Army_STTR_25D_R8.pdf

PDF 678 KB Posted

Attached to
Augmented Reality/Virtual Reality (AR/VR) for Railroad Inspection and Maintenance
Solicitation number
A25D-010
Issued by

About this file

This document is the Department of the Army's Component-Specific Proposal Instructions for the DoD 25.D Small Business Technology Transfer (STTR) Annual Broad Agency Announcement (BAA), Release 8, which supplements the DoD STTR 25.D Program BAA with Army-specific requirements and guidance for small business concerns (SBCs) submitting proposals.

The Army STTR program advertises funding opportunities through monthly topic releases under the DoD Annual BAA process and executes Phase I and Phase II awards through a dedicated SBIR|STTR Contracting Center of Excellence. All proposing SBCs must maintain active registration in the System for Award Management (SAM) and register in the Defense SBIR|STTR Innovation Portal (DSIP), with entity information correlated between the two systems to avoid delays or contract termination. Phase I proposals are limited to $250,000 for a 6-month period, with technical volumes not exceeding 7 pages in searchable PDF format. Required proposal components include a cover sheet, technical volume structured around introduction, Army benefits, technical approach, programmatic potential, and commercial potential sections; a cost volume with detailed labor, material, subcontract, travel, and indirect cost breakdowns; and supporting documents including a non-proprietary work plan (2 pages maximum), intellectual property allocation agreement with research institutions, foreign national information disclosures, and justification for any firm-selected Technical and Business Assistance (TABA) vendor. The Army offers matching funding up to $500,000 for Phase II awardees who obtain commitment of non-SBIR|STTR funding from DoD components, federal agencies, or commercial investors. Proposals are evaluated using the "Valid Evaluation" analytics tool against criteria including introduction clarity, Army benefits alignment and impact, technical feasibility and risk mitigation, programmatic potential with Army customer discovery and transition pathways, commercial potential, and proposal quality. Firms must comply with export control requirements (ITAR/EAR), Controlled Unclassified Information (CUI) handling, and Arms, Ammunition, and Explosives (AA&E) regulations if applicable, including pre-award physical security inspections for facilities handling sensitive conventional AA&E. Awards are made as FAR-based firm-fixed-price contracts tied to measurable milestones, with contract requirements including status reports, scientific and technical reports, start-of-work meetings, periodic review meetings, invention reporting via DD Form 882 within three months of completion, and hardware or data deliverables as specified per topic. The document includes five Phase I topics for Release 8: AR/VR for railroad inspection (A25D-010), emerging materials for cryogenic optical modulation (A25D-011), turn-key micro optical-frequency-comb modules (A25D-012), small innovative mission power sources for ammunition fuzing (A25D-013), and micro displays for augmented reality information overlay (A25D-014). Questions regarding Army component-specific instructions should be directed to usarmy.SBIRSTTR@army.mil at least 15 days prior to solicitation closing, with post-award protests to be submitted to the same email address or mailing address provided at U.S. Army SBIR|STTR Office, 2530 Crystal Drive, Suite 11192, Arlington, Virginia 22202.

View the file

Other files

File Type Posted
A25D-010.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Army - 1

DEPARTMENT OF THE ARMY

DoD 25.D Small Business Technology Transfer (STTR)

Annual Broad Agency Announcement (BAA) Component-Specific Proposal Instructions

Release 8

To the extent possible, all Department of the Army component specific text follows the same numbering as the related sections in the Department of Defense (DoD) STTR 25.D Program BAA. Supplemental numbering is used only when the text cannot be integrated intelligibly with the DoD STTR 25.D Program BAA counterpart.

Each Small Business Concern (SBC) (also referred to herein as “proposer”, “offeror”, and/or “firm”) is encouraged to thoroughly review the DoD STTR 25.D Program BAA, to include any amendments/revisions, and the Army component-specific proposal instructions herein.

Please note that these instructions contain active hyperlinks. Offerors are encouraged to utilize these hyperlinks for additional information and resources. Ensure your browser or Portable Document Format viewer settings permit hyperlink access to take full advantage of these resources.

The following resources are provided to assist SBCs with STTR Program Opportunities:

• The DoD STTR 25.D Program BAA is located at:

https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations.

• To remain apprised of important programmatic and solicitation changes, SBCs should register for the Defense Small Business Innovative Research (SBIR)|STTR Innovation Portal (DSIP) Listserv at: https://www.dodsbirsttr.mil/submissions/login.

• Department of the Army’s SBIR|STTR Website: https://www.armysbir.army.mil/.

https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations https://www.dodsbirsttr.mil/submissions/login https://www.armysbir.army.mil/

Army - 2

Table of Contents

1.0 PROGRAM DESCRIPTION 3

1.1 Objectives and Context 3

1.4 Eligibility and Performance Requirements 3

1.7 Program on Innovation Open Topics 3

1.8 Discretionary Technical and Business Assistance (TABA) 3

1.9 Department of the Army Phase II Enhancement Policy 4

1.9.1 Overview 4

1.9.2 Application Process 4

1.9.3 Limitations 5

2.0 CERTIFICATIONS AND REGISTRATIONS 5

2.1 System for Award Management (SAM) Registration 5

2.3 Defense SBIR|STTR Innovation Portal (DSIP) Registration 6

2.4 Required Certifications 6

3.0 PROPOSAL PREPARATION INSTRUCTIONS AND REQUIREMENTS 6

3.2 Export-Controlled Topic Requirements 6

3.7 Phase I Proposal Instructions 7

3.8 Phase II Proposal Information 14

3.9 Controlled Unclassified Information (CUI) 14

3.10 Arms, Ammunition, and Explosives (AA&E) 14

4.0 METHOD OF SELECTION AND EVALUATION CRITERIA 16

4.1 Evaluation Process 16

4.1.1 Initial Screening 16

4.1.2 Technical Evaluation 16

4.1.3 Selection 17

4.1.4 Other Assessment Considerations 17

4.1.5 Potential Contract Award 18

4.3 Proposal Status and Feedback 18

4.5 Pre-Award and Post Award BAA Protests 18

5.0 ADDITIONAL CONSIDERATIONS 19

5.1 Award Information 19

5.2 Contract Requirements 19

5.6 Invention Reporting 20

6.0 PROPOSAL SUBMISSION 21

6.3 Contact Information 21

Army - 3

1.0 PROGRAM DESCRIPTION

1.1 Objectives and Context

To capitalize on small business innovation and reduce the time from solicitation to award, the Army leverages an approach that advertises STTR funding opportunities through the DoD Annual BAA process, with monthly topic releases. Additionally, the Army has established a SBIR|STTR Contracting Center of Excellence dedicated to executing all SBIR|STTR Phase I and Phase II awards for Army customers.

1.4 Eligibility and Performance Requirements

Proposing SBCs may refer the DoD STTR 25.D Program BAA, to include any amendments/revisions, for full eligibility requirements.

Furthermore, firms must not be debarred, suspended, proposed for debarment, or excluded from Government contracting within the System for Award Management (SAM) –

• Contractors debarred, suspended, or proposed for debarment are excluded from receiving an award. Contractors that are debarred, suspended, or proposed for debarment are also excluded from conducting business with the Government as agents or representatives of other contractors.

• Contractors and other entities that have an active exclusion record in SAM because they have been declared ineligible on the basis of statutory or other regulatory procedures are excluded from receiving an award under the conditions and for the period set forth in the statute or regulation.

• The Army SBIR|STTR Program will not consent to subcontracts with these contractors.

1.7 Program on Innovation Open Topics

This release may contain an open topic. Proposing SBCs shall refer the DoD STTR 25.D Program BAA, to include any amendments/revisions, for additional information regarding open topic submissions.

1.8 Discretionary Technical and Business Assistance (TABA)

The Army's SBIR and STTR Policy Directive, Section 9(b), authorizes the provision of Technical Assistance and Business Assistance (TABA) to awardees. TABA aims to support awardees in several key areas, including making informed technical decisions, overcoming technical challenges, mitigating technical risks, and facilitating the commercialization of their SBIR|STTR projects. While participation in the Army SBIR|STTR TABA program is voluntary, the Army encourages awardees to utilize its preferred vendor, FedTech, for these services. Instructions to complete the Army's preferred vendor application will be provided upon contract award.

Alternatively, proposing SBCs may choose to contract TABA services themselves through one or more providers. To do so, the SBC must explicitly state in its Army SBIR|STTR proposal its intention to use a different TABA provider. The cost of TABA services, not exceeding the resource limitations specified below, must be included in the Cost Volume (Volume 3) of the proposal. This amount cannot include any profit/fee for the proposing SBC. Additionally, TABA costs cannot be factored into the calculation of general and administrative expenses (G&A) for the proposing SBC. The required justification for using a firm-selected TABA vendor must be provided in Supporting Documentation (Volume 5), following the instructions outlined in that section.

The Army SBIR program sponsors participation in the TABA program. The resource limitations for each firm is as follows:

Army - 4

Phase I Firms:

• Army-Preferred Vendor: If approved, the contractor may receive up to $6,500 for assistance services per project (in addition to the maximum award funding guideline limitation specified in the respective SBIR|STTR Topic). The Army’s preferred provider currently offers the following TABA services for Phase I awardees:

o Commercial Pitch Deck Review o Commercialization Strategy Review

• Firm-Selected Vendor: If approved, the contractor may receive up to $6,500 in contract obligations per project (this amount must be included as part of the maximum award funding guideline limitation specified in the respective SBIR|STTR Topic). Firm-Selected Vendor TABA funding will be denied if the offeror fails to include the cost in the Phase I proposal.

Phase II Firms:

• Army-Preferred Vendor: If approved, the contractor may receive up to $50,000 for assistance services per project (in addition to the maximum award funding guideline limitation specified in the respective SBIR|STTR Topic). The Army’s preferred provider currently offers the following TABA services for Phase II awardees:

o Customized market research and strategy o IP support o Cybersecurity Maturity Model Certification (CMMC) compliance o Defense Contract Audit Agency (DCAA) compliance o Communications and Marketing

• Firm-Selected Vendor: If approved, the contractor may receive up to $50,000 in contract obligations per project (this amount must be included as part of the maximum award funding guideline limitation specified in the respective SBIR|STTR Topic). Firm-Selected Vendor TABA funding will be denied if the offeror fails to include the cost in the Phase II proposal.

For additional resources regarding the Army SBIR Program’s TABA, please refer the following link:

https://www.armysbir.army.mil/taba/

1.9 Department of the Army Phase II Enhancement Policy

1.9.1 Overview

To further encourage the transition of SBIR|STTR research into both DoD acquisition programs as well as the private sector, the Department of the Army may provide a Phase II awardee with up to $500,000.00 in matching STTR funding (on a dollar-for-dollar basis) if the performer obtains commitment of non- SBIR|STTR funding from a DoD component(s), Federal Agency(ies), and/or a commercial investor(s).

Enhancement funding is typically applied to an active Phase II award via a contract modification and will result in an additional period of performance that is commensurate with the total funding received, typically 6 to 18 months (18 months being the maximum). On a case-by-case basis, however, a new Phase II contract may be awarded if appropriate. The proposed Enhancement effort must develop, deliver, and integrate a technology or product into a program within a DoD component(s), Federal Agency(ies), and/or the commercial sector.

1.9.2 Application Process

Enhancement requests should be submitted at least 6 months prior to the end of the Phase II period of performance to allow adequate time to complete the contracting process. Applications to the https://www.armysbir.army.mil/taba/

Army - 5

Enhancement Program will be reviewed for overall merit, transition potential, commercialization strategy, and value to the Army mission and are typically initiated through the Contracting Officer Representative (COR), Technical Point(s) of Contact (TPOC), SBIR|STTR Coordinator, and/or the Army SBIR|STTR Program Office, with oversight and input from the Contracting Officer.

Upon Army SBIR|STTR Program’s Source Selection Authority (SSA) approval to proceed, assigned contracting personnel will prepare and issue a letter request for proposal (RFP), soliciting the firm’s Enhancement proposal.

1.9.3 Limitations

All Enhancement requests are subject to the approval of the Army SBIR|STTR Program’s SSA, successful completion of negotiations, and the availability of funding.

In order to be considered for matching STTR funds under a Phase II Enhancement, the Contracting Officer must receive certified proof of the non-SBIR|STTR funding transfer. Certification consists of a notarized letter, stating that "$ in cash has been transferred to [company name] from [investor name] in accordance with the DA Enhancement Program procedures” that is signed by both the awardee and its investor. The letter must be sent to the Contracting Officer along with a copy of the STTR awardees bank statement showing the funds were deposited. This certification should be received by the Contracting Officer within 45 days of the Enhancement approval notification. Failure of the awardee to certify and provide proof of the Investor’s total cash contribution may significantly delay the Phase II enhancement or result in the awardee becoming ineligible for the Phase II Enhancement.

“Outside investment” must meet DoD Guidelines to qualify for Phase II Enhancement matching funds.

Eligible third-party investors include:

• Non-SBIR|STTR Department of Defense funds

• Any other non-SBIR|STTR federal agency funds

• An SBC other than the eligible/performing SBC

• Venture capital firms

• Individual investors

• A non-SBIR|STTR federal, state, or local government; or

• Any combination thereof

Ineligible sources include:

• The eligible SBC’s internal research and development funds

• Funding in forms other than cash (such as in-kind or other tangible assets)

• Funding from the owners of the eligible SBC, or the family members or affiliates of such owners; or

• Funding attained through loans or other forms of debt obligations

2.0 CERTIFICATIONS AND REGISTRATIONS

2.1 System for Award Management (SAM) Registration

Interested SBCs are required to be registered and active in SAM in accordance with FAR Provision 52.204-7, System for Award Management, when submitting an offer or quotation and at time of award.

Proposals or offers submitted by firms failing to meet this requirement may be deemed unresponsive. For the requirement to maintain SAM registration during performance, and through final payment, interested SBCs may refer to FAR Clause 52.204-13, System for Award Management Maintenance.

https://sam.gov/content/home https://www.acquisition.gov/far/part-52#FAR_52_204_7 https://www.acquisition.gov/far/part-52#FAR_52_204_7 https://www.acquisition.gov/far/part-52#FAR_52_204_13

Army - 6

SBCs may only submit offers using their legal business name or ‘Doing Business As’ (DBA) name, as indicated in the SAM registration for the provided Unique Entity Identifier (UEI). A firm submitting an offer using a DBA name shall have the DBA registered and linked to their current, active, SAM registration. Further, a firm may NOT submit an offer on behalf of another entity. Please refer to section

2.3 below for instructions regarding the correlation between your firm’s DSIP account profile, and the

SAM.

Refer to the Eligibility section above, for information regarding firms (proposing SBC and its subcontractor(s)) who are listed as debarred, suspended, proposed for debarment, or possessing an active exclusion within the SAM.

2.3 Defense SBIR|STTR Innovation Portal (DSIP) Registration

It is the SBCs responsibility to ensure that the firm’s DSIP account profile information correlates to the data found within the firm’s SAM registration. This includes, but is not limited to the following:

• 5-Digit Commercial and Government Entity Code

• 12-Digit UEI

• Legal Business Name

• “Doing Business As” Name

• Physical Address

Failure to correlate the SBCs entity information between the DSIP application and SAM and/or submit required certifications may significantly delay funding agreement award, become grounds for cancellation of the funding agreement, or become grounds for termination of an existing funding agreement.

2.4 Required Certifications

• Under a STTR Phase I contract, the contractor shall submit a STTR Funding Agreement Certification – Life Cycle Certification, certifying as to whether it follows specific program requirements at the time of final payment or disbursement. This form shall be submitted as an attachment in Wide Area Workflow (WAWF), when submitting an invoice for final payment or disbursement on the Phase I contract.

3.0 PROPOSAL PREPARATION INSTRUCTIONS AND REQUIREMENTS

3.2 Export-Controlled Topic Requirements

Export of all unclassified technical data with military or space application in the possession of, or under the control of, a DoD Component information, which includes, in some circumstances, release to foreign nationals within the United States, without first obtaining approval, authorization, or license from the Department of State for items controlled by the International Traffic in Arms Regulations (ITAR), or the Department of Commerce for items controlled by the Export Administration Regulations (EAR), may constitute a violation of law.

Pursuant to Defense Federal Acquisition Regulation Supplement (DFARS) Procedures Guidance and Information 225.7901-2, your firm should direct its attention to the clause at DFARS 252.225-7048, Export-Controlled Items for questions concerning compliance with ITAR/EAR.

Army - 7

Further, in accordance with Department of Defense Directive 5230.25, Withholding of Unclassified Technical Data from Public Disclosure, contractors, or subcontractors that will handle technical data that might have military or space applications, must certify that they will comply with all applicable U.S. laws that control the export of sensitive data, as follows:

If any portion of the proposed STTR effort is subject to ITAR your firm must complete a fully certified DD Form 2345, Military Critical Technical Data Agreement. The DD Form 2345, Military Critical Technical Data Agreement, instructions, and Frequently Asked Questions (FAQs) may be found at the United States/Canada Joint Certification Program (JCP) website, JCP Portal. Failure to complete the DD From 2345 in a timely manner will significantly delay contract award, become grounds for cancellation of the contract action, or become grounds for termination of an existing contract.

If any portion of the proposed STTR effort is subject to EAR, your firm must submit for and obtain the proper export licenses through the Department of Commerce’s Bureau of Industry and Security on-line system, SNAP-R. Failure to obtain the proper export licenses in a timely manner will significantly delay contract award, become grounds for cancellation of the contract action, or become grounds for termination of an existing contract.

Topics under this announcement may be subject to ITAR/EAR and may be identified as such. However, export control compliance statements found in this document are not meant to be all inclusive. They do not remove any liability from the applicant to comply with applicable ITAR or EAR export control restrictions.

3.7 Phase I Proposal Instructions

The following proposal instructions supplement, and in some cases, supersede, those found within the DoD STTR 25.D Program BAA, including any amendments/revisions/appendices.

a. Proposal Cover Sheet (Volume 1) The proposal cover sheet shall follow the instructions and requirements provided in the DoD STTR 25.D Program BAA. The offeror shall certify that to the best of its knowledge and belief, its eligibility information under the STTR Program is accurate, complete, and current as of the date of the offer.

b. Technical Volume Format (Volume 2) Proposals shall adhere to the formatting instructions provided in the DoD STTR Program 25.D BAA, including any amendments/revisions, as supplemented by the technical volume formatting requirements described herein. Information provided in these Service/Component-specific proposal instructions take precedence over any instructions listed in the DoD STTR Program BAA.

Submissions that fail to conform to the technical volume formatting requirements shall be deemed unresponsive.

1. File Type: The Technical Volume shall be a single Adobe Acrobat (supporting Windows 10-11) Portable Document Format (.pdf) searchable text format file, including graphics. PDF files that cannot be opened using Adobe Acrobat products may be rejected by the Government. Perform a virus check before uploading the technical volume file. If a virus is detected, the proposal may be rejected. Do not lock, password protect or encrypt the uploaded file. Do not include or embed https://snapr.bis.doc.gov/snapr/exp/welcome

Army - 8 active graphics, such as videos, moving pictures, or other similar media, in the document.

2. Length: The Technical Volume shall not exceed seven (7) pages including all key sections described in Section 3.7(c), Technical Volume Content, below. SBCs may allocate any portion of the seven (7) page technical volume limit to each of the key sections as desired. It is the proposing SBC’s responsibility to verify that the Technical Volume does not exceed the page limit after upload to DSIP. Any proposals exceeding the page count limit may be deemed unresponsive.

3. Layout: Number all proposal pages consecutively. Submit a direct, concise, and informative research or R&D proposal (no type smaller than 10-point on standard 8-1/2" x 11" paper with one-inch margins, including the header). The header on each page of the technical volume, which may be included in the one-inch margin, should contain the proposing SBC’s name, topic number, and the DSIP assigned proposal number from the cover sheet.

4. General:

• Technical volume MUST be a single Adobe Acrobat PDF file

• Graphics are strongly encouraged to be included throughout the white paper as you see fit.

Ensure they are logical and easy to read. Supporting images should be thoughtful and visually attractive.

• For plots and charts: Include title, caption, axes labels, and be sure to include scale.

• Avoid jargon and define all technical terms

• Use the "Compress Pictures" feature to reduce file size when possible.

c. Technical Volume Content (Volume 2) The following technical volume content instructions supersede those stated in the DoD STTR 25.D Program BAA, including any amendments/revisions/appendices.

Offerors must address the requirements outlined for the Non-Proprietary Work Plan in Supporting Documents (Volume 5). This overview should directly reflect the key elements of the technical approach detailed in this volume, ensuring consistency between both documents.

The Technical Volume shall be structured in the following order:

i. Introduction;

ii. Army Benefits;

iii. Technical Approach;

iv. Programmatic Potential; and

v. Commercial Potential

Each of the key sections align directly with the evaluation rubric, Phase I Evaluation Criteria (Appendix A), ensuring clarity in how proposals will be assessed. The following outlines the specific content expectations for each section of the Technical Volume, as guided by the evaluation criteria in Appendix A. Offerors should ensure their proposals clearly address the key elements identified in the rubric to maximize the proposal’s competitiveness.

i. Introduction: Write a clear, concise description of what your innovation does or will do, and where you are in your evolution. Make clear its intended impact on the Army. Evaluators should "get it" after reading this.

Army - 9

ii. Army Benefits: Briefly describe any identified Army use cases, the solutions’ advantages and potential level of impact and scale of impact the solution would have for the Army. If you are unsure how an Army end-user might benefit from this technology or the scale of impact it could have, please provide an analogous use case to allow the Army evaluators a way to connect the dots using their knowledge of potential Army use cases when evaluating this section. The rubric prompts below are provided to guide you in preparing this section:

• Alignment. Argue your technology innovation is aligned with this Army topic's priorities as defined in the solicitation.

• Solution’s Advantages. Prove your prospective customers will choose you given limited resources and myriad choices. Have you accounted for indirect substitute products as well as direct competitors?

• Solution’s Impact. The Army seeks higher-risk, high-impact solutions through SBIR - not engineering changes or incremental improvements. Use this section to describe your technology's impact and improvement upon the state of the art.

iii. Technical Approach: Provide details and supporting data on how the proposer is going to solve the problem. It shall detail key elements of the firm’s approach, the technical team, and any risks and mitigation plans identified. Use data to substantiate your claims that your technical risk mitigation plans are credible. Show us quality data attributed to reliable, credible sources. The rubric prompts below are provided to guide you in preparing this section:

• Scientific Feasibility. Convince readers that your innovation is built atop sound scientific and/or engineering principles. Ensure that your feasibility argument adequately responds to the requirements this Army topic.

• Enabling Technologies. Do the required enabling technologies introduce added risk?

• Technical Team. Briefly list and describe your core scientific and technical team with an emphasis on their past accomplishments and experiences that would relate to this Army SBIR topic.

• Technical Risk and Mitigation Plans. Describe any technical risks that still exist between you and a fully mature solution and your plans to mitigate those risks.

iv. Programmatic Potential: Outline where your company is today, what will be accomplished under this SBIR effort with Army customer discovery and in identifying the risks and mitigation plans for successfully transitioning beyond SBIR funding into a contract with an Army or integration with an Army system. The rubric prompts below are provided to guide you in preparing this section:

• Project Milestone Schedule. Outline your execution plan. What milestones do you hope to accomplish, and what deliverables if any do you hope to produce during this phase and subsequent phases of the effort.

• Army Customer Discovery and Validation. Argue you are "getting out of the building" to engage in productive customer-discovery with Army stakeholders and describe any customer validation you may have received formally or informally to date on this proposed technology.

• Army Transition Pathways. Describe the next type of deal you aim to make with

Army - 10 the Army following this award. Briefly outline your current plan to unlock that next opportunity and/or share the biggest risks you see post this SBIR award to transition this technology to the Army.

v. Commercialization Potential: Highlight any commercial market for this solution that the

DoD can build upon. Describe your past success and future potential in commercial applications. The rubric prompts below are provided to guide you in preparing this section:

• R&D to Product Revenue. Argue that your team members have transitioned research and development efforts into products successfully, as evidenced by product revenue. (Product revenue is realized by directly selling a solution to solve a problem

vs. selling consulting, services, or research activities.)

• Competitive Edge. Why will you win? A small company needs to have a competitive edge in the marketplace: Something your team does very well that is difficult to match. Some examples may include: well protected intellectual property;

unmatched relevant experience; a novel business model; network effects; etc.

• Other People’s Money. Make the case for the commercial market (non-DoD) potential of your technology from which the Army will benefit.

d. Cost Volume Content (Volume 3) Cost and duration limits are detailed within each topic. With the exception of the instructions provided below, Offerors must comply with all Cost Volume (Volume 3) requirements outlined in the DoD STTR 25.D Program BAA. Note: Options are not anticipated at this time. If an option is identified in the topic posting, costs for the Base and Option shall be separated and clearly identified.

In anticipation of a possible contract award, all proposed costs shall be accompanied by documentation to substantiate how the cost was derived. Failure to include supporting documentation with the proposal may delay any potential contract award, as the proposer will be asked to submit the necessary documentation to the Contracting Officer to substantiate costs. It is important to respond as quickly as possible to the Contracting Officer’s request for documentation.

Failure or refusal to provide documentation may result in dissolution of the contract action.

• DIRECT LABOR:

o List all key personnel by name as well as by number of hours dedicated to the project as direct labor.

o Provide a task-level, time-phased (e.g., annual) breakdown of labor hours, rates, and cost by appropriate Direct Labor category, and explain the basis of estimates.

Include substantiating documentation to support the costs (e.g., payroll reports)

• MATERIAL/TOOLING/EQUIPMENT:

o Provide a consolidated priced summary of individual raw materials, parts, components, assemblies, and services to be produced or performed by others.

For all items proposed, include the item nomenclature, description, part number, quantity, unit price, extended amount, vendor name, basis of estimate, and whether the item is commercial in accordance with the definition in FAR

Army - 11

2.101, based on adequate price competition or non-competitive.

o Proposing firms shall provide substantiating documentation for the cost of all material, tooling, and equipment (e.g. vendor quotes, invoice prices, competitive bids, etc.). If your choice isn’t the lowest cost available, explain the decision to choose one item or supplier over another.

o Ensure all materials are American made to the maximum extent practicable.

Offerors who propose to use a foreign-made product in its technology may be required to find an American-made equivalent.

o While special tooling and test equipment and material cost may be included, it will be carefully reviewed relative to need and appropriateness for the work proposed. The purchase of special tooling and test equipment shall, in the opinion of the Procurement/Government Component Contracting Officer, be advantageous to the Government and should be related directly to the specific topic. These may include such items as innovative instrumentation or automatic test equipment. Title to property furnished by the Government or acquired with Government funds will be vested with the DoD Component, unless it is determined that transfer of title to the contractor would be more cost effective than recovery of the equipment by the DoD Component.

• SUBCONTRACTS:

o Provide data showing the degree of Subcontractor competition and the basis for establishing the source and reasonableness of price through price analysis.

o Provide detailed substantiation of subcontractor costs in your cost proposal.

o Subcontracts with Federal Laboratories - As defined in 15 United States Code (U.S.C.) 3703, Federal Laboratory means any laboratory, any federally funded research and development center, or any center established under 15 U.S.C.

3705 and 3707 that is owned, leased, or otherwise used by a Federal Agency and funded by the Federal Government, whether operated by the Government or by a contractor. A waiver is no longer required for the use of federal laboratories and FFRDCs; however, Offerors must certify their use of such facilities on the Cover Sheet of the proposal. A list of eligible FFRDCs is available at: https://www.nsf.gov/statistics/ffrdclist/ o Offerors shall not propose to subcontract to any prohibited sources, as prescribed at FAR 25.7 – Prohibited Sources, and its supplements. Proposals identifying a subcontractor/vendor arrangement with a prohibited source will be deemed unresponsive.

o Considering the goals of the SBIR|STTR Programs, Offerors shall ensure subcontracts (as defined in Appendix B of the overarching DoD STTR 25.D Program BAA) are with United States SBCs to the maximum extent practicable. Offerors proposing a subcontractor arrangement with other than a United States SBC (such as, a large business, foreign firm, foreign government, educational institution, FFRDC, unit of Federal Government, etc.) may be https://www.nsf.gov/statistics/ffrdclist/

Army - 12 required to submit further explanation.

• TRAVEL:

o Virtual meetings shall be utilized to the maximum extent practicable.

o Explain the basis of proposed travel, including to/from locations, number of trips, number of travelers per trip, and number of days/nights per trip. Include substantiating documentation for the costs (e.g. screenshots of flight cost comparison, rental car quotes, etc.).

o In accordance with FAR 31.205-46 Travel costs incurred shall not exceed the maximum per diem rates set forth in Federal Travel Regulation, Joint Travel Regulation, or standard regulations, unless the travel is special or considered unusual. Any special or unusual travel costs shall be supported with substantiating documentation for review and consideration. Per diem rate lookup can be located at GSA Per Diem.

• INDIRECT COSTS:

o Indicate how you have computed and applied your indirect costs (e.g., overhead, general & administrative, material handling, fringe, etc.), including cost breakdowns. Indicate the rates used and provide an appropriate explanation.

o If a DCAA Audit has been conducted within the last five (5) years, include the audit compliance documentation in the cost proposal documents. The documentation should also include the offeror’s DCAA Point of Contact (if applicable). Further, if applicable Offerors shall provide any current Forward Pricing Rate Agreements in effect at time of proposal submission.

e. Company Commercialization Report (Volume 4) Completion of the Company Commercialization Report (CCR) as Volume 4 of the proposal submission in DSIP is required for prior SBIR|STTR awardees. Please refer to the DoD STTR 25.D Program BAA for full details on this requirement.

f. Supporting Documents (Volume 5) Volume 5 is provided for proposers to submit additional documentation to support the Cover Sheet (Volume 1) and the Technical Volume (Volume 2), and the Cost Volume (Volume 3). A completed proposal submission in DSIP does NOT indicate that the mandatory supporting documents have been uploaded. It is the responsibility of the proposing small business concern to ensure that the mandatory documents listed above have been uploaded and included with the proposal submission.

All proposing SBCs are REQUIRED to submit the following documents to Volume 5:

1. Non-Proprietary Work Plan: This summary, which should be based upon the technical approach discussed in your Technical Volume (Volume 2), is subject to a two (2) page limit and should provide a clear and concise overview of the proposed project's technical objectives, key milestones and their target completion dates, associated key https://www.gsa.gov/travel/plan-book/per-diem-rates?gsaredirect=perdiem.

Army - 13 deliverables, and the anticipated project duration. This information will serve as the basis for publicly releasable information about the project and will serve as the basis for establishing performance requirements within the contract. Therefore, the summary should be written in a manner understandable to a technically literate audience without disclosing sensitive or proprietary information.

2. Allocation of Intellectual Property Rights in STTR Award: As required by paragraph §8(d) of the SBA’s SBIR|STTR Policy Directive (current version), an SBC, before receiving a STTR award, must negotiate a written agreement between the SBC and the partnering Research Institution, allocating Intellectual Property rights and rights, if any, to carry out follow-on research, development, or Commercialization. The SBC must submit this agreement to the awarding agency with the proposal. The SBC must certify in all proposals that the agreement is satisfactory to the SBC. (see Model Agreement for the Allocation of Rights)

All proposing SBCs are required to submit the following documents to Volume 5, if applicable:

3. Verification of Eligibility of Small Business Joint Ventures

4. Assertion of use, release, or disclosure restriction (in accordance with DFARS 252.227- 7017)

5. DD Form 2345, Military Critical Technical Data Agreement – Applicable to actions subject to ITAR

6. Foreign National/Persons Information Identify any foreign citizens or individuals expected to be involved on your project as a direct employee, subcontractor, or consultant. For these individuals, please specify their country of origin, the type of visa or work permit under which they are performing and an explanation of their anticipated level of involvement on this project. Note: You may be asked to provide additional information during proposal evaluation and/or negotiations in order to verify the foreign citizen’s eligibility to participate on a SBIR contract.

7. Justification for SBC-selected TABA vendor In two (2) pages or less, clearly demonstrate the firm-selected TABA provider's unique qualifications and suitability for your project. Provide the TABA vendor's firm name and the point of contact's name, email address, and phone number. Detail the specific reasons this TABA provider is uniquely qualified to address your project's needs, focusing on their relevant expertise, experience, and specialized capabilities. Clearly outline the tasks they will perform, including the purpose and objectives of their assistance in relation to your project goals. Include a cost breakdown with the total cost of TABA services, the number of support hours, and labor rates (an average/blended rate is acceptable). Remember, the TABA provider cannot be your firm or any affiliated entity, and TABA costs must be directly related to their services, excluding indirect costs, profit, or fees passed through by your company.

8. Place of Performance - Ammunition and Explosives - refer to section 3.10 – Arms, Ammunitions and Explosives, Paragraph (f) below)

In addition to the Volume 5 requirements, the Department of the Army may accept the following documents in Volume 5:

9. Cost/Pricing Information https://www.dodsbirsttr.mil/submissions/api/public/download?uploadId=MTM3MjI5Mw==&fileName=STTR_Model_Agreement_for_the_Allocation_of_Rights.pdf&showOnWeb=true https://www.dodsbirsttr.mil/submissions/api/public/download?uploadId=MTM3MjI5Mw==&fileName=STTR_Model_Agreement_for_the_Allocation_of_Rights.pdf&showOnWeb=true https://www.dodsbirsttr.mil/submissions/api/public/download?uploadId=MTM3MjI4Nw==&fileName=Verification_of_Eligibility_of_Small_Business_Joint_Ventures_%5Bpdf%5D.pdf&showOnWeb=true

Army - 14

10. SBIR|STTR Funding Agreement Certification

11. Other (only as specified in the topic)

Please only submit documents that are identified immediately above, and as required by the DoD STTR 25.D Program BAA. All other documents submitted will be disregarded, including but not limited to promotional and non-project related information.

g. Fraud, Waste and Abuse Training (Volume 6) Follow instructions provided in the DoD Program BAA for completion of the Fraud, Waste and Abuse training in DSIP.

h. Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7) SBCs must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission.

Please be aware that the Disclosures of Foreign Affiliations or Relationships to Foreign Countries WILL NOT be accepted as a PDF Supporting Document in Volume 5 of the DSIP proposal submission. Do not upload any previous versions of this form to Volume 5. For additional details, please refer to the DoD STTR 25.D Program BAA.

3.8 Phase II Proposal Information

Phase II proposals may only be submitted by Phase I awardees. Submission of Phase II proposals is not permitted at this time, and if submitted, will be rejected without evaluation. Phase II proposal preparation and submission instructions will be provided via subsequent notification.

3.9 Controlled Unclassified Information (CUI)

Successful firms will be required to comply with CUI DoDI 5200.48. Firms must monitor CUI for aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information. Firms shall report the potential of classification of aggregated or compiled CUI to ASA(ALT) Security Manager. Firms, pursuant to mandatory DoD contract provisions, will submit unclassified DoD information for review and approval for release and approval for release in accordance with the standard DoDI 5230.09. All CUI records must follow the approved mandatory disposition authorities whenever the DoD provides CUI to, or CUI is generated by, non‐DoD entities in accordance with Section 1220‐1236 of Title 36, CFR, Section 3301a of Title 44, U.S.C., DoDI 5200.48.

3.10 Arms, Ammunition, and Explosives (AA&E)

If the proposed statement of work requires the use, development, production, manufacture, purchase, or delivery of Arms, Ammunition and Explosives (AA&E) data and/or hardware, the offeror shall follow the following instructions:

a. References:

1. MIL-STD-1168 - Ammunition Lot Numbering and Ammunition Data Cards

2. DODM 5100.76 - Physical Security of Sensitive Conventional Arms, Ammunition, and

Explosives (AA&E)

3. AR 190-11 - Physical Security of Arms, Ammunition, and Explosives

4. Defense Transportation Regulation 4500.9-R

5. Technical Bulletin (TB) 700-2 https://grants.nih.gov/grants/funding/sbir_forms/SBIR%20Funding%20Agreement%20Certification.pdf

Army - 15

b. The offeror, in its proposal, and resulting contractor, in performance of the work, shall comply with the requirements of the following DFARS provisions/clauses:

1. 252.223-7002, Safety Precautions for Ammunition and Explosives (NOV 2023);

2. 252.223-7003, Change in Place of Performance-Ammunition and Explosives (DEC

1991); and

3. 252.223-7007, Safeguarding Sensitive Conventional Arms, Ammunition, and

Explosives (NOV 2023).

c. The offeror, in its proposal, and resulting contractor, in performance of the work, shall provide proper storage and accountability. These standards are set forth in Department of Defense (DOD) 5100.76-M, entitled "Physical Security of Sensitive Conventional Arms, Ammunition and Explosives".

d. Prior to any contract award, the offeror must first pass a pre-award physical security inspection of its and its subcontractor’s facilities, conducted by Defense Security Service (DSS). See DOD 5100.76-M, Appendix 2, Attachment 1, for a listing of DSS regions. Facilities, including any subcontractor facilities, that do not meet all of the security requirements of DOD 5100.76-M will not be awarded a contract.

e. If the proposed statement of work requires transportation of Sensitive Conventional AA&E, the standards set forth in Defense Transportation Regulation 4500.9-R., Defense Traffic Management, shall be followed.

f. Place of Performance: In accordance with Federal Acquisition Regulation (FAR) provision/clause

52.215-6, Place of Performance (OCT 1997), and DFARS provision/clause 252.223-7003, Change in Place of Performance—Ammunition and Explosives (DEC 1991), the offeror shall include the following information in Volume 5 of its proposal. Failure to include this information in proposals involving AA&E may result in the proposal being deemed unresponsive.

1. The offeror, in the performance of any contract resulting from this solicitation, □ intends, □ does not intend [check applicable block] to use one or more plants or facilities located at a different address from the address of the offeror as indicated in its proposal.

2. If the offeror or respondent checks "intends" in paragraph (a), it shall include the following required information for each and every plant or facility (including subcontractor plants or facilities) located at a different address from the address of the offeror as indicated in its proposal.

i. Firm Name

ii. Place of Performance (Street Address, City, State, County, ZIP Code)

iii. Name and Address of Owner and Operator of the Plant or Facility

g. In accordance with local procedures and DFARS provision/clause 252.223-7007, Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives (NOV 2023), the offeror shall include the following information in Volume 5 of its proposal for itself and for each plant or facility (including subcontractor plants or facilities) that the offeror listed as a “Place of Performance”. The offeror shall include the information to the best of its ability in order to avoid delay in contract award. Do not include locations that will not use, develop, produce, manufacture, purchase, or deliver AA&E in performance of the work.

Army - 16

1. Firm Name

2. Identify if the firm is the prime-contractor or sub-contractor

3. Place of Performance (Street Address, City, State, County, ZIP Code)

4. Unique Entity Identification (UEI) and Cage Code

5. Confirm that address and cage code match the information in SAM.gov (“unknown” is an acceptable response if unable to look up sub-contractors)

6. Full name, phone number, and email address for a point of contact at this location

7. Description of the AA&E and/or work involving AA&E

8. National Stock Number (NSN) of the AA&E (if none exist, indicate “N/A”)

9. Identify the Security Risk Classification (SRC) of the AA&E (Instructions for determining the SRC are found in Enclosure 7 (p. 40 - p.46) of DODM 5100.76) (The SRC can be either I, II, III, IV or U) (“unknown” is an acceptable response if Government input is required to make this determination)

10. Identify the hazard classification (HC) of the AA&E (Instructions for determining the HC are found in Chapter 2 (p.2) of TB 700-2) (“unknown” is an acceptable answer if Government input is required to make this determination)

11. Identify whether the AA&E will be furnished by the Government as Government Furnished Property (GFP) or if it will be developed, produced, manufactured, or purchased by the prime or sub-contractor

4.0 METHOD OF SELECTION AND EVALUATION CRITERIA

4.1 Evaluation Process

4.1.1 Initial Screening

Proposals will only be evaluated in response to an active, corresponding Army topic. Proposals will be initially screened to determine responsiveness, timeliness, and SBC eligibility. Assessment of responsiveness and eligibility may continue during technical evaluation, and after selection. For purposes of this solicitation, these terms are defined as:

Responsiveness: When a proposal fails to meet a material requirement of the solicitation, to include compulsory terms and conditions, the proposal shall be deemed unresponsive.

Timeliness: A Timely Proposal is one that is received by the Government on or before the due date and prior to the established set time.

SBC Eligibility: To be eligible, SBCs must meet all requirements listed in the "Eligibility" section, Title 13 of the Code of Federal Regulations, Section 121.702, and the SBA SBIR|STTR Policy Directive.

4.1.2 Technical Evaluation

Proposals passing the initial screening will receive a technical evaluation using ‘Valid Evaluation,’ a software as a service analytics tool. Each proposal undergoes review by a cadre of evaluators (typically engineers, scientists, and/or program managers). These experts assess proposals against the criteria outlined in the DoD SBIR|STTR Program BAA, with further guidance provided by the Army’s Phase I Valid Evaluation Criteria (Appendix A). These supplemental criteria offer a more detailed breakdown, outlining specific sub-dimensions and elements for consideration..

Army - 17

It is the policy of the Army to ensure equitable and comprehensive proposal evaluations based on the evaluation criteria and to select the source (or sources) whose offer meets the Government's technical, policy, and programmatic goals. Selections for further consideration of possible contract award will be based on a determination of the overall technical merit of each proposal. As a common statement of work does not exist, each proposal is assessed on its own individual merit to determine how well the proposal meets the criteria stated in this BAA and the corresponding opportunity. Proposals will not be evaluated against each other during the evaluation process.

Note: Designated support contractors may review submissions for the purposes of technical evaluation.

All support contractors are bound by appropriate non-disclosure agreements.

4.1.3 Selection

Proposing firms will be notified via email of selection or non-selection status of its Phase I proposal within 90 days of the closing date of the Topic. The notification will be sent to the Corporate Official listed on the proposal cover sheet, from the Army SBIR|STTR Program Office mailbox.

Selected proposals are not guaranteed a contract award. Proposers shall not regard the notification email (selection decision notice) as an authorization to commit or expend funds. Upon selection, proposals are forwarded to a Government Contracting Officer for further evaluation and contract negotiation. A Government Contracting Officer may contact the proposer to discuss and request additional information required for award. This may include representations and certifications, certified or other than certified cost data, and/or other information as applicable to the proposed award. Proposers shall not regard these communications as an authorization to commence work or commit or expend funds.

4.1.4 Other Assessment Considerations

a. Contractor Responsibility: SBCs will be evaluated for responsibility, meaning the prospective SBC meets the standards set forth in FAR 9.104. A prospective contractor must affirmatively demonstrate its responsibility, including, when necessary, the responsibility of its proposed subcontractors.

b. Use of Foreign Nationals/Persons: In considering an SBC’s utilization of foreign national personnel, the Government may withdraw from negotiations based on deleterious findings associated with a firm’s Foreign Disclosure (Volume 7) or matters of national security not limited to: persons tied to foreign countries of concern; foreign influence or ownership; inability to clear the firm or personnel for security clearances; risk associated with Military Critical Technologies;

or other related issues.

c. Management of the STTR Project [STTR only]: The SBC, and not its partnering Research

Institution(s), is to provide satisfactory evidence that it will exercise management direction and control of the performance of the STTR Funding Agreement. Regardless of the proportion of the work or funding allocated to each of the performers under the Funding Agreement, the SBC is to be the primary party with overall responsibility for performance of the project.

d. Fair and Reasonable Price: In accordance with FAR 15.402(a), Contracting officers shall purchase supplies and services from responsible sources at fair and reasonable prices. As a result, Contracting Officials will conduct proposal analysis in accordance with the techniques identified at FAR 13.106-3 and/or 15.404-1. Proposals lacking a fair and reasonable price will be deemed unsuccessful.

https://www.acquisition.gov/far/part-9#FAR_9_104

Army - 18

4.1.5 Potential Contract Award

If at any point the proposal is deemed untimely, unresponsive, or the SBC (or its subcontractors) is deemed ineligible or non-responsible, the proposal will be unsuccessful, meaning the proposal is not one that will result in an award (it is un-awardable). Successful proposals, therefore, are those that have met all stated requirements and qualifications and will receive an award.

Upon an affirmative determination of proposal timeliness, responsiveness, compliance, and price reasonableness, as well as prospective contractor eligibility and responsibility, the Contracting Officer may proceed with an award, subject to the availability of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .