Statement of Work

1.0 BACKGROUND

The Naval Air Warfare Center - Aircraft Division (NAWCAD) provides flight test engineering, programmatic, and administrative support to Naval Air Systems Command (NAVAIR). This performance work statement is for the support of NAWCAD which provides Commander Naval Air Forces and NAVAIR with the people, processes, facilities, and aircraft for full life cycle program Test and Evaluation (T&E) support to include requirements review, design, execution, analysis, evaluation, and reporting of tests and experiments of aircraft, unmanned air systems, weapons and weapons systems. This statement of work (SOW) is necessary to ensure aircraft are maintained in accordance with the COMNAVAIRFORINST 4790.2B Maintenance and Training Programs and related policies to ensure compliance and safety of personnel and equipment.

NTWL is unique in the custody of numerous aircraft platform types, some with baseline modifications, supporting all three aircraft maintenance support levels, as well as unique systems configurations thus driving the requirements of this effort. Certified/correct aircraft maintenance support is paramount to the safety of the crew and aircraft.

2.0 SCOPE

This SOW will provide the inspection and testing to the 6-8 sets of low voltage cable for the NAWCAD TC-7 Catapult. Work shall be in accordance with this statement of work paragraph

3.0 below.

3.0 REQUIREMENTS

3.1 The vendor shall visually and mechanically inspect the cables, low-voltage, 480 volt maximum.

3.1.1. The vendor shall inspect exposed sections of cables for physical damage and evidence of overheating.

3.1.2. The vendor shall inspect compression-applied connectors for correct cable match and indentation.

3.2 Electrical Testing

3.2.1. Perform an insulation-resistance test on each conductor with respect to ground and adjacent conductors.

3.3 Place of Performance

TC-7 Building 162 Unit 4 22332 Cedar Point Road Patuxent River MD. 20670

3.4 Shipping Address

TC-7 Building 162 Unit 4 ATTN: Jerry Girdlestone 22332 Cedar Point Road Patuxent River, MD. 20670

3.5 Technical Point of Contact

TPOC: Jerry Girdlestone Phone: 301-342-0698 Email: jerome.h.girdlestone.civ@us.navy.mil

3.5.1. The TPOC can assist the vendor in interpretation of technical requirements and performance of the effort required. The TPOC shall have no authority to impose additional requirements or to change or delete existing requirements.

3.6 SECURITY

3.6.1. Unclassified.

3.6.2. The contractor shall comply with PAXR specific site access requirements and shall coordinate with the TPOC for site and facility access 10 Business days prior to facilitation.

4.0 Period of Performance

The period of performance is 14 November 2022 through 20 December 2022.