RFQ IFB RFP
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODEFACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATE . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
17a CONTRACTOR/
OFFEROR.
CODE
8 (A)
SIZE STANDARD:
NAICS:
% FOR:SET ASIDE:UNRESTRICTED OR
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
10. THIS ACQUISITION IS
EDWOSB
SMALL BUSINESS PROGRAM
NFFR7400-18-01093
AB133F18RQ0235
NOAH NIELSEN
NOAH.NIELSEN@NOAA.GOV 206-526-6034
2:00 PM PT
AJ630031
WESTERN ACQUISITION DIVISION
CONTRACTS BRANCH
7600 SAND POINT WAY NE, SOU6
SEATTLE WA 98115-6349
541620
15M
FT770031
NMFS PIFSC FSH RSRCH/MTRNG DIV
F/PIC7 NAT'L MARINE FISHER SVC
1845 WASP BLVD, BLDG 176
HONOLULU HI 96818
see continuation page for line item details.
See Schedule
MAR 30, 2018
Please x
STANDARD FORM 1449 (REV. 2/2012) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
AB133F18RQ0235
Attachment Page
SECTION C – CONTRACT CLAUSES
FAR 52.212-4 CONTRACT TERMS AND CONDITIONS -- COMMERCIAL ITEMS (JAN
2017) (DEVIATION 2017-02) (AUG 2017)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The
Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights --
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any
Federal lending agency in accordance with the Assignment of Claims Act
(31 U.S.C.3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter
71,Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays
PAGE 3 OF 80 AB133F18RQ0235
of common carriers. The Contractor shall notify the Contracting
Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the
Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include --
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on
Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the
PAGE 4 OF 80 AB133F18RQ0235
applicable solicitation provision, contract clause
(e.g., 52.232-33, Payment by Electronic Funds
Transfer— System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the
Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt
Payment Act (31 U.S.C. 3903) and Office of Management and Budget
(OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt Payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
PAGE 5 OF 80 AB133F18RQ0235
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable;
and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in
(i)(6)(v) of this clause, and then at the rate applicable for each six-month period at fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the
Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the
Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting
Officer (see 32.607-2).
PAGE 6 OF 80 AB133F18RQ0235
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the
Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt;
or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the
Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the
Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b.
destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
PAGE 7 OF 80 AB133F18RQ0235
(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the
Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the
Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the
Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable
Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. ) The
Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain
Federal contracts; 18 U.S.C. 431 relating to officials not to benefit;
PAGE 8 OF 80 AB133F18RQ0235
40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41
U.S.C. chapter 87, Kickbacks; 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other
Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) System for Award Management (SAM).
(1) Unless exempted by an addendum to this contract, the
Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data.
To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the
SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used
PAGE 9 OF 80 AB133F18RQ0235
in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the SAM database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The
Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer
(EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see
FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that
Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via SAM accessed through https://www.acquisition.gov.
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any
End Use License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any
PAGE 10 OF 80 AB133F18RQ0235
person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31
U.S.C. 1341), the following shall govern:
(i) Any such clause is unenforceable against the
Government.
(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the
Government or any Government authorized end user to such clause.
(iii) Any such clause is deemed to be stricken from the
EULA, TOS, or similar legal instrument or agreement.
(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.
(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the
System for Award Management (SAM), are incorporated by reference into the contract.
(End of Clause)
ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS -- COMMERCIAL
ITEMS (JAN 2017) ALTERNATE I (JAN 2017) (DEVIATION 2017-02) (AUG 2017)
The following clauses are incorporated as an addendum to this contract:
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/far/ https://farsite.hill.af.mil/vfcara.htm
PAGE 11 OF 80 AB133F18RQ0235
FAR 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER (MAY 2011)
FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
FAR 52.242-13 BANKRUPTCY (JUL 1995)
FAR 52.242-15 STOP-WORK ORDER (AUG 1989)
CAR 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010)
CAR 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010)
(End of Clause)
FAR 52.216-18 ORDERING (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from the effective date of the contract through the last day of the final option exercised period or following one year period, whichever is later.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered “issued” when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,500.00, the
Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor—
(1) Any order for a single item in excess of $900,000.00;
PAGE 12 OF 80 AB133F18RQ0235
(2) Any order for a combination of items in excess of $900,000.00; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the
Requirements clause at subsection 52.216-21 of the Federal Acquisition
Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the
Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor’s intent not to ship the item
(or items) called for and the reasons. Upon receiving this notice, the
Government may acquire the supplies or services from another source.
FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the
Schedule. The quantities of supplies and services specified in the
Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the “maximum.” The Government shall order at least the quantity of supplies or services designated in the
Schedule as the “minimum.”
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the
Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after one year following expiration of the effective period of this contract.
PAGE 13 OF 80 AB133F18RQ0235
FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting
Officer may exercise the option by written notice to the Contractor within 30 days prior to the end of the period of performance.
(End of Clause)
Inclusion of FAR clause 52.217-8, Option to Extend Services, in the solicitation and resultant contract is for use by the Government as outlined at FAR 37.111, Extension of Services. The option will be exercised as needed at any time during the life of the contract using the rates applicable at the time of exercise.
FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 45 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed five (5) years.
(End of Clause)
FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Commerce Acquisition Regulation (48 CFR Chapter 13) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
PAGE 14 OF 80 AB133F18RQ0235
CAR 1352.201-70 CONTRACTING OFFICER'S AUTHORITY (APR 2010)
The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.
(End of clause)
CAR 1352.201-72 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (APR 2010)
(a) [TO BE ASSIGNED AT AWARD BY SEPARATE LETTER] is hereby designated as the Contracting Officer's Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at:
[TO BE ASSIGNED AT AWARD BY SEPARATE LETTER]
(b) The responsibilities and limitations of the COR are as follows:
(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.
(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The
Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.
(End of clause)
CAR 1352.216–74 TASK ORDERS (APR 2010)
(a) In task order contracts, all work shall be initiated only by issuance of fully executed task orders issued by the Contracting
Officer. The work to be performed under these orders must be within the scope of the contract. The Government is only liable for labor hours and costs expended under the terms and conditions of this
PAGE 15 OF 80 AB133F18RQ0235
contract to the extent that a fully executed task order has been issued and covers the required work and costs. Charges for any work not authorized shall be disallowed.
(b) For each task order under the contract, the Contracting Office shall send a request for proposal to the contractor(s). The request will contain a detailed description of the tasks to be achieved, a schedule for completion of the task order, and deliverables to be provided by the contractor.
(c) The contractor shall submit a proposal defining the technical approach to be taken to complete the task order, work schedule and proposed cost/price.
(d) After any necessary negotiations, the contractor shall submit a final proposal.
(e) Task orders will be considered fully executed upon signature of the Contracting Officer. The contractor shall begin work on the task order in accordance with the effective date of the order.
(f) The contractor shall notify the Contracting Officer of any instructions or guidance given that may impact the cost, schedule or deliverables of the task order. A formal modification to the task order must be issued by the Contracting Officer before any changes can be made.
(g) Task orders may be placed during the period of performance of the contract. Labor rates applicable to hours expended in performance of an order will be the contract rates that are in effect at the time the task order is issued.
(h) If multiple awards are made by the Government, the CO shall provide each awardee a fair opportunity to be considered for each task order over the micro-purchase threshold unless one of the exceptions at FAR 16.505(b) applies.
Task orders will be issued on a firm-fixed price basis.
(End of clause)
CAR 1352.216-75 MINIMUM AND MAXIMUM CONTRACT AMOUNTS (APR 2010)
During the term of the contract, the Government shall place orders totaling a minimum of $2,500.00. The amount of all orders issued under the IDIQ contract awarded for these services shall not exceed
$900,000.00.
(End of clause)
CAR 1352.216-76 PLACEMENT OF ORDERS (APR 2010)
(a) The contractor shall provide goods and/or services under this contract only as directed in orders issued by authorized individuals.
In accordance with FAR 16.505, each order will include:
(1) Date of order;
(2) Contract number and order number;
PAGE 16 OF 80 AB133F18RQ0235
(3) Item number and description, quantity, and unit price or estimated cost or fee;
(4) Delivery or performance date;
(5) Place of delivery or performance (including consignee);
(6) Packaging, packing, and shipping instructions, if any;
(7) Accounting and appropriation data;
(8) Method of payment and payment office, if not specified in the contract;
(9) Any other pertinent information.
(b) In accordance with FAR 52.216-18, Ordering, the following individuals (or activities) are authorized to place orders against this contract: NOAA Western Acquisition Division Contracting
Officers
(c) If multiple awards have been made, the contact information for the DOC task and delivery order ombudsman is as follows:
Kelly Quickle
Risk Management Division
Office of Acquisition Management
1401 Constitution Ave., NW Room 1854
Washington, DC 20230
202-482-3780 bvoitk@doc.gov
(End of clause)
CAR 1352.246-70 PLACE OF ACCEPTANCE (APR 2010)
(a) The Contracting Officer or the duly authorized representative will accept supplies and services to be provided under this contract.
(b) The place of acceptance will be:
Pacific Islands Fisheries Science Center
1845 Wasp Blvd.
Honolulu, HI 96818
CAR 1352.270-70 PERIOD OF PERFORMANCE (APR 2010)
(a) The base period of performance of this contract is from November 1, 2018 through October 31, 2023. If an option is exercised, the period of performance shall be extended through the end of that option period.
(b) The option periods that may be exercised are as follows:
PAGE 17 OF 80 AB133F18RQ0235
Period Start date End date
Option I
Option II
Option III
Option IV
(c) The notice requirements for unilateral exercise of option periods are set out in FAR 52.217–9.
(End of clause)
NAM 1330.52.203-70 SCIENTIFIC INTERGRITY AND RESEARCH MISCONDUCT (OCT
2012)
(a) Definitions. As used in this provision –
Scientific activities mean activities that involve inventorying, monitoring, observations, experimentation, study, research, integration, modeling, and scientific assessment.
Scientific integrity means the condition resulting from adherence to professional values and practices when conducting and applying the results of science that ensures objectivity, clarity, and reproducibility, and that provides insulation from bias, fabrication, falsification, plagiarism, interference, censorship, and inadequate procedural and information security.
Presentation of scientific activities results includes the analysis, synthesis, compilation, or translation of scientific information and data into formats for the use of the Department of Commerce or the
United States of America.
Scientific and Research Misconduct means fabrication, falsification, or plagiarism in proposing, performing, or reviewing scientific and research activities, or in the products or reporting of the results of these activities. It specifically includes intentional circumvention of the integrity of the scientific and research process and actions that compromise that process, but does not include honest error or differences of opinion.
Investigation is formal collection and evaluation of information and facts to determine if scientific or research misconduct can be established, to assess its extent and consequences, and to recommend appropriate action.
(b) General Guidelines
1. Maintaining Integrity. The Contractor shall maintain the scientific integrity of research performed pursuant to this contract award including the prevention, detection, and
PAGE 18 OF 80 AB133F18RQ0235
remediation of research misconduct, and the conduct of inquiries, investigations and adjudication of allegations of research misconduct.
2. In performing or presenting the results of scientific activities under the contract, and in responding to allegations of scientific and research misconduct, the Contractor shall comply with the provisions herein and NOAA Administrative Order (NAO)
202-735D, Scientific Integrity, and its Procedural Handbook, including any amendments thereto.
3. Primary Responsibility. The Contractor shall have the primary responsibility to prevent, detect, and investigate allegations of scientific and research misconduct. Unless otherwise instructed by the contracting officer, the Contractor shall promptly conduct an initial inquiry into any allegation of such misconduct and may rely on its internal policies and procedures, as appropriate, to do so.
4. By executing this contract, the Contractor provides its assurance that it has established an administrative process for performing an inquiry, investigating, and reporting allegations of scientific and research misconduct; and that it will comply with its own administrative process for performing an inquiry, investigation and reporting of such misconduct.
5. The Contractor shall insert the substance of this requirement in subcontracts at all tiers that involve research being performed under this contract.
(c) Investigating Misconduct Research
1. Initiating Investigation. If the Contractor determines that there is sufficient evidence to proceed to an investigation, it shall notify the contracting officer and, unless otherwise instructed, the
Contractor shall:
a. Promptly conduct an investigation to develop a complete factual record and an examination of such record leading to either a finding of scientific and research misconduct and an identification of appropriate remedies or a determination that no further action is warranted.
b. If the investigation leads to a finding of scientific and research misconduct, obtain adjudication by a neutral third party adjudicator.
The adjudication must include a review of the investigative record and, as warranted, a determination of appropriate corrective actions and sanctions.
2. Finalizing Investigation. When the investigation is complete, the
Contractor shall forward to the contracting officer a copy of the evidentiary record, the investigative report, any recommendations made to the Contractor’s adjudicating official, the adjudicating official’s decision and notification of any corrective action taken or planned, and the subject’s written response (if any).
PAGE 19 OF 80 AB133F18RQ0235
(d) Findings and Corrective Actions
1. If the Contractor finds that scientific and research misconduct has occurred, it shall assess the seriousness of the misconduct and its impact on the research completed or in process and shall:
i. Take all necessary corrective actions, which includes, but are not limited to, correcting the research record, and, as appropriate, imposing restrictions, controls, or other parameters on research in process or to be conducted in the future, and
ii. Coordinate remedial action with the contracting officer.
(e) Department of Commerce Actions
1. The Department of Commerce may accept the Contractor’s findings or proceed with its own investigation, in which case the Contractor shall fully cooperate with the investigation. The contracting officer will inform the Contractor of the Department’s final determination.
2. The Department of Commerce reserves the right to pursue such remedies and other actions as it deems appropriate, consistent with the terms and conditions of the contract and applicable laws and regulations. Such remedies and actions may include, but are not limited to, disallowance of costs, recoupment of contract payments, and suspension or debarment.
(End of Clause)
NAM 1330.52.203-71 NOTICE OF POST-GOVERNMENT EMPLOYMENT RESTRICTIONS
(OCT 2015)
By submission of an offer in response to a NOAA solicitation or acceptance of a contract, the contractor acknowledges the restriction on current NOAA employees regarding contact with offerors regarding prospective employment and the corresponding obligations for contractors who engage them. The contractor further acknowledges that it has provided notice to former NOAA employees who will provide service to NOAA under the contract of post-Government employment restrictions that apply to them. Such restrictions include, but are not limited to, those set forth in:
(a) 41 U.S.C. § 2103 regarding contacts between a federal employee working on a procurement and an offeror about prospective employment;
(b) 18 U.S.C. § 207 regarding the restrictions on former federal employees having contact with a federal agency on behalf of another person or entity concerning a specific party matter with which the former employee was involved as a federal employee or for which the former federal employee had official responsibility;
PAGE 20 OF 80 AB133F18RQ0235
(c) 18 U.S.C. § 207 regarding the restrictions on former senior employees and senior political employees from having contact with his former federal agency on behalf of another person or entity concerning any official matter; and
(c) 41 U.S.C. § 2104 regarding the restrictions on a former federal employee involved in an acquisition over $10,000,000 from accepting compensation from a contractor.
NAM 1330.52.215.70 SCHEDULE OF DELIVERABLES
Following is a schedule of all deliverables, including administrative deliverables, required during the period of performance of this contract:
Deliverables will be indicated at the task order level.
NAM 1330.52.237-70 CONTRACTOR COMMUNICATIONS
(a) A contractor employee shall be identified both by the individual’s name and the contractor’s name when:
1. Included in NOAA’s locator, and
2. When submitting any type of electronic correspondence to any NOAA employee or stakeholder.
(b) Any written correspondence from a contractor or any contractor employee shall be printed on company/organization letterhead or otherwise clearly identify the sender as an employee of the company or organization and shall identify the contract number.
(c) Contractors and/or contractor employees shall clearly identify themselves as such in any verbal communications, whether in informal discussion or a formal meeting.
NAM 1330.52.242-70 SUBMITTAL OF INVOICES (FEB 2011)
The Contractor shall prepare and submit an invoice to the COR for approval [with a copy to the contracting officer for information]. All invoices shall be submitted by the 10th day of the subsequent month.
To constitute a proper invoice, the contractor’s invoice shall be prepared in accordance with, and contain all elements specified in, the paragraph titled, “Contractor’s Invoice,” of the applicable prompt payment provision of the contract (e.g., FAR 52.232-25, Prompt
Payment; FAR 52.232-26, Prompt Payment for Fixed-Price Architect
PAGE 21 OF 80 AB133F18RQ0235
Engineer Contracts; or FAR 52.232-27, Prompt Payment for Construction
Contracts). For contracts and orders for commercial items and services, paragraph (g) of FAR 52.212-4, titled, “Invoices,” applies.
If the invoice does not comply with the applicable prompt payment provision of the contract, the COR will return it to the contractor within seven days after the date the designated office received the invoice along with a statement as to the reasons why it is not a proper invoice.
(End of Clause)
NAM 1330.52.243-70 REQUEsTS FOR EQUITABLE ADJUSTMENT (OCT 2017)
(a) The amount of any request for equitable adjustment to contract terms shall accurately reflect the contract adjustment for which the contractor believes the Government is liable. The request shall include only costs for performing the change. All indirect costs included in the request shall be properly allocable to the change in accordance with applicable acquisition regulations.
(b) Any request for equitable adjustment to contract terms that exceeds the simplified acquisition threshold shall bear, at the time of submission, the following certificate executed by an individual authorized to certify the request on behalf of the Contractor:
I certify that the request is made in good faith, and that the supporting data are accurate and complete to the best of my knowledge and belief.
(Official’s Name)
(Title)
(c) The certification in paragraph (b) of this clause requires full disclosure of all relevant facts, including:
1. Certified cost or pricing data, if required, in accordance with subsection 15.403-4 of the Federal Acquisition Regulation (FAR);
and
2. Data other than certified cost or pricing data, in accordance with subsection 15.403-3 of the FAR, including actual cost data and data to support any estimated costs, even if certified cost or pricing data are not required.
(d) The certification requirement in paragraph (b) of this clause does not apply to:
PAGE 22 OF 80 AB133F18RQ0235
1. Requests for routine contract payments; for example, requests for payment for accepted supplies and services, routine vouchers under a cost-reimbursement type contract, or progress payment invoices; or
2. Final adjustments under an incentive provision of the contract.
(End of solicitation and contract language)
NAM 1330.52.270-304 NOAA ACQUISITION AND GRANTS OFFICE OMBUDSMAND (OCT
2016)
(a) The NOAA Acquisition and Grants Office (AGO) Ombudsman is available to organizations to promote responsible and meaningful exchanges of information. Generally, the purpose of these exchanges will be to:
Allow contractors to better prepare for and propose on business opportunities.
Advise as to technologies and solutions within the marketplace that the Government may not be aware of, or is not fully benefiting
Identify constraints in transparency
(b) The AGO Ombudsman will objectively, reasonably, and responsibly collaborate with parties and recommend fair, impartial, and constructive solutions to the matters presented to him/her. Further, the AGO Ombudsman will maintain the reasonable and responsible confidentiality of the source of a concern, when such a request has been formally made by an authorized officer of an organization seeking to do business with, or already doing business with NOAA.
(c) Before consulting with the AGO Ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations with the respective contracting officer for resolution. However, direct access to the AGO Ombudsman may be sought when an interested party questions the objectivity or equity of a contracting officer’s decision, or when there is a bona fide reason to believe that reasonable, responsible, and objective consideration will not be received from an assigned contracting officer.
(d)There are several constraints to the scope of the AGO Ombudsman’s authority, for instance:
Consulting with the AGO Ombudsman does not alter or postpone the timelines of any formal process (e.g., protests, claims, debriefings, employee employer actions, activities involving A76 competition performance decisions, judicial or congressional hearings, or proposal, amendment, modification or deliverable due dates).
PAGE 23 OF 80 AB133F18RQ0235
The AGO Ombudsman cannot participate in the evaluation of proposals, source selection processes, or the adjudication of protests or formal contract disputes.
The AGO Ombudsman is not authorized to generate or alter laws, judicial decisions, rules, policies, or formal guidance.
The AGO Ombudsman is not authorized to develop or alter opportunity announcements, solicitations, contracts, or their terms or conditions.
The AGO Ombudsman cannot overrule the authorized decisions or determinations of the contracting officer.
The AGO Ombudsman has no authority to render a decision that binds
AGO, NOAA, the Department of Commerce, or the S. Government.
The AGO Ombudsman is not NOAA’s agent relative to the service of magistrate or judicial process and cannot be used to extend service of process to another party (whether federal, public, or a private entity).
(e) After review and analysis of a filed concern or recommendation, the AGO Ombudsman may refer the interested party to another more suitable federal official for consideration. Moreover, concerns, disagreements, and/or recommendations that cannot be resolved by the
AGO Ombudsman will need to be pursued through more formal venues.
(f) The AGO Ombudsman is not to be contacted to request copies of forms and/or documents under the purview of a contracting officer.
Such documents include Requests for Information, solicitations, amendments, contracts, modifications, or conference materials.
(g) Questions regarding items (a) through (f) within this language shall be directed to Rafael Roman, NOAA AGO Ombudsman, at
Rafael.Roman@noaa.gov.
NAM NOAA GOVERNMENT-CONTRACTOR RELATIONS-NON-PERSONAL SERVICES
CONTRACT (SEPT 2017)
(a) The Government and the Contractor understand and agree that the services to be delivered under this contract by the Contractor to the
Government are non-personal services as defined in FAR Part 37, Service Contracting, and the parties recognize and agree that no employer-employee relationship exists or will exist under the…