A42_119687.pdf

PDF 2 MB Posted

Attached to
A42_2026 SMART SCALE - INTERSECTION IMPROVEMENTS
Solicitation number
IFB-118095
Issued by
Buchanan County, Virginia

About this file

This is a Bid Proposal and Contract document issued by the Virginia Department of Transportation (VDOT) for a highway construction project designated as Order No. A42, Contract ID C0000119687C01. The project involves SMART SCALE intersection improvements on Route 58 in Brunswick County within the Richmond District, spanning from 0.344 miles west of Robinson Ferry Road to 0.133 miles east of Robinson Ferry Road. The work encompasses site clearing and grubbing, drainage installation including storm sewer pipes and associated structures, earthwork (excavation and embankment), erosion control measures, subgrade preparation, aggregate base and subbase courses, asphalt concrete placement in multiple lift types (base, intermediate, and surface), pavement markings, signage, and traffic control maintenance. Bids were submitted electronically through Bidx on May 27, 2026, at 10:00 AM, with a projected completion date of August 6, 2027. The contract requires prequalification of bidders and strict adherence to all specifications, plans, and the Road and Bridge Specifications dated 2020 with 2022 supplements.

The contract is funded through federal aid highway programs (FHWA number STP-012-4(063)) and incorporates mandatory federal Davis-Bacon prevailing wage requirements, equal employment opportunity provisions, and disadvantaged business enterprise (DBE) participation guidelines. Bidders must submit a five percent proposal guaranty bond and comply with all FHWA-1273 required contract provisions including labor standards, non-discrimination, and environmental compliance. The estimated bid total and payment terms are to be determined through competitive bidding, with partial monthly progress payments issued based on work completion percentages. The contractor must maintain a certified Asphalt Field Level II Technician on-site during paving operations, perform required testing and quality control measures, and comply with specialized provisions for materials pricing adjustments related to asphalt, fuel, and steel costs. Additional requirements include submission of certified payrolls electronically, maintenance of traffic throughout construction, and adherence to Virginia's prevailing wage rates and supplemental specifications for various construction materials and methods.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORDER NO.: A42

CONTRACT ID. NO.: C0000119687C01

Form C-6a

Rev. 3-22-05

CNSP (F) 1-9-06

COMMONWEALTH OF VIRGINIA

DEPARTMENT OF TRANSPORTATION

BID PROPOSAL AND CONTRACT

ROUTE NUMBER: 58

FHWA NUMBER: STP-012-4(063)

PROJECT NUMBER: 0058-012-792, C501

COUNTY: BRUNSWICK

DISTRICT: RICHMOND

DESCRIPTION: SMART SCALE - INTERSECTION IMPROVEMENTS

FROM:

TO:

0.344 MI. W. OF ROBINSON FERRY RD.

0.133 MI. E. OF ROBINSON FERRY RD.

DATE BID SUBMITTED: 10:00 AM WEDNESDAY, MAY 27, 2026

Form C-118 Rev. 2-1-24

COMMONWEALTH OF VIRGINIA

NOTICE TO BIDDERS

As a matter of information, the bidder’s attention is directed to the points noted herein. Every point enumerated below is fully covered by proposal documents that describe them in detail. Bidders should check their proposal against all requirements, as strict compliance with all provisions is mandatory.

1. Bids shall be filed electronically through Bidx (https://bidx.com/site/home) at the times designated in the Notice of Advertisement for Bids. For information see (https://cabb.virginiadot.org/)

2. Unless otherwise specified or permitted in the proposal, prices shall be submitted on all items shown in the proposal.

3. Proposals conditioned by proposed alternates, other than those specified or permitted, or by reserving the right to accept or reject an award or to enter into a contract pursuant to an award will not be considered.

4. A bid total shall be shown in each space provided.

5. Bid bonds shall conform to Section 102.07. The bid bond number shall be placed in the appropriate space in your electronic bid. As an alternative you may complete the bottom line of the Form C-24. This form may be mailed or faxed but must be received prior to the opening of the bids.

6. Joint venture proposals shall show the Firm Name of each party and shall be signed by an authorized representative of each Firm. A letter shall be filed with the prequalification office describing responsibility of each firm and the amount of maximum capacity pledge by each firm of a joint venture.

https://bidx.com/site/home http://cabb.virginiadot.org/

Form C-24

Rev. 7-6-05

PROPOSAL GUARANTY

KNOW ALL MEN BY THESE PRESENTS, THAT WE _______________________________________ as principal, and ________________________________________ Surety, are held and firmly bound unto the

Commonwealth of Virginia as obligee, in the amount of FIVE PERCENT OF THE DOLLAR VALUE OF THE

BID, lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally and firmly by these presents.

SIGNED, sealed and dated this Day of , 20

WHEREAS, the above said principal is herewith submitting its proposal for:

PROJECT NUMBER: 0058-012-792, C501

NOW, THEREFORE, the condition of the above obligee is such, that if the aforesaid principal shall be awarded the contract upon said proposal and shall within the time specified in the Specifications after the notice of such award enter into a contract and give bond for the faithful performance of the contract, then this obligation shall be null and void; otherwise to remain in full force and effect and the principal and surety will pay unto the obligee the difference in money between the amount of the bid of the said principal and the amount for which the obligee may legally contract with another party to perform the said work if the latter amount be in excess of the former; but in no event shall the liability exceed the penal sum hereof.

(Principal*) (Surety Company)

By: By:

(Officer, Partner or Owner) (Seal) (Attorney-in-Fact**) (Seal)

(Principal*) (Address)

(Officer, Partner or Owner) (Seal) (Surety Company)

(Principal*) (Attorney-in-Fact**) (Seal)

(Officer, Partner or Owner) (Seal) (Address)

*Note: If the principal is a joint venture, each party thereof must be named and execution made by same hereon. If there is more than one surety to the bid bond, each surety must be named and execution shall be made by same hereon.

Electronic Bid Only: In lieu of completing the above section of the Contract Performance Bond, the Principal shall file an Electronic Bid Bond when bidding electronically. By signing below the Principal is ensuring the identified electronic bid bond has been executed and the Principal and Surety are firmly bound unto the Commonwealth of Virginia under the same conditions of the bid bond as shown above.

Electronic Bid Bond ID# Company/Bidder Name Signature and Title

**Attach copy of Power of Attorney

Form C-48 Rev. 10-03-25

SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION,

AND VENDOR SURVEY FORM (ALL VENDORS)

PROJECT

NO.

0058-012-792, C501

CONTRACT I.D.

NO.

C0000119687C01

FHWA NO. STP-012-4(063)

DATE SUBMITTED

All vendors submitting a bid as a Prime Contractor shall complete and submit with their bids the following information as requested for (1) Subcontractor/Supplier Solicitation, and Utilization, and (2) for Vendor Survey.

The vendor certifies this form accurately represents its solicitation and utilization or non-utilization, as indicated, of the firms listed below for performance of work on this contract. The vendor also certifies he/she has had direct contact with the named firms regarding participation on this project.

Vendor Signature:

Vendor ID No. Title:

Vendor’s Address: ____________________________________

City: __________________

State: __________________ Zip Code: _________

SUBCONTRACTOR/SUPPLIER SOLICITATION AND UTILIZATION (ALL)

VENDOR

NUMBER

NAME OF SUBCONTRACTOR/SUPPLIER TELEPHONE

NUMBER

UTILIZED

(Y/N)

NOTE: ATTACH ADDITIONAL PAGES, IF NECESSARY.

BIDDER MUST SIGN EACH ADDITIONAL SHEET TO CERTIFY ITS CONTENT AND COMPLETION OF FORM.

FEDERAL LAW REQUIRES ALL VENDORS SUBMITTING BIDS OR OFFERS PROVIDE THE INFORMATION

REQUESTED IN THIS FORM.

Form C-48 Rev. 10-03-25

VENDOR SURVEY

WHEN SUBMITTING A BID OR OFFER AS A PRIME CONTRACTOR, THE BIDDER MUST SUBMIT A

VENDOR SURVEY FOR THEMSELVES AND A VENDOR SURVEY FOR EACH SUBCONTRACTOR

AND SUPPLIER WHO SUBMITTED A BID OR QUOTE TO THE BIDDER.

VENDOR’S FULL LEGAL NAME: ________________________________________

VENDOR ID NO.: __________________

ADDRESS: ____________________________________

CITY: ____________________________________

STATE: _______________ ZIP CODE: _________

VENDOR’S YEARS IN BUSINESS: _____________

VENDOR’S ANNUAL GROSS RECEIPTS: ____ $ 0 - 25 million ____ $ 25 - 50 million ____ $ 50 - 75 million ____ More than $75 million

THE UNDERSIGNED, ON BEHALF OF VENDOR IDENTIFIED ABOVE, ACKNOWLEDGES AND CERTIFIES THAT THIS FORM ACCURATELY STATES THE INFORMATION CONTAINED HEREIN TO THE BEST OF VENDOR’S

KNOWLEDGE.

Printed Full Legal Name of Person Signing for Vendor

Signature: ____________________________________________

Form C-7

Rev. 2-2-24

TERMS OF THE PROPOSAL\CONTRACT

SUBMITTED: 10:00 AM WEDNESDAY, MAY 27, 2026

PROJECT NUMBER: 0058-012-792, C501

ROUTE NUMBER: 58

FHWA NUMBER: STP-012-4(063)

DESCRIPTION: SMART SCALE - INTERSECTION IMPROVEMENTS

FROM:

TO:

0.344 MI. W. OF ROBINSON FERRY RD.

0.133 MI. E. OF ROBINSON FERRY RD.

DISTRICT: RICHMOND COUNTY: BRUNSWICK

I/we declare that no other person, firm or corporation is interested in this proposal; that I/we have carefully examined the plans, job specifications, current Road and Bridge specifications, and all other documents pertaining thereto and thoroughly understand the contents thereof; that I/we meet the prequalification requirements for bidding on this proposal;

that I/we understand that the plans and current Road and Bridge specifications, are a part of this proposal; that all of the quantities shown herewith are a part of this proposal; that all the quantities shown herewith are approximate only; that I/we have examined the location of the proposed work and source of supply of materials; and that I/we agree to bind myself/ourselves upon award by the Commonwealth under this proposal to a contract with necessary surety bond to start work according to project specifications, and to complete all work in accordance with the plans, job specifications and current Road and Bridge Specifications within the time limit set forth in the contract.

COMPLETION DATE: AUGUST 6, 2027

BID TOTAL $

Attached is a bond conforming to the requirements of the current Road and Bridge Specifications, it being understood that such bond is to be forfeited as liquidated damages if, upon acceptance of the terms of this proposal, I/we fail to execute the contract and furnish bond as provided in the current Road and Bridge Specifications.

(Names of Individual(S),Firm(S) Or Corporation)

Street Address City State Zip Code Vendor#/Fin#

Print Name Signature Title

In consideration of the commitments made as shown herein, the Commonwealth of Virginia by The Commonwealth Transportation Commissioner agrees to pay for all items of work performed and materials furnished at the unit price(s) and under the conditions set forth in this proposal, in witnessed by the affixing of the name below.

Contract Execution Date By

CHIEF ENGINEER

VIRGINIA DEPARTMENT OF TRANSPORTATION

Virginia Department of Transportation 04/09/2026Date Printed:

Schedule of Items Page: 2

Proposal ID: C0000119687C01 0058-012-792, C501

Order No.: A42

Oversight/State Project No.:

Federal Project No.: STP-012-4(063)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0010 301SD20-0001

CLEARING AND GRUBBING LUMP SUM _________._____LUMP SUM

0020 302SD20-0002

BEDDING MATL. AGGR. NO.

TON

142.000

ATTD

0030 302SD20-0012

ENDWALL GRATE & FRAME

EW-11A

EA

2.000

0040 302SD20-0013

ENDWALL EW-12 EA

2.000

0050 302SD20-0030

18" CONC. PIPE LF

110.000

0060 302SD20-0032

18" STORM SEWER PIPE LF

169.000

0070 302SD20-0041

24" STORM SEWER PIPE LF

26.000

0080 302SD20-0204

24" END SECTION ES-1 OR 2 EA

1.000

0090 302SD20-0446

DROP INLET DI-5 EA

1.000

0100 302SD20-0448

DROP INLET DI-7A EA

1.000

0110 302SD20-0662

MANHOLE MH-1 OR 2 LF

9.800

0120 302SD20-0663

FRAME & COVER MH-1 EA

3.000

0130 303SD20-0001

REGULAR EXCAVATION CY

2,510.000

0140 303SD20-0010

EMBANKMENT CY

1,934.000

Schedule of Items Page: 3

Proposal ID: C0000119687C01 0058-012-792, C501

Order No.: A42

Oversight/State Project No.:

Federal Project No.: STP-012-4(063)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0150 303SD20-0021

TEMPORARY DIVERSION

DIKE

LF

100.000

0160 303SD20-0022

CHECK DAM ROCK TY. I EA

2.000

0170 303SD20-0023

CHECK DAM ROCK TY. II EA

25.000

0180 303SD20-0024

CHECK DAM SEDIMENT

RETENTION ROLL 18"

EA

7.000

0190 303SD20-0029

SILTATION CONTROL

EXCAVATION

CY

392.520

0200 303SD20-0030

INLET PROTECTION TYPE A EA

4.000

0210 303SD20-0034

TEMP. SILT FENCE TYPE A LF

1,840.000

0220 305SD20-0005

SELECT MATL. TY. I MIN. CBR-

TON

1,648.000

0230 305SD20-0009

GEOTEXTILE SUBGRADE

STAB.

SY

497.000

0240 308SD20-0012

AGGR. BASE MATL. TY. I NO.

21B

TON

2,396.000

0250 315SD20-0003

ASPHALT CONCRETE TY. SM-

12.5E CONST

TON

1,241.000

0260 315SD20-0006

ASPHALT CONCRETE TY. IM-

19.0E CONST

TON

578.000

0270 315SD20-0010

ASPHALT CONCRETE BM-25.0 TON

963.000

Schedule of Items Page: 4

Proposal ID: C0000119687C01 0058-012-792, C501

Order No.: A42

Oversight/State Project No.:

Federal Project No.: STP-012-4(063)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0280 315SD20-0104

SAW-CUT ASPHALT

CONCRETE (FULL DEPTH)

LF

2,657.000

0290 414SD20-0001

EROSION CTRL. STONE CL.

A1, EC-1

TON

10.500

0300 414SD20-0003

EROSION CTRL. STONE CL. I,

EC-1

TON

19.500

0310 501SD20-0004

UNDERDRAIN UD-4 LF

1,612.000

0320 501SD20-0009

OUTLET PIPE LF

114.000

0330 502SD20-0003

PAVED DITCH PG-2A SY

354.900

0340 502SD20-0014

CURB, STD. CG-3 LF

158.000

0350 502SD20-0015

CURB, RADIAL CG-3 LF

370.000

0360 502SD20-0053

MEDIAN STRIP MS-1 SY

154.000

0370 502SD20-0058

MEDIAN STRIP MS-2 LF

118.000

0380 504SD20-0010

CONCRETE CLASS A-3 MISC

TRUCK APRONS

CY

122.000

0390 505SD20-0009

REMOVE EX. GUARDRAIL

TERMINAL

EA

2.000

0400 505SD20-0073

REMOVE EXISTING

GUARDRAIL

LF

290.000

Schedule of Items Page: 5

Proposal ID: C0000119687C01 0058-012-792, C501

Order No.: A42

Oversight/State Project No.:

Federal Project No.: STP-012-4(063)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0410 508SD20-0004

DEMO. OF PAVEMENT

FLEXIBLE

SY

1,602.000

0420 510SX20-0031

MODIFY EXIST. DROP INLET EA

2.000

0430 512SD20-0013

TYPE 3 BARRICADE 8' EA

11.000

0440 512SD20-0014

TEMPORARY SIGN SF

1,297.000

0450 512SD20-0023

TRUCK MOUNTED

ATTENUATOR

HR

2,272.000

0460 512SD20-0024

GROUP 2 CHANNELIZING

DEVICES

DAY

15,715.000

0470 512SD20-0025

PORT.CHANGEABLE MESS.

SIGN

HR

2,272.000

0480 512SD20-0026

ELECTRONIC ARROW BOARD HR

2,072.000

0490 512SD20-0061

TEMP. PVMT MRKG TY. D, CL.

III, 4"

LF

17,953.000

0500 512SD20-0063

TEMP. PVMT MRKG TY. D, CL.

III, 8"

LF

4,275.000

0510 513SD20-0001

MOBILIZATION LUMP SUM _________._____LUMP SUM

0520 515SD20-0004

FLEXIBLE PAVE.PLANING 0"-

2"

SY

7,771.000

0530 517SD20-0001

CONSTRUCTION SURVEYING

CONSTR.

LUMP SUM _________._____LUMP SUM

Schedule of Items Page: 6

Proposal ID: C0000119687C01 0058-012-792, C501

Order No.: A42

Oversight/State Project No.:

Federal Project No.: STP-012-4(063)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0540 602SD20-0004

TOPSOIL CLASS B CY

290.000

0550 603SD20-0002

TEMPORARY SEED LB

7.000

0560 603SD20-0003

REGULAR SEED LB

194.000

0570 603SD20-0004

OVERSEEDING LB

155.000

0580 603SD20-0005

LEGUME SEED LB

9.000

0590 603SD20-0006

LEGUME OVERSEEDING LB

7.000

0600 603SD20-0014

FERTILIZER NITROGEN - N LB

59.000

0610 603SD20-0015

FERTILIZER PHOSPHOROUS

- P

LB

37.000

0620 603SD20-0016

FERTILIZER POTASSIUM - K LB

37.000

0630 603SD20-0017

LIME TON

2.660

0640 606SD20-0001

ROLLED EROSION CTRL

PRODUCT EC-2 TYPE 1

SY

379.300

0650 700SD20-0003

REMOVE EXISTING 1 POST

SIGN STRUCTURE

EA

13.000

0660 700SD20-0034

SIGN POST STP-1, 2", 14

GAUGE

LF

198.000

Schedule of Items Page: 7

Proposal ID: C0000119687C01 0058-012-792, C501

Order No.: A42

Oversight/State Project No.:

Federal Project No.: STP-012-4(063)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0670 700SD20-0035

SIGN POST STP-1, 2 3/16", 10

GAUGE

LF

48.000

0680 700SD20-0036

SIGN POST STP-1, 2 1/2", 10

GAUGE

LF

128.000

0690 700SD20-0037

SIGN POST STP-1, 2 1/2", 12

GAUGE

LF

209.100

0700 700SD20-0038

CONC. FOUND. STP-1, TY. A EA

35.000

0710 700SD20-0039

CONC. FOUND. STP-1, TY. B EA

10.000

0720 701SD20-0001

SIGN PANEL SF

639.200

0730 704SD20-0006

TYPE B CLASS I PVMT LINE

MRKG 4"

LF

5,994.000

0740 704SD20-0007

TYPE B CLASS I PVMT LINE

MRKG 6"

LF

2,527.000

0750 704SD20-0015

TYPE B CLASS II PVMT LINE

MRKG 24"

LF

89.000

0760 704SD20-0032

INLAID PAVEMENT MARKER

ASPHALT

EA

31.000

ATTD

0770 704SD20-0048

PVMT SYMB MRKG SGL

TURN ARR. TY B CL II

EA

8.000

0780 704SD20-0087

PVMT SYMB MRKG YIELD 2' X

3' TY B, CL II

EA

24.000

Schedule of Items Page: 8

Proposal ID: C0000119687C01 0058-012-792, C501

Order No.: A42

Oversight/State Project No.:

Federal Project No.: STP-012-4(063)

Contractor:

0001 REGULAR BID ITEMSSECTION:

Cat Alt Set ID: Cat Alt Mbr ID:

Bid AmountUnit Price Approximate Quantity and

UnitsDescription

Item ID Proposal

Line Number Dollars Cents Dollars Cents

Spec No.

0790 704SX20-0002

PAVEMENT MARKING U-TURN

ARROW, TY. B, CL. II

EA

4.000

Section: 0001 _________._____Total:

Total Bid: _________._____

Page

Bid Items Eligible For Fuel Adjustment

C0000119687C01

A42

Contract ID:

Order No.:

Instructions: This form shall be completed in accordance with the Special Provision for Optional Adjustment for Fuel. If you choose to have Fuel Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.

FORM C-21B

Rev 12-21-05

0001 REGULAR BID ITEMSSECTION:

ltem Description Fuel Factor gal/unit Option Item

Number

_______BEDDING MATL. AGGR. NO. 57 0.400302SD20-0002

_______REGULAR EXCAVATION 0.290303SD20-0001

_______EMBANKMENT 0.290303SD20-0010

_______SILTATION CONTROL EXCAVATION 0.290303SD20-0029

_______SELECT MATL. TY. I MIN. CBR-30 0.600305SD20-0005

_______AGGR. BASE MATL. TY. I NO. 21B 0.600308SD20-0012

_______ASPHALT CONCRETE TY. SM-12.5E CONST 3.500315SD20-0003

_______ASPHALT CONCRETE TY. IM-19.0E CONST 4.000315SD20-0006

_______ASPHALT CONCRETE BM-25.0 3.500315SD20-0010

_______EROSION CTRL. STONE CL. A1, EC-1 0.600414SD20-0001

_______EROSION CTRL. STONE CL. I, EC-1 0.600414SD20-0003

_______DEMO. OF PAVEMENT FLEXIBLE 0.200508SD20-0004

_______FLEXIBLE PAVE.PLANING 0"-2" 0.071515SD20-0004

Date:

Signature:

(Firm or Corporation)

(Vendor No.)

Bid Items Eligible For Steel Price Adjustment

C0000119687C01

A42

Contract ID:

Order No.:

Instructions: This form shall be completed in accordance with the Special Provision. If you choose to have Steel Price Adjustment applied to any of the items listed below, write the word "Yes" in the "OPTION" column beside the item. The form must be signed, dated, and submitted to the Contract Engineer within the timeframe required in the Special Provision.

Rev 12-21-08

FORM C-21C

0001 REGULAR BID ITEMSSECTION:

ltem Description Option Item

Number

_______SIGN POST STP-1, 2", 14 GAUGE700SD20-0034

_______SIGN POST STP-1, 2 3/16", 10 GAUGE700SD20-0035

_______SIGN POST STP-1, 2 1/2", 10 GAUGE700SD20-0036

_______SIGN POST STP-1, 2 1/2", 12 GAUGE700SD20-0037

Date:

Signature:

(Firm or Corporation)

(Vendor No.)

Bid Items Eligible For Asphalt Adjustment within this Project

C0000119687C01

A42

Contract ID:

Order No.:

0001 REGULAR BID ITEMSSECTION:

ltem Description Item

Number

ASPHALT CONCRETE TY. SM-12.5E CONST315SD20-0003

ASPHALT CONCRETE TY. IM-19.0E CONST315SD20-0006

ASPHALT CONCRETE BM-25.0315SD20-0010

Determination of Major Items

1C0000119687C01Contract ID:

ltem Description Item

Number

ASPHALT CONCRETE TY. SM-12.5E CONST315SD20-0003

REGULAR EXCAVATION303SD20-0001

FORMS and SCHEDULE OF ITEMS PRECEDE SPCNs, SPs and SUPPLEMENTAL SPECS.

*CN100-000026-09 GEN. PROJ. REQUIRE., SSS/SPS/SPCNS 12-11-25 (SPCN) 1

CN103-000100-01 SECTION 103.02—AWARD OF CONTRACT 6-17-25 (SPCN) 1

CN105-000140-00 SECTION 105.14—MAINTENANCE DURING CONST 12-20-24 (SPCN) 2

CN105-000150-00 SECURITY REQUIREMENTS FOR PCMS 1-30-26 (SPCN) 3

CN245-000100-01 SECTION 245.03—TESTING & DOCUMENTATION 1-10-24 (SPCN) 4

CN512-000100-00 TABLE V-1, ADT GROUPS 7-12-16 (SPCN) 5

CN512-000110-00 CONTRACTOR ALT. TRAFF. CONTR. PLANS R-7-12-16 (SPCN) 6

CN704-000200-00 INLAID PAVE. MARKER LOC. AND SPACING 8-11-21 (SPCN) 7

*DRUG-FREE WORKPLACE 7-3-19 (SPCN) 7

CQ107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY 5-11-22 (SPCN) 8

CONTINUOUS PROSECUTION OF WORK R-7-12-16_(SPCN) 9

CQ512-000321-00 CONTRACTOR MAINT. OF TEMP. MARKINGS 6-13-17 (SPCN) 9

BEDDING MATERIAL AGGREGATE NO. 57 5/15/19 (SPCN) 9

SP0F0-000100-00 PREDETERMINED MIN. WAGE RATES R-7-12-16 10

SP0F0-000130-02 FHWA 1273—REQ. PROVISIONS, FED-AID 10-3-23 15

SP0F0-000150-01 AFFIRMATIVE ACTION / EEO NOTICE 7-17-17 43

SP102-000120-00 NON-DISCRIMIN. EMPLOY. & CONTRACT. PRACTICES (EO-61) 1-10-17 49

SP107-000110-00 C-45–SWPPP GEN. PERMIT–CONTRACTOR CERTIFICATION R-10-27-16 50

*SP107-000120-00 ELEC. SUBMISSION OF DBE AND PAYROLLS 1-21/20 51

SP107-001510-05 INTERIM DBE REQUIREMENTS 11-05-25 53

SP107-003100-00 MADE IN THE USA REQUIREMENTS 10-03-25 57

SP108-000100-01 PROG. SCHED. FOR CAT. I PROJECTS 3-21-22 64

*SP109-000100-05 ASPHALT MATERIAL PRICE ADJUSTMENT 7-8-24 79

SP109-000110-00 OPTIONAL ADJUSTMENT FOR FUEL R-7-12-16 81

SP109-000120-01* PRICE ADJUSTMENT FOR STEEL 7-2-19 83

SP109-000130-01 ELECTRONIC OR PRINTED WEIGH TICKETS 3-10-25 88

SP302-000100-00 RESTORING EXISTING PAVEMENT 7-12-16 94

SP512-000310-00 POLICE ASSIST. FOR PAVING OPERATIONS R-7-12-16 96

*SP704-000120-00 INLAID PAVEMENT MARKERS 8-26-19 97

SP801-000100-01 LANE CLOSE COORD (LCC)/LANE CLOSE IMPLEMENT (LCI) 9-20-17 100

SEC. 105.06—SUBCONTRACTING (FEDERAL FUNDED PROJECTS) 2-9-17_(SP) 102

SQ107-001300-00 PREVAILING WAGE RATES 10-12-2023 103

TYPE E ASPHALT CONCRETE MIXTURES FOR RESURFACING PROGRAM 5-25-23 107

SS109-002020-01 SEC. 109—MEASUREMENT AND PAYMENT 5-1-23 110

*SS211-002020-03 SECT 211 – ASPHALT CONCRETE 3-18-24 113

*SS220-002020-01 SEC. 220 – CONCRETE CURING MATERIALS 8-28-20 118

SECTION 223 – STEEL REINFORCEMENT 04/04/2023 119

*SS234-002020-01 SECTION 234 – GLASS BEADS AND RETROREFLECTIVE OPTICS 5-6-22 120

*SS235-002020-01 SECTION 235 – RETROREFLECTORS 5-6-22 121

SS236-002020-01 SECTION 236 – WOOD PRODUCTS 5-14-21 122

*SS246-002020-02 SECTION 246 – PAVEMENT MARKING 5-6-22 126

SS248-002020-02 SECTION 248 – STONE MATRIX ASPHALT CONCRETE 3-18-24 134

*SS305-002020-02 SECTION 305 – SUBGRADE AND SHOULDERS 12-20-23 136

SS308-002020-01 SECTION 308 – SUBBASE COURSE 7-13-21 138

SS309-002020-01 SECTION 309 – AGGREGATE BASE COURSE 7-13-21 139

SS315-002020-05 SECTION 315 – ASPHALT CONCRETE PLACEMENT 5-27-25 140

SS317-002020-01 SECTION 317— SMA CONCRETE PLACEMENT 6-21-24 158

SS318-002020-01 SECTION 318—PAVEMENT INTERLAYERS 8-2-23 160

*SS319-002020-02 SECT 319 – THIN HOT MIX ASPHALT CONCRETE OVERLAY 3-18-24 161

SS321-002020-02 SECTION 321 – TRENCH WIDENING 5-4-23 165

*SS407-002020-02 SEC. 407 – STEEL & METAL STRUCT 11-01-22 167

TABLE OF CONTENTS FOR PROVISIONS

*SS411-002020-01 SEC. 411 – PROT. COAT. OF METAL 11-01-22 169

*SS512-002020-03 SECTION 512 – MAINTAINING TRAFFIC 7-1-22 170

*SS704-002020-02 SECTION 704 – PAVEMENT MARKINGS AND MARKERS 5-6-22 184

PERMITS 190

cn100-000026-09 GENERAL PROJECT REQUIREMENTS, SUPPLEMENTAL SPECIFICATIONS

(SSs), SPECIAL PROVISIONS (SPs) AND SPECIAL PROVISION COPIED NOTES (SPCNs)

This project shall be constructed according to: the Plans; the Virginia Department of Transportation Road and Bridge Specifications, dated 2020 and the Supplement thereto, dated 2022; the Virginia Department of Transportation Road and Bridge Standards, dated 2016, with revisions issued online as of the advertisement date for this project incorporated; the Virginia Work Area Protection Manual, version 11.0; the Virginia MUTCD version 11.0;

and the Supplemental Specifications, Special Provisions and Special Provision Copied Notes in this Contract. The status in the Contract of each of these documents will be according to Section 105.12 of the Specifications.

Special Provision Copied Notes in this Contract are designated with “(SPCN)” after the date.

The information at the top and left of each Special Provision Copied Note in this Contract is file reference information for Department use only. The information in the upper left corner above the title of each Supplemental Specification and Special Provision in this Contract is file reference information for Department use only.

12-11-25 (SPCN)

cn103-000100-01 SECTION 103.02—AWARD OF CONTRACT of the Specifications is replaced in its entirety with the following:

103.02 – Award of Contract

The Board, or the Commissioner as authorized under § 33.2-209 of the Code of Virginia, will award the Contract to the lowest responsive and responsible bidder without discrimination on the grounds of race, color, gender, national origin, status as a military family, or other basis prohibited by law. In the event of a tie bid, the tie will be decided by lot.

The award date will not be later than midnight on the 60th day after the opening of bids. If the Board, or the Commissioner where authorized by law, has not awarded the Contract within this period due to any circumstances not attributable to the bidder, the bidder may withdraw his bid without penalty or prejudice unless the time limit is extended by mutual consent.

After approval for the award of contracts, the Department will provide written notice of award to the successful bidder and will post the Ballots on the Department’s bidding webpage. The Ballot serves as public Notice of Award for a contract. The date of the Notice of Award is the “Approved” date appearing at the top of the Ballot that lists the Contract.

6-17-25 (SPCN)

cn105-000140-00 SECTION 105.14—MAINTENANCE DURING CONSTRUCTION of the Specifications is amended by the following:

Section 105.14(a)3 – Flagging Traffic is replaced with the following:

3. Flagging Traffic: Flaggers shall be able to communicate to the traveling public in English while performing the job duty as a flagger at the flagger station.

All flaggers shall possess a valid, current flagger certification card, be it a physical or electronic card, at all times while performing flagging duties.

Flaggers shall be certified by the VDOT Basic or Intermediate Work Zone Traffic Control Training course or by the ATSSA’s classroom Flagger Certification Program.

The following constitutes a valid flagger certification card:

• Cards issued by VDOT following completion of the Basic Work Zone course;

• Cards issued by VDOT following completion of the Intermediate Work

Zone course;

• Cards issued by ATSSA following completion of a Flagger course;

• Cards issued by VDOT following completion of the Flagger-only course, provided the cards were issued on or before December 31, 2024, and have not yet reached the expiration date (two years after date of issuance).

Flaggers who fail to possess a valid, current, flagger certification card, or refuse to allow inspection of same upon request, shall be removed from the flagging site, and operations requiring flagging shall be suspended by the Engineer. Suspended operations requiring flagging may resume once a certified flagger arrives on-site to perform flagging duties in accordance with applicable requirements. Flaggers improperly performing duties may be subject to flagger certification revocation at the sole discretion of the Engineer.

12-20-24 (SPCN)

cn105-000150-00 SECURITY REQUIREMENTS FOR PORTABLE CHANGEABLE MESSAGE SIGNS— The Contractor shall secure portable changeable message sign (PCMS) control cabinets with a grade 3 or stronger standard lock at all times unless maintenance is actively being conducted on the sign.

A password shall be required to change the PCMS message. The Contractor shall change the manufacturer's default password for ALL electronic signs. Electronic signs that support the use of complex passwords shall include at least 14 characters consisting of the following criteria:

• At least one special character

• At least one alphabetical character

• At least one numerical character

• A combination of upper-case and lower-case letters

Electronic signs that do not support the use of complex passwords shall be changed using the maximum number of characters and character types permitted by the manufacturer.

Password credentials are prohibited from being stored, displayed, or written on or within the sign. Any QR codes affixed to the sign shall be removed.

For all PCMS with remote or wireless accessibility, the Engineer will authorize remote access prior to this functionality being enabled. Prior to authorization, the Contractor shall update the PCMS to the most recent compatible software and firmware version available from the manufacturer. Following authorization and prior to use, the Contractor shall establish a remote connection to verify that access to the PCMS is password protected.

Electronic signs shall only post approved and documented messages. The Contractor shall log all messages posted with date and times for each public message.

The Contractor has the option for their signs to be connected to the Department’s Operations Technology (OT) network for management by Traffic Operations Center (TOC) staff. By using this method, messages are transmitted and posted by the TOC control room staff with all records and logging managed within the VDOT Advanced Traffic Management System (ATMS). Electronic message signs connected to the OT network shall follow the security requirements described below:

1. All electronic signs connected to the network shall be secured with a digital lock installed on the sign control cabinet.

2. Connected signs shall only be remotely accessible through secure communications that originated from the Department’s OT network.

3. Connected signs shall only be posted with messages from the

Department’s ATMS systems or designated backup systems.

4. Community strings (both public and private strings) shall be changed from default settings.

5. All vendor cloud connections shall be removed from the connected sign.

TOC system administration staff will configure VPN connections exclusively to the Department’s OT network.

6. All connected electronic signs shall adhere to the Cabinet Security

Standards found in the Department’s OT Cybersecurity Program Manual.

1-30-26 (SPCN)

cn245-000100-01 SECTION 245.03—TESTING AND DOCUMENTATION of the Specifications is amended by the following:

Section 245.03(e) – Prefabricated Geocomposite Pavement Underdrain is replaced by the following:

Prefabricated Geocomposite Pavement Underdrain: Prefabricated geocomposite pavement underdrain shall consist of a polymeric drainage core allowing water inflow from both sides, encased in a nonwoven filter fabric envelope having sufficient flexibility to withstand bending and handling without damage. Prefabricated geocomposite pavement underdrain shall conform to the following:

1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the pavement environment and shall have a thickness of not less than 3/4 inch. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.

Physical Properties Test Method Requirements

Compressive strength ASTM D1621, D2412, and D6364

Min. 40 psi at 20% max.

deflection immediately after 24 hrs of specimen conditioning at 0 deg F and at 125 deg F

Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 0.1)

ASTM D4716 Min. 15 gal/min/ft width for 12-in specimen length

2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over both sides of the core. Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.

Section 245.03(f) – Geocomposite Wall Drains is replaced by the following:

Geocomposite Wall Drains: Prefabricated geocomposite wall drain shall consist of a polymeric drainage core with a nonwoven filter fabric (single sided or double sided) having sufficient flexibility to withstand bending and handling without damage.

Geocomposite wall drains shall conform to the following:

1. Core: The drainage core shall be made from an inert, polymeric material resistant to commonly encountered chemicals and substances in the roadway. Outer surfaces shall be smooth to prevent excessive wear of bonded filter fabric.

Physical Property Test Method Requirements

Compressive strength ASTM D1621, D2412, and D6364

Min. 40 psi at 20% max.

deflection immediately after 24 hrs of specimen conditioning at 0 degree F and at 125 degree F

Physical Property Test Method Requirements

Water flow rate (after 100 hr at 10 psi normal confining pressure and gradient of no more than 1.0)

ASTM D4716 Min. 15 gal/min/ft width (for 12-in specimen length)

2. Filter Fabric: Geotextile shall be bonded to and tightly stretched over the core.

Geotextile shall not sag or block the flow channels, shall have a life equivalent to that of the core material, and shall conform to the requirements of Section 245.03(c) of the Specifications.

Section 245.03(g) – Geomembrane Moisture Barrier is replaced by the following:

Geomembrane Moisture Barrier: Geomembrane moisture barrier shall be resistant to biological attack. Geomembrane shall be constructed of PVC and shall conform to the requirements of ASTM D7176 for PVC 30 or higher grades. In addition, geomembrane shall comply with the requirements of ASTM D7408 for bond seam strength and peel strength.

1-10-24 (SPCN)

cn512-000100-00 TABLE V-1, ADT GROUPS — The Specifications are amended to include the following table:

TABLE V-1

Average Daily Traffic (ADT) Groups

Traffic Group ADT Traffic Group ADT

I 0-9 X 2,000-2,999

II 10-24 XI 3,000-3,999

III 25-49 XII 4,000-4,999

IV 50-99 XIII 5,000-5,999

V 100-249 XIV 6,000-9,999

VI 250-399 XV 10,000-14,999

VII 400-749 XVI 15,000-19,999

VIII 750-999 XVII 20,000-29,999

IX 1,000-1,999 XVIII 30,000-39,999

XIX 40,000 & over

7-12-16 (SPCN)

https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000100-00.docx cn512-000110-00 CONTRACTOR PROPOSED ALTERNATIVE TRAFFIC CONTROL PLANS —

The Contractor may prepare his own Contractor Alternative Traffic Control Plan (CATCP) as an alternative to that shown in the Contract. This alternative plan must be prepared in conformance with the requirements of AASHTO; the latest approved editions of the Manual of Uniform Traffic Control Devices (MUTCD) and the Virginia Work Area Protection Manual. The Contractor must provide, as part of this alternative plan, information and explanations consistent with, and to the same level of detail, as the project-specific Traffic Control plans in the Contract prepared by VDOT or its consultants. The alternative plan must clearly demonstrate coordination with the Contractor’s overall, comprehensive plan for prosecuting the work, through its various phases or stages of construction and sequencing. The plan must be supported by a detailed transportation network traffic operations analysis, consistent with the complexity of the project, using a methodology or computer software program approved by the Department. This analysis must satisfactorily demonstrate the operating conditions of the network, and particularly, the work zone given expected traffic volumes during the length of the construction schedule.

As a necessary and integral part of the plan, the Contractor shall be responsible for identifying all utilities and right of way that will be impacted by his proposed CATCP, to include but not be limited to: underground utility designations, securing any additional or supplemental permissions or permits required to construct the project and preparing all analyses, plans, summaries, specifications, special provisions, etc., necessary to secure approvals to construct the project according to his alternative plan. The analyses, plans, summaries, specifications, and special provisions shall be directly prepared by or prepared under the supervision of a Professional Engineer registered to practice civil engineering in the Commonwealth of Virginia who is trained and\or certified in traffic control analysis and design. All such documents shall be signed and sealed by the Professional Engineer.

The Department reserves the right to accept or reject any CATCP developed under the provisions of this specification. The Contractor must obtain the Engineer’s written approval before beginning any work using a Contractor Alternative Traffic Control Plan for Maintenance of Traffic. The Engineer’s written approval is required for all modifications to the accepted Contractor Alternative Traffic Control Plan. The Engineer will permit changes to the CATCP without proper documentation and authorization only in emergency situations where incident management is critical.

The Engineer’s acceptance of the Contractor’s Alternative Traffic Control Plan will not relieve the Contractor of his responsibility for all related project impacts, costs, delays, or damages, whether direct or indirect, resulting from Contractor initiated changes in the design or construction activities from those detailed in the original Contract specifications, design plans, including the Department’s temporary traffic control plans or other Contract Documents and which effect a change in project work different from that shown in the plans, joint project agreements, or other project construction schedules. No additional compensation or extension of time for contract completion will be considered in conjunction with the Contractor’s decision to proceed with use of a Contractor Alternative Traffic Control Plan that is approved by the Engineer.

3-27-08; Reissued 7-12-16 (SPCN) https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/cn512-000110-00.docx cn704-000200-00 INLAID PAVEMENT MARKER LOCATION AND SPACING — The Contractor shall not install markers on existing bridge decks Inlaid Pavement Markers shall be installed on new bridge decks where required by the Plans. Inlaid Pavement Markers shall be placed in relation to pavement joints and cracks as follows:

• In existing Asphalt Concrete pavement, new or existing Hydraulic Cement Concrete pavement, and bridge decks, the edge of the groove shall be at least 2 inches from pavement joints and cracks, ensuring that the finished line of markers is straight in accordance with the tolerance for pavement markings specified in Section 704.03 of the Specifications. Offset from the longitudinal joint shall take precedence over straightness of the line of markers.

• In new Hydraulic Cement Concrete pavement or when installed in conjunction with new latex modified microsurfacing or slurry seal treatments, the edge of the groove shall be 2 inches minimum from the surface course pavement joint and 1 inch maximum off alignment from the corresponding pavement marking line. The finished line of markers shall be straight in accordance with the tolerance for pavement markings specified in Section 704.03 of the Specifications. Straightness of the line of markers and alignment with the corresponding pavement marking line takes precedence over offset from the surface course joint.

8-11-21

DRUG-FREE WORKPLACE– The Contractor shall:

• Provide a Drug-Free Workplace for the Contractor’s employees.

• Post in conspicuous places, available to employees and applicants for employment, a statement notifying employees that the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana is prohibited in the Contractor’s workplace and specifying the actions that will be taken against employees for violations of such prohibition.

• State in all solicitations or advertisements for employees placed by or on behalf of the Contractor that the Contractor maintains a Drug-Free Workplace.

• Include the provisions of the foregoing clauses in every Subcontract or purchase order of over $10,000, so that the provisions will be binding upon each Subcontractor or vendor.

For the purposes of this provision, “Drug-Free Workplace” means a site for the performance of work done in connection with the Contract. The Contractors employees, and those of his Subcontractors, shall be prohibited from engaging in the unlawful manufacture, sale, distribution, dispensation, possession, or use of any controlled substance or marijuana during the performance of the Work.

7-3-19 (SPCN)

https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2020_Standard_Specifications/cn704-000200-00.docx cq107-000150-00 EQUAL EMPLOYMENT OPPORTUNITY

Section 107.14(a)1 – Required by §2.2-4201 and §2.2-4311 of the Code of Virginia is replaced with the following:

1. Required by §2.2-4201 and §2.2-4311 of the Code of Virginia: During the performance of this Contract, the Contractor agrees as follows:

a. The Contractor shall not discriminate against any employee or applicant for employment because of race, religion, color, sex, or national origin, age, disability, or other basis prohibited by state law relating to discrimination in employment, except where religion, sex, or national origin is a bona fide occupational qualification reasonably necessary to the normal operation of the Contractor. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this nondiscrimination clause, including the names of all contracting agencies with which the Contractor has contracts of over $10,000.

b. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that such contractor is an equal opportunity employer. However, notices, advertisements and solicitations placed in accordance with federal law, rule or regulation shall be deemed sufficient for the purpose of meeting the requirements of this chapter.

c. If the Contractor employs more than five employees, the Contractor shall (i) provide annual training on the Contractor's sexual harassment policy to all supervisors and employees providing services in the Commonwealth, except such supervisors or employees that are required to complete sexual harassment training provided by the Department of Human Resource Management, and (ii) post the Contractor's sexual harassment policy in (a) a conspicuous public place in each building located in the Commonwealth that the Contractor owns or leases for business purposes and (b) the Contractor's employee handbook.

The Contractor shall include the provisions of subdivisions a, b, and c in every subcontract or purchase order of over $10,000, so that such provisions shall be binding upon each subcontractor or vendor.

Nothing contained in this chapter shall be deemed to empower any agency to require any contractor to grant preferential treatment to, or discriminate against, any individual or any group because of race, color, religion, sex, or national origin on account of an imbalance that may exist with respect to the total number or percentage of persons of any race, color, religion, sex, or national origin employed by such contractor in comparison with the total number or percentage of persons of such race, color, religion, sex, or national origin in any community or in the Commonwealth.

5-11-22 (SPCN)

CONTINUOUS PROSECUTION OF WORK — The Contractor may schedule and perform work on this contract any time within the fixed time limit set forth in the contract; however, work on each route/section shall be continuously prosecuted once started until completion of that particular route/section.

6-20-06; Reissued 7-12-16_(SPCN)

CONTRACTOR MAINTENANCE OF TEMPORARY MARKINGS – The second, third, and fourth paragraphs of Section 512.03(k)3 of the Specifications will also apply to Sections 512.03(k)1 and 512.03(k)2 of the Specifications.

6-13-17 (SPCN)

BEDDING MATERIAL AGGREGATE NO. 57 shall be open graded and conform to the requirements of

Section 203 of the Specifications. Bedding material aggregate shall be measured in tons and will be paid for at the Contract unit price per ton. This price shall include furnishing, placing, and compacting the aggregate material, and for all materials, labor, tools, equipment, and incidentals necessary to complete the work. Placing aggregate shall be done in accordance with the procedures of Section 302 of the

Specifications, except as modified herein.

Payment will be made under:

Pay Item Pay Unit

Bedding material aggr. No. 57 Ton

5-15-19 (SPCN)

SP0F0-000100-00

Reissued July 12, 2016

PREDETERMINED MINIMUM WAGE RATES

"General Decision Number: VA20260068 01/02/2026

Superseded General Decision Number: VA20250068

State: Virginia

Construction Type: Highway

County: Brunswick County in Virginia.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;

bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;

and other major bridges).

Modification Number Publication Date

0 01/02/2026

SUVA2016-004 07/02/2018

Rates Fringes

CARPENTER, Includes Form Work....$ 17.77 0.96

CEMENT MASON/CONCRETE FINISHER...$ 19.35 0.00

IRONWORKER, REINFORCING..........$ 20.80 0.00

LABORER: Asphalt, Includes

Raker, Shoveler, Spreader and

Distributor......................$ 17.79 0.00

LABORER: Common or General......$ 14.25 0.00

LABORER: Pipelayer..............$ 16.75 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 17.74 0.00

OPERATOR: Broom/Sweeper.........$ 16.15 0.23

OPERATOR: Crane.................$ 26.68 0.00

OPERATOR: Grader/Blade, Includes Finishing...............$ 26.13 0.00

OPERATOR: Loader................$ 18.18 0.00

OPERATOR: Mechanic..............$ 19.15 0.00 https://covgov.sharepoint.com/sites/TM-VDOT-SC-Specifications-External/2016_Standard_Specifications/SP0F0-000100-00.docx

OPERATOR: Milling Machine.......$ 21.13 0.00

OPERATOR: PAVEMENT PLANER.......$ 15.95 0.00

OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 18.10 0.00

OPERATOR: Roller (Finishing)....$ 16.55 0.00

OPERATOR: Roller................$ 16.38 0.00

OPERATOR: TRACTOR (UTILITY).....$ 13.94 0.00

OPERATOR: Asphalt Spreader and Distributor..................$ 17.34 0.00

OPERATOR: Bulldozer, Including Utility................$ 17.66 0.00

PAVEMENT MARKING TRUCK DRIVER....$ 21.40 0.00

TRAFFIC CONTROL: Flagger.......$ 11.99 0.00

TRUCK DRIVER : HEAVY 7CY &

UNDER............................$ 16.69 0.00

TRUCK DRIVER: HEAVY OVER 7

CY...............................$ 17.74 0.00

TRUCK DRIVER: Single & Multi

Axle.............................$ 16.10 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between

January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive

Order 13658 does not apply to contracts subject only to the

Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than

""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007

6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .