A3 Justification for Other than Full and Open CompetitionFAR13UnderSAT.pdf
PDF 162 KB Posted
- Attached to
- Band Stage Federal contract opportunity
- Solicitation number
- M0068123Q0072
- Issued by
- United States Marine Corps
About this file
This document is a justification for using other than full and open competition to procure a Wenger StageTek seated riser system and additional Wenger stage components from a single source for the Marine Band San Diego. The stage is needed for the Band's performing mission and must integrate with their existing Wenger stage system to safely hold the entire Band and equipment. Procuring non-Wenger pieces would require structural modifications and customization that could compromise safety and introduce logistical complexities, additional costs, and delays when combining with the current stage setup. The contracting officer certification is dated August 18, 2023.
The related federal contract opportunity is solicitation number M0068123Q0072 for a band stage issued by the United States Marine Corps. The justification cites the need to match the preexisting Wenger components currently in use by Marine Band San Diego to integrate a compatible system without compromising safety or introducing operational issues.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| D1-Encl1 Band Staging Drawing.pdf | ||
| D1 M0068123Q0072 Stage.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Justification for Other than Full and Open Competition – FAR Part 13 Acquisitions under the SAT
V 1.4 (03 October 2022)
MEMORANDUM TO THE FILE
Subj: JUSTIFICATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION
FOR A FAR PART 13 ACQUISITION UNDER THE SIMPLIFIED
ACQUISITION THRESHOLD
I. BACKGROUND:
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement
(or for a portion of the requirement) and the requirement (or portion of the requirement to be sole-sourced) is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE:
The items requested is the Wenger StageTek seated riser system, and additional Wenger stage components. This stage will be used in Marine Band San Diego’s performing mission. The stage must be able to hold the entire Band with its equipment, and work in conjunction with the stage system already in use by the Band.
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION IS BASED ON THE FOLLOWING (select all that apply):
A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):
1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
Controlled by: DON, USMC, I&L HCA
Controlled by: RCO MCI-West
CUI Category(ies): CONREG, PROCURE, SSEL, Limited Dissemination Control: DL ONLY
POC: Sgt Michael McCormick 760-725-8127
2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
3. ___ OTHER REASONS.
B. ___ BRAND NAME
Item required must be a brand name, product, or feature of a product, particular to one manufacturer.
The system shall be brand name in order to match preexisting components currently in operation by Marine Band San Diego. The preexisting components are made by Wenger and have the same construction and safety features as the requested stage system. Other manufacturers do not have compatible systems.
Integrating non-Wenger pieces with our current system would require additional structural modification and customization from the manufacturers. Making these changes to our Wenger system would come at a risk to compromising the safety features and structural components, creating gaps and unlevel surfaces for those utilizing the stage. These systematic variations can introduce logistical complexities, additional costs, and delays when attempting to combine or repair mixed-stage setups.
C. ___URGENT AND COMPELLING.
The supplies or services are of such unusual and compelling urgency that the
Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified:
2. Required delivery date/period of performance:
3. Explanation of why delivery/commencement of services by the date mentioned above is required:
V. CERTIFICATIONS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date
B. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date
Nina Kanoa / 760-725-8127 08/18/2023
File details come from the government source that posted it. Updated .