A8 - Exhibit A CDRL.pdf

PDF 182 KB Posted

Attached to
Small Business Set Aside for Hexagon Brand Coordinate Measuring Machine See Attachments
Solicitation number
N61331-24-T-JK13
Issued by

About this file

This solicitation requests quotes for a Hexagon brand coordinate measuring machine as a small business set-aside for the Department of the Navy Naval Sea Systems Command. Quotes are due by January 24, 2024 at 11:00 AM Central Time and must be emailed to jamell.kilgore@navy.mil. Quotes should include the offeror's CAGE code and lead time. If shipping costs are not included in the price, offerors must provide a separate line item for shipping. The solicitation includes a redacted brand name justification, description and quantity of the required item, statement of work, and two contract data requirement lists as attachments. Offerors must review all provided attachments and be able to invoice the government through the Wide Area Workflow system.

View the file

Other files

File Type Posted
A5 - Statement of Work.docx DOCX document
C12 - Supply Clauses.pdf PDF
C14 - Redacted Brand Name Justification.pdf PDF
A6 - Description and QTY.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Coordinate Measuring Machine 1301120279 (240050)

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 Technical Report – Study/Services Installation and Set-up Details

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B SOW PARA 3.0 NSWC PCD CODE E42

18ESTIMATEDTOTA

L PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED 2TIMES 5 DAC b. COPIES

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final A 2 DARC Reg Repro

16. REMARKS NSWCPCD Code E42 1 1 1

Blk 8: Approval shall be for format and technical content. NSWC PCD will review each submittal and comment within two (2) days after receipt. All NSWC PCD comments shall be incorporated into the subsequent submittal.

Blk 13: “DARC” means “Days After Receipt of Government Comments”.

Blk 14: Reproducible copy shall be submitted as Microsoft Word files via e-mail to jesse.m.walton3.civ@us.navy.mil

LT ONLY:

NSWC PCD Code 024

15. TOTAL 1 1 1

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Technical Report – Study/Services Certificate of Decomission

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B SOW PARA 3.1 NSWC PCD CODE E42 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED 2TIMES SEE BLK 16 b. COPIES

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A 5 DARC Reg Repro each submittal and comment within five (5) days after receipt. All NSWC PCD comments shall be incorporated into the subsequent submittal.

Blk 12: Submit within five (5) days after completion of decommission.

Blk 13: “DARC” means “Days After Receipt of Government Comments”.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

NSWC PCD Code E42 5 December Tommy Chatman 10 December 2023

DD Form 1423-2, JUN 90 Previous editions are obsolete Page 1 of 2 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Coordinate Measuring Machine 1301120279 (240050)

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 Calibration Certificate Certificate of Calibaration

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-QCIC-80798C SOW PARA 3.2 NSWC PCD CODE E42

18ESTIMATEDTOTA

L PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED 2TIMES SEE BLK 16 b. COPIES

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final A 5 DARC Reg comments shall be incorporated into the subsequent submittal.

Blk 12: Submit within five (5) days after completion of calibration.

Blk 13: “DARC” means “Days After Receipt of Government Comments”.

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004 Computer Software Product End Items Software License

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-AVCS-80700 SOW PARA 3.3 NSWC PCD CODE E42 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED 2TIMES SEE BLK 16 b. COPIES

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A 5 DARC Reg comments shall be incorporated into the subsequent submittal.

Blk 12: Submit within five (5) days after completion of hardware.

Blk 13: “DARC” means “Days After Receipt of Government Comments”.

Blk 14: Reproducible copy shall be submitted on suitable electronic media. Submit notification of download to:

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

NSWC PCD Code E42 5 December Tommy Chatman 10 December 2023

DD Form 1423-2, JUN 90 Previous editions are obsolete Page 2 of 2 Pages 1161/183

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (x) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contact that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred, as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

The Government’s right to use the data shall be governed by the pertinent provisions of the contract.

DD Form 1423-2 Reverse, JUN

File details come from the government source that posted it. Updated .