This document is a draft Statement of Work (SOW) for the Cloudburst Bridge Replacement project. The work will consist of supplying and constructing a 16' x 50' prefabricated bridge superstructure with concrete grade beam foundations. The existing bridge superstructure will be removed, and the top of the concrete abutments will be cut and removed, with the remainder of the abutments left in place. Both approach roads will be built up to accommodate the over-span. The project site will be closed to the public during construction, and the contractor will be responsible for traffic control measures. The project location is in Mono County, California, approximately 4 miles west of the intersection of US 395 and CA 108. The contractor must submit a Fire Precaution and Response Plan and comply with fire danger rating requirements during construction. The contract start date is June 1, 2024, with 150 calendar days to complete the work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A3_ SOI Cloudburst.xls | XLS spreadsheet | |
| A3_Drawings Cloudburst.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
Section C - Description/Specifications/Statement of Work
Cloudburst Bridge Replacement
1.1 SCOPE OF CONTRACT (see drawings for more detail)
Work will consist of supplying and constructing a 16’ x 50’ prefabricated bridge superstructure with concrete grade beam foundations. The existing bridge superstructure shall be removed, and the top of the concrete abutments shall be cut and removed. The remainder of the abutments will be left in place, and the new bridge will over-span the existing abutment walls in the same location. Both approach roads will be built up to accommodate the over-span.
The project site will be closed to public during construction; see Traffic Control Section below for more detailed information.
See drawings and Schedule of Items for more detailed information.
1.2 PROJECT LOCATION
From the intersection of US 395 and CA 108 in Mono County, CA, travel west on Hwy
108 for approximately four miles. Turn north at the Mountain Warfare Training Center on Forest Service Road (FSR) 32059 for approximately three miles. Turn west on FSR
32062D for approximately 1.5 miles, then turn south on FSR 32062. The bridge is located over Wolf Creek, just south of this intersection at 38.36138° N, 119.55503° W.
1.3 SITE INFORMATION AND LIMITATIONS
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. Construction will occur in and over Wolf Creek. Construction must take place when creek flows are low, and ground is not frozen. In a typical year, work can be completed from August to October.
2. All construction equipment shall be pressure washed before entering National
Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brush-guard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.
3. In general, utilities are not available at the site for construction purposes.
4. The Contractor shall provide temporary toilet facilities at the site during all construction work.
5. Contractor to obtain all necessary construction permits.
1.4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
A. A Traffic Control Plan must be submitted and approved by the contractor to the CO prior to any ground disturbance. FSR 32062 at the intersection FSR 32062D shall be closed to the public during construction, and it will be the responsibility of the contractor to maintain this closure. The informal ford just upstream of the bridge shall be always maintained for vehicle access in case of emergency. Signage and turn-around areas shall be maintained at both ends of the project for the recreating public. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the CO. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
1.5 WORK CAMPS, STAGING AND STORAGE AREAS
Areas for staging operations and storage of materials shall be approved by the CO.
Generally, staging and storage areas shall be located on already disturbed and denuded areas, such as adjacent roads and parking areas. The Contractor must request in writing for approval from the CO to stage work trailers on site.
1.6 INSPECTION OF WORKSITE
A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.7 START DATE
A. June 1, 2024 (no ground disturbance until August 1, 2024)
1.8 CONTRACT TIME
150 calendar days
1.9 SPECIFICATIONS (by reference)
Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made.
A. FP-14, Standard Specifications for Construction of Roads and Bridges on Federal
Highway Projects
B. Forest Service Supplemental Specifications (FSSS) to the FP-14
1.10 FIRE PRECAUTION AND RESPONSE PLAN
A. The contractor shall update and submit, at a minimum, the following as part of the Fire
Precaution and Response Plan.
FIRE PRECAUTION AND RESPONSE PLAN
Holder Name:
Contact Name and Number:
A preconstruction field review is required before commencing operations.
The provisions set forth below outline the channels of responsibility for fire prevention and suppression activities and establish an attack procedure for fires within the project area.
Cooperate with local fire prevention authorities in eliminating hazardous fire conditions and implement the following fire plan under the direction of the project manager.
1. General requirements to be responsible for:
Immediately reporting all fires to the nearest fire suppression agency by calling 911. If a fire is unmanageable, field crews will evacuate. All fires shall be reported to the Sierra Front
Interagency Dispatch Center 775-883-5995, regardless of size and actions taken.
When reporting a fire, provide the following information:
▪ Your Name
▪ Call back telephone number.
▪ Project Name
▪ Location: Legal description (Township, Range, Section or
Latitude/Longitude); and Descriptive location (Reference point)
▪ Fire Information: Including Acres, Rate of Spread and Wind Conditions
a) Notify the Sierra Front Interagency Dispatch Center (775-883-5995) with the scheduled work activities including hours of operation and request that the Fire Duty Officer is notified with this information. Obtain the daily fire danger rating for the project area and follow the required mitigation measures according to the adjective ratings in Section (7) of this document. The website is https://gacc.nifc.gov/gbcc/fuels.php
b) Smoking shall not be permitted, except in a barren area or in an area cleared to mineral soil at least three feet in diameter. All burning tobacco and matches will be completely extinguished and discarded in ash trays, not on the ground.
https://gacc.nifc.gov/gbcc/fuels.php
c) Briefing all employees on the fire precaution plan and associated requirements.
2. Except for motor trucks, truck tractors, buses and passenger vehicles equipped with a maintained muffler, equip all hydro-carbon fueled engines, both stationary and mobile, including off-highway vehicles and motorcycles, and with spark arresters that meet U.S. Forest Service
Standards as specified in the Forest Service Spark Arrester Guide and maintain the spark arresters in good operating condition. The Forest Service Spark Arrester Guides are available at the https://www.fs.fed.us/t-d/programs/fire/spark_arrester_guides/.
3. Equipment service areas, parking areas and gas and oil storage areas shall be located so that there is no flammable material within a radius of at least fifty feet of these areas. Keep work areas clear of flammable material such as oily rags and waste, paper, cartons, and plastic waste and utilize proper containers for material storage.
4. Small mobile or stationary engine sites shall be cleared of flammable material for a radius of at least sixteen feet from the engine.
5. Confine welding and grinding activity to cleared areas having a minimum radius of ten feet measured from the place of welding or grinding.
6. Furnish each piece of equipment with the following:
a) Each truck, personnel vehicle tractor, grader or other heavy equipment with one shovel, one axe or pulaski, and one fully charged fire extinguisher UL rated at 2-A:10-B:C, or larger.
b) Each welder will have one shovel, one fire extinguisher and one back-pack filled with five gallons of water with hand pump.
c) Each gasoline-powered tools such as chain saws, soil augers and rock drills require one shovel and one fully charged chemical pressurized fire extinguisher. The required fire tools shall, at no time, be farther than twenty-six feet from the point of operation of the power tool.
d) Equip each mechanized machine that have hydraulic systems with at least two 4A:80-B:C fire extinguishers, or equivalent for each powered by an internal combustion engine
(chipper, feller/buncher), except tractors and skidders. In addition, concentrations of wood dust and debris shall be removed from such equipment daily.
e) All shovels shall be size "O" or larger and shall be not less than 4 feet in length.
7. The wildland fire danger rating system established by the United States Forest Service is designed to estimate the relative effect of weather on several aspects of fire behavior, such as spread, intensity, and ignition. The combination of these effects makes up the fire danger rating, the severity of which is as follows: Low, Medium, High, Very High, Extreme.
https://www.fs.fed.us/t-d/programs/fire/spark_arrester_guides/
8. When the fire adjective rating is not being generated daily or when the fire adjective rating is
“Low” all the precautions listed above shall be implemented
9. When the fire adjective rating reaches “Moderate” the following precautions shall be taken in addition to the conditions specified above:
Provide water tank truck or trailer on or in proximity to the project area for fire control during all working hours and as specified herein.
a. Equip truck with fire tools (shovel, axe or pulaski’s) to provide for one tool per person, two back-pack 5-gallon water-filled tanks with pumps.
b. In addition to being available at the work site, the truck and operator shall patrol the area of construction for at least 30 minutes after shutdown.
10. When the fire adjective rating reaches "High", the following precautions shall be taken in
Provide water tank truck or trailer on or in proximity to the project area for fire control during all working hours and as specified herein.
a. Equip truck with a three hundred gallons or greater tank of water with a gasoline motor powered pump and one hundred feet of 3/4 inch hose on a reel with a pump capacity of
150 psi or greater.
b. All welding and grinding shall be discontinued except in an enclosed building or within an area cleared of all flammable material for a radius of sixteen feet and must be pre-wet.
c. No welding or grinding, unless it is in an enclosed building during the time designated as
Red Flag Warning. Burning or blasting shall not be permitted. At project access points provide a sign to notify workers of the time the restriction becomes effective.
11. When the fire adjective rating reaches "Very High", the following precautions shall be taken in
a. Chainsaw and mastication operations shall be discontinued after 1:00 PM.
b. All welding and grinding shall be discontinued except in an enclosed building or within an area cleared of all flammable material for a radius of sixteen feet and must be pre-wet for a radius of at least forty feet.
c. All blasting shall be discontinued unless the area has been previously cleared from all flammable materials.
d. Smoking will be permitted only in an enclosed vehicle equipped with an ashtray or in an enclosed building.
e. Except in case of emergency, vehicular travel will be restricted to cleared areas or areas which have been pre-wet and are accessible by pressurized water hose or pressurized water tank.
f. In areas not cleared for a radius of sixteen feet pre-wet the area before beginning operations. Maintain the area in a wet condition and provide one lookout with fire-fighting equipment.
g. During the time designated as Red Flag Warning, no welding or grinding, unless it is in an enclosed building. Burning or blasting shall not be permitted. At project access points provide a sign to notify workers of the time the restriction becomes effective.
12. When the Fire Adjective Rating reaches "Extreme", the following precautions shall be taken in
a. A special written authorization from the District Ranger in consultation with the District
Fire Management Officer must be obtained in advance of any welding, grinding, blasting or cutting metal. All other activities are prohibited.
b. Any work that could start a fire shall require properly equipped fire personnel to be assigned to an operation for the duration of the work to provide for immediate fire response.
c. No welding, blasting or grinding of any kind shall be permitted unless it is in an enclosed building or within an area cleared of all flammable material for a radius of thirty-two feet and must be pre-wet for a radius of at least sixty feet.
d. In areas not cleared for a radius of thirty-two feet pre-wet the area before beginning operations for example but not limited to mastication or mowing. Maintain the area in a wet condition and provide a lookout with fire-fighting equipment.
e. During the time designated as Red Flag Warning, no welding or grinding, unless it is in an enclosed building. At project access points provide a sign to notify workers of the time the restriction becomes effective.
13. Proper vehicle maintenance should be followed including:
• Securing trailer chains, no dragging parts ensuring they do not drag on the ground.
• Check tire pressure, driving on exposed wheel rims will throw sparks.
• Carry a fire extinguisher in your vehicle and be prepared to use it.
• Properly maintain brakes, brakes worn too thin may cause metal to metal contact which can cause a spark.
• Do not drive your vehicle onto dry grass or brush. Hot exhaust pipes and mufflers can start fires that you will not even see until it is too late.
I have reviewed and agree to follow the direction in this Fire Protection Plan.
Date
END OF SECTION C