U. S. DEPARMENT OF COMMERCE
NATIONAL OCEANIC AND ATMSOPHERIC ADMINISTRATION
December 07, 2020
TABLE OF CONTENTS
SECTION 01100 GENERAL 1-20
PART 1 GENERAL
1.1 SCOPE 1
1.1A Ground Source Heat Pump 1 1.1B Air exchange Heat Pump 3 1.1C Heat Redistribution installation 7
1.1 PRECEDENCE 9
1.2 INQUIRIES 9
1.3 DEFINITIONS 9
1.4 [RESERVED ] 10
1.5 CONSTRUCTION SCHEDULING 10
1.6 [DELETED] 10
1.7 SUPERINTENDENCE OF SUBCONTRACTORS 10
1.8 IDENTIFICATION OF EMPLOYEES 10
1.8.1 Identification Badge 11
1.8.2 Display of ID Badges 11
1.8.3 Reserved 11
1.8.4 Utilizing Electronic Mail 11
1.8.4.1 Contractor-Sent Email 11
1.8.4.2 User Address on Government Computers 11
1.9 APPLICATION OF WAGE RATES 11
1.10 PAYMENTS TO SUBCONTRACTORS 11
1.11 PAYMENTS TO CONTRACTOR 12
RELEASE OF CLAIMS 12
1.12 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER 13
1.13 WORKING HOURS 13
1.14 REQUIRED INSURANCE SCHEDULE 13
1.15 INTERRUPTIONS TO UTILITY SERVICES 14
1.16 CONTRACTOR-FURNISHED EQUIPMENT DATA 14
1.17 SAFETY AND HEALTH REQUIREMENTS MANUAL 15
1.18 COMPLIANCE WITH OCCUPATIONAL SAFETY AND
HEALTH ACT (OSHA). 15
1.19 [DELETED] 15
1.20 SHOP DRAWINGS 15
1.21 SUBMITTALS 15
1.22 SPECIAL REFERENCES 17
1.23 DIFFERENCES IN DRAWINGS 17
1.24 DAMAGE TO WORK 17
1.25 WORK ADJACENT TO ROADS AND HIGHWAYS 18
1.26 APPROVED EQUAL 18
1.27 SCHEDULE OF WORK 19
1.28 [DELETED] 19
1.29 PROTECTION OF UTILITY LINES 19
1.30 UNEXPECTED HAZARDOUS SUBSTANCES 19
1.31 ORDERING PROCEDURES 20
1.32 DRAWINGS 20
1.33 CONSTRUCTION REQUIREMENTS 20
1.33.1 Preconstruction Conference. 20
1.33.2 Contract Closeout. 20
SECTION 01320A PROJECT SCHEDULE 21-30
PART 1 GENERAL 21
1.1 REFERENCES 21
1.2 QUALIFICATIONS 21
PART 2 PRODUCTS (Not Applicable) 21
PART 3 EXECUTION 21
3.1 GENERAL REQUIREMENTS 21
3.2 BASIS FOR PAYMENT 21
3.3 PROJECT SCHEDULE 21
3.3.1 Use of the Critical Path Method 22
3.3.2 Level of Detail Required 22
3.3.2.1 Activity Durations 22
3.3.2.2 Permit Activities 22
3.3.2.3 Procurement Activities 22
3.3.2.4 Critical Activities 22
3.3.2.5 Government Activities 23
3.3.2.6 Responsibility 23
3.3.2.7 Work Areas 24
3.3.2.8 Modification or Claim Number 24
3.3.2.9 Bid Item (Not applicable) 24
3.3.2.10 Phase of Work 24
3.3.2.11 Category of Work 24
3.3.2.12 Feature of Work 24
3.3.3 Scheduled Project Completion 24
3.3.3.1 Project Start Date 24
3.3.3.2 Constraint of Last Activity 25
3.3.3.3 Early Project Completion 25
3.3.4 Interim Completion Dates 25
3.3.4.1 Start Phase 25
3.3.4.2 End Phase 25
3.3.4.3 Phase X 26
3.3.5 Default Progress Data Disallowed 26
3.3.6 Out-of-Sequence Progress 26
3.3.7 Negative Lags 26
3.4 PROJECT SCHEDULE SUBMISSIONS 26
3.4.1 Preliminary Project Schedule Submission 26
3.4.2 Initial Project Schedule Submission 27
3.4.3 Periodic Schedule Updates 27
3.4.4 Standard Activity Coding Dictionary 27
3.5 reserved 27
3.6 PERIODIC PROGRESS MEETINGS 27
3.6.1 Meeting Attendance 27
3.6.2 Update Submission Following Progress Meeting 27
3.6.3 Progress Meeting Contents 28
3.6.3.1 Start and Finish Dates 28
3.6.3.2 Time Completion 28
3.6.3.3 Cost Completion 28
3.6.3.4 Logic Changes 28
3.6.3.5 Other Changes 28
3.7 REQUESTS FOR TIME EXTENSIONS 28
3.7.1 Justification of Delay 29
3.7.2 Submission Requirements 29
3.7.3 Additional Submission Requirements 29
3.8 DIRECTED CHANGES 29
3.9 OWNERSHIP OF FLOAT 30
SECTION 01330 SUBMITTAL PROCEDURES 30-33
PART 1 GENERAL 26
1.1 SUBMITTAL IDENTIFICATION 30
1.2 SUBMITTAL CLASSIFICATION 30
1.2.1 Government Approved 30
1.2.2 Information Only 31
1.3 APPROVED SUBMITTALS 31
1.4 DISAPPROVED SUBMITTALS 31
1.5 WITHHOLDING OF PAYMENT 31
PART 2 PRODUCTS (Not used) 31
PART 3 EXECUTION 31
3.1 GENERAL 32
3.2 SUBMITTAL REGISTER 32
3.3 SCHEDULING 32
3.4 TRANSMITTAL FORM 32
3.5 SUBMITTAL PROCEDURE 32
3.5.1 Procedures 33
3.5.2 Deviations 33
3.6 CONTROL OF SUBMITTALS 33
3.7 GOVERNMENT APPROVED SUBMITTALS 33
3.8 INFORMATION ONLY SUBMITTALS 33
3.9 [reserved] 33
SECTION 01355A ENVIRONMENTAL PROTECTION 34-43
PART 1 GENERAL 34
1.1 REFERENCES 34
1.2 DEFINITIONS 34
1.2.1 Environmental Pollution and Damage 34
1.2.2 Environmental Protection 34
1.2.3 Contractor Generated Hazardous Waste 34
1.2.4 Land Application for Discharge Water 35
1.2.5 Pesticide 35
1.2.6 Pests 35
1.2.7 Surface Discharge 35
1.2.8 Waters of the United States 35
1.2.9 Wetlands 35
1.3 GENERAL REQUIREMENTS 36
1.4 SUBCONTRACTORS 36
1.5 PAYMENT 36
1.6 SUBMITTALS 36
1.7 [reserved] 36
1.8 PROTECTION FEATURES 36
1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT
DEVIATIONS 37
1.10 NOTIFICATION 37
PART 2 PRODUCTS (NOT USED) 37
PART 3 EXECUTION 37
3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS 37
3.2 LAND RESOURCES 37
3.2.1 Work Area Limits 38
3.2.2 Landscape 38
3.2.3 Erosion and Sediment Controls 38
3.2.4 Contractor Facilities and Work Areas 38
3.3 WATER RESOURCES 39
3.3.1 Cofferdams, Diversions, and Dewatering Operations 39
3.3.2 Stream Crossings 39
3.3.3 Wetlands 39
3.4 AIR RESOURCES 39
3.4.1 Particulates 39
3.4.2 Odors 40
3.4.3 Sound Intrusions 40
3.4.4 Burning 40
3.4.5. Exhaust Fumes from Construction Equipment 40
3.5 CHEMICAL MATERIALS MANAGEMENT AND WASTE
DISPOSAL 40
3.5.1 Solid Wastes 40
3.5.2 Chemicals and Chemical Wastes 40
3.5.3 Contractor Generated Hazardous Wastes/Excess Hazardous
Materials 41
3.5.4 Fuel and Lubricants 41
3.5.5 Waste Water 41
3.6 RECYCLING AND WASTE MINIMIZATION 42
3.7 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL
RESOURCES 42
3.8 BIOLOGICAL RESOURCES 42
3.9 PREVIOUSLY USED EQUIPMENT 42
3.10 MAINTENANCE OF POLLUTION FACILITIES 43
3.11 MILITARY MUNITIONS 43
3.12 TRAINING OF CONTRACTOR PERSONNEL 43
3.13 POST CONSTRUCTION CLEANUP 43
SECTION 01451 CONTRACTOR QUALITY CONTROL 43-52
PART 1 GENERAL 43
1.1 REFERENCES 43
1.2 PAYMENT 44
PART 2 PRODUCTS (Not Applicable) 44
PART 3 EXECUTION 44
3.1 GENERAL 44
3.2 QUALITY CONTROL PLAN 44
3.2.1 General 44
3.2.2 Content of the CQC Plan 45
3.2.3 [reserved] 45
3.2.4 Acceptance of Plan 46
3.2.5 Notification of Changes 46
3.3 COORDINATION MEETING 46
3.4 QUALITY CONTROL ORGANIZATION 46
3.4.1 CQC Organizational Staffing 46
3.4.2 Organizational Changes 46
3.5 SUBMITTALS 47
3.6 CONTROL 47
3.6.1 Preparatory Phase 47
3.6.2 Initial Phase 48
3.6.3 Follow-up Phase 48
3.6.4 Additional Preparatory and Initial Phases 49
3.7 TESTS 49
3.7.1 Testing Procedure 49
3.7.2 [reserved] 49
3.7.3 [reserved] 49
3.8 COMPLETION INSPECTION 50
3.8.1 Contractor's Quality Control Completion Inspection 50
3.8.2 Pre-Final Inspection 50
3.8.3 Final Acceptance Inspection 50
3.9 DOCUMENTATION 51
3.10 NOTIFICATION OF NONCOMPLIANCE 52
SECTION 01780A CLOSEOUT SUBMITTALS 52-65
PART 1 GENERAL 52
1.1 SUBMITTALS 53
1.2 PROJECT RECORD DOCUMENTS 53
1.2.1 As-Built Drawings 53
1.2.1.1 Government Furnished Materials 53
1.2.1.2 Working As-Built and Final As-Built Drawings 53
1.2.1.3 Drawing Preparation 55
1.2.1.4 Computer Aided Design and Drafting Drawings 55
1.2.1.5 Payment 57
1.2.2 As-Built Record of Equipment and Materials 57
1.2.3 As-Built Shop Drawings 57
1.2.4 Construction Contract Specifications 57
1.2.5 Real Property Equipment 57
1.3 WARRANTY MANAGEMENT 58
1.3.1 Warranty Management Plan 58
1.3.2 Performance Bond 59
1.3.3 Pre-Warranty Conference 60
1.3.4 Contractor's Response to Construction Warranty Service
Requirements 60
1.3.5 Warranty Tags 62
1.4 MECHANICAL TESTING, ADJUSTING, BALANCING, AND
COMMISSIONING 63
1.5 OPERATION AND MAINTENANCE MANUALS 63
1.6 FINAL CLEANING 64
PART 2 PRODUCTS (NOT USED) 64
PART 3 EXECUTION (NOT USED) 64
SCHEDULE OF DELIVERABLES 64
The potential list of General Facilities Construction project areas 66
U. S. DEPARTMENT OF COMMERCE
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
STATEMENT OF WORK SECTIONS
01100 General
01320A Project Schedule
01330 Submittal Procedures
01355A Environmental Protection
01451 Contractor Quality Control
01500A Temporary Construction Facilities
01780A Closeout Submittals
Schedule of Deliverables
The potential list of General Facilities Construction project areas
U. S. DEPARMENT OF COMMERCE
NATIONAL OCEANIC AND ATMSOPHERIC ADMINISTRATION
SECTION 01100
GENERAL
1.1 SCOPE
The requirements of this Statement of Work (SOW) shall apply to all task orders issued under this contract for task services in support of all owned and leased U. S. Department of Commerce (DOC) bureau facilities, including particularly those of the National Oceanic and Atmospheric Administration (NOAA) line office components in the Central portion of the U.S. The work could include various types of Heating Ventilation and Air Conditioning (HVAC) installation and repairs. This work could include, but not limited to, the conversion of a conventional HVAC system to a Ground Source Heat Pumps (GSHP) systems, conversion of a conventional HVAC system to an air to air heat pump system, installation of heat recovery systems, conversion of Computer Room Air Conditioning (CRAC) systems to through the wall systems and replacement of a complete existing HVAC system or some of its individual components. HVAC systems can be tied to Weather Forecast Offices (WFO’s) or NEXRAD locations. Existing systems include Liebert Units, Roof Top Units (RTU’s), conventional split systems, through the wall units, GSHP systems, air exchange heat pump systems, Variable Air Volume (VAV) distribution systems and constant volume distribution systems. Repairing or replacing Building Automation Systems (BAS) for controlling HVAC components can also be included as part of this SOW.
Individual components that can get replaced include humidifiers, condenser units, Air handling units, Roof Top Units and compressors. The size of existing Air-Conditioning (AC) systems range from 1 ton to 40 tons. When replacing a system, investigation will need to take place to ensure that the system that is being installed is being right sized and not just replacing wrong sized components.
1.1A Ground Source Heat Pump
Scope: This is for a HVAC system that enhances efficiency including the installation of the components necessary to reconstitute a complete HVAC system including controls. This effort will include all materials and labor necessary to remove the existing system and install a complete HVAC system including any additional equipment necessary to achieve a significant reduction in energy usage. A requirement of this design is the incorporation of a redundant ground source heat pump HVAC system to replace the inefficient redundant system in use for the main operations. This effort will include the disassembly, removal and proper disposition of the existing equipment. This solution should address the entire facility.
General Requirement:
The contractor shall furnish all labor, materials, tools, permits, supervision, engineering, and qualified installation personnel necessary to make their equipment fully functional to meet their proposed solution. This includes the integration of controls for the equipment to achieve energy savings while maintaining the specified environment.
The installation of a completely redundant (not inclusive of the well field or applicable piping) ground source heat pump system to replace the current redundant HVAC system serving the operations area along with solutions for both the equipment room and administrative areas.
The contractor shall provide the methodology, labor and materials required to precondition any fresh air intake utilizing exhausted air. Specifics of this should be included in the contractor’s proposal regarding sources of supply and volumes of air required.
The new equipment / system shall be controlled by installing a new web based Building Automation System (BAS) for the entire building’s HVAC system. This system must be interactive and visible at both the installed location and the regions Headquarter facility located in Kansas City MO.
Installation must be achieved without an interruption of service to the existing redundant systems operation for the associated operations area, except for the loss of redundancy.
The contractor shall perform an onsite review of the facility to appropriately size the HVAC equipment, develop an implementation plan that would not hamper operation of the WFO, and ensure implementation of the design being proposed.
End result is an environment of in all areas affected with individual zone control of & non-condensating relative humidity of 35% 5%.
“As built” drawings of the facility and systems must be provided prior to acceptance and final progress payment.
Work shall conform to applicable standards and guidelines as published by, American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 62.1 Ventilation, 55 Thermal Comfort, 90.1 Energy Efficiency; IGSHPA, International Ground Source Heat Pump Association; NGWA National Ground Water Association – Loop well construction standards. All work performed shall be in accordance with all applicable Federal and local building codes.
The contractor shall be responsible for the removal and proper disposal of any unused existing equipment in accordance with EPA guidelines.
The contractor shall address the need for, and supply an energy efficient solution that will maintain a stable environment addressing all the diverse heating and cooling requirements contained within the buildings shell. The contractor shall clearly explain which technologies are used in each area and how areas of the building will interact with each other through energy exchange.
1. A redundant ground source heat pump system with detailed well design to support the proposed equipment and environment of the operations area as a minimum.
2. A proposed solution that will satisfy the requirements of both the administrative area and Equipment room considered to be a higher than normal heat load. The design should consider the interoperation of all three areas within the building envelope.
3. A methodology on how to cool the equipment room and utilize the excess heat being generated in that area to offset heating costs in the remainder of the building. Note: The equipment room shall not exchange air with other parts of the building.
4. A methodology on how to control the buildings fresh air exchange and any steps to pre-condition outside air. This should include a target CFM for exchanged air and if this varies with outside temperature.
5. The proposed system will minimize the use of Freon and limit any charged lines running within the facility.
6. A single level drawing depicting the equipment being proposed and a narrative describing how the individual components will provide a stable environment throughout the buildings envelope.
1.1B Air exchange Heat Pump
Purpose:
This is to replace the existing conventional Heating Ventilation and Air Conditioning (HVAC) system along with the associated components and controls with a more efficient system. The new system will be energy efficient and utilize an environmentally friendly refrigerant.
In October 2009, Executive Order 13514 was issued and each Federal Agency was mandated to reduce its energy consumption and subsequently, its carbon footprint. As part of this initiative, the National Weather Service, Central Region Headquarters, Facilities Division, is seeking quotes for the design and installation of a more efficient HVAC system.
Scope:
This project is for the replacement of the HVAC system. The goal is to get an HVAC system that is efficient and affordable. The following information represents the minimum efficiency standards that will be acceptable. The contractor shall provide all labor, materials, tools, permits, supervision, engineering, and qualified installation personnel to perform a turnkey installation.
The existing condensers shall be replaced with a heat pump system in the operation and administration areas of the WFO.
Note: One of the redundant HVAC units that maintains the environment in the operations area must remain fully operational during an HVAC replacement to provide adequate environmental conditioning. When this is not possible a plan with schedule will be submitted prior to the start of construction.
o The new heat pump shall utilize R-410A. If a different refrigerant is being used it must be approved by the government representative.
o The minimum efficiency standards for the new heat pumps shall be 11 EER (Energy Efficiency Ratio) and a minimum COP (Coefficient of Performance) of
3.3 at 47 degrees F and a minimum COP of 2.2 at 17 degrees F.
o Evacuate refrigerant from existing system.
o Recover refrigerant and oil and provide disposal according to EPA guidelines.
o Remove and properly dispose of old equipment.
o Installed heat pump units shall be labeled with a permanently attached phenolic engraved (or equivalent) label with black background and engraved white letters.
o All refrigerant lines connecting the new heat pumps and the coils inside the air handlers shall be replaced. All refrigeration piping shall be installed with high temperature brazed joints. Prevailing good refrigeration practices according to ASHRAE 15 and ANSI B 31.5 and equipment manufacturer’s requirements and recommendations shall be employed for piping supports, leak testing, dehydration and charging of the refrigeration circuits. The refrigeration piping shall be isolated from the building by use of vibration isolating supports as applicable. Interior exposed hot gas and liquid lines to be insulated.
When an air handler is being worked on the following items must be addressed.
(Replacement of the air handler is also allowed if deemed more cost effective than rebuilding the existing unit.)
o A new coil shall be installed to be compatible with the new heat pump.
o A new variable speed fan motor shall be installed in the air handler.
o There shall be a smoke sensor with unit alarm and shutdown.
o The air handler shall have adequate capacity to ensure the environment is maintained year round. Sizing shall adequately support overall system operation. Engineering calculations shall be supplied at the time of proposal submission to support sizing of system components.
o Contractor shall be responsible for coordination, scheduling and performance of a complete Test Adjust and Balance (TAB) of the new systems. Contractor shall be certified by a recognized Test Adjust and Balance Association, such as National Environmental Balancing Bureau (NEBB) or Associated Air Balance Council (AABC).
The contractor shall be responsible for installing a new Building Automation System (BAS). The contractor shall have this BAS interface with the server located at Central Region Headquarters (CRH) which is running Honeywell AX Supervisor Software. CRH is located at 7220 NE 101st Terrace, Kansas City, MO 64153. The finished controls interface will be similar in appearance to the existing system. Any additional license requirements and getting the interface to function shall be the responsibility of the contractor.
o The new BAS shall utilize new controllers, temperature sensors, humidity sensors, thermostats, etc. All devices shall be new. Existing wiring that the contractor is willing to include in a warranty can be reused.
o As a minimum, the graphics for each air handler will display the outside air dampers (% open), return air dampers (% open), return air temperature, mixed air temperature, supply air temperature, fan command status (on or off), amp draw of the fan, fan speed, duct pressure set point and duct pressure measured.
o As a minimum the heat pumps shall display status (heating mode, cooling mode, off), amp draw and if the unit has multiple stages, the stages that are running.
o As a minimum heat duct heater/VAV box shall display commanded air volume (CFM), Measured air volume (CFM), heat status (On or Off) for each stage.
If the duct heater has a continuous range, then the percent (%) on shall be displayed.
o Outside temperature and humidity shall be displayed.
o There shall be a controller on the inside for the WFO which allows for the outside air intake to be closed. When this happens, the rest of the HVAC system shall remain functional.
o Controls shall be calibrated for high efficiency.
Contractor shall ensure that the operations area can maintain an acceptable humidity level year round. When installing a humidifier, the new humidifier shall be a resistive humidifier unit with low watt coated heating elements that can shed mineral scale. No plastic tanks and no Ionic beds or plastic valves. This unit must have a float level switch that has a high, fill and low control valve and a water skimmer. The unit must have a Stainless Steel Cleanable vaporizing chamber with a removable cover and a temperature sensor. The unit should have a steel frame with cleanable cover. The new humidifier shall be integrated into the Building Automation System. Additionally the new humidifier is required to have a keypad display. It will be set with a new humidistat, high limit duct humidistat, air flow proving switch and dispersion tube.
The equipment supplied will be appropriately sized to meet the load requirements during peak heating months and shall be supported by an industry acceptable engineering model justifying sizing.
A design schematic shall be submitted at the time of the proposal.
(3) O&M manuals on new units shall be supplied including description, manufacturer, model number(s) and serial number(s). One manual to remain on site. The second and third manuals shall be sent to NWS Central Region Headquarters, Attn: Jeff Hua, or Mark Betsch, 7220 NW 101st Terrace, Kansas City, MO 64153, Phone 816-268- 3141.
Contactor shall be responsible for engaging any required factory representatives to perform initial unit startup for warranty purposes. O&M manuals to include any accomplished startup checklist.
Contractor to complete NOAA/NWS Equipment Data Sheet which is contained within this Statement of Work package to reflect new equipment data plate information. The Equipment Data Sheet shall be included in the O&M manuals.
Contractor to complete NOAA/NWS HVAC Training Document which is contained within this Statement of Work Package to reflect documentation of site personnel training on new equipment. The Training Document shall be included in the O&M manuals.
Contractor is responsible for a complete weather tight, rodent and insect seal for replaced equipment including all electrical and refrigerant pipe openings/penetrations.
Contractor is responsible for updating electrical panel schedules to reflect replaced equipment as appropriate.
Work shall conform to applicable standards and guidelines as published by American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 62.1 Ventilation, 55 Thermal Comfort, 90.1 Energy Efficiency. All work performed shall be in accordance with all applicable Federal and local building codes.
General Requirement:
The contractor shall furnish all labor and materials necessary to make their proposed system fully functional. This shall be a turnkey installation.
Installation must be achieved without an interruption of service to the system for the operations area, except for loss of redundancy.
The contractor shall perform an onsite review of the facility to appropriately size the HVAC units, develop an implementation plan that would not hamper operation of the WFO, and ensure proper implementation of the system being proposed.
End result is an environment of in all areas affected with individual zone control of & non-condensating relative humidity of 30% to 55%.
“As built” drawings of the facility and systems must be provided prior to acceptance and payment of work. The drawings shall be supplied in both paper and AutoCAD formats.
The contractor shall be responsible for the removal and proper disposal of any unused existing equipment.
1.1C Heat Redistribution installation
Purpose:
To capture and repurpose the heat energy from the existing equipment room and reutilize this heat / energy to condition the rest of the office area. The main goal of recapturing the heat from the equipment room and repurposing this heat is to reduce overall building energy usage. Any existing equipment room cooling systems shall stay in place and be utilized when excess heat exists in the equipment room i.e. summer months. The new system will need to be energy efficient, controlled and correctly sized to ensure the ability to maintain a stable environment in the equipment room and the remaining facility at all times.
Scope:
This project covers the installation of all necessary components to establish the heat redistribution system throughout the facility, operation and control. The contractor shall provide all labor, materials, tools, permits, supervision, engineering, and qualified installation personnel for the installation of the system.
Note: This is a 24/7 operation and a plan for the uninterrupted environment in the equipment room and operations area must be maintained during the installation of equipment.
Complete redundancy of HVAC equipment must be maintained in both the equipment room and operations area. Any equipment installed must support the redundant operation of those areas.
Any new equipment utilizing Freon shall utilize R-410A as the refrigerant. If a different refrigerant is being used it must be approved by the government representative.
The end system shall work in combination with the HVAC system to supply sufficient cooling / heating capacity to maintain a stable year round operational environment.
The environment of in all areas affected with individual zone control of Relative humidity shall be and non-condensing relative humidity of 30% +/- 5% during times of humidification and 40% +/- 5% during times of dehumidification in both the equipment room and the operations area.
The equipment supplied will be appropriately sized to meet the load requirements during peak heating months and shall be supported by an industry acceptable engineering model justifying sizing at the time of proposal submission.
Installed components shall be labeled with a permanently attached phenolic engraved (or equivalent) label with black background and engraved white letters.
The contractor shall be responsible for providing Direct Digital Controls (DDC) for all newly installed equipment that can be monitored locally or at Central Region Headquarters in Kansas City.
A design schematic shall be submitted at the time of the proposal.
(2) O&M manuals on new equipment shall be supplied including description, manufacturer, model number(s) and serial number(s). One manual to remain on site.
The second manual shall be sent to NWS Central Region Headquarters, Attn: Jerry Forste, 7220 NW 101st Terrace, Kansas City, MO 64153, Phone 816-268-3163.
Contactor shall be responsible for engaging any required factory representatives to perform initial unit startup for warranty purposes. O&M manuals to include any accomplished startup checklist.
The Equipment Data Sheet shall be included in the O&M manuals.
Contractor to provide training and associated documentation. The Training Document shall be included in the O&M manuals.
Contractor is responsible for a complete weather tight, rodent and insect seal for installed equipment including all electrical and refrigerant pipe openings/penetrations.
Work shall conform to applicable standards and guidelines as published by American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) 62.1 Ventilation, 55 Thermal Comfort, 90.1 Energy Efficiency. All work performed shall be in accordance with all applicable Federal and local building codes.
General Requirement:
The contractor shall furnish all labor and materials necessary to make their proposed system fully functional.
Any new equipment / system installed shall include all necessary controls to operate and interface with existing equipment. These controls shall not interfere or degrade the capability of the existing controls.
Installation must be achieved without an interruption of service to the system for the operations area and equipment room, except for loss of redundancy.
The contractor shall perform an onsite review of the facility to appropriately size any new equipment, determine the correct configuration of equipment required, develop an implementation plan that would not hamper operation of the WFO, and ensure the ability of their chosen system will accomplish the requirements of this SOW.
“As built” drawings of the facility and systems must be provided prior to acceptance and payment of work.
The contractor shall properly dispose of any equipment, debris or waste products generated by or associated with their work. This shall include following all appropriate EPA guidelines.
Contractor shall verify field conditions.
1.1 PRECEDENCE
Where the following requirements differ from requirements established by a specific task order, the task order requirements shall govern.
1.2 INQUIRIES
Inquiries regarding individual task orders shall be directed to the persons indicated in the Task Order Request for Proposal (RFP). Typically, these will be the Contracting Officer’s Representative (COR) for technical inquiries and the Contracting Officer (CO) or Contract Specialist (CS) for contractual inquiries.
1.3 DEFINITIONS
The terms listed below are defined as indicated wherever they may be used in the technical specifications.
"General Clauses", "General Conditions", or "General Provisions" shall be read as "Contract Clauses".
"Construction quality control" shall be read as "Contractor quality control".
“Contracting Officer’s Representative (COR) or Contracting Officer’s Technical Representative (COTR)” shall be read as Contracting Officer’s Representative.
"Provide" shall be defined as "furnish, install, test and make ready for use".
Days shall be defined as calendar days, unless specifically stated otherwise.
Bare surface: The term "bare" is defined as unpainted and uncoated surface.
Appurtenance: Appurtenance is defined as any built-in or attached nonstructural portion of a building; a subordinate part or accessory of a major item, such as a shed, garbage rack or fence.
Paint: The term "paint" as used herein is defined as emulsions, enamels, paints, stains, varnishes, sealers, cement-emulsion filler, and other coatings, whether used as prime, intermediate, or finish coat.
Complete hiding: "Complete hiding" is defined as the application of one or more coats of paint to all surfaces such that an additional overcoat of paint of the color and tint identical to the previous coat will not alter the color, shade, or texture of any portion of the painted surface. At least two coats of paint shall be applied to bare surfaces.
Task order: A task order is an order for services under this contract, awarded after evaluation of a proposal. The task order documentation will consist of an order form signed by a Contracting Officer, the RFP, and the accepted proposal.
1.4 RESERVED
1.5 CONSTRUCTION SCHEDULING
The instructions for preparation and submittal of the contractor-prepared schedule will be included with individual task orders.
1.6 [DELETED]
1.7 SUPERINTENDENCE OF SUBCONTRACTORS
If the Contracting Officer, at any time after 50% of the subcontracted work has been completed, finds that satisfactory progress is being made, he/she may waive all or part of the requirements for on-site superintendence subject to the right of the Contracting Officer to reinstate such requirements if at any time during the progress of the remaining work he/she finds that satisfactory progress is not being made.
1.8 IDENTIFICATION OF EMPLOYEES
The Contractor shall be responsible for furnishing to each employee and for requiring each employee engaged on the work site to display identification as may be approved and directed by the Contracting Office. All prescribed identification shall immediately be delivered to the Contracting Officer for cancellation upon the release of any employee. When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed or to be employed on the project.
1.8.1 Identification Badge
The Contractor shall provide each employee an identification (ID) badge on the contract start date or on employment start date. The ID badge shall be made of nonmetallic material to prevent electrical shock. The badge shall be easily readable and include the employee's name, contractor's name, functional area of assignment, security clearance if applicable, and color photograph. The ID badge shall be approved by the COR before the contract start date.
1.8.2 Display of ID Badges
Contractor personnel shall wear the ID badge at all times when performing work under this contract, to include attending Government meetings and conferences. Unless otherwise specified in the contract, each contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist, except when safety or health reasons prohibit such placement. Also, see paragraph in this section titled "Access Control Requirements".
1.8.3 Reserved
1.8.4 Utilizing Electronic Mail
1.8.4.1 Contractor-Sent Email
When Contractor personnel send email messages to Government personnel while performing on this contract, the Contractor's email address shall include the company name together with the person's name.
1.8.4.2 User Address on Government Computers
When it is necessary for the Contractor personnel to have a user address on a Government computer, the Government will ensure that person's email address includes the name of the Contractor.
1.9 APPLICATION OF WAGE RATES
Applicable Davis-Bacon Wage Rates will be provided with individual task orders.
1.10 PAYMENTS TO SUBCONTRACTORS
The Contractor's attention is directed to Contract clause "Payment under Fixed-Price Construction Contracts." In addition to the requirements set forth in the referenced paragraph, the Government will reimburse the Contractor, upon request, for the amount of premiums paid by the subcontractors for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor furnishes evidence of full payment to the surety.
1.11 PAYMENTS TO CONTRACTOR
The following is an example of a Contractor's release of claims required to comply with the provisions of paragraph (h) of the Contract clause "Payments under Fixed-Price Construction Contracts":
RELEASE OF CLAIMS
The undersigned contractor, and its assignee(s), if any, pursuant to the terms of Contract No.
___________ (the contract), between the United States of America and said contractor for the _________________ located at __________________ hereby agrees to remise, release, and forever discharge the United States, its officers, agents, and employees of and from any and all liabilities, obligations, claims, appeals, and demands, including any and all subcontractor claims, whether known or unknown, asserted or unasserted, directly or indirectly, whether administrative or judicial, legal or equitable, arising under, related to, or by virtue of said contract or any modification or change thereof except as follows: (Here list any claims against the Government and the amounts thereof. If none, so state.)
Witness the signature and seal of the undersigned this _____ day of __________, (Year).
CONTRACTOR
WITNESS ______________________(Seal) (Print or Type)
(Signature) (Signature)
(Address) (Official Title)
1.12 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract clause "Default: (Fixed Price Construction)." In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
(1) The weather experienced at the project site during the task order period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
1.13 WORKING HOURS
Working hours under this contract will normally be limited to Monday through Friday, 7:30 a.m.
to 4:30 p.m., local time unless different times are agreed upon under a specific task order.
However, work will generally not be permitted on weekends and Federal holidays. Under unusual circumstances, such as when utility turn-off is required for an extended period of time, authorization for weekend or holiday work may be requested from the Contracting Officer.
These instances must be coordinated well in advance, in writing. Likewise, utility turn-off of short duration or work which will disrupt normal operations or traffic flow must be scheduled at least 3 working days in advance and may require schedule changes to ensure that safety is maintained.
1.14 REQUIRED INSURANCE SCHEDULE
In accordance with contract clause "Insurance - Work on A Government Installation," the Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance.
Type Amount
Workers’ Compensation coverage Complying with applicable State Statute.
Employers' Liability Minimum amount of $100,000.00.
General Liability on Minimum limits of $500,000 per occurrence Comprehensive Form of Policy for bodily injury which includes, but is not limited to, insurance for all work required herein.
Comprehensive Automobile Minimum limits of $200,000 per person and Liability $500,000 per occurrence for bodily injury, and
$20,000 per occurrence for property damage
1.15 INTERRUPTIONS TO UTILITY SERVICES
A schedule showing the approximate times of interruptions of utility services and roads shall be submitted approximately 30 days in advance of interrupting services to make connections.
Where it is necessary to interrupt services to make connections and the period of interruption will last more than 2 hours, the connections shall be performed on Saturday or Sunday, unless otherwise approved by the Contracting Officer. Final arrangements shall be made with the Contracting Officer at least 72 hours in advance of the scheduled times of interruptions.
1.16 CONTRACTOR-FURNISHED EQUIPMENT DATA
At or before 30 days prior to final inspection and acceptance of the work, the Contractor shall submit the data mentioned in the following sub-clauses.
(a) Equipment List. An itemized equipment list showing unit retail value and nameplate data including serial number, model number, size, manufacturer, and other pertinent information for all Contractor-furnished items of mechanical equipment, electrical equipment, and fire protection systems installed under this contract.
(b) Guarantees. A list of all equipment items which are specified to be guaranteed accompanied by a copy of each specific guarantee therefore. For each specific guaranteed item, a name, address, and telephone number shall be shown on the list for the subcontractor who installed the equipment, the equipment supplier or distributor, and the equipment manufacturer. The completion date of the guarantee period shall correspond to the applicable specification requirements for each guaranteed item.
(c) Warranty Service Calls. The Contractor shall furnish to the Contracting Officer the names of local service representatives and/or Contractors that are available for warranty service calls and who will respond to a call within the required time periods, as follows: 4 hours for heating, air-conditioning, refrigeration, air supply and distribution, and critical electrical service systems and food service equipment, and 24 hours for all other systems. The names, addresses, and telephone numbers for day, night, weekend, and holiday service responses shall be furnished to the Contracting Officer and also posted at a conspicuous location in each mechanical and electrical room or close to the unit.
1.17 SAFETY AND HEALTH REQUIREMENTS MANUAL
Before initiation of work at the job site, an accident prevention plan, written by the prime contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of the Occupational Safety and Health Act (OSHA) will be reviewed and found acceptable by designated Government personnel.
1.18 COMPLIANCE WITH OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA).
The Contractor shall comply with OSHA standards. The OSHA standards are subject to change and such changes may affect the Contractor in his performance under the contract. It is the Contractor's responsibility to know such changes and the effective dates of those changes.
1.19 [DELETED]
1.20 SHOP DRAWINGS
The Contractor's attention is directed to the clause "Specifications and Drawings for Construction."
1.21 SUBMITTALS
(a) Submittal Procedures. See SECTION 01330: SUBMITTAL PROCEDURES. The following shall apply to the individual task orders issued under this contract.
(b) Shop Drawings shall be submitted in ample time to secure approval prior to the time that the items they cover, are to be delivered to the site. Unless otherwise specified, shop drawings shall be submitted not less than 30 days before commencement of fabrication of fabricated items and not less than 15 days before delivery of standard stock manufactured items. Where materials are stock with the manufacturer, catalog data, including specifications and full descriptive matter, may be submitted as shop drawings. When catalog includes non-applicable data, the applicable data shall be clearly designated and identified by item number, item name, and name of manufacturer. Shop drawings submitted (including initial and final submittals) shall be reproductions on high quality paper with clear and legible print. Drawings shall generally be bordered a minimum of one inch and trimmed to neat lines and unless otherwise specified, the minimum scale shall be 3/8-inch to the foot. Shop drawings quality shall be subject to approval. Each shop drawing, including catalog data, shall be identified with a title block including the name of Contractor, contract number, name and location of project, and name of item of work or structure to which the shop drawing applies. Material fabricated or delivered to the site before approved shop drawings have been returned to the Contractor shall be subject to rejection. NO CONSTRUCTION OR INSTALLATION SHALL BE DONE
FOR ANY ITEM REQUIRING SHOP DRAWINGS, UNTIL ALL SHOP DRAWINGS FOR
THAT ITEM HAVE BEEN APPROVED.
(c) As-Built Shop Drawings: Upon completion of the work under this contract, the Contractor shall furnish five complete sets of prints or one complete set of reproducibles of all shop drawings as finally approved. These drawings shall show all changes and revisions made up to the time the equipment is completed and accepted. The quality of the reproducibles and prints is subject to approval.
(d) As-Built Drawings: The Contractor shall maintain three separate sets of red-lined, full scale, as-built construction drawings marked up to fully indicate as-built conditions. These drawings shall be maintained in a current condition at all times until completion of the work, and shall be available for review by Government personnel at all times. All variations from the contract drawings, for whatever reason – including those occasioned by modifications, optional materials, and the required coordination between trades – shall be indicated. These variations shall be shown in the same general detail used in the contract drawings. In addition, the Contractor shall indicate on the As-Built Drawings, the brand-name, description, location, and quantity of any and all materials used which contain asbestos. The Contractor shall also be responsible for updating the Government-furnished Computer Aided Design and Drafting (CADD) files to reflect the current as-built conditions throughout the duration of the project.
The updated CADD design files shall be maintained in the Autocad format consistent with the graphic standards established in the CADD contract drawings provided by the Government.
The Contractor will be provided a copy of the current Government standards to facilitate his efforts in the maintenance of design files. The updated CADD files shall be reviewed by the Government on a monthly basis during the progress payment evaluation. The Contractor shall be prepared to demonstrate the status of the updated CADD files in his on-site office. The as-built utility drawings shall show locations and elevations of all underground new utilities and existing utilities encountered, including dimensions from permanent structures and/or survey locations. The submittal requirements for as-built utility drawings shall be shown as separate activities on the Contractor-prepared network analysis. Upon completion of the work, the marked-up drawings and the updated CADD files shall be furnished to the Contracting Officer on CD. In multi-phased construction where portions of a system are to be turned over to the user prior to completion of the project, the marked-up drawings for that portion shall be furnished to the Contracting Officer at that time.
(e) CADD Files: The Government will provide to the Contractor, within 30 calendar days after Notice of Award, copies of the CADD computer files of the contract drawings for the production of as-built drawings. These files will be in Autocad format. The Government provides no warranty, expressed or implied, of the CADD computer files. The Contractor shall assume all responsibility to verify the CADD drawing files. The Contractor shall not use the CADD drawing computer files to resolve dimensional or other discrepancies. The Government shall not guarantee the measurable accuracy of the CADD drawing computer files.
(f) Purchase Orders: Each purchase order issued by the Contractor or his subcontractors for materials and equipment to be incorporated into the project shall be maintained on file at the Contractor's field office for inspection and review by Government representatives. Each purchase order shall (1) be clearly identified with applicable contract number, (2) carry an identifying number, (3) be in sufficient detail to identify the material being purchased, and (4) indicate a definite delivery date. At the option of the Contractor, the copies of the purchase orders may or may not indicate the price of the articles purchased.
(g) [deleted]
1.22 SPECIAL REFERENCES
(a) Shop Drawings. The Contractor's attention is directed to the Contract clause "Shop Drawings." The basic requirements for Shop Drawings are set forth in the contract clauses and special clauses.
(b) Approved Equal. The Contractor's attention is directed to the Contract clause "Approved Equal."
(c) Payment to Subcontractors. The Contractor's attention is directed to Contract clause "Payments to Subcontractors."
1.23 DIFFERENCES IN DRAWINGS
In addition to the provisions of paragraph entitled "Specifications and Drawings for Construction," the structural drawings shall govern in cases where they differ from the architectural drawings.
1.24 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in the contract clause "Permits and Responsibilities." However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood or earthquake, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to contract clause, "Changes," shall be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices.
Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plants shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.
1.25 WORK ADJACENT TO ROADS AND HIGHWAYS
In addition to the requirements in contract clause "Operations and Storage Areas," the Contractor shall comply with the following requirements: Where the construction work is on or adjacent to, or involves hauling over public or private roads, streets, or highways, all herein referred to as "roads," the said roads shall, except as otherwise specified or directed, be kept open for traffic at all times during the construction period. Further, the Contractor shall, during said construction, provide, erect and maintain warning signs, lanterns or torches or other safety devices and, when necessary, provide flagmen for protection of traffic to the satisfaction of the Contracting Officer and local authorities. The Contractor shall keep the roads and the right-of-way of the roads open for traffic at all times during the construction period and free of debris that might be caused to accumulate thereon by his operations. Upon completion of the work, the Contractor shall clean up the said roads and construction site, and repair any damage to the roads occasioned by his operations under this contract to the satisfaction of the Contracting Officer and local authorities having jurisdiction. The drainage from the roads shall not be obstructed by the construction work. The Contractor shall be responsible for obtaining and paying for all permits required for operation on all roads.
1.26 APPROVED EQUAL
The drawings and the technical provisions of these specifications may, in some instances, refer to certain items of equipment, material, or article by trade name. References of this type shall not be construed as limiting competition, but shall be regarded as establishing a standard of quality.
In this respect, the Contractor's attention is directed to the contract clause "Material and Workmanship."
1.27 SCHEDULE OF WORK
The Contractor's attention is directed to the contract clause "Schedule for Construction Contracts," wherein if, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to…