A25-035 JLG Boom Lift Engine Replacement - Item Description - Revised 20241122.pdf
PDF 192 KB Posted
- Attached to
- A25-035 JLG Boom Lift Engine Replacement
- Solicitation number
- FA812525Q0028
About this file
This is an Item Description memorandum from the Department of the Air Force outlining requirements for a JLG Boom Lift Engine Replacement at Tinker Air Force Base. The document is dated November 22, 2024.
The contractor must provide and install one new or remanufactured engine to replace the existing Deutz D2011L03 engine (Serial #10740091) in a JLG 450AJ Series II Boom Lift (Serial #0300139059). The work scope includes removing the old engine, installing the new/remanufactured engine at the contractor's facility, providing transportation of the boom lift from Tinker AFB to the contractor's facility and back, providing core charge pricing with shipping for the old engine core, and performing verification testing. The requirement is being managed by the 76 AMXG (Aircraft Maintenance Group) under solicitation number FA812525Q0028.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS AIR FORCE SUSTAINMENT CENTER (AFMC)
TINKER AIR FORCE BASE OKLAHOMA
22 November 2024
MEMORANDUM FOR RECORD
SUBJECT: Item Description, A25-035 JLG Boom Lift Engine Replacement
1. The 76 AMXG is requesting utilization of funds for a Boom Lift Engine Replacement.
2. The requested equipment item descriptions/specifications are outlined below.
• Contractor shall provide QTY 1, new or remanufactured engine for JLG 450AJ Series II Boom Lift
• Contractor shall remove the old engine Model - Deutz D2011L03 Serial # 10740091 at contractor’s facility.
• Contractor shall install a new/remanufactured engine in the JLG 450AJ Series II Boom Lift serial # 0300139059 at contractor’s facility.
• Contractor shall provide shipping for the boom lift from Tinker to contractor’s facility and back.
• Contractor shall provide Core charge pricing to include shipping of bad core back to the Government at time of quote and should the Government Core be deemed unusable then the Government will exercise the option to provide the Core Charge to the contractor.
• Contractor shall provide performance verification
• Contractor must meet all requirements outlined in accordance with (IAW) this
SOW.
File details come from the government source that posted it. Updated .