This document is a Determination that Only One Source is Reasonably Available (FAR Part 13) memorandum for a Marine Corps Depot Maintenance (MDMC) procurement. The document justifies a sole-source acquisition for the Kardex Remstar Power Pick software installation and training within Vertical Lift Modules. Market research indicates Kardex Remstar is the exclusive Original Equipment Manufacturer, and no other compatible software exists for the government-owned modules. The procurement is being processed under the Simplified Acquisition Threshold, with the justification based on the "Brand Name" requirement criteria. The document is signed by technical and contracting personnel, with distribution limited to specific MCFCS, procurement team, and designated personnel.

View the file

Other files

File Type Posted
D1_M6700425Q0050.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//SP-PROCURE//DL ONLY

Determination that Only One Source is Reasonably Available (Including Brand Name) – FAR Part 13 Acquisitions under the SAT

V 1.6 (20 December 2023)

MEMORANDUM TO THE FILE

Subj: DETERMINATION THAT ONLY ONE SOURCE IS REASONABLY

AVAILABLE FOR A FAR PART 13 ACQUISITION UNDER THE SIMPLIFIED

ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement (or portion of the requirement to be sole-sourced) is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

The Marine Corps Depot Maintenance (MDMC) PPA, has a procurement for the installation and training of the Kardex Remstar Power Pick software within the Vertical Lift Modules.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. _ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

2. __ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

3. OTHER REASONS

Controlled by: DON, USMC, J&L HCA Controlled by: MARCORLOGCOM MCFCS CUI Category(ies): PROCURE Limited Dissemination Control: DL ONLY POC: MARCORLOGCOM Contracts Department Limited Dissemination Control DL ONLY

Determination that Only One Source is Reasonably Available (Including Brand Name) – FAR Part 13 Acquisitions under the SAT

B. _X_ BRAND NAME

Item required must be a brand name, product, or feature of a product, particular to one manufacturer.

The inventory warehouse management software to be installed at MDMC PPA is the Kardex Remstar Power Pick Software. Kardex Remstar, Original Equipment Manufacturer, is the only provider of the required software. Market research indicates that no other companies or similar software will be compatible with the Government-owned Vertical Lift Modules.

C. _ URGENT AND COMPELLING. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified:

2. Required delivery date/period of performance:

3. Explanation of why delivery/commencement of services by the date mentioned above is required:

Determination that Only One Source is Reasonably Available (Including Brand Name) – FAR Part 13 Acquisitions under the SAT

CUI//SP-PROCURE//DL ONLY

V 1.6 (20 December 2023)

V. CERTIFICATIONS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

B. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

MARTIN.PATRICIA.D

IANE.1186131831

Digitally signed by

MARTIN.PATRICIA.DIANE.1186131831

Date: 2025.03.17 10:36:22 -04'00'

Determination that Only One Source is Reasonably Available (Including Brand Name) – FAR Part 13 Acquisitions under the SAT

Distribution List for DL ONLY Limited Dissemination Control

MCFCS Personnel

LB Personnel

Procurement Team Personnel (to include but not limited to: Legal, Customers/Requirements Owners, Source Selection Personnel, Small Business Representatives)

Any other individual designated by the KO

2025-04-08T07:19:32-0400
RADI.MATTHEW.SCOTT.1284456935
Name Printed Phone: GySgt Matthew S. Radi / 229-639-8183