A3 AF66 Schedule of Material Submittals 20240417.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Repair West Base Backflow Preventer
Solicitation number
W50S8K24QJB01
Issued by

About this file

This document is a Schedule of Material Submittals for a federal contract opportunity to repair the West Base Backflow Preventer at Jefferson Barracks Air National Guard Station. The contract number is W50S8K24QJB01.

The key requirements include furnishing labor, equipment, and tools to replace the existing failed backflow preventer assembly, which is located in a below ground valve pit/vault. The contractor must be a licensed plumber in St. Louis County. Key submittal items include the backflow preventer assembly, proof of plumber licensing, and annual testing and filing of the backflow prevention system. Submission dates are provided, with the backflow preventer assembly due within 14 days of the Notice to Proceed and the plumber licensing documentation due within 10 days of contract award. The contract is being issued by the Department of the Army Missouri Army National Guard.

View the file

Other files

File Type Posted
B7 Pre-Award RFI.xlsx XLSX spreadsheet
A2 SOW_LTUY242011_20240417.pdf PDF
B4 WD MO20240001 Mod 4_20240419.pdf PDF
W50S8K24QJB01 Rpr Backflow Preventer.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER LTUY242011 PROJECT TITLE Repair West Base Backflow Preventer SOLICITATION / CONTRACT NO.

W50S8K24QJB01

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

fergusog: Enter any comments pertaining to the submittal

1Backflow Preventer Assembly111111Within 14 days of NTP.
2Proof of Plumber Licensing in St. Louis County1Within 10 days of contract award.
3BFP Annual Testing and filing - St. Louis County Backflow Prevention Assembly Test Data and Maintence Report Form inidcating system successfully passed.1See Statement of Work.
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)

Sheet1

File details come from the government source that posted it. Updated .