This is a Contract Data Requirements List (CDRL) on DD Form 1423-2 for the MK 64 Quickstrike MOD5 system under Contract Number 260272. The CDRL specifies three data items required from the contractor, with the Naval Surface Warfare Center Panama City Division (NSWC PCD Code E61) designated as the requiring office.

The three required data items are: (1) Test/Inspection Report (A001) per DI-NDTI-80809B, to be submitted concurrently with hardware delivery in draft and final format with one reproducible copy each to NSWC PCD Code E61 and one to Code 024; (2) Certificate of Compliance (A002) per DI-MISC-81356A, similarly requiring concurrent submission with hardware delivery in draft and final reproducible copies; and (3) Monthly Status Report (A003) per DI-MGMT-80368, requiring monthly submission no later than the 10th of each month with a 30-day after receipt of comments (DAC) submission window. All data items require Government approval of draft versions, with NSWC PCD reviewing initial submittals and providing comments within five business days. Reproducible copies must be submitted as Microsoft Word 2019 files via electronic media or email to jomo.k.marting.civ@us.navy.mil. The CDRL was prepared on March 4, 2026, and approved by Tommy Chatman on March 5, 2026.

View the file

Other files

File Type Posted
C03 - Questions and Answers N61331-26-Q-JK09.pdf PDF
A04 - Swivel spec 9496337.pdf PDF
A04 - Statement of Work.pdf PDF
C12. Clauses-Supply.pdf PDF
A5 - Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK 64 Quickstrike MOD5 260272

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 Test / Inspection Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80809B SOW PARA 3.1 NSWC PCD CODE E61

18ESTIMATEDTOTA

L PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED ASREQ SEE BLK 16 b. COPIES

8. APP CODE SEE SOW 8.0 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A 5 DARC Reg Repro

16. REMARKS NSWC PCD Code E61 1 1 1

Blk 8: Approval shall be for format and technical content. NSWC PCD will review the initial submittal and comment within 5 days after receipt. All Government comments shall be incorporated into the subsequent submittal.

Blk 12: Submit concurrently with delivery of hardware.

Blk 13: “DARC” means “Days After Receipt of Government Comments”.

Blk 14: Reproducible copy shall be submitted as Microsoft Word 2019 files on electronic media or via e-mail to: jomo.k.marting.civ@us.navy.mil

LT ONLY:

NSWC PCD Code 024

15. TOTAL 1 1 1

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Certificate of Compliance

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-81356A SOW PARA 3.1 NSWC PCD CODE E61 18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ SEE BLK 16 b. COPIES

8. APP CODE SEE SOW 8.0 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A 5 DARC Reg Repro

16. REMARKS NSWC PCD Code E61 1 1 1

Blk 8: Approval shall be for format and technical content. NSWC PCD will review the initial submittal and comment within 5 days after receipt. All Government comments shall be incorporated into the subsequent submittal.

Blk 12: Submit concurrently with delivery of hardware.

Blk 13: “DARC” means “Days After Receipt of Government Comments”.

NSWC PCD Code 024 1

15. TOTAL 1 1 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

NSWC PCD Code E61 04 March 2026 Tommy Chatman 05 March 2026

DD Form 1423-2, JUN 90 Previous editions are obsolete Page 1 of 2 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST

(2 Data Items)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/Pr No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

MK 64 Quickstrike MOD5 260272

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 Status Report Monthly Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80368 SOW PARA 3.3 NSWC PCD CODE E61

18ESTIMATEDTOTA

L PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION LT REQUIRED MTHLY 30 DAC b. COPIES

8. APP CODE SEE SOW 8.0 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

A 0 SEE BLK 16 Reg Repro

16. REMARKS NSWC PCD Code E61 1

Blk 11: Report shall be current through to the last work day of each month.

Blk 13: Submit report monthly, no later than the 10th of each month.

NSWC PCD Code 024 1

15. TOTAL 2

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

18 ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

NSWC PCD Code E61 04 March 2026 Tommy Chatman 05 March 2026

DD Form 1423-2, JUN 90 Previous editions are obsolete Page 2 of 2 Pages 1161/183

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (x) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contact that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred, as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.

The Government’s right to use the data shall be governed by the pertinent provisions of the contract.

DD Form 1423-2 Reverse, JUN

File details come from the government source that posted it. Updated .