Duel_Point_Davit_System_SOW.pdf
PDF 2 MB Posted
- Attached to
- Duel point davit system
- Solicitation number
- AB133M-13-RP-0107
About this file
Duel point davit system SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Amendment_002.pdf | ||
| AB133M-13-RP-0107_Amendment_001.pdf | ||
| AB133M-13-RP-0107.pdf | ||
| Duel_Point_Davit_System_SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOAA
Statement of Work by Jessica Long
3/1/2013
NOAA Ship Oscar Dyson
– Peggy D. Davit
DUAL POINT DAVIT SYSTEM FOR 27’ PILOTMASTER (NOAA SHIP OSCAR DYSON’S
WORKBOAT, PEGGY D.) – FEBRUARY 2013
Table of Contents
1.0 BACKGROUND AND SCOPE
1.1 PURCHASE OF DAVIT
1.2 MODIFICATION DESIGN: NOAA SHIP OSCAR DYSON FOR DUAL POINT
DAVIT
1.3 BACKGROUND
1.4 NOAA SHIP OSCAR DYSON GENERAL SPECIFICATIONS
1.5 OUTBOARD PROFILE OF NOAA SHIP OSCAR DYSON
1.6 PEGGY D
1.7 CURRENT PHOTOGRAPHS
1.8 SUMMARY OF DELIVERABLES
2.0 APPLICABLE DOCUMENTS, REFERENCES AND STANDARDS
2.1 DOCUMENT AVAILABILITY
2.2 GOVERNMENT DOCUMENTS
NOAA DOCUMENTS
MILITARY SPECIFICATIONS
OTHER GOVERNMENT DOCUMENTS
COMMERCIAL DOCUMENTS
2.3 APPLICABLE STANDARDS
3.0 REQUIREMENTS
3.1 FUNCTIONAL REQUIREMENTS FOR DUAL POINT DAVIT
3.2 ENVIRONMENTAL CONDITIONS
3.3 TOP LEVEL DESIGN REQUIREMENTS
3.4 LAUNCH AND RETRIEVAL PROCESSES
3.5 DESIGN REQUIREMENTS
3.6 ARCHITECT-ENGINEERING SERVICES
3.7 INTEGRATED LOGISTICS SUPPORT
3.8 OPERATIONAL AND MAINTENANCE TRAINING
3.9 RESISTANCE TO MARINE ENVIRONMENT
3.10 WARRANTY AND TECHNICAL SUPPORT
4.0 QUALITY ASSURANCE AND TESTING
4.1. QUALITY ASSURANCE
4.2 TEST REQUIREMENTS
5.0 PRESERVATION, MARKING AND PACKAGING
6.0 NOTES
GOVERNMENT DOCUMENTS
COMMERCIAL DOCUMENTS
6.2 DETAILED DRAWINGS
NOAA Ship Oscar Dyson Outboard Profile, STBD Side NOAA Ship Oscar Dyson 01 Deck Layout Plan Peggy D. Structural Profile, Beam Plan, and Frame Plan
7.0 LOCATION OF OSCAR DYSON
8.0 PERIOD OF PERFORMANCE
9.0 POINT OF CONTACT FOR TECHNICAL QUESTIONS:
1.0 BACKGROUND AND SCOPE
The scope of this statement of work is for the architectural and engineering services for installing a davit on the NOAA Ship Oscar Dyson as well as the supply of the davit. Submittals to the solicitation can be each of these items (1.1 and 1.2) individually, or both provided together.
1.1 PURCHASE OF DAVIT
This specification sets forth the minimum requirements for purchase of dual point davit equipment for the NOAA to install on the 209’ NOAA Ship Oscar Dyson. It also includes all hardware described in this statement of work for the davit and auxiliary release equipment. The dual point davit will be used to launch and recover NOAA’s 27’ PilotMaster Aluminum Hull Hybrid Collar Boat, Peggy D, as well as other boats of similar configuration that may be assigned in the future. The davit shall be equipped with an adjustable integrated cradle arrangement allowing various boats to be carried. The davit shall be rated for a Safe Working Load of at least 12,040 lbs. The davit will be located on the starboard side, 01 Level, aboard the NOAA Ship Oscar Dyson.
1.2 MODIFICATION DESIGN: NOAA SHIP OSCAR DYSON FOR DUAL
POINT DAVIT
Awardee shall supply a qualified professional engineer from an Architect- Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for installing the new davit on the 01 Level of the NOAA Ship Oscar Dyson. This includes any additional supporting structure and/or relocation of existing deck fixtures to safely accommodate the davit. All relevant drawings must be stamped by a professional engineer.
1.3 BACKGROUND
The Peggy D. workboat was installed in 2004 and has been using the starboard Appleton crane to deploy it. Using a crane to deploy the small boat has not been ideal and the ship is seeking to install a davit for safer, smoother deployments.
1.4 NOAA SHIP OSCAR DYSON GENERAL SPECIFICATIONS
• Length (LOA): 63.8 m (209 ft)
• Breadth: 15.0 m (49.2 ft)
• Depth to Main Deck: 8.65 m (28.4 ft)
• Draft (Centerboard retracted): 6.0 m (19.4 ft) Full load
• Draft (Centerboard extended): 9.05 m (29.7 ft)
• Full Load Displacement: 2,479 metric tons
• Lightship Displacement: 1,840 metric tons
1.5 OUTBOARD PROFILE OF NOAA SHIP OSCAR DYSON
This diagram provides a general display of hull features, although some details may vary. The starboard crane is showed stowed aft. The red oval indicates the general location of the Peggy D and future location of a davit.
1.6 PEGGY D.
The Peggy D. workboat is a 27’ X 10’3” Pilot Master, welded aluminum cabin vessel, with integrated air/foam collar, manufactured in 2003 by Northwind Marine. The original delivered dry weight was 6,800 lbs including the propulsion system. The fuel capacity is 142 gals of diesel at 100% tank capacity. The manufacturers’ suggested capacity is a maximum carrying capacity of 1800 lbs, persons and cargo, not more than 8 persons.
1.7 CURRENT PHOTOGRAPHS
Photograph’s depicting the current location of the Peggy D workboat on board the Oscar Dyson. The Appleton Crane boom rest and the storage location of the boom will be relocated in the aft direction, making more room for a davit.
Tape measure on deck indicating 14’ from outboard deck edge
Peggy D currently on deck with the crane stowed forward, resting on the crane boom rest.
The crane boom rest will be relocated aft of this area so that the crane can be stowed aft to accommodate the new davit.
The deck area before the installation of the Peggy D cradle. The crane book rest will be relocated. The crane and white control box will remain as located at the aft end of this 01 deck. The net drum is pictured on the right side of the picture. It will not be relocated and there must be sufficient room between the new davit and the net drum for shipboard personnel to walk between the two and access the controls on the side of this net drum.
1.8 SUMMARY OF DELIVERABLES
This list is meant to be a general summary, but may not be all inclusive.
Please reference the rest of this statement of work to ensure all components of it are accounted for.
1.8.1 Supply of Davit and all related components
� Davit system with the following features:
• Constant tension/self tensioning winch
• Emergency launching and recovery system that works without electric power (SOLAS approved)
• Adjustable pick point span to accommodate various sized vessels
• Davit foundation to be permanently fixed to the ship
• Davit hinges welded to the ship. Hinge bolts to be removed if davit is to be taken off.
• Cradle (adjustable for various sized boats)
• Sea painter system
• Integrated remote hook release system for both points of davit and sea painter, to be mounted in the house of the Peggy D.
• 2 Henriksen style HMK 3.5 off-load hooks, or similar, and all necessary mounting hardware including swivel joints. Features include safety remote release.
• Sea painter release hook and all necessary mounting hardware.
• Control station with emergency manual control
• Recommended spares list
• Tuned shock absorber for each fall that takes away peak loads.
• Hydraulic guide arms
• Wire puller system, automatic feeding of empty fall wire to avoid bird nesting on winch system.
• Stainless steel HPU, built for mounting out on ship’s weather deck. Soft starter for HPU motor.
• Single fall wire with rings, to be connected to Henriksen
Hooks in the boat.
• Recommended inspection and maintenance plan
• Acceptance Test
� Architectural and Engineering Services:
• Design development for davit installation on board NOAA Ship Oscar Dyson including any additional supporting members to accommodate the weight of the davit. Design shall include relocated crane boom support pedestal, relocated life rafts, davit control station, etc.
• Construction documents
• Technical specifications
• As built documentation
• Updated AutoCAD drawings of the Dyson to reflect davit addition
• Table of weights (and heights) added, relocated
• Updated Trim and Stability Booklet through coordination with NOAA’s Naval Architect to reflect added davit.
• Plan for adding permanent ballast on the NOAA Ship Oscar Dyson to accommodate the added davit, if necessary.
• Update the Trim and Stability Booklet to reflect these four freeing ports that were welded shut. Provide approval letter from ABS that these changes are acceptable.
2.0 APPLICABLE DOCUMENTS, REFERENCES AND STANDARDS
2.1 DOCUMENT AVAILABILITY
To obtain the referenced documents see section 6.1.
2.2 GOVERNMENT DOCUMENTS
The following documents form a part of this specification to the extent specified herein. In the event of a conflict between the reference documents and the contents of this specification, the contents of this specification shall take precedence. The Contractor is required to notify the Contracting Officer in writing for a resolution if an ambiguity or conflict is found in these specifications.
NOAA DOCUMENTS
01_FinalDrawingIndex.pdf
Northwind_Pilotmaster_Specifications[1] FA01-002-03_OutboardProfile_STBD.dwg FA01-002-03_OutboardProfile_STBD-Model.pdf FA02-003-05_MainDeck_SecondDeck_Layout.dwg FA02-003-05_MainDeck_SecondDeck_Layout-Model.pdf FA02-004-05_01Deck_02Level_Layout.dwg FA02-004-05_01Deck_02Level_Layout-Model.pdf NOAA 27 Hoisting Fittings.pdf NOAA 27 Hoisting Fittings Color.pdf OD-583-005 Peggy D Workboat-Model.pdf T&S_Booklet_Oscar_Dyson_Rev-0
MILITARY SPECIFICATIONS
MIL-STD-419E – Cleaning and Protecting Piping, Tubing, and Fittings for Hydraulic Power Transmission Equipment, 2010.
MIL-STD-1310H, Shipboard Bonding, Grounding and Other Techniques for Electromagnetic Compatibility and Safety, 2009.
MIL-STD-1399C Section 300B, Interface Standard for Shipboard Systems, Electric Power, Alternating Current, 2008.
DOD-STD-1399C Section 301A, Interface Standard for Shipboard Systems Ship Motion and Attitude, 07/21/86
MIL-PRF-17672D, Specification for Hydraulic Fluid, Petroleum, inhibited, Amend. 3, 5/31/95.
MIL-PRF-18458C – Grease, Wire Rope, Type II, 2007
MIL-C-24643C Amend 1 – Cables and Cords, Electric, Low Smoke, for Shipboard Use, General Specification for, 2011
MIL-V-24695B - Valve, Hose Assembly and Adapter, Vent and Test, Hydraulic Service, General Specification for, 2011
OTHER GOVERNMENT DOCUMENTS
Code of Federal Regulations (CFR 46), U.S. Coast Guard, Subchapters F and J
FED-STD-595B Colors Used In Government Procurement, 1/94
INTERNATIONAL LIFE-SAVING APPLIANCE CODE,
International Maritime Organization Safety of Life at Sea (SOLAS) Publication IMO-982E, Chapter VI, Launching and embarkation appliances, 1997
COMMERCIAL DOCUMENTS
American Bureau of Shipping, Rules for Building and Classing Steel Vessels Under 90 meters, 2012 Edition.
International Maritime Organization International Convention for Safety of Life at Sea (SOLAS 1974), as amended.
IEEE 45 “Recommended Practice for Electric Installations on Shipboard”.
2.3 APPLICABLE STANDARDS
All inspections, tests, and certifications provided under this statement of work shall be in accordance with the American Bureau of Shipping (ABS).
3.0 REQUIREMENTS
Provide all parts, labor, materials, equipment, services, travel costs, disposal fees, tools, and misc. related items necessary to accomplish this specification item.
3.1 FUNCTIONAL REQUIREMENTS FOR DUAL POINT DAVIT
3.1.1 The davit shall function as the SOLAS Life Saving Appliance (LSA) “Rescue Boat” davit for emergency (man overboard) launch and retrieval operations. The davit shall be capable of launching the boat with a 3 person crew in less than 03 minutes from stowage in the cradle, directly to the sea. This time period shall include release of gripes, crew loading at the cradle, davit start-up from “off”, and the lift / extend / and lower of the boat to the sea.
3.1.2 The davit shall be capable of being launched in an emergency without electric power, with stored energy and gravity. The davit shall be capable of recovering the boat using a combination of stored energy, manual recharge of stored energy, and manual cranking of the main lifting winch.
3.1.3. The davit shall support research operations by pre-
positioning the boat at the main deck transfer station, suspending the boat for multiple hours at the main deck rail position (cribbed to the deck edge) without slippage, and then launching the boat with full rated load to the sea in a maximum of 02 minutes under Sea State 4 (SS4) conditions as defined by the World Meteorological Organization. SS4 is significant wave height between 1.25 to 2.5 meters or 4 to 8 feet.
3.1.4. The davit shall support research operations by recovering the boat fully loaded, under SS4 conditions, and suspending and cribbing the boat at the main deck rail position for personnel transfer, and the subsequent re-launching of the boat to the water or transfer up to its cradle. The davit shall have a constant tension feature. During the recovery process, the boat crew shall recover and attach the sea painter, and the boat shall then be towed by the cutter directly under the extended davit arms. The boat crew shall recover and attach the fore and aft davit arm hooks, and then be capable of riding in the water with constant tension engaged until ready for lift.
3.1.5. When recovering the boat with 3 man crew, the davit shall be capable of recovering the boat from the water directly to its cradle.
3.1.6. The davit shall routinely launch with the davit arms fully extended. The davit shall be capable of being manually operated with the davit arms at partial extension and the boat closer to the boat. The davit must move the boat 11’ 3” to starboard to launch clear of the maximum beam. Under a 20 degree adverse list to port the boat may briefly contact the hull. The currently assigned boat has a dual lift point spacing of 257.52 inches. This boat is subject to replacement. The davit system must be adaptable to handle boats with other lift spacing when new or different boats are assigned.
The boat shall stow bow forward.
3.1.7. The davit shall utilize a contractor provided sea painter system, to launch and retrieve the boat away from the vessel.
3.1.8 The davit shall have a tuned shock absorber in each fall which takes away peak loads.
3.1.9 That davit shall include hydraulic guide arms.
3.2 ENVIRONMENTAL CONDITIONS
3.2.1 SHIP MOTION
The davits and cradles shall be designed to restrain the boat under Sea State 8 (Pierson-Moskowitcz Scale) environmental conditions.
3.2.2 TEMPERATURE LIMITS
The davit shall be designed to launch and retrieve the boat under temperature operating limits of 0 degrees F to +125 degrees F ambient air temperature plus solar gain. The latter results in an equivalent equipment surface temperature of 140 degrees F for weather deck equipment. Salt-water cooling systems shall be designed to operate with 28 to 95 degree F seawater.
3.2.3 LIST AND TRIM
The crane shall be designed to perform all functions at Safe Working Load (SWL) against a permanent list of 20 degrees and permanent trim of 5 degrees. In a stowed condition the crane shall survive the cutter rolling 45 degrees single amplitude and pitching 10 degrees single amplitude, which may occur simultaneously.
3.3 TOP LEVEL DESIGN REQUIREMENTS
3.3.1. The davit shall meet SOLAS LSA requirements for a Rescue Boat davit.
3.3.2. The davit shall have a nominal Working Load Limit of not less than 12,040 lbs.
3.3.3. The boat may have an eccentric weight loading condition of 60 % stern, 40 % bow; the davit shall be designed to accommodate this loading condition.
3.3.4. The davit shall be designed to operate in up to a 20 degree list to port or starboard. Adverse list shall be considered launching on the starboard side against a list to port.
3.3.5. Each of the davit arms and rigging shall be designed to accept the following loading condition: With the davit at a 20 degree list to starboard (outboard), a vertical load downward of not less than 9175 lbs (12,040 x 0.6 x 1.27), a horizontal load aft of 867 lbs (12,040 x 0.6 x 0.12), and a horizontal load athwartship (outboard) of 2384 lbs (12,040 x 0.6 x 0.33). These arm stresses shall be translated back into the davit structure. The davit structure shall also be subject to the same operational acceleration factors.
Stress levels shall not exceed stress limits based on a design factor of 4.5 on the ultimate strength of material (SOLAS-LSA).
3.3.6. With the davit in a retracted position, and the boat resting on the cradle (not suspended from the davit), the davit shall survive application of survival accelerations without exceed 70 percent of the yield strength of materials.
3.3.7. Each wire rope, falls, link and block element shall be designed to a load of not less than 9175 lbs, with a design factor of 6 on the ultimate strength of materials.
3.3.8. The davit shall be designed for installation on the starboard side of the vessel, between approximate frames 63 and 81, on ship foundations to be constructed, with the ability to remove the davit if necessary. The davit shall not interfere with other vessel operations which must occur on the 01 level, but shall utilize the main deck edge as a general personnel transfer area. Perform ship check(s) of NOAA Ship Oscar Dyson and confer with Port Engineer regarding specific equipment locations, power sources and other issues (e.g.
access routes on deck.)
3.3.9. Lift point spacing shall have a variable range from 257.52 inches, continuously variable or adjustable in increments not greater than 2 inches; one specific spacing shall be 257.52 inches.
Adjustment may be infrequently required when new boats with different lift point spacing are assigned. Adjustment may require the use of a crane, but shall not require welding.
3.3.10. The davit shall be capable of supporting a boat up to 29 feet in length and 10.5 feet in width. Outline and interface drawings shall show the davit assembled to support the largest boat configuration. Installation drawings shall show the davit assembled with a lift spacing of 257.52 inches.
3.3.11. Provision shall be made for adjustment of the wire rope reeving to adjust the balance of the boat and adjust for lifting point spacing changes, without replacing the wire.
3.3.12. EMERGENCY MANUAL CONTROL - Provision shall be made
for the manual control of hydraulic control valves on the davit for emergency and maintenance use.
3.3.13 The sea painter system shall support the vessel towing the 8,600 lb boat at not less than 7 knots speed under Sea State 5 operating conditions. At full extension the sea painter shall line up with fully extended davit arms, and at partial extension the sea painter shall line up with the boat dropping just clear of the hull.
The sea painter shall be made fast to a deck cleat.
3.3.14 The manufacturer shall provide a statement of fact from
American Bureau of Shipping, or other member of the International Association of Classification Societies, that the davit system design meets the requirements of SOLAS and the requirements herein; that the davit system components, fabrication and welding meet the requirements herein; and that the davit factory testing meets the SOLAS requirements and the requirements herein.
3.4 LAUNCH AND RETRIEVAL PROCESSES
3.4.1. Launch processes shall include the pre-process of
deployment of the sea painter, attachment of the sea painter, and attachment of a lanyard from the sea painter to the forward davit hook. The launch process shall end with release of the davit hooks and release of the sea painter. Recovery processes shall include the pre-process of staging the boat boom and sea painter, attachment of the sea painter and towing of the boat, and then recover and attachment of the davit hooks. Recovery post-processes shall include the release of the bow painter, recovery of the bow painter.
3.4.2. The davit operator shall remain in control of the processes at all times.
3.4.2.1. The davit shall be capable of launching the boat from cradle to the sea. Once the decision is made to launch, the davit shall lift the boat, extend to full extension or clear of the ship’s side, and lower the boat to the sea.
3.4.2.2. The davit shall be capable of recovering the boat from sea to cradle. The constant tension feature shall maintain tension in the lifting wire ropes. Once the decision is made to recover the boat, constant tension control shall transition to the lifting winch, and the davit shall lift the boat to the davit heads, retract the davit arms, and stop. Lowering the boat to the cradle shall be manually controlled by the davit operator.
3.4.2.3. The davit shall be capable of pre-staging the boat in the at-the-rail position for personnel transfer. Once the decision is made to pre-stage the boat, the davit shall lift the boat, partially extend, lower the boat to the main deck rail, and retract to crib the boat at the rail.
3.4.2.4. The davit shall be capable of lowering the boat from the rail to the sea. Once the decision is made to launch the boat, the davit shall lower the boat along the ship side or at the fully extended position, and lower the boat to the sea.
3.4.2.5. The davit shall be capable of retrieving the boat from sea to the rail position. Once the decision is made to recover the boat, constant tension is to be switched off before the wave crest. The boat is then to be lifted fast out of the sea and the davit shall lift the boat to the 01 deck level, operate the hydraulic guiding to control the boat, and retract the davit arms, and retract to crib the boat at the rail.
3.4.2.6. The davit shall be capable of transferring the boat
from the rail position to the cradle. Once the decision is made to transfer the boat, the davit shall extend sufficient to uncrib the boat, lift the boat to the davit heads, operate the hydraulic guiding to control the boat and retract the davit arms, and stop. Lowering the boat to the cradle shall be manually controlled by the davit operator.
3.4.3. Davit controls shall permit manual operation for launch, retrieval and maintenance. Controls shall provide for selection of the constant tension feature.
3.4.4. Davit controls shall permit launch of the boat, in an
emergency, without electric power. This process shall be documented in the technical publication, and in a placard posted on the console.
3.4.5. Davit controls shall permit recovery of the boat, in an emergency, without electric power. Stored energy may be manually recharged with a portable hand pump via quick-disconnect valves. The main winch may require manual cranking.
This process shall be documented in the technical publication, and in a placard posted on the console.
3.5 DESIGN REQUIREMENTS
3.5.1 LAYOUT:
3.5.1.1 For shipping purposes, the davit shall be modular
or a series of modular assemblies that bolt to ships foundations, via a skid. One module may be the control console. All machinery necessary for davit operation (hydraulic power unit, winches, motors, etc) shall fit within the confines of these assemblies. This “pallet” or group of assemblies shall fit within the deck space available. The life rafts may be relocated to accommodate this davit. The locations of the davit arms, machinery and boat (with projections) shall fit within the confines of the deck. The control station shall be made such that it allows for installation in a suitable location of the boat and with a view of the boat being launched or recovered from the water. The location of the control station must be approved by the commanding officer of the vessel.
3.5.1.2 The davit layout must permit a) the boat to be
secured using bow and stern tie-down fittings to deck structural fittings (to be located and installed as part of the installation process), b) standing and kneeling personnel to access the bow and stern of the boat and to access the fore/aft and inboard sides of the davit for maintenance (ASTM F1166 clearances), and c) personnel to transit the boat platform level on the inboard side (ASTM F1166 clearances).
These issues will be addressed by the installing activity, but should not be precluded by the davit design. The layout design shall permit the boat in the cradle to be quickly accessed by a 3 man crew; full loading of the boat in the cradle is not required.
3.5.1.3 The davit arm positions of fully retracted and fully
extended shall be defined by positive structural stops.
Hydraulic cylinders shall not bottom in either position.
3.5.1.4 Davit arm position misalignment shall not exceed
1 inch at the end of travel. Davit arm alignment shall automatically self-reset.
3.5.1.5 The footprint of the Peggy D. housed in the davit
cradle and the davit combined shall not have a width greater than 12.5 feet.
3.5.2 CRADLE: The Contractor shall provide an adjustable cradle system to support the keel and rib structure of the assigned boat.
Keel blocks shall not be more than 5 inches in depth. The cradle shall be adjustable to support future boats.
3.5.3 HOISTING AND LOWERING: The davit shall feature constant tension winches. The hoist shall have continuously variable line speeds from zero to at least 90 feet per minute in both directions at design hoisting load and rated sea states. The control station shall have hoist raise/lower controls and provision for the selection and cancellation of the constant tension mode. The constant self tension mode shall not be possible to engage if the boat is hanging in the falls. The winch control system shall minimize slack wire induced tension surges and damage to equipment.
3.5.4 HOOKS AND SEA PAINTER:
3.5.4.1 HOOK SPECIFICATIONS
The davit system shall be fitted with two SOLAS approved off-load release hook systems for handling RHI type boats. The hooks shall be fitted with handles suitable for grasp of the hooks with mittened hands in accordance with ASTM F1166.
The hooks shall be the Henriksen Safety Quick Release Hook HMK 3.5 or similar dual point safety quick release hook system designed to have the handles released when the boat is being lowered into the water. The hook shall open automatically when the Peggy D. is waterborne and the pull in the wire is less than 25-30 kg. Swivel joints shall be included in this system. Hooks provided shall attach, fit, and secure safely to the lift points documented in reference “NOAA 27 Hoisting Fittings Color”.
3.5.4.2 REMOTE RELEASE HOOK SPECIFICATIONS
The hooks shall be capable of remote release from inside the Peggy D. pilothouse. All necessary equipment for remote release shall be provided with davit delivery and available for immediate installation.
3.5.4.3 PAINTER RELEASE
Provide Peggy D. with an Integrated Henriksen System or similar system that incorporates the release of the painter into this system. This includes a remote release Henriksen Hook or similar hook, control box, painter line release, painter line hook and external remote release control box, gear for properly mounting to the Peggy D. and all related stainless steel push/pull cabling. The hook release system shall ensure that the Painter Hook cannot release before the boat is waterborne and the off-load hooks have been released.
3.5.5 WIRE, PINS AND FASTENERS
3.5.5.1 Wire shall be of a single construction type and shall be pressure lubricated with DynaGard Blue, DynaGard E, or equivalent. Standard construction wire, if provided, shall meet the requirements of API-9A or BS EN 12385. No left-hand lay wire shall be provided.
Sufficient wire rope shall be provided to place the davit hooks 10 feet below the keel line of the boat.
3.5.5.2 All bearing pins shall be of a corrosion resistant or equivalent material, and shall be fitted with grease distribution grooves and stainless steel zerk fittings.
All bolts used for mounting of the davit to the vessel shall be K-Monel and shall be provided with the davit.
All non-load bearing fasteners, bolts, nuts and hardware shall be Grade 316L Stainless Steel.
All through bolts shall be of a length such that two threads are visible beyond the nut or threaded material.
3.5.6 EMERGENCY OPERATION - The davit system shall be capable of launching the boat, in the event of loss of external power, without recharging of stored energy. The davit system shall be capable of recovering the boat, in the event of loss of external power, through a combination of stored energy, manual recharging of stored energy and manual cranking. Accumulator systems shall be nitrogen charged type. A portable hydraulic hand pump with quick disconnect fitting shall be provided for recharging. Provision shall be made for manual cranking of the primary lift winch.
3.5.7 ELECTRICAL
Electric motors and associated equipment shall meet the design, performance, application and installation requirements of IEEE- STD-45, 46 CFR, Subchapter J, and National Electric Manufacture's Association (NEMA) standards MG1 and ICS. Electric motor frames and cases shall be steel, and shall be coated with marine grade paint system meeting paragraph 3.6. Stainless steel HPU, built to be placed outside on a ship’s deck.
The davit system shall be designed to operate on 440 VAC, 3 phase, 60 Hertz, ungrounded ship service power. All electrical equipment shall be ungrounded. The davit system shall be ready for electrical connection to ship service power.
The NOAA Ship Oscar Dyson’s service distribution system maintains the system characteristics of Type 1 power as defined in MIL-STD-1399, Section 300A. This does not require installation of an isolation transformer nor inverter filter. The Davit system shall operate within the constraints specified by this standard.
Electrical junction boxes on the davit shall meet IP67 requirements, junction boxes on the motors shall be brass or bronze. Fasteners such as bolts, nuts and pins shall be 316 Grade stainless steel.
Equipment bonding and grounding shall be provided in accordance with MIL-STD-1310G for type I (topside level) bond strap, using CRES 316 1/4 inch wire rope with lugs of CRES 316L. Bond straps terminating to equipment shall meet requirements of Fig A-2 and surface preparation/seal termination shall meet paragraphs A.5.2.3 and A.5.2.4
All cabinets and junction boxes shall be equipped with anti-condensation heaters, factory-sealed pre-lubricated bearings and shall be rated for continuous duty.
All motors shall have locked rotor currents as low as practicable to keep voltage fluctuations on the power distribution system to a minimum.
All motors shall be selected with characteristics that will meet the performance requirements of the driven equipment. Speed, torque and power characteristics of the motor shall be compatible with the operating range requirements of the driven equipment.
Motor control circuits shall operate on 120 volts or less and power for motor control circuits shall be obtained from transformers integral to the motor controllers.
Motor control circuits shall be designed so that any grounding in the external circuits will not start the motor or by-pass any shut down provisions.
All power and control cables shall be installed from the bottom of the controllers. Cable penetrations shall be waterproof.
Electrical cabling in the weather, outside of enclosures, shall be watertight and meet MIL-DTL-24643, or shall be installed in ABS approved flexible conduit for marine applications.
The davit winch system must offer reduced current during start up to a maximum 2.5 times the running current.
Each davit arm shall have two marine grade floodlight assemblies at the tip, one with white lens and one with blue lens, to illuminate the boat below for night operations. Each of the floodlights shall produce a minimum average of 75 lux or 7 foot candles of light at a distance of 40 feet over a 40 degree cone. Light assemblies shall be gimbaled or otherwise made to direct downwards from any davit arm aspect and shall be made to be manually adjustable by the ship’s crew. The lights shall be operated from a power switch on the operator’s console to select Off, Blue light or White light.
The operators console shall be fitted with a pole mounted light fixture to illuminate the console for night operations. The spotlight shall be fitted with a blue lens, and shall produce a minimum of 150 lux or 14 foot candles on the console.
All controller panels shall be NEMA Standard 250 Type 4 Grade 316 stainless steel and shall be fitted with stainless steel latching devices and drain plug(s).
All indicator lights shall have the capability of dimming. One dimming control located on the operator’s console shall be provided to facilitate dimming all indicator lights.
3.5.8 HYDRAULIC SYSTEM REQUIREMENTS
The hydraulic system shall be self-contained. No external source of hydraulic fluid under pressure shall be required. Hydraulic system design operating pressures shall not exceed 25 MPa (3600 psi). The system shall have a secondary reduced pressure level for periods of inactivity. The hydraulic system shall be unloaded when the pump starts.
The fluid shall be compatible with hydraulic fluid designation 2135 in accordance with MIL-PRF-17672D. The Coast Guard desires to achieve multi-year service life of hydraulic fluid. The manufacturer shall not provide a system design which requires instructions to change oil annually.
The hydraulic particulate contamination and water content limit levels shall be ISO 4406, level 17/15/12 and 0.05% by weight or better. The Contamination Limit Level shall be clearly identified on the system diagram and in the technical publication. Hydraulic piping systems shall be cleaned to ISO 4406, level 16/14/11 or better.
Hydraulic power unit output shall be fitted with a hydraulic noise and shock suppressor.
Hydraulic piping, tubing, and fittings shall be stainless steel with a design factor of 4.0. Piping connections shall be welded, to the extent practical. Tubing bends are preferred to mechanical fittings.
Equipment interfaces and take-down joints for maintenance purposes shall be fitted with flange type connections with O-ring seal or straight thread type connections with O-ring seal. National Pipe Connections or British Standard Pipe (BSPP) tapered threaded connections shall not be used. Piping shall be supported by isolation hangers.
Hydraulic hoses shall meet the requirements of SAE J1942, with the exception that BSP straight threading shall be permitted, and should not exceed 30 inches in length except as necessary to support the movement of equipment. Hoses exposed to weather shall be covered by independent sleeves. Hydraulic hose covers shall be designed for marine weather deck service, and shall be resistant to ultraviolet light degradation. Hose fittings shall be stainless steel and shall be permanently installed on the hose.
Hydraulic hose connections shall have "O"-ring seals. Each installed hose shall have affixed a weather resistant tag engraved or embossed in ¼” high letters with the part number, “S/N DAV-HYD- XXX” (where XXX is a sequential number), "Tested 150% WP" and Test Date [DD/MM/YY]. The hose tag numbers shall relate to a deliverable hose log spread sheet which shall identify system design pressure, hose test pressure, hose length, hose model, and both end fitting OEM part numbers.
Cadmium shall not be used where it will be in contact with hydraulic oil.
Valves shall be accessible for maintenance and repair. Manifold and sub plate type valves are preferred for maintenance purposes.
Locking devices shall be provided for locking adjustable valves at service adjustment and valves that are required to be locked in the open or closed position for normal operation. The use of wire ties or similar devices is not acceptable as locking devices. Manually adjustable valves shall have a calibration marking system to permit repeat setting.
The hydraulic control valves, solenoids and handles shall be protected from the weather by a stainless steel cover or access panel door.
The hydraulic system shall be fitted with shock-resistant type gages sufficient for normal operation of the system. Gages shall be stainless steel. As a minimum, pump discharge pressure and stored operating pressure shall be indicated locally on the equipment.
Gages shall be installed with damping devices and root valves.
All quick-disconnect fittings shall be valved-type fittings meeting ISO 7241/1 Series B.
Hydraulic cylinders will have a measured drift tolerance or creep of ½ mm or smaller in 10 minutes during factory and commissioning testing. Resistance to drift shall be maintained when the boat is stowed for long periods of time at the ship’s side. Hydraulic cylinders shall not bottom out in any position.
The hydraulic system shall be fitted with diagnostic equipment to temporarily instrument major components for operational analysis and calibration. MIL-V-24695 or equivalent commercial marine test, vent and sampling valves (Schroeder MINI-CHEK™ Series 1215, or equal) shall be installed throughout on both sides of all major components such as pumps, motors, regulating valves and cylinders. The valves shall be designed to connect/disconnect with the fluid system under pressure. Sampling valves and/or fittings shall be stainless steel. The intent is to provide detailed diagnostic capability without shut-down of the systems.
Pumps – Hydraulic pumps shall be commercial marine continuous duty type which is of a shock resistant type. They shall have a rated static pressure of at least 1.7 times the system design pressure, and shall have a rated fatigue pressure of at least 1.35 times the system design pressure per NFPA T-3.9.22 R.1. Pump and motor porting shall terminate in bosses cast or machined in the case or cover. Porting shall be straight thread connections and, except for gage ports, shall have O-ring seal, or O-ring seal flange connections. Tapered thread bosses with adapters are not permitted. The hydraulic pump shall be sized for the highest single flow rate crane function (rotate, raise, winch or extend as applicable) at rated speed, or the two highest flow rate crane functions simultaneously at not less than 2/3 of their respective rated speeds, whichever is greater. A digital service hour meter shall be provided to record the service life of each hydraulic pump.
All Hydraulic cylinders shall meet applicable industry standards, have a design factor of 4:1 on ultimate strength, and have cartridge type seal systems.
Fluid filters used in the system shall be in accordance with SAE J1782-99. Filtration requirements and minimum standards shall be established using Beta ratings, and SAE or ISO standard multi-pass test methods. Fluid filters shall be able to be removed from the power pack without spilling or without requiring disassembly of other components. Pressure, return line and suction strainers shall be provided.
Fluid reservoirs shall be stainless steel to minimize rust and contamination. Internal baffles shall be installed. Manual fill ports shall not be provided. Fluid reservoirs shall be fitted with stainless steel valved, quick-disconnect suction and discharge ports for fluid fill and for off-line kidney loop filtration of the reservoir contents, using a filter buggy. Fluid reservoirs shall be fitted with valved, desiccant filter type breather vents. Under no-flow conditions, the vent shall prevent the passage of air, and minimize vented contamination. Reservoir shall be sized to provide not less than 1.5 minutes of pump operation at maximum flow rate. Reservoirs shall not spill fluid when the ship rolls 45 degrees.
The hydraulic system and reservoir shall be fitted with thermostatically adjustable heater devices to maintain the davit system in operational condition at all times while the cutter is underway. Hydraulic oil shall be maintained at less than 140 degrees F under all conditions including multiple hours of no-flow service.
If an oil cooler is required, it shall be a titanium plate type sea water cooler.
The hydraulic system shall be provided with a stainless steel water guard structure over the power pack.
3.5.9 NAMEPLATES
The equipment to be delivered under this contract shall be clearly marked at the subassembly level with nameplates. These plates are to be manufactured to best commercial practice of stainless steel, and contain (at a minimum) sub-assembly name, contract number, date of manufacture, serial number, design working load, brake test load (designated in para. 4.2.4.5) and the dynamic test load (designated in para. 4.2.4.6). In addition to the above requirements, an additional nameplate containing the Contractor’s name and address shall be permanently affixed to the main winch gearbox.
Use of the contractor’s job order number and sequence number as the serial number is acceptable. The plates shall be permanently affixed to their respective sub-assemblies in a clearly visible position.
3.5.10 CONTROL CONSOLE:
3.5.10.1. A pedestal mounted control console shall be provided for the davit. Controls in the weather shall be operable by personnel wearing cold weather mittens (see ASTM F1166). Touch screens shall not be provided for davit functional controls. Functional and system on/off controls shall be switches, pushbuttons, joysticks or finger levers, as appropriate.
3.5.10.2. The console shall have at least the following
functions:
3.5.10.2.1. Visual indicator (white) that power is
available to the panel and the davit.
3.5.10.2.2. On/off control of the hydraulic power unit.
Hydraulic pressure shall be digitally displayed.
3.5.10.2.3. Digital display of hydraulic pressure, and
other important equipment parameters necessary for the safe operation of the davit.
3.5.10.2.4. On/off control of the HPU electric heater;
visual indication (blue) when the heater is on.
3.5.10.2.5. On/off control of accessory functions, if
provided.
3.5.10.2.6. On/off/color selection control of floodlights.
3.5.10.2.7. Joystick variable speed / direction control of
all winches. Joystick handles for constant tension shall be distinctly different or shorter than the joystick handle for the primary winch.
3.5.10.2.8. Joystick variable speed / direction control of
davit extension functions.
3.5.10.2.9. On/off selection control, and joystick tension
adjustment for the constant tension feature.
3.5.10.2.10. Audible and visual alarms (amber) that
hydraulic power unit or other davit maintenance is required. Alarms shall be consolidated. An audible alarm silencing feature shall silence the audible alarm.
Visual alarm shall be solid until the problem is corrected.
3.5.10.2.11. Audible and visual alarms (red) of eminent
hydraulic power unit or davit equipment failure. Alarms shall be consolidated. An audible alarm silencing feature shall silence the audible alarm. Visual alarm shall be solid until the problem is corrected.
3.5.10.2.12. Dimming controls for all panel lights.
3.5.10.2.13. Emergency Stop switch.
3.5.10.2.14. The console shall provide the capability to
diagnose equipment component failures.
3.5.10.2.15. The console shall provide a space
reservation (4 inch by 4 inch by 4 inch) for potential future installation of hand-set or telephone communication equipment within the console, for use by the operator.
3.5.10.2.16. The console shall be arranged so that it
can be installed forward of the davit, looking aft, and looking left and down to the water. The console cabinet shall not require access on the left or outboard side.
3.5.10.3. Displays shall be visible during daylight and under night lighting conditions (blue). An anti-glare feature shall be provided to permit use during direct sunlight.
3.5.10.4. E-STOP SWITCHES: Mushroom type, waterproof, Emergency Stop switches shall be provided; one on the console, and two for installation on the deckhouse at the 01 and 02 levels for use by observers. The loose switches shall be provided with waterproof J boxes. Switch color shall be red. These switches shall be protected from inadvertent use with a lift-to-access bezel. These switches shall be wired in series, and activation shall cause all power to be lifted from the davit. After use, power shall have to be manually restored.
3.5.11 Welding shall be in accordance with SFLC Standard
Specification 0740.
3.6 ARCHITECT-ENGINEERING SERVICES
Awardee shall supply a qualified Architect-Engineering (AE) firm to provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-Built Documentation, and all other related information for installing the new davit on the 01 Level of the NOAA Ship Oscar Dyson.
This includes any additional supporting structure and/or relocation of existing deck fixtures to safely accommodate the davit, its control station, and any associated ancillary equipment.
3.6.1 All planned locations and weights added to the NOAA Ship Oscar Dyson via the davit, associated equipment, and its additional supporting members will be summarized in a table and provided to NOAA’s Naval Architect, Port Engineer, and Captain.
3.6.1.1 Detailed plan for the addition of permanent ballast, if necessary.
3.6.2 Provide Drawings and Specifications for Peggy D. Davit. Develop modification and installation drawings (structural, electrical and mechanical) and detailed specifications for work.
3.6.2.1 All design work shall be submitted to and approved by ABS by the contractor.
3.6.3 Four freeing ports in the wet lab, below the 01 Deck, where the Peggy D is located, were welded shut in 2009. Update the Trim and
Stability Booklet to reflect these changes. Provide approval letter from ABS that these changes are acceptable. If these changes are not acceptable, write a condition found report with a recommended action plan and submit to the Port Engineer, Captain of the Oscar Dyson, and NOAA’s Naval Architect.
3.6.3.1 The following is a comment from NOAA’s internal fleet inspection team. The purpose of this section is to resolve this comment:
Four ABS required freeing ports, measuring 368,000mm2 in the Wet lab bulkhead have been welded shut. Two freeing ports measuring 250,402mm2 have been added to the aft bulkhead. This configuration is in violation of the requirements of the ABS damage stability review found in letter T-8-2 dated July 17, 2003. This letter required 368,000mm2 freeing ports in the Wet Lab to remain within the limiting KG during damage. This arrangement violates the stability letter which states "Results indicate that the stability of the OSCAR DYSON, as presently outfitted and equipped, is satisfactory for operation on Exposed Waters, provided that the operating and loading restrictions delineated in the following document (Trim and Stability Booklet) are strictly observed:" Operating Instruction number 7 of the Trim and Stability Booklet states: "All freeing ports shall be maintained operable and completely unobstructed at all times." The Port Engineer reports that a 1-½ inch drain has been installed in the wet lab. Verification that this is sufficient drainage to meet the stability requirements of ABS should be obtained and presented to close this item. Approval from ABS has still not been received. (Reference: 46 CFR §173) For 2012 inspection, a request was made by the inspection team for the ABS approval documentation to close out this item. No documentation was available. This documentation needs to include documentation of the submittal of the details of the change to ABS as well as the ABS approval letter)
3.7 INTEGRATED LOGISTICS SUPPORT
3.7.1 The contractor shall provide the following logistical support and information for the davit. Revised documentation in response to the government’s initial review shall be deliverable prior to any subsequent deliveries. Modifications made to the equipment provided during the term of the contract must be accompanied by updates of all the following that relate to those changes.
All Integrated Logistics Support documents shall be submitted to the Contracting Officer. The documents shall be submitted in MICROSOFT OFFICE(tm) format as electronic files. One electronic copy of each submitted and revised document shall be submitted on
CD-ROM.
3.7.2 Design and Interface Report
The Contractor shall submit a Design and Interface Report for review and comment by the COTR and NOAA Ship Oscar Dyson’s Commanding Officer. The intent of this document is to enable the government to provide the installing activity the technical information for the development of the installation design and work specification and to ensure interface between new elements and other existing systems are correct, well in advance of the delivery.
In addition to documenting the marine davit system design, the report shall include a test plan to meet 4.7 testing requirements and interface documentation such as weights, interface dimensions and standards, centers of gravity and power requirements. The offeror should not delay submission in order to format it into a smooth document as is required for the Technical Publication; the emphasis on this is the early acquisition of raw technical data, manufacturer’s cutsheets, performance curves and similar information is acceptable. The report shall include copies of the following information:
3.7.2.1 Planned paint systems for the davit components
including manufacturers data sheets.
3.7.2.2 First Article and Factory Test Plan for all required
structural, hydraulic and electrical tests including verification of pass-fail criteria for each test.
3.7.3 The Contractor shall provide Data for Provisioning for the davit components in accordance with USCG Specification ELC-D- 083-0351 for review and comment. Exceptions to this specification are that the list required in 3.7.4.1 (identified below as OBRP) shall be for a period of two year’s support vice one and that the delivery schedule shall be per this contract. This shall include end items as installed as well as the individual parts of each end item, Original Equipment Manufacturer (OEM) part numbers, OEM’s name and address, quantity used in each piece of equipment, and keying to any provided drawings. The price listing shall identify prices during the initial and all option years of the contract.
3.7.4. Recommended Spare Parts
3.7.4.1. On Board Repair Parts (OBRP)
The Contractor shall identify the manufacturer's recommended spare parts list for On-Board Repair Parts within the Technical Publication required in 3.7.5 and in the Data for Provisioning (including pricing) required in 3.7.3. Within 1 year of receipt of the OBRP recommendations, the Government may execute a contract amendment to procure the necessary parts for storage on the vessel.
The parts on the recommended OBRP list shall be sufficient to perform shipboard maintenance on the equipment for two years.
The list shall include gaskets and seals as necessary to install…