A23_131 _ JCFM_PW _ Addendum 1.pdf

PDF 261 KB Posted

Attached to
Jackson County Fleet Maintenance & Public Works Facility Construction manager at Risk (CMAR)
Solicitation number
PE-67800-NONST-2024-000000011
Issued by
Jefferson County, Georgia

About this file

This document is an Addendum to a Request for Proposals (RFP) issued by the Jackson County Board of Commissioners for Construction Manager at Risk (CMAR) services for a new 22,000 square foot Fleet Maintenance & Public Works Facility in Jefferson, Georgia. The addendum provides clarification on the availability of an Excel file for the Exhibit A Worksheet. Proposals for this project must be submitted by 2:00 pm EST on September 6, 2024 at the Jackson County Administrative Building. The contract will be for preconstruction services, and potentially for the subsequent construction of the new facility, at the County's discretion.

The Exhibit A Worksheet provided outlines the maximum allowable general conditions costs for the project, including line items for personnel, field office and site expenses, and insurance. No direct CMAR labor may be billed as Cost of Work without prior written approval from the Owner. The RFP states that the Owner reserves the right to reject any and all proposals and waive technicalities.

View the file

Other files

File Type Posted
JCFM _ CMAR RFP 24_08_01.pdf PDF
A23_131 Jackson County Fleet _ 30_ CONSTRUCT.pdf PDF
Exhibt A Worksheet.xlsx XLSX spreadsheet
JCFM _ CMAR RFP Advertisement 24_08_01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CMAR Services for Fleet Maintenance & Public Works Facility ADDENDUM NO. ONE (1) A24-131 | Addendum No. 1 dated September 3, 2024 Page 1

ADDENDUM NO. ONE (1)

Date: September 3, 2024 Architect’s Project No. A23-131

PROJECT: CMAR Services for Jackson County Fleet Maintenance & Public Works Facility

Client: Jackson County Board of Commissioners

Contract for: Construction Manager at Risk

This Addendum forms a part of the Contract Documents and Construction Drawings and modifies the original Proposal Documents for the above referenced project.

CHANGES TO THE PROPOSAL REQUEST:

A. QUESTIONS / CLARIFICATIONS

Q1: Is Exhibit A available as an Excel file?

A1: An Excel file for the Exhibit A Worksheet is attached.

ATTACHMENT:

Exhibit A Worksheet (Excel File – 1 page)

PLEASE NOTE: Contractors must acknowledge receipt of this Addendum on the Proposal Form.

END OF ADDENDUM NO. ONE (1)

ITEM DURATION UNIT COST TOTAL COST

Project Director 12 Months $ $ Superintendent 12 Months $ $ Assistant Superintendent 12 Months $ $ Senior Project Manager 12 Months $ $ Project Manager/Project Engineer 12 Months $ $ Field Engineering 12 Months $ $ MEP/BIM Coordination 12 Months $ $ In‐House Accounting 12 Months $ $ On Site Safety Engineer 12 Months $ $ Safety Materials Program 12 Months $ $ Field Office Rental, Setup and Removal 12 Months $ $ Storage Trailer Rental 12 Months $ $ Temporary Power 12 Months $ $ Temporary Water 12 Months $ $ Temporary Gas 12 Months $ $ Temporary Toilets 12 Months $ $ Jobsite Dumpsters 12 Months $ $ Temporary Fencing 12 Months $ $ Jobsite Cleaning 12 Months $ $ Job Signs LUMP SUM $ $ Copier, Fax Machine 12 Months $ $ Telephone and Internet Costs and Setup 12 Months $ $ Ice, Cups, Water 12 Months $ $ Office Supplies 12 Months $ $ Office Furniture LUMP SUM $ $ Jobsite Computers and Technology LUMP SUM $ $ Postage and Couriers 12 Months $ $ Progress Photographs 12 Months $ $ Final Photographs LUMP SUM $ $ Plan Printing and Copying LUMP SUM $ $ Cellphones and Radios 12 Months $ $ Supervision Vehicles and Travel 12 Months $ $ Management Vehicles and Travel 12 Months $ $ Gas, Oil and Maintenance 12 Months $ $ Ground Breaking Ceremony LUMP SUM $ $ Ribbon Cutting Ceremony LUMP SUM $ $ Final Cleaning LUMP SUM $ $ Project Closeout LUMP SUM $ $ Builder’s Risk Insurance LUMP SUM (based on $6M) $ $ General Liability & Umbrella Insurance LUMP SUM (based on $6M) $ $ Payment and Performance Bond LUMP SUM (based on $6M) $ $

Total General Conditions Cost -$ Note: No direct CMAR labor may be billed as Cost of Work without prior written approval by the Owner

EXHIBIT A

Jackson County Fleet Maintenance & Public Works Faciity (The Project)

Maximum Allowable General Conditions

Exhibt A Worksheet.pdf
Sheet1

File details come from the government source that posted it. Updated .