This document is a Statement of Work (SOW) for Sandblast Grit Removal Services at the Trident Refit Facility Bangor (TRFB). The contract requires removing 282 skids (approximately 1.24 million lbs.) of spent garnet sandblast grit from the S/71A laydown area outside the Waterfront Restricted Area. The contract is a 100% small business set-aside for a Firm Fixed Price Commercial Service type, with a performance period from 19 May 2025 to 18 July 2025.

The contractor must weigh truck unloaded and loaded with spent sandblast grit, maintain a record log for each truck load, and provide a copy of the record log to the Contracting Office upon completion. The contractor is responsible for all materials needed for grit removal services and must comply with performance standards, including 100% compliance with delivery schedules and maintaining close communication with the government. Performance will be assessed by a Government Surveillance Officer using services documents and reports, with the potential for unsatisfactory performance if quality levels are not met.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Compliance with FAR Clause 52.222-50, Combat Trafficking In Persons

100% Compliance and immediate notification of any violation

Inspection of contractor's policy by COR

AQL = Acceptable Quality Level

If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.