This document is a detailed Statement of Work (SOW) for a 5-ton overhead electric traveling (OET) training trolley to be installed at Puget Sound Naval Shipyard (PSNS) in Bremerton, Washington. The trolley is designed specifically for crane maintenance and inspection training purposes, featuring a double girder configuration with radio remote operation, powered by 480 VAC, 3-phase, 60-Hertz electricity. Key technical specifications include separate hoist and trolley drive mechanisms, multiple brake systems, precise speed controls (hoist speeds of 2-40 feet per minute, trolley speeds of 5-75 feet per minute), and comprehensive safety features like limit switches, emergency stop functionality, and motor over-temperature protection.
The training trolley will be fabricated to meet stringent engineering standards, including CMAA #70, ASME B30.2, and OSHA regulations. It will include specialized components such as a Magnetek Series 5 VFD for the hoist, an Emerson Industrial Automation Control Techniques Mentor MP DC Drive for the trolley, and multiple brake systems (primary, secondary, and tertiary). The system will be painted safety yellow, feature an engineering workstation, and include extensive cybersecurity protections. The contractor will be responsible for detailed documentation, shop and field testing, installation, and providing eight hours of training for mechanics and electricians on the trolley's functions and maintenance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 TON OVERHEAD ELECTRIC TRAVELING
(OET) TRAINING TROLLEY FOR PUGET
SOUND NAVAL SHIPYARD (PSNS),
BREMERTON, WASHINGTON
PREPARED BY:
PSNS Lifting and Handling Department
Engineering and Procurement Code 713
Bldg. 448, PSNS
Bremerton Washington 98314
SPECIFICATION PREPARED BY:
Project Engineer: Morgan Smith
Branch Head Supervisor: Bryan Lemos-Goncalves
Contract Representative: Rickie Edmonds
Contract Number Table of Contents 2
Table of Contents
1. General
1.1. Standards
1.2. Defini ons
1.3. Contractor Compliance
1.4. Submi als
1.4.1. Submi al Summary Table
1.4.2. SD-01 Preconstruc on Submi als
1.4.3. SD-02 Drawings
1.4.4. SD-03 Product Data
1.4.5. SD-04 Not Used
1.4.6. SD-05 Design Data
1.4.7. SD-06 Hazardous Materials
1.4.8. SD-07 Coupling Alignments
1.4.9. SD-08 Brake Adjustment Records
1.4.10. SD-09 Opera on and Maintenance Data
1.4.11. SD-10 Closeout Submi als
1.5. Quality Assurance
1.5.1. Contractor Verifica on and Post-Award Mee ng (Contractor at PSNS or Virtual)
1.5.2. Contractor Tes ng
1.5.3. Pre-Installa on Mee ng (Teleconference or Contractor at PSNS)
1.5.4. Government Inspec on
1.5.5. Field Acceptance Test
1.5.6. Acceptance
1.5.7. Conference Calls
1.5.8. Government Inspec ons
1.5.9. Manufacturer Qualifica ons
1.5.10. Welding
1.5.11. Non-Destruc ve Tes ng (NDT)
1.5.12. Cybersecurity Cer ficates
Contract Number Table of Contents 3
1.5.13. Cybersecurity Closeout Submi als
2. Products
2.1. System Descrip on
2.2. Trainer Requirements
2.2.1. Materials
2.2.2. Structural Design
2.2.3. Mechanical Design
2.2.4. Electrical Design
2.2.5. Required Commercial Products
2.2.6. Control System and Networking
2.2.7. Corrosion Protec on
2.2.8. Pain ng System (Priming and Finish Pain ng)
2.2.9. Trolley Stand
2.2.10. Le ering, Markings, and Label Plates
2.2.11. Engineering Worksta on
3. Execu on
3.1. Site Specific Requirements
3.2. TRAINER INSTALLATION
3.2.1. CONSTRUCTION SERVICES
3.3. Delivery, Storage, and Handling
3.4. Fabrica on
3.4.1. Mechanical Fastener Tightening
3.4.2. Structural Fastener Tightening
3.5. Trainer Installa on
3.6. Training
4. APPENDIX (A) CRANE ENVELOPE DRAWING – NOT USED
5. APPENDIX (B) SHOP TEST PROCEDURE
5.1. GENERAL INSTRUCTIONS
5.2. SHOP TEST PROCEDURE
5.3. POWER AVAILABLE LIGHT TEST
5.4. ENERGIZING MAIN LINE CONTACTOR
Contract Number Table of Contents 4
5.4.1. DE-ENERGIZING MAIN LINE CONTACTOR
5.5. DE-ENERGIZE USING E-STOP
5.6. WIRELESS CONTROLLER FUNCTIONALITY
5.7. MOTOR CONTROLS
5.7.1. HOIST CONTROLS
5.7.2. TROLLEY CONTROLS
5.7.3. SLOW SPEED SWITCH
5.8. UPPER LIMIT SWITCHES
5.8.1. HOIST PRIMARY LIMIT SWITCH
5.8.2. HOIST SECONDARY LIMIT SWITCH (WEIGHTED LIMIT SWITCH)
5.9. LOWER LIMIT SWITCH
5.9.1. HOIST LIMIT SWITCH
5.10. CRANE FAULT SIMULATION
5.10.1. MOTOR OVER-TEMPERATURE
5.11. DRIVE CONTROLLER FAULT SIMULATION
5.12. BRAKES
5.12.1. NORMAL OPERATION
5.12.2. LOSS OF POWER (HOIST)
5.12.3. LOSS OF POWER (TROLLEY)
5.12.4. PRIMARY BRAKE TEST KEY SWITCH
5.12.5. SECONDARY BRAKE TEST KEY SWITCH
5.12.6. TERTIARY BRAKE TEST KEY SWITCH
5.12.7. HOIST BROKEN DRIVETRAIN TEST
5.12.8. COMMENTS
6. APPENDIX (C) FIELD ACCEPTANCE TEST PROCEDURE
6.1. General Instruc ons
6.2. No Load Acceptance Test Procedure
6.2.1. POWER AVAILABLE LIGHT TEST
6.2.2. ENERGIZE/DE-ENERGIZE MAIN LINE CONTACTOR
6.2.3. DE-ENERGIZE USING E-STOP
Contract Number Table of Contents 5
6.2.4. WIRELESS CONTROLLER FUNCTIONALITY
6.2.5. MOTOR CONTROLS
6.2.6. HOIST CONTROLS
6.2.7. TROLLEY CONTROLS
6.2.8. SLOW-SPEED SWITCH
6.2.9. HOIST ROLL BACK CHECK
6.2.10. HOIST ROLL UP CHECK
6.2.11. UPPER LIMIT SWITCHES
6.2.12. HOIST LOWER LIMIT SWITCH
6.2.13. MOTOR OVER TEMPERATURE SIMULATION
6.3. BRAKES
6.4.1 NORMAL OPERATION
6.4.2. LOSS OF POWER (HOIST)
6.3.1. LOSS OF POWER (TROLLEY)
6.3.2. PRIMARY BRAKE TEST KEY SWITCH
6.3.3. SECONDARY BRAKE TEST KEY SWITCH
6.3.4. TERTIARY BRAKE TEST KEY SWITCH
6.3.5. HOIST BROKEN DRIVETRAIN TEST
6.5. Final Verifica on
6.5.2. PARAMETER RECORD
6.5.3. COMMENTS
7. APPENDIX (D) BRAKE DATA SHEET
8. APPENDIX (E) SITE SPECIFIC REQUIREMENTS FOR PUGET SOUND NAVAL SHIPYARD & INTERMEDIATE
MAINTENANCE FACILITY BREMERTON NAVAL COMPLEX, WASHINGTON
8.1. SCOPE
8.2. APPLICABLE DOCUMENTS
8.3. GENERAL REQUIREMENTS
8.4. ENVIRONMENTAL AND SAFETY COMPLIANCE, GENERAL AWARENESS
TRAINING, AND REGULATORY INTERFACE
8.5. DEFINITIONS
8.6. MANAGEMENT OF HAZARDOUS MATERIALS
Contract Number Table of Contents 6
8.7. CONTRACTOR PLAN
8.8. HANDLING AND DISPOSAL OF WASTE
8.9. SPILLS
8.10. WATER POLLUTION AND BEST MANGEMENT PRACTICES (BMPs)
8.11. AIR POLLUTION CONTROL AND REPORTING
8.12. HEALTH AND SAFETY
8.13. SECURITY REQUIREMENTS
8.14. SECURITY CAUTIONS
8.15. CONTRACTOR CRANES
9. APPENDIX (F) CONTROL SYSTEM INVENTORY
10. APPENDIX (G) SHAFT ALIGNMENT RECORD
Contract Number Section 1 - General 7
1. General
1.1. Standards
The following documents, of the issue in effect on date of invita on for bids or request for proposal, form a part of this specifica on to the extent specified herein. In cases where the following documents and this specifica on do not agree, this specifica on shall govern to the extent of such differences. If standards other than those listed below are used, proof of equivalence shall be provided. NEMA, OSHA, ASME, AWS, AISC, and NFPA rules shall govern.
The most recent revision on the day the contract is awarded shall be used for all standards listed in this specifica on. (SUBMITTAL REQUIRED)
AMERICAN GEAR MANUFACTURES ASSOCIATION (AGMA)
6001-F19 – Design and Selec on of Components for Enclosed Gear Drives
6013-B16 - Standard for Industrial Enclosed Gear Drives
9001-C18 - Flexible Couplings - Lubrica on
9009-E20 - Nomenclature for Flexible Couplings
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
360 - AISC Steel Construc on Manual
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
B4.1 - Posi onal Fits and Tolerance for Cylindrical Parts
ECMA 15 - Specifica on for Cable-less Controls for Electric Overhead Traveling Cranes
AMERICAN SOCIETY OF MECHANICAL ENGINEERS INTERNATIONAL (ASME)
B17.1 - Keys and Keyseats
B30.2 - Overhead and Gantry Cranes (Top Running Bridge, Single or Mul ple Girder, Top Running Trolley Hoist)
B30.20 - Below-the-Hook Li ing Devices
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
A27 - Mild to Medium Strength Carbon Steel Cas ngs for General Applica on
A36 - Structural Steel
A148 - High Strength Steel Cas ngs for Structural Purposes
A325 - Standard Specifica on for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength
Contract Number Section 1 - General 8
A434 - Standard Specifica on for Steel Bars, Alloy, Hot-Wrought or Cold-Finished Quenched and Tempered
A490 - Standard Specifica on for Heat-Treated Steel Structural Bolts, 150 ksi Minimum Tensile Strength
A521 - Standard Specifica on for Steel, Closed Impression Die Forgings for General Industrial Use
A536 - Standard Specifica on for Duc le Iron Cas ngs
A572 - Standard Specifica on for High-Strength Low-Alloy Columbium-Vanadium Structural Steel
A668 - Steel Forgings, Carbon and Alloy, General Industrial Use
A992 - Standard Specifica on for Steel for Structural Shapes for Use in Building Framing
B26 - Aluminum Alloy Sand Cas ngs
B108 - Specifica on for Aluminum Alloy Permanent Mold Cas ngs
F436 - Standard Specifica on for Hardened Steel Washers
F593 - Stainless Steel Bolts, Hex Cap Screws, and Studs
F594 - Stainless Steel Nuts
AMERICAN WELDING SOCIETY (AWS)
D1.1 - Structural Welding Code Steel
D14.1 - Welding of Industrial and Mill Cranes and other Material Handling Equipment
CRANE MANUFACTURERS' ASSOCIATION OF AMERICA, INC (CMAA)
No. 70 - Specifica on for Top Running & Gantry Type Mul ple Girder Electric Overhead Traveling Cranes
INTERNATIONAL ORGANIZATION FOR STANDADIZATION (ISO)
ISO 15408 - Informa on Technology
NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION (NEMA)
ICS 8 - Industrial Control and Systems Crane and Hoist Controllers
250 - Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION
70 - Na onal Electric Code
70E - Standard for Electrical Safety in the Workplace
Contract Number Section 1 - General 9
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
Title 29 CFR, Part 1910.147 - The Control of Hazardous Energy (lo
Title 29 CFR, Part 1910.179 - Overhead and Gantry Cranes
Title 29 CFR, Part 1910.306 - Specific Purpose Equipment and Installa ons
RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC)
Specifica on for Structural Joints Using High-Strength Bolts
SOCIETY OF AUTOMOTIVE ENGINEERS (SAE)
SAE J429 - Mechanical and Material Requirements for Externally Threaded Fasteners
SAE J995 - Mechanical and Material Requirements for Steel Nuts
1.2. Defini ons
Angularity – Angle of sha centerline measured from other sha centerline.
Collision forces (CF) – Defined per CMAA 70.
Coupling, Flexible - A mechanical means to connect drive sha s to transmit torque without slip and accommodate misalignment.
Coupling, Full Flex (double engagement) - A coupling that has flexible elements on each sha mounted hub (double engagement) such as: a geared hubs, flexible disc hubs, or slo ed hubs for grids. Full flex (double engagement) couplings transmit torque without slip and can accommodate angular and parallel offset misalignment between the sha s.
Coupling, Half flex (or semi flex) - A coupling that has one sha mounted hub with a flexible element and one rigid sha mounted hub (i.e. with no flex element). Half flex (single engagement) couplings transmit torque without slip and can accommodate only angular misalignment. Half flex couplings are commonly used to connect a floa ng (spacer) sha between two drive train sha s, or connect wire rope drums to reducer sha s (e.g. barrel coupling).
Coupling, Barrel – A semi-flexible type coupling used to drive a wire rope drum from a rota ng sha using barrel-shaped cylindrical roller elements to transmit torque.
Coupling, Rigid – A coupling that does not allow for any angularity or offset misalignment. Flange-to-flange sha connec ons are an example of a rigid-rigid coupling.
End Gap – Distance between the ends of two sha s a er coupling installa on.
Hoist Brake, Primary – A mechanical brake located nearest to the hois ng motor ac ng on the high-speed sha .
Hoist Brake, Secondary – A mechanical brake located furthest from the motor while s ll ac ng on the high-speed sha .
Hoist Brake, Ter ary – A mechanical brake ac ng on the final-drive sha or hoist drum.
Contract Number Section 1 - General 10
Holding Brake – A brake that does not set on a moving sha during normal opera ons, not including tes ng opera ons.
Joint Class I – Defined per AWS D14.1.
Joint Class II - Defined per AWS D14.1.
Load Bearing – Components are considered load bearing if they contribute to the support of any por on of the crane’s li ed or dead load.
Loss of Power Test – A test that removes supply power while the crane is hois ng or lowering a 125% load, simula ng a loss of power.
Offset – The ver cal and horizontal distance between the centerline of two sha s.
Sha , Floa ng – A torque transferring rota ng sha that is indirectly supported by only the bearings of the driving and driven equipment using semi-flexible couplings at each end.
Spliced Connec on – A connec on of two structural members where the two members are treated as one con nuous member.
Trainer - En re assembly of the Training Trolley to include the disconnect switch, control panel, trolley stand, trolley, and all equipment mounted thereon.
Welds, Primary – Defined per AWS D14.1.
Welds, Secondary – Defined per AWS D14.1.
1.3. Contractor Compliance
The Contractor is required to read, understand, and comply with this en re specifica on.
The Government will determine compliance with the requirements of this specifica on by reviewing and accep ng the submi als shown in sec on 1.4, a ending an on-site shop test (Appendix B), performing Trainer inspec ons, and witnessing the Contractor complete the Acceptance Test (Appendix C).
1.4. Submi als
The Contractor is required, per this specifica on, to provide a submi al to the Government any me there is a SUBMITTAL REQUIRED designa on a er a sentence, paragraph, or sec on. The Government will review each submi al within the me period stated in the Submi al Summary Table (sec on 1.4.1), and either provide comments or accept the submi al. For convenience each occurrence is listed in the Submi al Summary Table (sec on 1.4.1) along with the file format, loca on, due dates, and number of copies. The Contractor shall ensure that all submi als are en rely legible and suitable for reproduc on.
A complete design submi al (e.g., catalog cuts, calcula ons, drawings/schema cs) must be submi ed before the Government will begin its review. The Government reserves the right to require changes to submi als, which may change the design, if the requirements of this specifica on are not met. Any fabrica on work performed prior to obtaining design approval is at the Contractor’s risk. Design approval from the Government will be given upon a sa sfactory comple on of the Final Design Submi al.
Contract Number Section 1 - General 11
1.4.1. Submi al Summary Table
SUBMITTAL FILE FORMAT
SPECIFICATION
SECTION
CONTRACTOR DUE DATE
GOVERNMENT DUE
DATE COPIES
TECHNICAL FORMS
Cer ficate of Compliance for Standards Listed in this Specifica on
.pdf 1.1 Prior to shop test
Review, comment, and submit within ten (10) business days a er date received
Contractor Schedule .pdf 0
First submi al prior to post-award mee ng (a er first submission an updated schedule shall be submi ed monthly at a minimum)
Con nual Feedback and Communica on Regarding Schedule
Preliminary Drawings (Structural, Mechanical, Electrical, General Arrangement and Control System/Network)
.pdf and .dxf or .dwg
1.4.3 Prior to manufacturing of Trainer
Review, comment, and submit within fi een (15) business days a er date received
Final As-Built Drawings (Structural, Mechanical, Electrical, General Arrangement and Control System/Network)
.pdf and .dxf or .dwg
1.4.3 Ten (10) business days a er Trainer acceptance
Review, comment, and submit within twenty (20) business days a er date received
Catalog Cuts (Structural, Mechanical, Electrical and Control System/Networking)
.pdf 1.4.4 Prior to manufacturing of Trainer
Review, comment, and submit within fi een (15) business days a er date received
Preliminary Calcula ons (Structural, Mechanical, and Electrical)
.pdf 1.4.6 Prior to manufacturing of Trainer
Review, comment, and submit within fi een (15) business days a er date received
Final Calcula ons (Structural, Mechanical, and Electrical)
.pdf 1.4.6 Prior to Trainer delivery
Review, comment, and submit within fi een (15) business days a er date received
Hazardous Material Cer ficate
.pdf 1.4.7 Prior to shop test mee ng
Review, comment, and submit within one (1) business days a er date received
Contract Number Section 1 - General 12
SPECIFICATION
SECTION
CONTRACTOR DUE DATE
GOVERNMENT DUE
DATE COPIES
Coupling Alignment Cer ficate
.pdf 1.4.8 Prior to acceptance of Trainer
Review, comment, and submit within five (5) business days a er date received
Brake Se ng Cer ficate .pdf 1.4.9 Prior to shop test
Review, comment, and submit within two (2) business days a er date received
Preliminary Maintenance, Technical, and Opera ons Manual
.pdf 1.4.10 Twenty (20) business days prior to Trainer delivery
Review, comment, and submit within fi een (15) business days a er date received
Final Maintenance, Technical, and Opera ons Manuals
Hard copy and .pdf
1.4.10 Ten (10) business days a er Trainer acceptance
Review, comment, and submit within twenty (20) business days a er date received
2 Hard Copies, 1 pdf
Closeout Submi als .pdf 1.4.11 Ten (10) business days a er Trainer acceptance
Review, comment, and submit within twenty (20) business days a er date received
1 pdf
Appendix (B) Shop Test .pdf 1.5.2.1 Ten (10) days a er comple on of shop test
Review, comment, and submit within two (2) business days a er date received
Contractor Request to Ship .pdf 1.5.2.1 Prior to shipping any por on of the Trainer to
PSNS
Review, comment, and submit within ten (10) business days a er date received
Appendix (C) Field Acceptance Test
.pdf 1.5.5 Ten (10) days a er comple on of field acceptance test
Review, comment, and submit within ten (10) business days a er date received
Final Parameter Record .pdf & USB memory device
1.5.5 A er field acceptance test
Review, comment, and submit within three (3) business days a er date received
1 pdf &
1 CD/
DVD
Welder Cer fica ons .pdf 1.5.10 Prior to performing welding
Review, comment and submit within five (5) business days a er date received
Contract Number Section 1 - General 13
SPECIFICATION
SECTION
CONTRACTOR DUE DATE
GOVERNMENT DUE
DATE COPIES
NDT Qualifica on Report .pdf 1.5.11 Prior to performing any
NDT
Review, comment, and submit within five (5) business days a er date received
Weld NDT Reports .pdf 1.5.11 Prior to shop test mee ng
Review, comment, and submit within five (5) business days a er date received
Cybersecurity Cer ficate – Public Domain So ware
.pdf 1.5.12 Prior to manufacturing of Trainer
Review, comment, and submit within ten (10) business days a er date received
Cybersecurity Cer ficate – So ware and Services
.pdf 1.5.12 Prior to manufacturing of Trainer
Review, comment, and submit within ten (10) business days a er date received
Cybersecurity Closeout Submi als
.pdf and USB memory device
1.5.13 Forty (40) business days prior to Trainer delivery
Review, comment, and submit within twenty (20) business days a er date received
1 pdf &
1CD/
DVD
Lubrica on SDS .pdf 2.2.3.18 Prior to applying lubrica on or filling gearbox
Review, comment, and submit within five (5) business days a er date received
Trainer Installa on Plan .pdf 3.2 Prior to Trainer delivery
Review, comment, and submit within fi een (15) business days a er date received
Training Syllabus .pdf 3.6 Prior to trolley delivery
Review, comment, and submit within ten (10) business days a er date received
APPENDIX (E) FORMS
Contractor Hazardous Material Inventory (CHMI) (A achment 1)
Hard Copy or .pdf
3.1.a Ten (10) business days prior to trolley delivery
NA TBD
Solid Waste Tracking Sheet (SWTS) (A achment 3)
Hard Copy or .pdf
3.1.b
Filled out when disposing of waste at Contractor determined disposal facility
NA TBD
Contract Number Section 1 - General 14
SPECIFICATION
SECTION
CONTRACTOR DUE DATE
GOVERNMENT DUE
DATE COPIES
Contractor’s Monthly Project Waste Summary Report (CMPWSR) (A achment 4)
Hard Copy or .pdf
3.1.c Monthly during on-site work
NA TBD
Personal Informa on for Visitor Request (A achment 6)
Hard Copy or .pdf
3.1.d Ten (10) business days prior to coming to PSNS
NA TBD
AIS Survey (A achment 7) Hard Copy or .pdf
3.1.e Twenty (20) business days prior to bringing a laptop into the CIA
NA TBD
Radio Opera ons Request (A achment 8)
Hard Copy or .pdf
3.1.f Ten (10) business days prior to coming to PSNS with a radio
NA TBD
Vehicle Pass Request for Access to the Controlled Industrial Area (CIA) (A achment 12)
Hard Copy or .pdf
3.1.g
Twenty (20) business days prior to bringing a vehicle into the CIA at
PSNS
NA TBD
Foreign Interest Determina on (A achment 13)
Hard Copy or .pdf
3.1.h Twenty (20) business days prior to coming to
PSNS
NA TBD
Cer ficate of Compliance Form (A achment 16)
Hard Copy or .pdf
3.1.i
Prior to use of trolley/li ing and handling equipment at
PSNS
Government will fill out form on-site with Contractor
TBD
Waste Informa on Sheet
(WIS)
Hard Copy or .pdf
3.1.j Ongoing as waste is generated
NA TBD
Contractor Operator License Hard Copy or .pdf
8.12.7
Submit License(s) prior to opera ng equipment such as fork li , aerial work pla orm, trolley, and other types of equipment
NA TBD
1.4.2. SD-01 Preconstruc on Submi als
Contractor shall submit monthly status reports. The first page of the report shall contain the following iden fying informa on: Title/Project Descrip on, Repor ng Period, Contract Number, Name and Title of Report Preparer, and Distribu on Statement. The content of the report shall address: the overall project status and the status of each milestone/task, for designs in process indicate the percent complete and es mated submission dates, for designs under review indicate level of government review and projected approval date, list and describe current RFIs, describe outstanding problems and proposed resolu ons indica ng who has the next ac on, describe significant results from conferences and trips, list all contract modifica ons issued, provide a summary of work planned in the next month, and provide any necessary suppor ng documenta on as an a ached appendix.
The Contractor shall submit a preliminary schedule that details key events in the design, fabrica on, and installa on of the Trainer. The schedule shall be updated and submi ed, at a minimum, monthly
Contract Number Section 1 - General 15 throughout the dura on of the contract (SUBMITTAL REQUIRED). At a minimum the schedule shall include the informa on below (the order of events shown below is not fixed):
a. Post-Award Mee ng
b. Preliminary Drawings and Calcula on Submi als
c. Government Review of Ini al Design
d. Final Drawings and Calcula on Submi als
e. Government Review of Final Design
f. Start of Fabrica on
g. Shop Test Mee ng
h. Comple on of Fabrica on
i. Pre-Installa on Mee ng
j. Trainer Delivery
k. Trainer Installa on
l. Post Installa on Government Inspec on
m. Acceptance Test
n. Trainer Acceptance
o. Comple on of Warranty
(SUBMITTAL REQUIRED)
1.4.3. SD-02 Drawings
Provide a preliminary drawing package to the Government for review (SUBMITTAL REQUIRED). Provide a final design drawing package that complies with all requirements listed in sec on 1.4.3 (SUBMITTAL REQUIRED). The preliminary and final design drawing packages shall include all general arrangement drawings, structural/mechanical drawings, and electrical drawings.
Drawings that use foreign language and nomenclature shall include corresponding English equivalents.
Metric units may be used for drawings, but they shall include conversions to English units on the drawings.
All drawings shall have a complete tle block that includes the trolley number, and the signature and seal of a registered Professional Engineer that directly oversees the work. There shall be no proprietary notes on any of the drawings.
All drawings shall have a comprehensive and complete bill of materials for the given drawing.
Each revision shall be tracked and marked on the drawing. An index of drawings shall be included that tracks current revisions of drawings.
All drawings must be provided in PDF format during the design review phase and in PDF and DWG for final as built drawings. These files shall be compa ble with AutoCAD 2021.
Contract Number Section 1 - General 16
(SUBMITTAL REQUIRED)
1.4.3.1. SD-02.G General Arrangement Drawings
The Trainer assembly and each major component shall be shown in plan, eleva on, and end views. All major features of the Trainer shall be shown including: speeds, electrical power supply, and general loca ons of components such as: brakes, motors, speed reducers, and control panels (including size).
Fastener installa on torque values for base-mounted components shall be indicated on the drawing. In addi on, es mated weights shall be shown for the completely assembled Trainer and major components.
General arrangement drawings shall show the trolley-to-trolley stand interface.
(SUBMITTAL REQUIRED)
1.4.3.2. SD-02.S Structural Drawings
Provide a complete drawing package clearly detailing all fabricated components and structural assemblies/weldments, include tolerances, size and loca on (dimensions), camber requirements, weld call outs per AWS A2.4, material type and the standard associated with the material type, e.g., ASTM A36.
For structural fasteners, include size and type of fastener, associated hardware and joint type for RCSC Specifica on for Structural Joints Using High-Strength Bolts. Dimensioned loca ons of li points (for components to be li ed by suspended rigging) and approximate loca ons of center of gravity for each major component listed below shall be provided on the design drawings.
The drawings shall at a minimum include:
a. Trolley Fabrica on
b. Li Point Fabrica on
c. Trolley Stand Fabrica on
(SUBMITTAL REQUIRED)
1.4.3.3. SD-02.E Electrical Drawings
The drawings shall at a minimum include:
a. Complete schema c diagram with narra ve of any special descrip on of opera on. All components shown on schema cs shall have labels that correspond to the nameplates that will be on the Trainer. Wiring type, size, and temperature ra ngs shall be included on schema c diagrams. For components with adjustable se ngs, set-points shall be included on schema c diagrams. All op onal equipment not provided with the delivered equipment shall be removed from the schema c diagrams. Loca ons of contacts and coils shall be cross-referenced to each other within the schema c diagrams.
b. Motor nameplate data (including all informa on called for in NFPA 70, Sec on 430.7)
c. Ra ng and types of over-current protec ve devices including se ngs for adjustable breakers.
d. Complete assembly (wiring) diagrams including a comprehensive component material list showing all electrical components used on the Trainer. These drawings shall show the
Contract Number Section 1 - General 17 layout of electrical equipment on the Trainer, including layout of control panel enclosures, motors, brakes, limit switches, conduits, and conductor systems.
e. Layout diagrams showing component placement in control panel enclosures.
f. Complete assembly (wiring) diagrams showing all conductor rou ngs and termina ons.
g. Comprehensive and complete drive parameter lis ng and all custom programming associated with the Trainer.
h. One-line diagram that correlates to the SD-05.E4 and SD-05.E5 submi als.
(SUBMITTAL REQUIRED)
1.4.3.4. SD-02.M Mechanical Drawings
The drawings shall at a minimum include:
a. Drive arrangements (including assembled components).
b. Base mounted component bolt torque values shall be provided for installed fasteners with considera on for any lubrica on and/or washer types used; generic bolt torque tables shall not suffice.
c. Wheels and Sheaves (if not standard commercially available items).
d. Coupling installa on drawings including: loca ons, applicable sha engagement, and bore and key details.
e. Brake installa on drawings including: loca ons, applicable sha engagement, and bore and key details.
f. Upper Sheave (including equalizer) detail drawings.
g. Lubrica on drawings showing all lubrica on points, the type of lubrica on used, and the recommended lubrica on frequency.
(SUBMITTAL REQUIRED)
1.4.3.5. SD-02.C Control System and Network Drawings
Network diagram must show interconnec ng cabling, equipment loca ons, names, models, and unique network iden fica on on network communica ons schema c for all network-capable devices.
So ware logic graphical diagram (e.g., flow or block diagram, ladder-logic diagram, etc.)
Ladder logic and/or so ware flow/block diagrams shall include comments explaining the func on of each unique so ware task or opera on.
Network variable cross-reference list (or table) for all variables spanning mul ple network protocols shall be provided in a drawing format. This list or table shall provide variable names and register addresses used in each communica on protocol and each variable shall be correlated to the hardware/device served.
Contract Number Section 1 - General 18
1.4.4. SD-03 Product Data
Catalog cuts for all commercially available components shall be provided as a submi al to the Government. The catalog cuts shall be marked to clearly display what component and component op ons are used on the trolley, e.g., part number, model, load ra ng, and noun-name or designa on describing how the component applies to the delivered equipment.
The Contractor shall submit for approval all applicable component preliminary (SUBMITTAL REQUIRED) and final (SUBMITTAL REQUIRED) catalog cuts listed below and any other commercially available components not listed in their respec ve design submi als. If components below are fabricated by the Contractor, then design drawings will need to be submi ed in place of catalog cuts.
1.4.4.1. SD-03.M Mechanical Product Data
SD-03.M1 Speed Reducers including gear ra o
SD-03.M2 Brakes (including electrical informa on)
SD-03.M3 Bearings and Bearing Housings
SD-03.M4 Couplings
SD-03.M5 Wheels and Sheaves
(SUBMITTAL REQUIRED)
1.4.4.2. SD-03.E Electrical Product Data
SD-03.E1 Variable Frequency AC Drives and Variable Speed DC Drives
SD-03.E2 Motors and Encoders
SD-03.E3 Electrical Enclosures
SD-03.E4 Limit Switches
SD-03.E5 Warning and Pilot Devices
SD-03.E6 Disconnect Switches
SD-03.E7 Contactors, Relays, and Timers
SD-03.E8 Radio Control System
SD-03.E9 Ancillary Equipment (as applicable)
SD-03.E9 Over-current Protec ve Devices
SD-03.E10 Electrifica on and Festooning
SD-03.E10 Transformers and Reactors
Contract Number Section 1 - General 19
1.4.4.3. SD-03.S Structural Product Data
SD-03.S1 End Trucks (including Drive Units)
SD-03.S2 Pain ng System
SD-03.S3 Li Points
(SUBMITTAL REQUIRED)
1.4.4.4. SD-03.C Control System and Network Product Data
Ensure the following is provided in the product data for PLC, RTU, Supervisory Controller, or other network-capable (whether networked or not upon delivery) control devices as applicable:
SD-03.C1 Hardware list (Hardware list must include the following for each device):
i. Manufacturer,
ii. Model,
iii. Loca on,
iv. Key technical ra ngs (e.g., memory),
v. Serial number,
vi. MAC addresses,
vii. IP addresses.
SD-03.C2 So ware List (So ware list must include the following for each device):
i. Manufacturer,
ii. Version/subversion
iii. Loca on of device using so ware
iv. Network ports, protocols, services used with delivered equipment
SD-03.C3 List and discussion of all security features of vendor hardware and so ware.
(SUBMITTAL REQUIRED)
1.4.5. SD-04 Not Used
1.4.6. SD-05 Design Data
The Contractor shall provide preliminary (SUBMITTAL REQUIRED) and final (SUBMITTAL REQUIRED) structural, mechanical, and electrical calcula ons to the Government that validate that the design complies with the requirements in sec on 1.4.6, CMAA No. 70, and all other applicable requirements in this specifica on. Design calcula ons shall be provided for custom items, and sizing calcula ons shall be provided for commercial items. Calcula ons shall be stamped and signed by a PE. The stamp and signature shall be original, or otherwise comply with the applicable rules or regula ons pertaining to their reproduc on.
Contract Number Section 1 - General 20
Design calcula ons that use foreign language and nomenclature shall include English equivalent nomenclature. Metric units may be used for calcula ons, but they shall include conversions to English units. In the case of calcula ons, only the ini al inputs and final results need to be converted.
All calcula on submi als shall be labeled with the Trainer number.
Any Finite Element Analysis (FEA) that is provided as a submi al shall come with hand calcula ons that verify the FEA model and a write-up that details the designer’s assump ons and explains the thought process behind the model.
1.4.6.1. SD-05.S Structural Calcula ons
SD-05.S1 Calcula ons verifying Trainer design in accordance with Sec on 3 of CMAA #70 for any non-commercial items.
SD-05.S2 Calcula ons verifying trolley stand design in accordance with AISC’s Steel Construc on manual.
SD-05.S3 Calcula ons shall be provided that verify all li ing a achment points for the trolley and the trolley stand. Custom designed a achments shall be designed to Category B, Service Class 0 criteria of ASME BTH-1. All li ing a achment points shall meet ASME B30.20 provisions that apply to the marking, construc on, installa on, inspec on, and tes ng. If requested by the government, load tes ng per ASME B30.20 of the li ing a achments shall be performed and witness by the government.
(SUBMITTAL REQUIRED)
1.4.6.2. SD-05.M Mechanical Calcula ons
SD-05.M1 Calcula ons verifying compliance with Sec on 4 of CMAA #70 for any noncommercial items
SD-05.M2 Calcula ons verifying brake selec on
SD-05.M3 Calcula ons verifying coupling selec on
(SUBMITTAL REQUIRED)
1.4.6.3. SD-05.E Electrical Calcula ons
SD-05.E1 Minimum required horsepower for each drive motor - Motor power ra ngs shall be based upon the formulae given in CMAA #70. For hoist motor sizing calcula ons, the factor "Kc" shall not be less than 1.0. For the trolley drive the minimum accelera on me to rated speed shall be 3 seconds. All drive calcula ons may be performed with the allowable 10% speed reduc on, however no addi onal la tude in selec ng the nearest rated horsepower under the calculated value is allowed.
SD-05.E2 Overcurrent protec on and conductor sizing of feeders and power distribu on circuity.
Contract Number Section 1 - General 21
SD-05.E3 Conduit fill calcula ons (using tables from NFPA 70 and/or manufacturer’s data sheets). Grounding conductors shall be included in the calcula ons.
SD-05.E4 Protec ve device coordina on study showing proper coordina on for all power distribu on overcurrent protec ve devices . This study shall include all devices from the line side of the facility overcurrent device.
SD-05.E5 Contractor shall provide arc flash energy calcula ons for each electrical enclosure showing proper data necessary for appropriate arc flash labels per NFPA 70E. The incident energy calcula on method to be used shall be the IEEE 1584-2018 method, and a report shall be due to the government mee ng all recommended deliverables of IEEE 1584.1 sec on 10. If computa on so ware is used to perform these calcula ons, all so ware files including project files, overcurrent protec on libraries, and other relevant files required to perform a complete arc flash analysis u lizing the so ware in which the arc flash analysis was originally performed shall be provided.
(SUBMITTAL REQUIRED)
1.4.7. SD-06 Hazardous Materials
The Trainer shall not contain any asbestos, lead, cadmium, chromium, polychlorinated biphenyl (PCB) or elemental mercury. The Contractor shall submit a hazardous material cer ficate that states that the Trainer does not contain any of the above listed hazardous materials.
(SUBMITTAL REQUIRED)
1.4.8. SD-07 Coupling Alignments
The Contractor shall provide a cer ficate that describes the method of alignment, the manufacturer’s recommenda ons, and the actual alignment (offset, angularity, end gap and so foot readings) that was obtained during installa on. Coupling alignments shall be verified by the Contractor and witness by the Government a er Trainer installa on. The coupling alignments shall be adjusted using laser alignment equipment. The final alignment recording shall be taken a er the coupling's final installa on, using the provided form found in Appendix (G) (SUBMITTAL REQUIRED). A copy of the laser alignment computer generated printout shall be supplied with the submi al.
(SUBMITTAL REQUIRED)
1.4.9. SD-08 Brake Adjustment Records
The contractor shall provide a brake adjustment record for each brake on the Trainer using the provided form found in Appendix (D). Each brake measurement shall have a tolerance traceable to the associated brake manual or documenta on provided by brake manufacturer and an “actual” se ng. Changes made to se ngs of the brake at any me will void this record. The contractor shall also provide the manufacturers' documenta on (installa on manual or other documents as necessary) that indicates the tolerances associated with the brake.
Contract Number Section 1 - General 22
1.4.10. SD-09 Opera on and Maintenance Data
The contractor shall submit the Trainer Opera on and Maintenance (O&M) Manual to the Government for review. The Opera on and Maintenance Manuals shall include a table of contents for opera on instruc on, preven ve maintenance, parts informa on, drawing list, supply list, catalog cuts, photographs, and calcula ons. The body of the technical manuals shall include the following: contractor’s detailed wri en procedures, opera on instruc ons, preven ve maintenance informa on, drawings, parts informa on, supplies needed, catalog cuts, photographs, and calcula ons. Maintenance informa on shall include recommended maintenance procedures and manufacturer’s installa on and maintenance manuals (for purchased components) and lubrica on instruc ons. Opera on informa on shall include detailed Trainer opera ng and safety instruc ons. Parts informa on shall include all informa on on all contractor-designed parts, all purchased sub-assemblies and components including the manufacturer’s part number. The informa on shall be itemized to the smallest replacement part. Within these sec ons the following informa on shall also be included:
a. Maintenance and programming instruc ons for the drives.
b. Maintenance instruc ons including alignment, adjustment, and calibra on instruc ons for commercial components and parts lists.
c. Opera ng instruc ons and special precau ons for star ng/stopping, opera on, and safety.
d. Preven ve maintenance instruc ons including loca on of lubrica on points, type of lubricant to be used, and the frequency of lubrica on, which shall agree with the lubrica on drawing provided.
e. Recommended spare parts list.
f. A complete lis ng of all control system parameters with an explana on of their func ons.
(SUBMITTAL REQUIRED)
1.4.11. SD-10 Closeout Submi als
(SUBMITTAL REQUIRED)
1.4.11.1. SD-10.1 Drawings on USB Memory Device
The contractor shall provide the Trainer’s as-built drawings on a USB memory device viewable in AutoCAD 2021. The file shall be in .dwg format and a separate copy in Portable Document Format (.pdf). The as-built drawings shall be submi ed to the Government following final Government acceptance of the Trainer. The USB memory device shall include an index of the drawings.
(SUBMITTAL REQUIRED)
1.4.11.2. SD-10.2 Opera on and Maintenance Manuals
The contractor shall provide the opera on and maintenance manuals on a USB memory device and hard copies following final Government acceptance of the manuals for the Trainer. The manuals shall be in Portable Document Format (.pdf). The manuals shall be indexed using bookmarks in Adobe Acrobat.
Contract Number Section 1 - General 23
1.4.11.3. SD-10.3 Control System Parameter Record
The contractor shall complete a control system parameter record and provide the parameter files downloaded from the hoist and trolley drives at me of acceptance. The records shall include the contract number, contractor’s name and address, date, all control system parameters, and their final se ngs. Each control system parameter shall be designated as either used or unused. A copy of the parameter file records shall be provided on a USB memory device.
(SUBMITTAL REQUIRED)
1.4.11.4. SD-10.4 Product Data
Electronic submission of catalog cuts shall be submi ed as one unit with a cover sheet containing a tle block and index sheet iden fying individual catalog cuts. Ensure each page is numbered and iden fied to allow proper filing if separated or if provided in .PDF format linked book marking is acceptable vice page numbering.
(SUBMITTAL REQUIRED)
1.4.11.5. SD-10.5 Property Transfer Verifica on
The contractor shall transfer possession of all small items associated with the opera on and maintenance of the Trainer, including but not limited to: keys, control so ware, engineering worksta on, computer cabling remote controls, etc. The property shall be given to the point of contact of the supported command. The contractor shall provide an itemized invoice showing the quan ty and descrip ons of items transferred and obtain the signature of the recipient on the dated invoice. Submit a copy of the signed invoice.
(SUBMITTAL REQUIRED)
1.5. Quality Assurance
1.5.1. Contractor Verifica on and Post-Award Mee ng (Contractor at PSNS or Virtual)
The Contractor shall meet with the Government at PSNS or virtually a er the contract has been awarded.
This mee ng will be used to discuss the contract and any other ques ons that arise.
1.5.2. Contractor Tes ng
Prior to the Shop Test and Inspec on (see sec on 1.5.2.1), the Contractor shall test the opera ons of the Trainer under a no-load condi on. The Contractor shall perform a detailed inspec on of the Trainer and its components and test all possible func ons of the assembled Trainer. The Trainer is to be fully assembled during the test and inspec on, unless otherwise approved by the Government. Once the Contractor successfully tests and inspects the Trainer, the Contractor shall provide a copy of the completed self-test, recorded on the shop test procedure verifying the Contractor’s self-test has been completed.
The Contractor shall then work with the Government to schedule the Shop Test and Inspec on.
Contract Number Section 1 - General 24
1.5.2.1. Shop Test and Inspec on (Government at Contractor’s Facility)
The Contractor shall allow the Government to come to the Contractor’s facility and par cipate in a Trainer Inspec on and Shop Test. This mee ng will cover the submi als that the Contractor is responsible for providing to the Government, shop tes ng, shipping, site mobiliza on, erec on dates, Trainer installa on plan, roles and responsibili es of the en es involved, and the overall schedule. The shop test shall occur a er the Government approves the final design submi al of the Trainer. Sufficient me shall be provided to allow the Government to thoroughly inspect the Trainer prior to the start of the shop test. The Contractor shall establish the specific energy control requirements and lockout/tagout (LO/TO) procedures in accordance with 29 CFR Part 1910.147 to ensure all hazardous energy will be secured prior to the start of the inspec on. The Contractor shall advise the Government of the an cipated shop test two weeks prior to the beginning of the Government witnessed shop test.
The Contractor shall be available to operate the Trainer, perform the shop test, complete the shop test shown in Appendix (B) (SUBMITTAL REQUIRED), and answer any ques ons that arise. All contract viola ons found during the shop test and inspec on will be recorded by the Government on a punch list.
The Government will conduct an out-brief with the Contractor and will go over every punch list item with the Contractor before leaving the Contractor’s facility. All punch list items shall be resolved by the Contractor prior to shipping the Trainer to PSNS. The Trainer shall not be shipped to PSNS un l the Government accepts the Contractor’s request to ship (SUBMITTAL REQUIRED). The request to ship shall include details of how the Trainer will be shipped to the site, along with all submi als required in Appendix E.
1.5.3. Pre-Installa on Mee ng (Teleconference or Contractor at PSNS)
The Contractor shall a end a Government conducted pre-installa on conference that will either be a teleconference or will be held at the installa on site. This conference will provide the Contractor/Sub- Contractors, and the Government the ability to review all aspects of the Trainer installa on to ensure accuracy and safety.
1.5.4. Government Inspec on
Once the Contractor has installed, tuned, and tested the Trainer to verify it is ready for acceptance tes ng, the Contractor shall allow the Government to conduct a 5-day inspec on prior to field acceptance tes ng.
The Contractor shall be available to operate the Trainer at the request of the inspectors during this 3–5-day period. The Government shall be given a 2-day no ce that the Trainer is ready for inspec on before the 3–5-day period begins. All references to “days” in this sec on are considered working days (M-F) excluding federal holidays.
All items that are found during the Government inspec on that do not meet the requirements of this contract shall be wri en on the punch list and corrected by the Contractor prior to acceptance tes ng.
A er the correc ons have been made, the Government has one day to re-inspect the Trainer to ensure all the correc ons have been made.
1.5.5. Field Acceptance Test
The Acceptance Test, shown in Appendix (C) (SUBMITTAL REQUIRED), shall be sa sfactorily completed a er the Trainer is installed inside Building 455 at PSNS by the Contractor. If the Trainer fails to complete
Contract Number Section 1 - General 25 an item listed in Appendix (C) the test shall be repeated a er repairs/adjustments have been made un l the test is passed. Any repairs that would affect an already tested component will require retes ng of the previously tested component. The Government may, if necessary, request addi onal tests to determine that the Trainer meets the requirements of this specifica on.
The Government shall have one regular workday to conduct a final inspec on a er the Field Acceptance Tes ng is completed.
A er the Trainer has passed the field acceptance test, the contractor shall complete a control system parameter record, including authorized parameter range tolerances, for the Trainer and provide the Trainer parameter file downloaded from the Trainer at a me of acceptance, if applicable. The record shall include the contract number, contractor's name and address, date, all control system parameters and their final se ngs. Each control system parameter shall be designated as either used or unused. A copy of the parameter file records shall be provided to the Government on a USB memory storage device. (SUBMITTAL
REQUIRED)
1.5.6. Acceptance
Final Government acceptance of the Trainer shall take place only a er the following condi ons are met:
a. Contractor receives Government approval for all tests, inspec ons, and verifica on that all submi als have been received and acceptable.
b. The Trainer meets all contract requirements.
c. The Trainer passes a final inspec on by the Government.
d. All punch list items have been corrected or a method of resolu on has been determined.
Outstanding punch list items not corrected prior to the Government's acceptance shall be carried as warranty items, which shall be corrected by the Contractor.
1.5.7. Conference Calls
The Contractor shall support 30-minute teleconferences at the Government’s request including the Contractor project manager and lead engineer.
1.5.8. Government Inspec ons
The Government may perform scheduled inspec ons of material, workmanship, and documenta on throughout the life of the contract. If the Government determines there is a problem with quality, then they will submit a wri en no fica on to the Contractor and they shall respond to each iden fied problem within ten day(s) of receiving the no fica on.
1.5.9. Manufacturer Qualifica ons
The Trainer, including sub-system components manufactured by vendors, shall be designed and manufactured by a company with experience in designing CMAA-70 compliant equipment and can meet the requirements of this specifica on.
Contract Number Section 1 - General 26
1.5.10. Welding
Welders shall be qualified per AWS D14.1 sec on 9 (SUBMITTAL REQUIRED). Welded or fabricated items (not including commercially purchased components) shall be per AWS D14.1. Workmanship regarding welds shall be performed per Sec on 7 of AWS D14.1. All weld repairs for primary and secondary welds shall be per sec on 12 of AWS D14.1.
1.5.11. Non-Destruc ve Tes ng (NDT)
The Contractor shall provide a cer ficate with qualifica on data showing that the inspector performing NDT on the Trainer is qualified as a level 2 examiner per ASNT-SNT-TC-1A (SUBMITTAL REQUIRED).
All NDT performed per 1.5.11.1 Visual Examina on, shall be fully documented, and submi ed to the Government (SUBMITTAL REQUIRED). At a minimum, the test document shall provide the acceptance criteria used, iden fica on of the weld or component that was tested, test results, and the individual who performed the test/inspec on.
1.5.11.1. Visual Examina on:
All welds shall undergo a visual examina on. Acceptance criteria for a Visual Examina on shall be per sec on 7, 10.6, and 10.7 of AWS D14.1 and any other applicable standards included in these sec ons.
1.5.12. Cybersecurity Cer ficates
The Contractor shall provide a declara on that public domain so ware (e.g., freeware, shareware) is not used in the system (SUBMITTAL REQUIRED).
The Contractor shall provide a cer ficate sta ng that all so ware and services that are not required for opera on and/or maintenance of the product have been removed (SUBMITTAL REQUIRED). If removal is not technically feasible, then the contractor shall take ac on to disable so ware not required for the opera on and/or maintenance of the product, and shall note this on the submi ed cer ficate. Configure the product to allow the ability to re-enable ports and/or services if they are disabled by so ware. The removal of so ware or services shall not impede the primary func on of the product. If so ware that is not required cannot be removed or disabled, document a specific explana on and provide risk mi ga ng recommenda ons and/or specific technical jus fica on. The so ware/service to be removed and/or disabled shall include, but not be limited to:
a. Cameras
b. Games
c. Device drives or product components not procured/delivered
d. Messaging services (e.g. Email, instant messenger, peer-to-peer file sharing, etc.)
e. Source code
f. So ware compilers in worksta ons
g. So ware compilers for programming languages that are not used in the control system
h. Unused networking and communica ons protocols
Contract Number Section 1 - General 27
i. Unused administra ve u li es, diagnos cs, network management, and system management func ons
j. Backups of files, databases, and programs used only during system development
k. All unused data and configura on files
l. Remove and/or disable, through so ware, physical disconnec on, or engineered barriers, all services and/or ports in the procured product not required for normal opera on, emergency opera ons, or troubleshoo ng. This shall include communica on ports and physical input/output ports (e.g., USB docking ports, video ports, and serial ports).
1.5.13. Cybersecurity Closeout Submi als
1.5.13.1. Disabled Ports, Connec ons, and Interfaces (SUBMITTALS REQUIRED)
Provide list of disabled ports, connectors, and interfaces associated to all network capable devices including the engineering worksta on.
Provide disclosure of any known methods for bypassing computer authen ca on in the product, o en referred to as backdoors, and provide wri en documenta on that all such backdoors created have been permanently deleted from the system.
Provide summary documenta on of the procured product's security features and security-focused instruc…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .