This document outlines specifications for a federal construction contract to convert an existing Game Stop and H&R Block into a Panera Bread in Fort Drum, New York. The project involves selective demolition of existing interior and exterior components as well as new construction work. Key requirements include rough-in of plumbing, electrical, and HVAC systems; installation of metal framing, doors, finishes, and food service equipment; and final connections, start-up, and commissioning. Army and Air Force Exchange Service will furnish certain food service equipment to be installed by the contractor. The specifications provide extensive health and safety, environmental protection, and waste disposal requirements and reference numerous codes and standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
CONVERT GAME STOP TO PANERA BREAD CONCEPT –
TO GO
FT. DRUM, NEW YORK
AAFES PN: 1367-23-000002
CONTRACTS: COMBINED WORK – ALL TRADES
BY:
DATE: 28 JULY 2023
SOLICITATION SPECIFICATIONS
Illinois Design Firm License Number 184-002661 Post Office Box 820 600 West Main Street ▪ Suite 2 Carbondale, Illinois 62901 618 ▪ 457 ▪ 5709 Fax 618 ▪ 457 ▪ 5638
CONVERT GAME STOP TO
PANERA BREAD CONCEPT – TO GO
PN: 1367-23-000002
ARCHITECT
hmb ARCHITECTS LLC 600 West Main Street Suite 2
Carbondale, Illinois 62901 618 457 5709 Fax 457 5638
E-mail jjones@hmbarchitects.com
PROFESSIONAL CONSULTANTS
MECHANICAL/ELECTRICAL ENGINEERING
McCoy & Howard Consulting Engineers, Inc.
413 West Main Street Post Office Box 581
Mt. Vernon, Illinois 62864 618 242 0473 Fax 242 2330
E-mail ccalvert@mhengineers.com hmb PROJECT NO. 2303-175
28 JULY 2023
© 2023 hmb ARCHITECTS LLC
CONVERT GAMESTOP
TO PANERA BREAD CONCEPT – TO GO
FT. DRUM, NEW YORK
PN: 1367-23-000002
ARCHITECT: h. michael bohnsack ARCHITECTS Project Manual: Section 00860 All Sections of Division 1 All Sections of Division 2 All Sections of Division 3 All Sections of Division 5 All Sections of Division 6 All Sections of Division 7 All Sections of Division 8 All Sections of Division 9 All Sections of Division 10 All Sections of Division 11
SIGNATURE All Sections of Division 31
CURRENT DATE 28 JULY 2023
LICENSE EXPIRATION DATE 30 NOVEMBER 2024
Drawing Sheets: All T-Sheets, All D-Sheets, All A-Sheets, All FS-Sheets
FIRE PROTECTION ENGINEER: McCoy & Howard Consulting Engineers, Inc.
Project Manual: All Sections of Division 21 All Sections of Division 28
SIGNATURE
LICENSE EXPIRATION DATE 30 SEPT 25
Drawing Sheets: All FPD-Sheets, All FP-Sheets, All FAD-Sheets, All FA-Sheets, All LS-
Sheets
MECHANICAL ENGINEER: McCoy & Howard Consulting Engineers, Inc.
Project Manual: All Sections of Division 22 All Sections of Division 23
LICENSE EXPIRATION DATE 30 NOV 23
Drawing Sheets: All MD-Sheets, All M-Sheets, All PD-Sheets, All P-Sheets
ELECTRICAL ENGINEER: McCoy & Howard Consulting Engineers, Inc.
Project Manual: All Sections of Division 26
LICENSE EXPIRATION DATE 30 NOV 23
Drawing Sheets: All ED-Sheets, All E-Sheets
PROJECT MANUAL
TOC – Table of Contents
TABLE OF CONTENTS TOC-1
CONVERT GAME STOP
TO PANERA BREAD CONCEPT – TO GO
AAFES PN: 1367-23-000002
BIDDING REQUIREMENTS PAGES
CONTRACT REQUIREMENTS
List of Drawings 00860-1
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
Requirements of Ft. Drum 01000-5 Summary of Work 01010-13 Exchange (AAFES) Furnished & Installed Equipment 01017-2 Exchange (AAFES) Furnished/Contractor Installed Equipment 01018-3 Substitution Procedures (with CSI Form Attached) 01030-3 Cutting & Patching 01045-2 Grades, Lines & Levels 01051-1 Exchange (AAFES) Safety Policies & Procedures 01060-4 Exchange (AAFES) Safety Regulations & Codes 01090-8 Schedule of Values 01210-2 Exchange (AAFES) Progress Meetings 01220-2 Progress Payments 01230-3 Project Management & Coordination 01310-3 Construction Progress Schedules 01320-3 Exchange (AAFES) Weather Table 01331-2 Shop Drawings, Product Data & Submittals 01340-9 Quality Control 01400-3 Testing Laboratory Services 01410-4 Exchange (AAFES) Environmental Protection 01420-10 Temporary Facilities, Barriers & Controls 01500-10 Temporary Utilities 01510-6 Exchange (AAFES) Field Offices & Sheds 01590-3 Material & Equipment 01600-2 Storage & Protection 01620-3 Systems Start-up 01650-2 Project Closeout (with DoD Form 1354 Attached) 01700-28 Cleaning 01710-2 Project Record Documents 01720-2
DIVISION 3 – CONCRETE WORK
Cast-in-Place Concrete 03300-9
DIVISION 5 – METALS
Structural Steel 05120-7 Cold-Formed Metal Framing 05400-7 Metal Fabrications 05500-11
DIVISION 6 - WOOD & PLASTICS
TABLE OF CONTENTS TOC-2
Rough Carpentry 06100-6 Finish Carpentry 06200-6 Fire Retardant Wood Treatment 06300-4 Architectural Woodwork 06400-7
DIVISION 7 - THERMAL & MOISTURE PROTECTION
Firestopping 07270-5 Modifications to Warranted EPDM Roof System 07541-7 Flashing & Sheet Metal 07600-6 Building & Paving Joint Sealers 07920-6
DIVISION 8 – DOORS & WINDOWS
Access Doors 08305-3 Overhead Rolling Grille 08331-5 Double Acting Doors 08380-3 Aluminum Entrances & Storefronts 08410-8 Glass & Glazing 08800-7
DIVISION 9 – FINISHES
Gypsum Drywall Systems 09250-10 Tile 09300-8 Acoustical Panel Ceilings 09510-4 Resilient Tile Flooring 09650-3 Painting 09900-6 Fiberglass Reinforced Wall Panels 09986-3
DIVISION 10 – SPECIALTIES
Wall Surface Protection Systems 10265-4 Specialty Signs 10440-3 Fire Extinguishers, Cabinets and Accessories 10522-4
DIVISION 11 – EQUIPMENT
Food Service Equipment 11400-7
DIVISION 21 – FIRE PROTECTION
Wet Pipe Sprinkler Systems 211313 -5
DIVISION 22 – PLUMBING
General Provisions for Plumbing 220510-6 Meters and Gages for Plumbing Piping 220519-3 General-Duty Valves for Plumbing Piping 220523-4 Hangers And Supports for Plumbing Piping and Equipment 220529-7 Identification For Plumbing Piping and Equipment 220553-3 Plumbing Insulation 220719-10 Domestic Water Piping 221116-10 Domestic Water Piping Specialties 221119-5 Sanitary Waste and Vent Piping 221316-5 Sanitary Waste Piping Specialties 221319-4 Facility Natural-Gas Piping 221613-7 Natural Gas Water Heaters 223400-4 Commercial Plumbing Fixtures 224213-5
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING
TABLE OF CONTENTS TOC-3
Mechanical – General Provisions 230100-4 Common Motor Requirements for HVAC Equipment 230513-3 Hangers and Supports for HVAC Piping and Equipment 230529-7 Identification for HVAC Piping and Equipment 230553-4 Air Systems Testing, Adjusting, and Balancing 230593-7 Testing, Adjusting, and Balancing of HVAC Systems 230596-2 HVAC Insulation 230700-14 Metal Ductwork 233113-8 Ductwork Accessories 233300-5 Fans 233423-3 Air Outlets and Inlets 233713-2 Food Service Ventilation Systems 233813-6 Split System Air Conditioners 238126-4
DIVISION 26 – ELECTRICAL
Electrical Demolition for Remodeling 260060-3 Building Wire and Cable 260519-4 Grounding and Bonding 260526-2 Supporting Devices 260529-2 Conduit 260533-5 Boxes 260534-4 Identification 260553-2 Occupancy Sensors 260925-2 Panelboards 262416-3 Wiring Devices 262726-3 Enclosed Switches 262817-2 Interior Luminaires 265100-4 Testing 266000-2
DIVISION 28 – ELECTRICAL
Fire Alarm Mass Notification Systems 283176-14
SUPPLEMENTARY CONDITIONS
Section 008600 – LIST OF DRAWINGS
LIST OF DRAWINGS 008600-1
SHEET NO. TITLE
GENERAL
T-1.01 GENERAL INFORMATION SHEET
T-1.02 REFERENCE FLOOR PLAN AND LIFE SAFETY PLAN
T-1.03 PHASING FLOOR PLAN
CIVIL
C-1.00 SITE PLAN
CU-1.01 SITE PLAN - ELECTRICAL
C-1.01 SITE DETAILS
DEMOLITION
D-1.01 DEMOLITION FLOOR PLAN
D-1.02 DEMOLITION FLOOR SLAB PLAN
D-6.01 DEMOLITION INTERIOR ELEVATIONS
D-7.01 DEMOLITION REFLECTED CEILING PLAN
ARCHITECTURAL
A-1.01 FLOOR PLAN
A-1.02 FLOOR SLAB & DIMENSION PLANS
A-5.01 ROOF PLAN
A-6.01 INTERIOR ELEVATIONS - MALL/ FRONT OF HOUSE
A-6.02 INTERIOR ELEVATIONS - BACK OF HOUSE
A-6.03 CASEWORK SECTIONS, SCHEDULES & DETAILS, 3-D VIEWS
A-7.01 REFLECTED CEILING PLAN & CEILING DETAILS
A-8.01 DOOR SCHEDULE, ELEVATIONS & DETAILS
A-9.01 INTERIOR MATERIALS LIST & FINISH FLOOR PLANS
FS-1.01 EQUIPMENT PLAN
FS-1.02 EQUIPMENT SCHEDULE, NATIONAL ACCOUNTS CONTACTS
MECHANICAL
MD-1.01 DEMOLITION FLOOR PLAN - MECHANICAL
M-1.01 FLOOR PLAN - MECHANICAL
M-2.01 SYMBOLS & SCHEDULES - MECHANICAL
PLUMBING
PD-1.01 DEMOLITION FLOOR PLAN - PLUMBING
P-1.01 FLOOR PLAN - PLUMBING
P-2.01 SYMBOLS, SCHEDULES, & GENERAL NOTES - PLUMBING
FIRE PROTECTION
FP-1.01 FLOOR PLAN - FIRE PROTECTION
FA-0.01 SYMBOLS, SCHEDULES AND GENERAL NOTES - FIRE ALARM
FAD-1.01 DEMOLITION FLOOR PLAN - FIRE ALARM
FA-1.01 FLOOR PLAN - FIRE ALARM
ELECTRICAL
E-0.01 SYMBOLS, SCHEDULES - ELECTRICAL
ED-1.01 DEMOLITION FLOOR PLAN - LIGHTING
ED-2.01 DEMOLITION FLOOR PLAN - POWER
E-1.01 FLOOR PLAN - LIGHTING
E-2.01 FLOOR PLAN - POWER
E-3.00 RISER DIAGRAM AND PANEL SCHEDULES - ELECTRICAL
E-5.00 RISER DIAGRAM, PANEL SCHEDULES & PARTIAL FLOOR PLAN
All drawings dated: 16 June 2023
END 008600.
DIVISION 1 – GENERAL REQUIREMENTS
Section 010000 – REQUIREMENTS OF FT. DRUM
REQUIREMENTS OF FT. DRUM 010000-1
1 GENERAL
1.1 WORK INCLUDES
A. Safety Plan.
B. Construction Site Layout Plan.
C. Work Schedule.
D. Excavation Permit.
E. Welding Permit and Protection for Open Flame Devices.
F. Protection of Government Property and Personnel.
G. Covering of Debris.
H. Environmental Protection.
I. Waste Recycling.
J. Waste Disposal.
K. Site Use.
L. Contractor Installation Identification Credentials.
M. Special Requirements.
1.2 RELATED SECTIONS
A. Section 01 10 00 – Project Summary.
B. Section 01 35 43 – Exchange (AAFES) Environmental Protection.
C. Section 01 51 00 – Temporary Utilities.
D. Section 01 52 00 – Field Offices & Sheds.
E. Section 01 55 00 – Temporary Facilities, Barriers & Controls.
F. Section 01 74 19 – Construction Waste Management & Disposal.
G. Section 01 77 00 – Project Record Drawings.
H. Section 31 23 13 – Excavation, Backfill & Compaction.
I. Army & Air Force Exchange Service - General Provisions, a copy of which is included in the
Solicitation Package.
1.3 SAFETY PLAN
A. Contractor shall provide the following for review in compliance with Section 01 13 00, AAFES Safety Policies & Procedures:
1. Contractor generated job Safety and Health Plan.
2. Contractor generated Construction Hazard Plan.
B. These Plans shall be submitted to and approved by Ft. Drum DPW Safety Office.
REQUIREMENTS OF FT. DRUM 01 00 00-2
1. Resubmit Safety and Health and Construction Hazard Plans until all concerns expressed by reviewer(s) are addressed and approval is obtaining in writing from Ft.
Drum DPW.
2. Submit Installation approved Safety and Health and Construction Hazard Plans to Contracting Officer or designated representative and to the Architect-Engineer prior to commencement of any work on this Project.
C. In case of an emergency of any kind at Ft. Drum Contractor shall:
1. Phone: 911
1.4 CONSTRUCTION SITE LAYOUT
A. Contractor shall provide a proposed Construction Site Layout Plan for review that graphically illustrates the following minimum information:
1. Location of all temporary office, construction and storage trailers or buildings.
2. Construction lay down area for materials scheduled to be stored at the Site of construction.
3. Location of equipment storage and parking.
4. Location of construction vehicles including employee parking.
5. Location of portable fire extinguishers and safety signage.
6. Trash dumpsters and containers.
7. Temporary construction fencing.
B. Indicate on proposed Construction Site Layout Plan all required temporary utility connection points and temporary utility routing.
C. Submit photographs of pre-construction conditions of construction Site and surrounding streets, sidewalks, landscape and other Site appurtenances for record.
D. Indicate provisions for controlling dust and debris:
1. Dust control to prevent hazardous conditions on roadways and accumulation of excessive dust on surrounding areas and structures.
2. Temporary construction entrance(s) to the Site of construction and measures to control accumulation of dirt and debris from adjacent roadways.
E. Construction Site Layout Plan shall be submitted to and approved by Ft. Drum DPW.
1. Resubmit Construction Site Layout Plan until all concerns expressed by reviewer(s) are addressed and approval is obtaining in writing from Ft. Drum DPW.
2. Submit Installation approved Construction Site Layout Plan to Contracting Officer or designated representative and to the Architect-Engineer prior to commencement of any work on this Project.
1.5 WORK SCHEDULE
A. All work at Ft. Drum shall be accomplished during normal working hours 0700 to 1600 hours exclusive of Saturdays, Sundays, and federal holidays unless other times are approved by the Contracting Officer, or otherwise stated in the contract.
1. Coordinate the work schedule with the Contracting Officer and Ft. Drum DPW.
2. Work may be expanded to 0600 and 1800 hours and weekends if approved by the
Contracting Officer and Ft. Drum DPW.
REQUIREMENTS OF FT. DRUM 01 00 00-3
a. Contractor shall obtain written approval from both parties to expand work schedule and submit to Contracting Officer and designated representative for record prior to initiating expanded schedule.
b. Expansion of work schedule shall not constitute cause for adjustments in the Contract amount.
1.6 EXCAVATION PERMIT
A. No excavation shall be done prior to receiving a Ft. Drum Excavation Permit.
B. Prior to initiating an Excavation Permit request:
1. Identify the exact location of anticipated excavation with white flags or paint.
2. Contact Dig Safely New York 811 or 800-962-7962 or at www.digsafelynewyork.com.
a. Obtain UFPO ticket number provided by Dig Safely New York.
3. Submit a Ft. Drum Excavation Permit online through the Excavation Permit System
(WEPS) at https://mapsrus.drum.army.mil/WEPS/weps.jsp with the assistance of a Master Planning Branch employee who will use a Common Access Card (CAC) to access the website.
a. Example of Fort Drum Form 555-E attached at the end of this Section.
4. Upon approval applicant will receive the Permit in an email from WEPS.
C. Contractor shall comply with New York State Code Rule Part 753, Protection of
Underground Facilities.
D. A signed copy of the approved Excavation Permit shall be on site at all times.
E. Contractor and all subcontractors intending to perform excavation shall request permits a minimum of ten (10) days prior to scheduled start of digging.
1. Contractor shall contact each of fifteen (15) individual offices indicated on Fort Drum
Excavation Permit application form to coordinate identification of underground utilities:
a. Provide information regarding type of work, means of excavation and provide construction drawings.
2. Contractor shall be on site during the identification of utilities to ensure first-hand knowledge, assist in locating utilities and identifying work areas.
3. After required signatures are obtained and utilities located, return forms to issuer (Government Project Manager/COR) for final approval.
F. Hand digging (vacuum excavation accepted) shall be required to locate utilities shown on the contract drawings or 3 feet on either side of locations identified by Ft. Drum since located utilities are only guaranteed to an accuracy of plus or minus 5' on either side of markings.
G. Contractor shall maintain and preserve all marked utilities throughout the excavation period.
H. Changes to, enlargement of sites and/or start delay of over 30 days may nullify approved Excavation Permit and excavators shall be required to apply for a new Permit.
I. Contractor shall be responsible for all repairs, costs and damages due to excavating or for damaging an unidentified utility at no additional cost to Ft. Drum or AAFES.
http://www.digsafelynewyork.com/ https://mapsrus.drum.army.mil/WEPS/weps.jsp
REQUIREMENTS OF FT. DRUM 01 00 00-4
J. Contractor shall record exact location and depths all existing and new utilities for this Project on Record Drawings to be submitted to Architect in accord with the requirements set forth in Section 01720, Project Record Documents.
1.7 WELDING AND PROTECTION OF OPEN FLAME DEVICES
A. Prior to commencing any welding, Contractor shall obtain a Fire/Hot Permit through Ft.
Drum DPW offices from the Ft. Drum Fire Department.
B. When open flame and/or spark producing devices, i.e., acetylene oxygen welding equipment, electric arc welding, sweat soldering, etc., are employed for job accomplishment, the following procedures are mandatory:
1. Inspect all surroundings and equipment to ensure that combustible substances are not present in any area where contact of metal at a temperature above the flashpoint of any compound is possible.
2. Ensure that no open containers or spills of combustible substances are present.
3. Ensure that ignition is not possible by conduction, convection, radiation, or dispersion of molten metal.
4. Proper protection equipment and practices will be used, i.e., fireproof blankets, wetting of surrounding area, removal o combustible materials where practicable, earth filled backing and portable fire extinguishers of proper type on hand.
5. When the above devices are being used notify the Post Fire Department 24 hours ahead of usage and obtain a permit.
a. POC: Scott Day, Fire Inspector
b. E-mail: scott.a.day2.civ@army.mil
c. Phone: (315) 772-4702
1.8 PROTECTION OF GOVERNMENT PROPERTY AND PERSONNEL
A. Contractor shall furnish, place, and maintain all required barricades as directed by the Safety Office and the Contracting Officer.
B. Access drives and roadways shall remain clear at all times.
C. Contractor shall conduct operations to offer the least possible obstruction and inconvenience to public traffic.
1. All traffic shall be permitted to pass adjacent to work without delay.
2. Where the nature of construction operations in progress, equipment, and machinery in use are of character to endanger passing traffic, Contractor shall provide lights and signs, erect fences or barriers, and station flaggers necessary to give adequate warning to avoid damage or injury to passing traffic.
3. Signs, flags, lights, warning and safety devices shall conform to applicable installation, city, county, and state requirements.
D. If road/lane closures or traffic interruption becomes necessary during the course of work:
1. Contractor shall submit to DPW for approval a barricade and sign plan clearly showing work area, location, and type of sign to be placed for rerouting traffic.
a. The traffic control plan shall be in accordance with “Traffic Controls for Street and Highway Construction and Maintenance Operations”, latest edition, of the “New York Manual on Uniform Traffic Control Devices”.
b. At least one lane of traffic shall be maintained operational at all times.
REQUIREMENTS OF FT. DRUM 01 00 00-5
2. Submit traffic control plan to Ft. Drum DPW a minimum of 21 days prior to commencing work affecting traffic and allow Ft. Drum sufficient time for notification of concerned parties.
1.9 COVERING OF DEBRIS
A. Contractor and all subcontractors shall be required to cover all loads of debris before hauling them off from the Site.
B. Contractor shall be responsible for cleanup of all incidental debris that inadvertently falls onto pavements or other properties during hauling operations.
1.10 ENVIRONMENTAL PROTECTION
A. Contractor shall abide by the environmental requirements of Ft. Drum, the State of New York and Federal Government.
1. Detailed requirements are set forth in Section 01 35 43, Exchange (AAFES)
Environmental Protection.
B. Vehicles and other powered equipment shall meet local air quality regulations for emissions.
1. Vehicles and equipment shall be mechanically sound and have all seals, grease rings, and other containment systems in place to ensure against leakage.
2. Drip pans shall be maintained such that overflow and spills do not occur.
3. There shall be no activities for equipment maintenance including oil changes, filter replacements, or hydraulic equipment repair performed on Ft. Drum Property.
C. Whenever a spill of oil or hazardous material is discovered, Contractor shall take immediate action to:
1. Stop the flow of product.
2. Advise personnel of the incident.
3. Immediately shut down equipment and minimize sources of ignition.
4. Contain the spill.
5. Notify Ft. Drum DPW Environmental immediately for further instruction.
D. Contractor shall also prepare a formal “Spill Report” chronicling the events leading to the spill and the efforts to contain it.
1. This Spill Report shall be submitted to the Ft. Drum Environmental Division:
POC: Tony Rambone, Ft. Drum Environmental Coordinator E-mail: Anthony.I.rambone.civ@army.mil Phone: (315) 772-4154
E. Contractor shall submit a monthly report of fuel consumption for each fuel burning unit, whether permitted or not, for all operational time throughout construction until Substantial Completion or when that unit is retired from service on this Project, whichever is longer.
1. Make monthly submittals to Ft. Drum DPW.
2. At Substantial Completion submit the total amount of fuel used for each unit to Ft.
Drum DPW substantiating monthly reports.
1.11 WASTE RECYCLING
A. Ft. Drum promotes recycling of demolished materials and construction waste and requires that the Contractor recycle as many materials as are feasible under this Contract.
REQUIREMENTS OF FT. DRUM 01 00 00-6
B. Recycling of Construction waste shall be mandatory to reduce the amount of solid waste deposited in landfills and shall follow procedures outlined in Section 01 74 19, Construction Waste Management & Disposal and the Technical Sections of the Project Manual.
1. Examples of materials that Contractor shall consider for recycling include but are not limited to all materials listed in Section 01 74 19.
C. All construction debris, demolition debris and refuse shall be recycled to the maximum extent possible and not less than 50% per the Ft. Drum Environmental Management System
(EMS).
1. All refuse and recycle disposal shall be reported to Ft. Drum DPW on a monthly basis with submittal to:
POC: Tony Reali, Ft. Drum Recycling Coordinator E-mail: Anthony.p.reali.civ@army.mil Phone: (315) 772-2678
2. The disposal and recycle report shall include:
a. Quantity, measured in weight by pounds, and material disposed.
b. Quantity, measured in weight by pounds, and material recycled.
c. Date upon which material was disposed or recycled.
d. Final destination of material disposal or recycling.
3. Per AR 200-1, all manifest or shipping papers that require the Installation EPA ID number must be signed by authorized a responsible party of the Environmental Division, Ft. Drum, New York.
1.12 WASTE DISPOSAL
A. Contractor shall refer to applicable paragraphs in Section 01 35 43, Exchange (AAFES) Environmental Protection for details pertaining to waste disposal including:
1. Hazardous waste generation, handling and disposal.
2. Non-hazardous waste disposal.
3. Normal construction debris disposal.
B. All excess soils and organic matter shall be removed from the site and legally disposed of in approved landfill on Ft. Drum property as directed by Ft. Drum DPW and in accordance with Section 01 35 43.
C. Unless recycled per Paragraph 1.11 above, or hazardous waste, all other solid waste shall be collected and disposed of off Ft. Drum Property.
1. There shall be no accumulation of solid waste unless properly containerized or put within a fenced area to prevent windblown pollution.
2. No materials shall be put into dumpsters owned or managed by Ft. Drum.
D. Only empty paint cans shall be allowed in Contractor furnished trash receptacles.
1. Paint cans are considered empty if paint comprises less than 1 inch or 3% by weight of the total capacity of the container, whichever is less.
2. If the residue in the container exceeds these limits, contact the Contracting Officer for disposal instructions.
E. All site paving scheduled for removal shall be recycled, salvaged or salvaged and reused in new construction.
REQUIREMENTS OF FT. DRUM 01 00 00-7
F. All underground piping scheduled for removal shall be recycled when appropriate, removed from the site and legally disposed of in accord with Section 01 74 19, off Ft. Drum property.
G. Unless recycled per Paragraph 1.9 above, all solid waste not specifically indicated shall be removed from the site and legally disposed of in approved landfill off Ft. Drum property.
1.13 SITE USE
A. Contractor shall furnish, place and maintain temporary construction fencing to separate construction areas from entry by unauthorized personnel including, but not limited to:
1. Building construction site.
2. Construction trailers.
3. Temporary storage trailers, sheds and lay-down areas.
4. Equipment parking areas.
5. Other areas subject to construction work under this Contract.
B. Contractor shall coordinate all site use areas with Ft. Drum DPW and Contracting Officer or designated representative.
1. Submit detailed site plan for approval indicating all areas to be temporarily fenced and indicate specific use proposed for all areas within fencing at least 21 days prior to commencing work.
a. Indicate proposed location of all temporary construction trailers, storage trailers and sheds.
b. Provide temporary utility needs and proposed source for each.
2. Obtain written approval of proposed site use plan from Ft. Drum DPW and Contracting Officer prior to construction of temporary fencing or utilities.
3. Pay all costs for temporary facilities and utilities until Substantial Completion of Project construction as determined by Contracting Officer.
1.14 CONTRACTOR PERSONNEL IDENTIFICATION CREDENTIALS
A. Contractor shall comply with the following procedures for obtaining Installation identification passes for the Contractor’s personnel and subcontractors.
1. Contractor shall submit a written request on company letterhead to the Ft. Drum sponsoring entity (identified at the Pre-construction Meeting) specifying the following at least 7 days prior to access being required:
a. Contract number.
b. Location of work site.
c. Date entry to the Installation must begin and contemplated termination date of entry.
d. Names, date of birth (DOB), social security numbers (SSN), ID type, ID number and state of Contractor and subcontractor employees requiring access to the Installation.
e. Vehicle make, color, license plate number and state of vehicles requiring access to the Installation.
2. The Ft. Drum sponsoring entity will submit information to authority having jurisdiction and that authority may:
a. Endorse the request.
REQUIREMENTS OF FT. DRUM 01 00 00-8
b. Attach a copy of the contract cover page and any other pages that provide performance information, such as the need for and duration of access to the work site.
c. Forward this request to the Security Police, Pass and Identification Office of the installation where the work is to be performed.
d. Provide appropriate blank Form to the Contractor.
3. The Contractor shall be required to complete and submit Form and request for identification credentials, for each of the firm’s employees and for each subcontractor employee who must have access to the installation.
4. The Contractor shall also request appropriate Form for vehicle decals when the request for identification credentials is submitted.
5. To obtain the vehicle decal from the Security Police, Pass and Identification Office, the Contractor shall produce:
a. A valid driver’s license.
b. Proof of financial responsibility or insurance
c. Current vehicle registration.
B. Contractor employees, at all times while on a military installation shall wear visible identification either as a part of, or attached to, their outer clothing.
C. The identification shall clearly identify the individual as being a Contractor employee.
D. During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel, and for prompt return of credentials and vehicle registration decals to the Security Police, Pass and Identification Office, for any employee who no longer requires access to the work site within four (4) calendar days.
1. Local Access Badges will not be reproduced or copied.
2. If a Local Access Badge is lost, stolen or reproduced the Contractor shall verbally report the loss, theft or reproduction to the Ft. Drum Physical Security Division on the day such loss, theft or reproduction is discovered, followed by a written report of the circumstances to the Ft. Drum Physical Security Division within two (2) calendar days.
E. At the termination or completion of the contract, or upon expiration of credentials (if any such expirations are specified), the Contractor shall return all installation identification credentials and vehicle registration decals for all Contractor and subcontractor employees to the Security Police, Pass and Identification Office.
1.15 SPECIAL REQUIREMENTS
A. Endangered Species Act Requirements:
1. Ft. Drum provides habitat for Federally-endangered and Federally-threatened species of bats:
a. Federally-endangered Indiana bat.
b. Federally-threatened Northern Long Eared Bat.
2. Actions on Fort Drum shall be in accordance with requirements negotiated with the US Fish & Wildlife Service under Section 7 of the Endangered Species Act.
3. Contractor shall be responsible for coordination with Ft. Drum's Fish & Wildlife Management Program as directed by Ft. Drum DPW Environmental to ensure compliance with the Endangered Species Act and all other applicable laws and regulations pertaining to wildlife.
REQUIREMENTS OF FT. DRUM 01 00 00-9
4. Contractor shall minimize interference with, disturbance to, and damage to plants, fish, wildlife, and their habitats on and adjacent to this Project Site in full cooperation with Ft. Drum DPW Environmental.
B. Outdoor Lighting Minimization Measures:
1. Ft. Drum regulates outdoor lighting to reduce or prevent light pollution.
2. Guidelines will be made available to Contractor to provide hooded, fully shielded, full cutoff fixtures for temporary construction lighting.
3. Contractor shall comply with these requirements in full cooperation with Ft. Drum
DPW Environmental and with Ft. Drum Fish and Wildlife Management Program.
2 PRODUCTS (Not Used).
3 EXECUTION (Not Used).
END 01 00 00.
FORT DRUM EXCAVATION PERMIT
(Required for any excavations within Fort Drum boundaries) The excavator shall comply with New York State Code Rule Part 753 (Protection of Underground Facilities), REQUESTOR OF PERMIT:
Name:
Address:
Phone:
Organization:
E-mail:
EXCAVATOR OF SITE:(Individual performing the dig)
Name: Christopher Kenney
Address:
Phone:
Organization:
E-mail:
Permit ID: Project ID: Project Name:
Project Number: Depth:
Dig Start Date: Dig Completion Date:
Status:
Contract:
PURPOSE:
Location Description:
The excavator shall personally contact each office below to coordinate identification of underground utilities. Identify the exact location of excavation in white on the ground prior to requesting an excavation permit. Provide information on the type of work, means of excavation, and provide construction drawings. The excavator shall be on-site during the identification of utilities to ensure first-hand knowledge, assist in locating utilities and identifying work areas. Once required signatures are obtained and utilities located, return to issuer (Government Project Manager/COR) for final approval. A signed copy of the completed Excavation Permit shall be on site at all times. Throughout the excavation period, the excavator shall maintain and preserve all marked utilities. Before use of mechanized equipment in the tolerance zone, the excavator shall verify the precise location, type, size, depth and direction of such underground facility or its encasement, by hand digging, vacuum excavation accepted. The marked utilities are to be assumed to be plus or minus 5' either side of markings. Changes to, enlargement of sites and/or start delay over 30 days requires a new Excavation Permit.
The undersigned have ensured existing underground utilities and other appurtenances have been identified prior to excavation. The excavator shall repair any damage to identified/located utilities and other appurtenances at no cost to the Government. Special instructions shall be annotated by marking authority if required. After identification, verification & completion all "as-built" construction drawings shall be submitted as per contract.
Obtain signatures within 30 days of excavation start. Excavation Permit is valid throughout the excavation period.
Signature
Discipline Status Comments Review Date
FDMCH
Master Planning
Env, Petroleum
Env, Water Quality
Env, Wetlands
Env, NEPA
Env, Cultural
O-M Plumbing
Engineering
O-M Electrical
NEC Planning
Power Plant
UFPO
FIRE
USACE
Overview:
Comments:
FORT DRUM FORM 555-E, NOV 2007 PE v6.5.0
Section 011000 – SUMMARY OF WORK
SUMMARY OF WORK 011000-1
1 GENERAL
1.1 STATEMENT OF WORK
A. Scope: The work covered by these specifications consists of furnishing all plant, supervision, labor, equipment and materials required to convert the existing Game Stop and H&R Block to Panera Bread in accordance with these specifications and the applicable drawings, and subject to the terms and conditions of the contract.
B. Location: The work to be performed is located at the site of the existing Game Stop and
H&R Block at Ft. Drum, New York with site location described as follows:
1. Access from Post security perimeter by the Lt. Gen. Paul Cerjan / Main Gate, accessed via Iraqi Freedom Dr via Paul Cerjan Memorial Highway I-781.
2. Once through the gate the site location access via a right on Chaple Dr. to N Riva
Ridge Loop, take a left at N Riva Ridge Loop to Enduring Freedom Dr., Take a right on Enduring Freedom Dr. The project is located inside the Fort Drum Exchange building.
C. Principal Features:
A. Contractor Selective Demolition:
1. Building Exterior:
a. Roofing system as needed for installation of new equipment curbs.
2. Building Interior Demolition:
a. Construct temporary barriers.
b. FA devices/boxes.
c. Electrical components.
d. Data/comm. wiring.
e. Lighting fixtures.
f. HVAC diffusers, grilles, and flex-duct.
g. Plumbing fixtures & piping.
h. Concept Signage- Retain for reuse
i. Sales counters & supporting elements.
j. Acoustical ceiling tile (ACT) & grid.
k. Gypsum drywall ceilings, soffits, & framing/suspension system.
l. Ductwork.
m. Sprinkler heads & branch piping.
n. Gypsum drywall, metal panels, FRP & slat-wall finishes.
o. Metal stud/gypsum drywall partitions & soffits.
p. Door & frames.
q. Carpet Tile Flooring
r. Vinyl Tile Flooring
s. Slab joint filler removal.
t. Designated floor slab as needed to repair large cracks & installation of new under-slab plumbing.
B. Exchange Provided Selective Demolition:
SUMMARY OF WORK 011000-2
1. Remove & salvage furnishings & fixtures.
C. New Construction:
1. Building Exterior:
a. Roof mounted equipment curbs.
b. Roof mounted condensers for ice dispensers.
c. Roof mounted exhaust fan.
d. EPDM roofing membrane patching.
2. Building Interior:
a. Serving Area:
1) Rough-in underslab plumbing.
2) Patch concrete floor slab.
3) Metal stud wall/soffit framing.
4) Hollow metal door frames.
5) Rolling grilles & related structure.
6) Rough-in electrical.
7) Rough-in FA
8) Rough-in HVAC.
9) Rough-in above slab plumbing.
10) Rough-in sprinkler branch piping.
11) Data/comm. wiring.
12) Hang new gypsum drywall/plywood/cement board.
13) Tape/finish gypsum drywall soffits & partitions.
14) ACT grid.
15) Lighting fixtures.
16) HVAC diffusers & grilles.
17) Sprinkler heads
18) Ceramic floor tile & base.
19) Ceramic wall tile, wood planking, thin brick and paint finishes per
Panera standards.
20) Solid surface counter and counter frontal system.
21) Traffic doors & hardware.
22) Casework.
23) ACT ceiling pads.
24) Panera Bread serving equipment provided by vendor.
25) Signage.
26) Provide final connections for AF/AI and AF/CI equipment.
27) Trim out electrical devices/FA.
28) Install furnishings if applicable.
29) Remove temporary barriers.
30) Remove protective coverings, clean and turnover to Exchange.
b. Preparation Areas:
1) Rough-in underslab plumbing.
2) Patch concrete floor slab.
3) Metal stud wall/soffit framing.
4) Walk-in cooler/freezer boxes, refrigerant piping.
5) Hollow metal door frames.
6) Rough-in electrical.
7) Rough-in FA.
8) Rough-in HVAC.
9) Rough-in above slab plumbing.
SUMMARY OF WORK 011000-3
10) Rough-in sprinkler branch piping.
11) Data/comm. wiring.
12) Hang new water-resistant gypsum drywall/plywood/cement board.
13) Tape/finish gypsum drywall soffits & partitions.
14) ACT grid.
15) Lighting fixtures.
16) HVAC diffusers & grilles.
17) Sprinkler heads.
18) FRP/ ceramic wall tile.
19) Quarry tile floor finish & base.
20) Traffic doors & hardware.
21) ACT ceiling pads.
22) Panera Bread kitchen equipment by vendor.
23) Provide final connections for AF/AI and AF/CI equipment.
24) Trim out electrical devices/FA.
25) Remove protective coverings, clean and turnover to Exchange.
c. H&R Block FOH
1) Vanila box for Game Stop fit out.
2) Metal stud wall/soffit framing.
3) ACT grid and panels.
4) Rough-in sprinkler branch piping.
5) Data/comm. wiring.
6) Rough-in HVAC.
7) Rough-in electrical.
8) Lighting fixtures.
9) HVAC diffusers & grilles.
10) Sprinkler heads.
11) Paint gyp walls
12) Sealed concrete floors
13) No wall base
14) Install new and existing concept signage
d. H&R Block Store Room
1) Vanila box for Game Stop fit out.
2) Metal stud wall/soffit framing.
3) ACT grid and panels.
4) Rough-in sprinkler branch piping.
5) Data/comm. wiring.
6) Rough-in HVAC.
7) Rough-in electrical.
8) Lighting fixtures.
9) HVAC diffusers & grilles.
10) Sprinkler heads.
11) Paint gyp walls
12) Sealed concrete floors
13) No wall base
D. Substantial Completion:
1. Equipment startup.
2. Systems testing.
a. Fire alarm.
b. Plumbing systems.
c. Electrical systems.
SUMMARY OF WORK 011000-4
3. Punch list.
4. Repair/replace punch list deficiencies.
E. Closeout:
1. O & M Manuals.
2. As-built documents.
3. GWB's.
4. DD-1354.
5. Final pay request and "Release of Claims".
D. General Provisions
1. The Contractor is advised to take note of the following General Provisions of the
Contract:
a. Cleaning up.
b. Material and Workmanship.
c. Accident Prevention.
d. Existing structures on and surrounding site.
e. Utilities and improvements.
f. Operation and storage areas.
g. Site investigation.
h. Permits.
i. Other responsibilities indicated in General Provisions.
j. Final Training
2. A copy of the Army and Air Force Exchange Service - General Provisions is included in the Solicitation Package.
1.2 EXISTING CONDITIONS
A. The Project will be constructed on an occupied Military Installation in and around an occupied facility.
B. Work performed under this Contract will require extensive coordination with Exchange (AAFES) and Ft. Drum DPW personnel to ensure the health, safety and welfare of Exchange (AAFES) employees, customers and Post personnel.
C. Contractor shall be responsible for the construction of temporary barricades, barriers and services as indicated to:
1. Protect occupants and pedestrians from injury.
2. Protect vehicles and existing construction to remain from damage.
3. Maintain security of the Site and the Building at all times.
1.3 Refer to paragraph 1.28 of this Section and provisions of Section 01420, Environmental Protection for information pertaining to encounter of potentially hazardous materials.
1.4 SPECIAL INSTALLATION REQUIREMENTS
A. General working hours on Post are from 0700 to 01600 hours.
B. No streets will be blocked without DPW approval.
C. Contractor shall immediately clean up any debris tracked on to streets resulting from this construction operation.
D. Construction areas, including equipment, temporary office and storage areas, shall be
SUMMARY OF WORK 011000-5
kept clean and neat.
E. No burning is permitted on the Installation.
1.5 UTILITIES (WATER, SEWER, GAS AND ELECTRICITY)
A. Refer to Section 01510, Temporary Utilities.
B. Exchange (AAFES) will pay for utilities consumed within the building and related exterior construction work.
C. Contractor will be required to pay designated utility companies the prevailing rate for utilities consumed for this Project for temporary offices and storage sheds (water, sewer, gas and electricity).
D. Ft. Drum utilities information:
A. Contractor will be required to pay designated utility companies the prevailing rate for utilities consumed for this Project (water, sewer, gas and electricity).
B. Ft. Drum utilities information:
1. Sewer, Natural Gas and Electrical Power – Ft. Drum:
a. POC: Bob Avar
b. E-mail: Roert.i.avar.civ@army.mil
c. Phone: (315) 772-2862
2. Water – Ft. Drum:
a. POC: Christopher Whitman
b. E-mail: christopher.h.whitman2.civ@army.mil
3. Communication (NEC) and Data/LAN – Ft. Drum:
a. POC: John Decillis.
b. E-mail: Lyle.j.decillis.civ@army.mil.
c. Phone: (315) 772-2862.
C. Utility service responsibilities:
1. Water/Sewer: Water and sewer utilities are owned and operated by Ft. Drum.
2. Natural Gas: Natural gas utilities are owned and operated by Ft. Drum.
3. Power: Power utilities are owned and operated by Ft. Drum.
4. Communications: Communication lines available from the Site are owned by Ft.
Drum and commercial lines are leased back to Verizon.
5. Contractor responsibilities:
a. Notify and coordinate with Ft. Drum regarding all utilities.
b. Tap and provide the complete utility services to the new Express Mini Mall as indicated.
c. Ft. Drum DPW will inspect Contractor’s installation during Construction of the utility services but it shall be Contractor's responsibility to ensure compliance with these and Ft. Drum's specifications.
d. 10-day advance notification will be required for all utility work unless other arrangements can be made with Ft. Drum DPW to shorten that notification period.
SUMMARY OF WORK 011000-6
1.6 LAYING OUT WORK
A. Layout:
1. Dimensions and elevations indicated in layout of work shall be verified by
Contractor.
2. Discrepancies between Drawings, specifications, and Conditions shall be referred to the Contracting Officer in writing for adjustment before work affected is performed.
3. Failure to make such notifications shall place responsibility upon Contractor to carry out work in a satisfactory and workmanlike manner.
B. Contractor shall be responsible for the location and elevation of all the construction contemplated by the construction documents.
C. Prior to commencement of work, Contractor shall carefully compare and check all Architectural, Structural, Mechanical, and Electrical drawings, each with the other, that in any way affect the locations of elevation of the work to be executed by him.
1. Any discrepancy shall be immediately reported to the Contracting Officer or designated representative for verifications and adjustment.
2. Any duplication of work made necessary by failure or neglect on Contractor's part to comply with this function shall be done at his expense.
D. Field Dimensions:
1. The drawings accompanying these specifications indicate the general design and arrangement of all apparatus, fixtures and accessories necessary to complete the work required.
2. Exact location or arrangement of equipment may be subject to minor changes necessitated by field conditions and shall be made as required without additional cost to Exchange (AAFES).
3. Measurements shall be verified by actual observations at the construction site, and Contractor shall be responsible for all work fitting into place in a satisfactory and workmanlike manner meeting the approval of the Contracting Officer.
1.7 EXISTING OVERHEAD OR UNDERGROUND WORK
A. Carefully check the site where project is to be erected and observe any overhead wires and equipment.
1. Any such work shall be moved, replaced, or protected, as required, whether or not shown or specified.
B. Attention is directed to the existence of pipe and other underground improvements that are shown on the drawings.
1. All reasonable precautions shall be taken to preserve and protect all such improvements shown on the drawings and not scheduled for demolition.
C. Locations of underground lines, shown on the drawings, are based on the best available sources, but are to be regarded as approximate only.
1. Exercise extreme care in locating and identifying these lines before excavating in adjacent areas.
1.8 INTERRUPTION OF EXISTING UTILITIES SERVICES
A. Contractor shall make utility connections “Hot/Live” whenever possible.
SUMMARY OF WORK 011000-7
B. When “Hot/Live” connections are not feasible, Contractor shall perform the work under this Contract with a minimum of outage time for all utilities.
1. Contractor may be required to perform the work while the existing utility is in service.
2. Interruption shall be by written approval from utility owner.
3. Existing utility services may only be interrupted when approved, in writing, by the
Contracting Officer and Ft. Drum DPW.
C. When it is necessary to interrupt the existing utilities, Contractor shall notify the
Contracting Officer, Ft. Drum DPW and utility owner in writing at least ten (10) business days in advance of the time he desires the existing service to be interrupted.
1. Interruption time shall be kept to a minimum.
2. Depending upon the activities at the facility that require continuous service from the existing utility, an interruption may not be subject to schedule at the time desired by the Contractor.
a. In such cases the interruption may have to be scheduled at a time of minimum requirement of demand for the utility including nights, weekends or holidays.
b. The amount of time requested by the Contractor for interruption of existing utility services shall be as approved, in writing, by the Contracting Officer, Ft.
Drum DPW and utility owner.
1.9 EXCAVATION
A. Prior to commencing any excavation work the Contractor shall obtain a valid Excavation Permit from Ft. Drum DPW.
B. It shall be the Contractor's responsibility to obtain utility locates and the necessary signatures and coordination for the permit.
C. Forms shall be obtained from Ft. Drum DPW, by contacting POC listed in Section 01000.
1.10 WELDING PERMIT
A. When open flame and/or spark producing devices, i.e., acetylene oxygen welding equipment, electric arc welding, sweat soldering, etc., are employed for job accomplishment, the following procedures are mandatory:
1. Inspect all surroundings and equipment to ensure that combustible substances are not present in any area where contact of metal at a temperature above the flashpoint of any compound is possible.
2. Ensure that no open containers or spills of combustible substances are present.
3. Ensure that ignition is not possible by conduction, convection, radiation, or dispersion of molten metal.
4. Proper protection equipment and practices will be used, i.e., fireproof blankets, wetting of surrounding area, removal o combustible materials where practicable, earth filled backing and portable fire extinguishers of proper type on hand.
B. Prior to commencing any welding, Contractor shall obtain a welding permit through Ft.
Drum DPW offices from the Ft. Drum Fire Department.
C. When the above devices are being used welding is implemented during construction notify the Post Fire Department 24-hours ahead of usage and obtain a permit through POC list below and in Section 01000, Requirements of Ft. Drum.
1. POC: Brian Drappo, Fire Inspector
SUMMARY OF WORK 011000-8
2. E-mail: Brian.r.drappo.civ@army.mil
3. Phone: (315) 772-4567
1.11 BARRICADES AND WARNING DEVICES
A. Contractor shall provide barricades and lighting devices, in accordance with Manual for Uniform Traffic Control Devices by Department of Transportation, latest Edition, at all points of excavation and construction in vehicle traffic areas.
B. Refer to Section 01500, Temporary Facilities, Barriers and Controls for additional information and provide detailed Traffic Control Plan for review and approval by Contracting Officer and Ft. Drum Safety Officer.
1. Include provisions for transportation and delivery of materials and equipment to site without interference with normal traffic operations.
2. Include provisions for controlling and directing customers on site for ingress and egress to and from building, gasoline dispensing islands and parking without interference with other site functions.
1.12 PROTECTION FOR OPEN FLAME DEVICES
A. When open flame and/or spark producing devices, i.e., acetylene oxygen welding equipment, electric arc welding, sweat soldering, etc., are employed for job accomplishment, the following procedures are mandatory:
1. Inspect all surroundings and equipment to insure that combustible substances are not present in any area where contact of metal at a temperature above the flashpoint of any compound is possible.
2. Ensure that no open containers or spills of combustible substances are present.
3. Ensure that ignition is not possible by conduction, convection, radiation, or dispersion of molten metal.
4. Proper protection equipment and practices will be used, i.e., fireproof blankets, wetting of surrounding area, removal of combustible materials where practicable, earth filled backing and portable fire extinguishers of proper type on hand.
5. When the above devices are being used notify Ft. Drum DPW 24 hours ahead of usage and obtain a permit.
6. Point of Contact shall be Post DPW:
a. Phone: 798 FIRE
1.13 FIRE PROTECTION
A. Contractor shall at all times maintain good housekeeping practices to reduce the risk of fire damage.
B. All scrap materials, rubbish, and trash shall be removed daily from in and about the building and shall not be permitted to be scattered on adjacent property.
C. Suitable storage space shall be provided 50 feet minimum outside the building area for storing flammable materials and paints.
1. No storage will be permitted within the building.
D. Excess flammable liquids being used inside the building shall be kept in closed metal containers and removed from the building during unused periods.
E. Contractor shall provide fire extinguishers in accordance with the recommendations of
SUMMARY OF WORK 011000-9
NFPA Nos. 10 and 241, however, in all cases a minimum of four fire extinguishers shall be available for each area of work and temporary building.
F. Fire Codes: Contractor shall obey all requirements of the National Fire Codes, Air Force Fire Regulations and Installation Fire Regulations, as they relate to his work on this Post.
G. Contractor shall provide a fire extinguisher at each location where cutting and welding is being performed.
1. Where electric or gas welding or cutting is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and hot metal.
2. When temporary heating devices are used they shall be monitored when operating when other workmen are not on the premises.
1.14 WORK BY OTHERS
A. Work not included: Except for such auxiliary work as is shown or specified or is necessary as a part of the construction, the following work is not included in the Contract:
1. Any work shown, but marked "NOT IN CONTRACT" (N.I.C.).
2. Any work indicated to be furnished and installed by the Vendors or
Concessionaires.
3. Any work indicated to be furnished and installed by Exchange (AAFES).
1.15 EXCHANGE (AAFES) FURNISHED AND INSTALLED EQUIPMENT
A. See Specification Section 011017, Exchange (AAFES) Furnished and Installed Equipment (EF/EI).
1.16 EXCHANGE (AAFES) FURNISHED/CONTRACTOR INSTALLED EQUIPMENT
A. See Specification Section 011018,…