (U/W) - Internal, Preserve WORK ITEM 16: Chain Locker(s), Clean and Inspect WORK ITEM 17: Voids (Non-Accessible), Leak Test WORK ITEM 18: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 19: Tanks (MP Fuel Service), Clean and Inspect WORK ITEM 20: Tanks (Ballast), Clean and Inspect WORK ITEM 21: Tanks, Dirty Oil and Waste, Clean and Inspect WORK ITEM 22: Z-Drive Propulsion Unit, Renew (Drydock) WORK ITEM 23: Sw Heat Exchangers; Clean, Inspect And Hydro WORK ITEM 24: Fathometer Transducer, Renew WORK ITEM 25: Underwater (Speed) Log Transducer(s), Renew WORK ITEM 26: Sea Valves and Waster Pieces, Overhaul Or Renew WORK ITEM 27: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 28: Sea Bay, Clean and Inspect WORK ITEM 29: Sea Bay, Preserve 100% WORK ITEM 30: Thruster Unit (General), Overhaul WORK ITEM 31: Anchor Windlass, Inspect And Service WORK ITEM 32: Anchor Chain(s) and Ground Tackle, Inspect and Repair WORK ITEM 33: Anchor Chain and Ground Tackle, Preserve WORK ITEM 34: Anchor(s), Preserve WORK ITEM 35: Hawse Pipes, Preserve WORK ITEM 36: Chain Locker, Preserve 100% WORK ITEM 37: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 38: Hull Plating Freeboard (Buoy Port Areas), Preserve WORK ITEM 39: Cathodic Protection, Zinc Anodes, Renew, WORK ITEM 40: Drydock, WORK ITEM 41: Temporary Services, Provide, Cutter WORK ITEM 42: Sea Trial Performance, Support, Provide iii (Draft-3)
WORK ITEM 43: Crane Winch DCV, Replace WORK ITEM 44: Oily Water Separator, Replace WORK ITEM 45: Thruster Quick Disconnects (QDs), Install WORK ITEM 46: Fan Coil Unit, Clean and Inspect WORK ITEM 47: Handrails and Stanchions, Renew WORK ITEM 48: ASW Valves, Renew WORK ITEM 49: Bilges, Preserve WORK ITEM 50: Watertight Hatches (External DC Deck and Below), Renew WORK ITEM 51: Pilothouse Windows, Renew WORK ITEM 52: Fan Coil Units, Cleaning WORK ITEM 53: Watertight Door (External), Renew WORK ITEM 54: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 55: 03 Deck - Exterior, Preserve (“Mil-Spec/Flight Deck” System) iv (Draft-3)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Draft-3)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
APM: If editing a WI's References, change the same reference in the Spec's Consolidated List of
References and send feedback to the WI's Developer.
Coast Guard Drawing {XXX XXX 136-XXX, Rev X, XX} Level Plating and Framing
Coast Guard Drawing {XXX XXX 612-XXX, Rev X}, Rails, Stanchions and Lifelines
Coast Guard Drawing {xxxxxx}, Rev {x}, Title
Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages
Coast Guard Drawing 175 WLM 130-001, Rev -Mods to Buoy Deck Incidental to Hawser Pipe Cover
Coast Guard Drawing 175 WLM 180-011, Rev F, Sheet 5 Bow Thruster Foundation
Coast Guard Drawing 175 WLM 184-001, Rev A, V850 Transducer Adaptor Ring
Coast Guard Drawing 175 WLM 184-001, Rev-, CRP-V850 Transducer Adapter Ring
Coast Guard Drawing 175 WLM 184-001, V850 Transducer Adaptor Ring
Coast Guard Drawing 175 WLM 185-001, Rev -, Foundation Incidental to Boss 2.2 GPM OWS
Installation
Coast Guard Drawing 175 WLM 201-001, Rev C, Machinery Spaces Arrangement
Coast Guard Drawing 175 WLM 202-002, Rev G, MPCMS Wiring Data (COED)
Coast Guard Drawing 175 WLM 245-001, Rev A, Propeller
Coast Guard Drawing 175 WLM 245-002, Rev A, Z-drive Propeller Details, Modified Design
Coast Guard Drawing 175 WLM 256-001, Rev J, Seawater Cooling System Diagram
Coast Guard Drawing 175 WLM 256-001, Rev K, Seawater Cooling System Diagram
Coast Guard Drawing 175 WLM 256-003, Rev D, Seawater Cooling System FR 61 Forward
Coast Guard Drawing 175 WLM 256-004, Rev J, Seawater Cooling System Arrangements and Details
Coast Guard Drawing 175 WLM 256-004, Rev J, Sheets 5 and 13, Seawater Cooling System A & D, Hull
Blocks 940-970
Coast Guard Drawing 175 WLM 256-005, Rev -, Z-Drive Lube Oil Heat Exchanger Tube Bundle, Replacement and Piping Mods
Coast Guard Drawing 175 WLM 256-012, Rev B, Auxiliary Seawater System Piping Mods
Coast Guard Drawing 175 WLM 256-013, Rev -, Sea Bay Thermometer Installation
Coast Guard Drawing 175 WLM 262-001, Rev J, Lube Oil System Diagram
Coast Guard Drawing 175 WLM 262-002, Rev H, Waste Oil System Diagram vi (Draft-3)
Coast Guard Drawing 175 WLM 262-005, Rev G, Lube Oil System A/D – Hull Blocks 910, 930, 940, &
Coast Guard Drawing 175 WLM 320-001, Rev AL, Electrical One-Line Diagram
Coast Guard Drawing 175 WLM 320-004, Rev G, Power System Deck Plan ER and Pump Rm Hull
Block 920
Coast Guard Drawing 175 WLM 320-012, Rev -, Power System Mods Incidental to OWS
Removal/Installation One-Line Diagram
Coast Guard Drawing 175 WLM 505-003, Rev A, Sea Connection Arrangements
Coast Guard Drawing 175 WLM 541-001, Rev H, Fuel Oil System Diagram
Coast Guard Drawing 175 WLM 541-006, Rev C, Independent Tanks, Emergency Generator Day Tank
IIP:7-1
Coast Guard Drawing 175 WLM 561-001, Rev J, Z-drive Hydraulic System Diagram
Coast Guard Drawing 175 WLM 568-2, Rev M, Bow Thruster Assembly (Model 125 Fixed Pitch)
Coast Guard Drawing 175 WLM 573-001, Rev T, Buoy Deck Arrangement
Coast Guard Drawing 175 WLM 581-001, Rev E, Anchor Handling System Arrangement
Coast Guard Drawing 175 WLM 581-001, Rev F, Anchor Handling System Arrangement
Coast Guard Drawing 175 WLM 581-001, Rev F, Anchor Handling System
Coast Guard Drawing 175 WLM 593-002, Rev H, Oily Bilge System Diagram
Coast Guard Drawing 175 WLM 593-013, Rev C, Oily Water Separator A&D
Coast Guard Drawing 175 WLM 593-014, Rev A, OWS System Operating Instructions BOSS 2.2T-107-
YM
Coast Guard Drawing 175 WLM 601-001, Rev L, General Arrangement and Inboard and Outboard
Profiles
Coast Guard Drawing 175 WLM 601-001, Rev P, General Arrangement and Inboard and Outboard
Profiles
Coast Guard Drawing 175 WLM 601-001, Rev T, General Arrangement Inboard & Outboard Profiles
Coast Guard Drawing 175 WLM 601-001, Rev T, General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings (552-564)
Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings 552-564
Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Plans
Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet Of General Plans
Coast Guard Drawing 175 WLM 601-003, Rev N, Booklet of General Plans
Coast Guard Drawing 175 WLM 601-1, Rev N, Arrangement, Inboard And Outboard Profiles
Coast Guard Drawing 175 WLM 633-001, Rev D, Cathodic Protection
Coast Guard Drawing 175 WLM 635-001, Rev F, Hull Thermal and Acoustic Insulation Schedule
Coast Guard Drawing 175 WLM 801-001, Rev A, Hull Lines
Coast Guard Drawing 175 WLM 801-003, Rev A, Curves of Form
Coast Guard Drawing 175 WLM 801-006, Rev H, Docking Plan
Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Drawing
Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan
Coast Guard Drawing 175 WLM 801-015, Rev C, Scantlings, Decks & Platforms
Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion
Coast Guard Drawing 175 WLM 801-19, Rev C; Shell Expansion vii (Draft-3)
Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels
Coast Guard Drawing 175 WLM 940-002, Rev K, Hull Block 940 Modules
Coast Guard Drawing 175 WLM 940-004, Rev J, Hull Block 940 - Transverse Frames & BHD
Coast Guard Drawing 175-WLM 256-1, Rev J, Seawater Cooling System Diagram
Coast Guard Drawing 175-WLM 256-12, Rev -, ASW System Piping Mods
Coast Guard Drawing 175-WLM 512-1, Rev D, HVAC Diagram
Coast Guard Drawing 175-WLM 512-13, Rev A, HVAC Std Details & General Instructions
Coast Guard Drawing 175-WLM 568-001, Rev B, Bow Thruster Arrangement & Detail
Coast Guard Drawing 175-WLM 256-001, Rev H, Seawater Cooling System Diagram
Coast Guard Drawing 175-WLM 256-001, Rev J, Seawater Cooling System Diagram
Coast Guard Drawing 175-WLM 256-003, Rev A, Seawater Cooling System, Fr 61 Fwd Blocks 910, 920, Coast Guard Drawing 175-WLM 256-003, Rev D, Seawater Cooling System, Fr 61 Fwd Blocks 910, 920, Coast Guard Drawing 175-WLM 256-004, Rev J, Seawater Cooling System A & D, Hull Blks 940-970
Coast Guard Drawing 175-WLM 256-012, Rev B, ASW System Piping Modifications
Coast Guard Drawing 175-WLM 551-5, Rev E, Compressed Air System a/D Hull Block 940, 950
Coast Guard Drawing 175-WLM 556-1, Rev J, Hydraulic System Diagram
Coast Guard Drawing 175-WLM 568-002, Rev K, Bow Thruster Detail
Coast Guard Drawing 175-WLM 801-15, Rev C, Scantlings, Decks & Platforms
Coast Guard Drawing 175-WLM-167-001, Rev L, Structural Closures
Coast Guard Drawing 175-WLM-505-002 Rev F Mechanical Remote Valve Operators Arrangement and
Details
Coast Guard Drawing 175-WLM-529-002 Rev G Main Drainage System Diagram
Coast Guard Drawing 175-WLM-601-001, Rev T, General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 175-WLM-625-001, Rev K, Windows & Portlights Arrangement & Details
Coast Guard Drawing 901 WMEC 514-001, Rev K, HVAC System Diagram
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
COAST GUARD PUBLICATIONS
«REF_A»
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 3446, Jun 2009, Doppler Speed Log, Model SRD-500 Dual Axis
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3605A, Nov 2007, MPCMS Operating Manual (Volume 1)
Coast Guard Technical Publication (TP) 3605B, SWBS 86; Section B; Machinery Plant Control &
Monitor System (MPCMS) Z-Drive Direction Indicator System Technical Manual
Coast Guard Technical Publication (TP) 3628, 1/1/1999; Vol 4 of 9, Instruction Manual, Bow Thruster
Coast Guard Technical Publication (TP) 3628, SWBS 568, Section A, March 2017, Bow Thruster –
(Bird-Johnson Company) viii (Draft-3)
Coast Guard Technical Publication (TP) 3630, 07-JAN-97, Manufacturers Instruction Book-SWBS
Group(s) 573
Coast Guard Technical Publication (TP) 3631, Section 581-A, Sep 2013, Manufacturer's Instruction
Book-SWBS Groups 573-581, Anchor Windlass
Coast Guard Technical Publication (TP) 3653, Jul 2013; SWBS 245, Section A; Z-drive - Model 1350-H
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Requirements for Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, And Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014 Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2018, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2018, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2018, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary
Hull Accesses
OTHER REFERENCES
«OTHER_REF»
ix (Draft-3)
American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End
American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and
Welding End
Appleton Marine Control Valve Retrofit Manual 20793
ASTM International (ASTM) A106, 2015, Standard Specification for Seamless Carbon Steel Pipe, for
High-Temperature Service
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3359, 2009, Standard Test Methods for Measuring Adhesion by Tape
Test
ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component
Adhesives (AN)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-
Petrolatum
Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting
Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert
Federal Specification (Fed Spec) RR-C-271, Rev E, Dec 2010, Chain and Attachments, Welded and
Weldless
Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and
Alloy Steel
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2018 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe
Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
MIL PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-46106, Jun 1992, Adhesive-Sealants, Silicone, Rtv, One-Component
MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded x (Draft-3)
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required
MIL-DTL-23549, Sep 2016, Grease, General Purpose
MIL-F-24402, May 1995, Filters (Hydraulic), Filter Elements (High Efficiency), and Filter Differential
Pressure Indicators, General Specification
MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness
MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
MIL-PRF-24647, 2013, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
MIL-S-45180, 1998, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2011, Chapter 16, Cofferdams
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Nov 2011, Chapter 16, Cofferdams
NAVSEA 803-1401892,.Rev H, Scuttle, WT, Raised Quick Acting, 21 DIA 16 PSI - Arrangement
NAVSEA 805-1624092, Rev E, Hatch W.T. Raised Individually Dogged 30 IN X 30 IN Scuttle, 30 P.S.I.
Arrangement
QPL-24667, May 2008, Qualified Product List (Military) of Products Qualified Under Detail
Specification MIL-PRF-24667, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering
Application
Recovered Energy, Inc, BOSS 107 Separator System Operation & Maintenance Manual – YM Model
Ribbon Sealant 3M 5422 Strip Sealant 1/8 IN THK x 1 IN WIDE
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032A, 2012
Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install New
Deck Covering Systems
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning xi (Draft-3)
The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2006, Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough
Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-4/NACE WJ-4, 2012, Waterjet Cleaning of Metals – Light Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning xii (Draft-3)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
22 Y Starboard Z-drive
(CCW rotation)
NSN: 2010-21-920-0919 1 ea. 500,250.00
22 Y Port Z-drive (CW rotation)
NSN: 2010-21-920-0899 1 ea. 500,250.00
22 Y Special Alignment
Pointer Set- CG Tool
N/A 1 ea. 500.00
22 Y Z Drive Alignment
Tool
NSN: 5220-01-F16-4720 1 ea. 3600.00
23 Y **Z-Drive Hyd. Fluid
Cooler
NSN: 4420-01-505-9267 2 ea. 7,725.00
23 Y **Z-Drive Lube Oil
Cooler
NSN: 4420-01-603-3557 2 ea. 3,910.00
23 N Heat Exchanger, Gasket
NSN: 5330-01-449-2451 2 ea. 22.53
23 N Heat Exchanger, Gasket
NSN: 5330-01-449-2479 2 ea. 18.66
24 N ***Fathometer
Transducer, Shallow
Water, 50-200 kHz
(Airmar Technology
SS505)
NSN: 5845-01-470-2500 1 ea. 343.63
25 Y ***Sperry SRD 500
Doppler speed log
NSN: 5999-01-472-7499 1 ea. 16504.43
27 Y **3in• Duplex
Strainer
NSN: 4730-01-643-2221 PN:
3-792FB (Mueller)
1 ea. 10,400.00
30 N Seal Kit, Bow Thruster NSN: 2010-01-555-9048 1 ea. 3,634.00
30 N Anode, Zinc NSN: 5365-01-495-5350 9 ea. 113.75
31 N Anchor Windlass
Overhaul kit
NSN: 5430-01-546-4684 1 ea. 12,474.00
31 N Ball Valve NSN: 4820-01-013-3430 1 ea. 87.36
31 N Valve, Counterbalance NSN: 4820-01-F16-4571 PN:
CBEH-LKN-BCL Sun
Hydraulics Corp
1 ea. 354.00
31 N ** Motor, Hydraulic NSN: 4320-01-419-3520 1 ea. 1,811.00
31 N ** Valve, Linear, Directional Control
NSN: 4810-01-511-3173 1 ea. 983.14
31 N Hydraulic Brake NSN: 2530-01-F14-4033 P/N:
90B3C4G087
1 ea 2000.00
40 Y *Transducer Cover
Plate
N/A 2 ea. 50.00
43 N HDRAULIC
CONTROL VALVE
PN: AMD-2633 ACN 4810-
01-F18-5588
1 15,061.00 xiii (Draft-3)
ASSEMBLY PARTS
KIT
44 N Boss 2.2 GPM OWS NSN: 4330-01-F13-3461 PN:
BOSS 2.2T-107 YM
1 ea. 14,300.00
50 N 30in x 30in Raised
Watertight Hatch, Steel, (Raised 12 inch combing, 2in QAWTS
(hinge fwd)}
STOCK NUMBER 0000-XF-
CC0-4021 APL NUMBER
31061011B0
2 ea.
51 N Item 2. 47 IN W x 42
IN H Electric Heated
Clear Heat Treated
Window, Fixed, Fwd
Frame 61, 4in-2 IN off
CL, Starboard
NSN: 2090-01-425-3100 1 ea. 7800.00
51 N Item 6 62 IN W Top x
42 IN H x 55 IN W
Bottom Electric Heated
Clear Heat Treated
Window, Fixed, Frame
52, 14in-7 inch off CL
Starboard
NSN: 2090-01-425-3116 1 ea. 8100.00
51 N Item 7 62 IN W Top x
42 IN H x 55 IN W
Bottom Electric Heated
Clear Heat Treated
Window, Fixed, Frame
52, 14in-7 inch off CL
Port
NSN: 2090-01-425-3917 1 ea. 8100.00
53 N 26 IN x 66 IN QA
Watertight Door, Steel, LH Swing; W/O Fixed
Light
NIIN: 014863599 1 5894.27
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiv (Draft-3)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
2 Hull Plating (U/W Body), Ultrasonic Testing
3 U/W Body, Preserve (100%)
14 Appendages (U/W), Leak Test
17 Voids (Non-Accessible), Leak Test
19 Tanks (MP Fuel Service), Clean and Inspect
22 Z-Drive Propulsion Unit, Renew (Drydock)
27 Sea Strainers - Duplex (All Sizes), Overhaul
28 Sea Bay, Clean and Inspect
31 Anchor Windlass, Inspect And Service
32 Anchor Chain(s) and Ground Tackle, Inspect and Repair
43 Crane Winch DCV, Replace
49 Bilges, Preserve
54 Deck Covering (Interior Wet/Dry), Renew xv (Draft-3)
PRINCIPAL CHARACTERISTICS - TENDER
175' WLM, BUOY TENDER
PHYSICAL
Length overall 174' 8"
Length between perpendiculars 155' 1"
Depth 14' 8"
Maximum beam 36' 0"
Designed draft 8' 0"
Mast height (above 8' waterline) 58' 8"
Frame spacing 20"
Full load displacement 855.15 Long Tons SW
Light load displacement 719.78 Long Tons SW
Minimum op condition displ 852.19 Long Tons SW
HULL
Hull material Steel
MACHINERY
Main propulsion Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @ 1500 RPM
Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @ 1600 ERPM
Reduction gears Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio
Shaft seal John Crane Type ND
Shaft bearings Five pedestal mounted, Cooper split roller bearings
Number of propellers 2
Number of blades 4
Diameter 57.1"
Rudders None; Z-drive
Ship's service generators Three Caterpillar Model 3406 DITA Turbocharged; 285KW, 450V, 60 Hz, 1800
RPM
Emergency diesel generator One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM
TANK CAPACITIES
Diesel oil capacity (100%) 16,385 gal
Fresh water capacity (100%) 7,339 gal
Lubricating oil (100%) 86 gal
1 (Draft-3)
00000_0220_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Draft-3)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
Or
3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.
Or
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
A-Team Note: Determine whether the Contractor or the Coast Guard will provide fire watches; then select applicable paragraph 3.2 above (fire watch, fire extinguisher s, or a combination of both requirements), and delete the others. Under normal circumstances, for all cutters, fire watch personnel for contract work will be provided by ship's force with the contractor providing fire extinguishers. For situations involving a small cutter crew (such as WLIC and WLR tenders) and an inordinate amount of hot work or multiple shift work, the A-team may consider the requirement for contractor provided fire watch personnel or a combination of both fire watch and fire extinguishers.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3 (Draft-3)
WMEC 270B class cutters APM:
270’s APM: Add the “NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP
1688), May 1997, Requirements for Fabrication, Welding, and Inspection of
Submarine Structure” to the References Section, if this package is for a 270 “B-
Class” cutter.
The following paragraphs 3.4.1, 3.4.2 and 3.4.3 are for 270B cutters only!
Change the following content of these three (3) paragraphs, and the follow-on
“NOTE” box to the Normal, Paragraph Title, Note Title, and Note Body styles when included in this General Requirements WI.
3.4.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in
NAVSEA TP 1688 as applicable for welding HY-130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The
Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-Class” cutters, the Contractor shall provide written
Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Weldox 900 shall be considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
APM: Select the appropriate 3.5.1 paragraph(s) for the location of the planned availability. Delete the other 3.5.1 paragraph(s).
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, 4 (Draft-3) ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
Or
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
APM: For availabilities to be conducted at Coast Guard facilities, the Contractor must be provided the USCG Activity Generator Status for the Coast Guard Facility.
Provide the Generator Status code in paragraph 3.5.1.1, and other applicable environmental permits in paragraph 3.5.1.2 below.
Ensure the CG Base or Sector Environmental POC for this is actively engaged in the early planning for this availability to ensure the Facility can accommodate the planned work.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________.
APM: If applicable, provide the list of unit-specific plans and permits required, and provide description of the specifics of these plans in paragraph 3.5.1.2. Otherwise delete paragraph 3.5.1.2.
CG Base or Sector Environmental POC must provide these details.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
APM: Retain further 3.5 paragraphs for all availabilities.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
5 (Draft-3)
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:
None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
6 (Draft-3)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Draft-3)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
8 (Draft-3)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 (Draft-3)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
10 (Draft-3)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Draft-3)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (Draft-3)
11000_0320_FLT
REC_11000_UWHIB_FLT_175’ WLM (ALL) (1211)
APM: Do not edit any part of the Work Item Title.
WORK ITEM 1: Hull Plating (U/W Body), Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s
Under Water (U/W) hull plating, including U/W appendages and coating system.
1.2 Government-furnished property.
APM: Validate all GFP data. If the Spec Package's Consolidated List of GFP is changed, ensure it is changed in the source WI and GFP style is applied.
None.
2. REFERENCES
APM: If adding/deleting/editing a WI's Reference, change the same ref. in the
Spec Pkg.'s Cons. List of Refs. and send feedback to the WI's developer.
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages
Coast Guard Drawing 175 WLM 801-006, Rev H, Docking Plan
Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
OTHER REFERENCES
ASTM International (ASTM) D4138, 2013, Standard…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .