ABAC 5100289 Drawings.pdf

PDF 958 KB Posted

Attached to
ABAC Project No. 5100289_REPLACE BRANCH AND BOWEN MAIN SWITCHBOARDS
Solicitation number
PE-47200-RFQ-2025-000000074
Issued by
Terrell County, Georgia

About this file

This is a set of electrical engineering drawings from NBP Engineers, Inc. for a project at Abraham Baldwin Agricultural College in Tifton, Georgia to replace main switchboards in Branch and Bowen Halls (Project No. 24094). The bid set is dated 12.05.2024 and includes detailed electrical schematics showing the main switchboard elevations and schedules for both buildings. The scope notes indicate the work involves disconnecting and removing existing MSB sections while preserving service entrance and sub-feeders, providing new MSB per elevation drawings, reconnecting service entrance conductors and sub-feeders, and reconnecting grounding electrode conductors.

The drawings specify technical requirements including a surge protection device (SPD) that must meet ANSI/IEEE C62.41 Category C standards with a 5-year warranty. All power outages must be coordinated with ABAC at least 10 days in advance through campus contact Tim Carpenter, with no outages exceeding 24 hours. For outages longer than 4 hours, the contractor is responsible for providing and paying for fire watch services. The switchboards operate at 208V 3-phase and 480V 3-phase respectively with 65 KAIC ratings. Existing conductors may be reused with field verification required for all breaker sizes prior to equipment submittal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF

DRAWINGS

TITLESHEET NO.

NBP

ENGINEERS

NBP Project No.: 24094

Tifton, Georgia

Abraham Baldwin Agricultural College Replace Branch and Bowen Main Switchboards

PROJECT CONSULTANTS

NBP ENGINEERS, INC.

MACON, GEORGIA316 CORPORATE PARKWAY

CONSULTANTS

478-745-1691 www.nbpengineers.com

12.05.2024 BID SET

SITE MAP

E1 BOWEN HALL MSB ELEVATION/SCHEDULE

E2 BRANCH HALL MSB ELEVATION/SCHEDULE

CT COMPARTMENT

AND RECONNECT

CT'S TO NEW GEAR

RELOCATE EXISTING

1200A

BREAKER

MAIN

MAIN SECTION SUB-FEEDER SECTION

AHU

60/3

PANEL D

125/3

PANEL A

125/3

ELEV. RM

PANEL LPB

125/3

PANEL E

125/3

DRIVE

WATER

COLD

35/3

PANEL b

150/3

BOWEN HALL MSB ELEVATION/SCHEDULE

NOT TO SCALE

E-1

ELEVATION/SCHEDULE

BOWEN HALL MSB

DRIVE

WATER

HOT

125/3

PUMP

WATER

HOT

20/3

PUMP

WATER

HOT

20/3

PUMP

WATER

CHILL

50/3

PUMP

SYS

50/3

PANEL K & C

400/3

65 KAIC

208V, 3-PH

65 KAIC

SUBMITTAL.

VERIFY ALL BREAKER SIZES PRIOR TO EQUIPMENT

EXISTING CONDUCTORS MAY BE REUSED. FIELD

PROVIDE LUG LOCATIONS TO MATCH EXISTING, SO

BREAKER LOCATIONS ARE SHOWN SCHEMATICALLY.

SCOPE NOTES:

PROVIDE NEW MSB PER ELEVATION.

RECONNECT SERVICE ENTRANCE CONDUCTORS AND SUB-FEEDERS.

CONDUCTOR SIZE INSIDE MSB AS REQUIRED.

RECONNECT TO EXISTNG GROUNDING ELECTRODE CONDUCTOR. EXTEND WITH MATCHING

COORDINATION IS TIM CARPENTER.

APPROVED IN WRITING AT LEAST 10 DAYS IN ADVANCE. CAMPUS CONTACT FOR OUTAGE

ALL OUTAGES SHALL BE COORDINATED WITH ABAC, AND NOTICE SHALL BE GIVEN AND

REQUIRED FOR THE NEW MSB.

THE EXISTING MSB IS NOT MOUNTED ON A CONCRETE PAD. A CONCRETE PAD IS NOT G

F

E

D

C

B

A

SUB-FEEDERS.

DISCONNECT AND REMOVE EXISTING MSB SECTIONS. PRESERVE SERVICE ENTRANCE AND

(PAST THE 4 HOURS). NO OUTAGE SHALL BE LONGER THAN 24 HOURS.

FOR PROVIDING AND PAYING FOR A FIRE WATCH FOR AS LONG AS THE POWER IS OFF

IF BUILDING POWER IS OFF LONGER THAN 4 HOURS, THE CONTRACTOR IS RESPONSIBLE

H

SPD

30/3

SPACE

200/3

SPACE

200/3CONDUCTORS AND THE GROUND/NEUTRAL BAR.

LOAD SIDE OF THE MAIN DISCONNECT DEVICE AS CLOSE AS POSSIBLE TO THE PHASE

CURRENT CAPACITY SHALL BE 240kA PER PHASE, 120kA PER MODE. LOCATE THE SPD ON THE

INDICATOR LIGHT THAT REPORTS THE STATUS OF THE PROTECTION OF EACH PHASE. SURGE

HAVE SURGE COUNTER WITH RESET BUTTON. DEVICE SHALL HAVE GREEN/RED SOLID STATE

PROTECTED METAL OXIDE VARISTORS, PROTECTING L-N, L-G, L-L, AND N-G. DEVICE SHALL

BOARD SUBMITTAL. SPD SHALL BE ANSI/IEEE C62.41 CATEGORY C, UTILIZING THERMALLY

AS SWITCHBOARD. PROVIDE 5-YEAR WARRANTY. SUBMIT SPD PRODUCT DATA WITH SWITCH-

PROVIDE SURGE PROTECTION DEVICE (SPD) FOR SWITCHBOARD, BY SAME MANUFACTURER

SealProject Title

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

SCALE:

FILE PATH:

DESIGNED:

DATE:

PROJECT NUMBER:

P:\24094\24094e1.dgn

DATE PLOTTED

DGN FILE

05-DEC-2024

SHEET NUMBER:

Sheet Title

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

CONSULTANTS

12.05.2024

AS SHOWN

P:\24094\24094e1.dgn

Replace Branch and Bowen Main Switchboards

Tifton, Georgia

Abraham Baldwin Agricultural College

24094

SHD

BCO

SHD

COA Expiration: 6.30.2026

COA#PEF000774

NBP Engineers, Inc.

MAIN SECTIONSUB-FEEDER SECTION

BRANCH HALL MSB ELEVATION/SCHEDULE

NOT TO SCALE

E-2

ELEVATION/SCHEDULE

BRANCH HALL MSB

PUMP

ELEVATOR

100A/3P

PANEL H1A

60A/3P

PANEL H1B

45A/3P

SPARE

100A/3P

THRU X1B

PANEL L1B

125A/3P

H2B & H3B

PANELS

100A/3P

THRU X3R

PANEL L3R

60A/3P

SPARE

100A/3P

PANEL HEM

50A/3P

PANEL H3M

400A/3P

800A

BREAKER

MAIN

65 KAIC

TO NEW BREAKER IN SUBFEEDER SECTION.

FROM EXISTING BREAKER IN MAIN SECTION

EXTEND EXISTING CONDUCTORS, 4#6, 1#10G

65 KAIC

480V, 3-PH

SCOPE NOTES:

PROVIDE NEW MSB PER ELEVATION.

RECONNECT SERVICE ENTRANCE CONDUCTORS AND SUB-FEEDERS.

CONDUCTOR SIZE INSIDE MSB AS REQUIRED.

RECONNECT TO EXISTNG GROUNDING ELECTRODE CONDUCTOR. EXTEND WITH MATCHING

COORDINATION IS TIM CARPENTER.

APPROVED IN WRITING AT LEAST 10 DAYS IN ADVANCE. CAMPUS CONTACT FOR OUTAGE

ALL OUTAGES SHALL BE COORDINATED WITH ABAC, AND NOTICE SHALL BE GIVEN AND

REQUIRED FOR THE NEW MSB.

THE EXISTING MSB IS NOT MOUNTED ON A CONCRETE PAD. A CONCRETE PAD IS NOT G

F

E

D

C

B

A

ALL BREAKER SIZES PRIOR TO EQUIPMENT SUBMITTALS

EXISTING CONDUCTORS MAY BE REUSED. FIELD VERIFY

PROVIDE LUG LOCATIONS TO MATCH EXISTING, SO

BREAKER LOCATIONS ARE SHOWN SCHEMATICALLY.

H

SUB-FEEDERS.

DISCONNECT AND REMOVE EXISTING MSB SECTIONS. PRESERVE SERVICE ENTRANCE AND

(PAST THE 4 HOURS). NO OUTAGE SHALL BE LONGER THAN 24 HOURS.

FOR PROVIDING AND PAYING FOR A FIRE WATCH FOR AS LONG AS THE POWER IS OFF

IF BUILDING POWER IS OFF LONGER THAN 4 HOURS, THE CONTRACTOR IS RESPONSIBLE

CONDUCTORS AND THE GROUND/NEUTRAL BAR.

LOAD SIDE OF THE MAIN DISCONNECT DEVICE AS CLOSE AS POSSIBLE TO THE PHASE

CURRENT CAPACITY SHALL BE 240kA PER PHASE, 120kA PER MODE. LOCATE THE SPD ON THE

INDICATOR LIGHT THAT REPORTS THE STATUS OF THE PROTECTION OF EACH PHASE. SURGE

HAVE SURGE COUNTER WITH RESET BUTTON. DEVICE SHALL HAVE GREEN/RED SOLID STATE

PROTECTED METAL OXIDE VARISTORS, PROTECTING L-N, L-G, L-L, AND N-G. DEVICE SHALL

BOARD SUBMITTAL. SPD SHALL BE ANSI/IEEE C62.41 CATEGORY C, UTILIZING THERMALLY

AS SWITCHBOARD. PROVIDE 5-YEAR WARRANTY. SUBMIT SPD PRODUCT DATA WITH SWITCH-

PROVIDE SURGE PROTECTION DEVICE (SPD) FOR SWITCHBOARD, BY SAME MANUFACTURER

SPD

30A/3P

SPACE

200A/3P

SealProject Title

No. REVISIONS/SUBMISSIONS DATE

DRAWN:

CHECKED:

SCALE:

FILE PATH:

DESIGNED:

DATE:

PROJECT NUMBER:

P:\24094\24094e2.dgn

DATE PLOTTED

DGN FILE

05-DEC-2024

SHEET NUMBER:

Sheet Title

316 CORPORATE PARKWAY

NBP Engineers, Inc.

MACON, GEORGIA 31210

NBP

ENGINEERS

478-745-1691 www.nbpengineers.com

CONSULTANTS

12.05.2024

AS SHOWN

P:\24094\24094e2.dgn

Replace Branch and Bowen Main Switchboards

Tifton, Georgia

Abraham Baldwin Agricultural College

24094

SHD

BCO

SHD

COA Expiration: 6.30.2026

COA#PEF000774

NBP Engineers, Inc.

24094cov
24094e1
References
tb, 24094tb.dgn
24094e2
References
tb, 24094tb.dgn

File details come from the government source that posted it. Updated .