A3 AF66 Schedule of Material Submittals 20240417.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- Repair West Base Backflow Preventer
- Solicitation number
- W50S8K24QJB01
About this file
This document is a Schedule of Material Submittals for a federal contract opportunity to repair the West Base Backflow Preventer at Jefferson Barracks Air National Guard Station. The contract number is W50S8K24QJB01.
The key requirements include furnishing labor, equipment, and tools to replace the existing failed backflow preventer assembly, which is located in a below ground valve pit/vault. The contractor must be a licensed plumber in St. Louis County. Key submittal items include the backflow preventer assembly, proof of plumber licensing, and annual testing and filing of the backflow prevention system. Submission dates are provided, with the backflow preventer assembly due within 14 days of the Notice to Proceed and the plumber licensing documentation due within 10 days of contract award. The contract is being issued by the Department of the Army Missouri Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B7 Pre-Award RFI.xlsx | XLSX spreadsheet | |
| A2 SOW_LTUY242011_20240417.pdf | ||
| B4 WD MO20240001 Mod 4_20240419.pdf | ||
| W50S8K24QJB01 Rpr Backflow Preventer.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER LTUY242011 PROJECT TITLE Repair West Base Backflow Preventer SOLICITATION / CONTRACT NO.
W50S8K24QJB01
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| 1 | Backflow Preventer Assembly | 1 | 1 | 1 | 1 | 1 | 1 | Within 14 days of NTP. | |
| 2 | Proof of Plumber Licensing in St. Louis County | 1 | Within 10 days of contract award. | ||||||
| 3 | BFP Annual Testing and filing - St. Louis County Backflow Prevention Assembly Test Data and Maintence Report Form inidcating system successfully passed. | 1 | See Statement of Work. | ||||||
| 4 | |||||||||
| 5 | |||||||||
| 6 | |||||||||
| 7 | |||||||||
| 8 | |||||||||
| 9 | |||||||||
| 10 | |||||||||
| 11 | |||||||||
| 12 | |||||||||
| 13 | |||||||||
| 14 | |||||||||
| 15 | |||||||||
| 16 | |||||||||
| 17 | |||||||||
| 18 | |||||||||
| 19 | |||||||||
| 20 | |||||||||
| 21 | |||||||||
| 22 | |||||||||
| 23 | |||||||||
| 24 | |||||||||
| Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) |
Sheet1
File details come from the government source that posted it. Updated .