REQUEST FOR QUOTATION

PLEASE RETURN TO:

US Army Corps of Engineers

US Army Corps of Engineers Clock Tower Annex Pavement, Sidewalk & Slab Repair

W912EK23Q0028

Attn: Samantha Johanson 1500 Rock Island Drive Rock Island, Illinois 61201 Email: samantha.k.johanson@usace.army.mil

PLEASE INCLUDE THE FOLLOWING INFORMATION:

1. Complete Block 17a on the SF1449 - Enter Name, Address, and Current Phone Number of Person to

Contact Regarding Proposal

2. Complete and sign Blocks 30a, 30b, and 30c on the SF1449

3. Complete Offeror Representations and Certifications (Clause 52.212-3) if your company has not completed the Representations and Certifications located with your company’s SAM record (https://www.sam.gov).

4. Complete and submit the Schedule of Prices and Technical Capabilties per clause 52.212-2. This will be awarded based on price once contractor is found technically acceptable.

5. Please fill out the the below information completely and include this cover page with your offer, along with the above items that need to be filled out.

6. Include the Solicitation Number on the outside of your envelope or as subject line if submitting by email pdf format. It is the responsibility of the offeror to verify that their offer has been received and is legible when using a method other than electronic format to submit an offer.

Contractors must be current in their registration in the System for Award Management (SAM) Database before a Government Contract award can be made.https://www.sam.gov/

Please provide: Taxpayer ID Number: ____________________________ CAGE Code (SAM):_______________________________ Point of Contact: _________________________________ Phone & Email: __________________________________

FOR ADDITIONAL INFORMATION, CONTACT:

Samantha Johanson - Phone: 309-794-5259 or

Email: samantha.k.johanson@usace.army.mil

SEE ADDENDUM

(No Collect Calls)

W912EK23Q0028 18-May-2023

b. TELEPHONE NUMBER

309-794-5259

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 02 Jun 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EK9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

SAMANTHA K JOHANSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D

ROCK ISLAND IL 61201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$45,000,000

NAICS:

237310

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF52

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

CLAUSES INCORPORATED BY FULL TEXT

MVR.03

QUESTION AND ANSWER

via email

Technical inquiries and questions relating to this solicitation are to be submitted to Samantha Johanson at samantha.k.johanson@usace.army.il no later than 25 May 2023 at 12:00 PM CST.

SCOPE OF WORK

PERFORMANCE WORK STATEMENT

Clock Tower Annex Pavement, Sidewalk, and

Slab Repair 1500 Rock Island Drive Rock Island Il. 61201.

PART 1 PROJECT DESCRIPTION

1.1 Summary of Work:

The U.S. Army Corps of Engineers requires services of a Contractor to perform concrete pavement, sidewalk, and slab repair at the Clock Tower Annex, Building

217. The Contractor shall furnish all material, equipment, and labor for removal and installation as shown in the attached drawings and described herein.

1.2 Project Narrative:

The Clock Tower Annex on the Rock Island Arsenal needs upgrades to the east pavement area, sidewall, and slab. The work is required due to trip hazards and deterioration of the existing concrete.

1.3 Objectives:

The project scope of work includes the following: mobilization and demobilization; demolition of concrete pavement, sidewalk, and bike rack slab; stripping and excavation;

compaction of subgrade; placement and compaction of aggregate base; installation of reinforcement; placement of concrete for pavement, sidewalk, and bike rack slab; placement of topsoil and mulch; seeding; turf establishment; and site restoration. Construct project as indicated in the Scope of Work and on the Drawings.

1.4 Bid Schedule:

Description Unit Price Amount

001 - Demolition and Concrete Work Job

002 - Stripping, Excavation, Backfilling, and Placement of Topsoil

003 - Seeding, Turf Establishment, and Site Restoration

TOTAL

CONTRACT: $

PART 2 PERFORMANCE REQUIREMENTS

2.1 Period of Performance:

The contract work shall be completed within Ninety (90) calendar days from Notice to Proceed (NTP).

2.1.2 Hours of Operation:

Business hours are typically Monday thru Friday, 7:00 AM to 5:00 PM. In order to meet period of performance, Contractor may be required to perform work on weekends. Therefore, any work schedule to be performed outside of regular business hours and or on weekends will be coordinated with the Contracting Officer (KO) or the Contracting Officer’s Representative (COR) in writing prior to commencement.

2.1.3 Federal Holidays:

The U.S Army Corps of Engineers offices are closed for the observance of Federal Holidays listed below.

New Year’s Day Labor Day

Martin Luther King’s Day Columbus Day

President’s Day Veterans Day

Memorial Day Th anksgiving Day Juneteenth National Holiday Ch ristmas Day Independence Day This includes any other day designated by Federal statute, by Executive Order or by the President’s proclamation. When a holiday falls on a non-workday, Saturday or Sunday, the holiday is typically observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday).

2.2 Submittals:

The Contractor is required to submit all documents related to the execution of this contract to the KO in accordance with the submittal requirements outlined in section 3.1 Required Submittals, of Part 3 SPECIAL REQUIREMENTS.

2.2.1 Work Submittals:

Documentation required to be submitted to the KO and approved (if required), at any phase of work during which they are completed and ready for review and acceptance.

2.3 Contractor Business Relations:

The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The Contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

2.4 Contractor Administration and Management:

The Contractor shall designate one employee to act as the Project Manager. The Contractor shall submit in writing, name, title, office, and mobile telephone number of the Project Manager. The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The Contractor must maintain continuity between the support operations at the job site and the Contractor's corporate offices. This individual shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this Contract. This Designation of Project Manager shall be submitted within three calendar days of contract award to the Contracting Officer.

The Contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The Contractor shall respond to Government requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The Contractor shall assign work effort while maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.5 Subcontract Management:

The Contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement. The Contractor shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the KO or Contracting Officer Representative

(COR).

2.6 Contractor Personnel:

The Contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The Contractor shall be required to provide personnel with that meet or exceed a combination of qualifications and experience. Personnel requirements can be found in 3.2 PERSONNEL QUALIFICATIONS, of PART 3 SPECIAL REQUIREMENTS. The Contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources.

2.7 Contractor Schedule of Services:

The Contractor shall perform tasks according to a detailed written performance schedule and plan which is to be prepared by the Contractor, submitted, and accepted by the COR ten (10) calendar days prior to commencement of work.

The schedule shall include the date the work is to be initiated and completed as well as the amount of work projected to be completed daily. The schedule shall identify the hours when the Contractor will perform the work. Any modification to the Contractor’s Schedule of Services must be submitted in writing to the KO or COR, for review and approval prior to incorporating any proposed changes.

2.8 Quality Control:

The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is how he assures himself that his work complies with the requirement of the contract.

The Contractor is not required to perform quality control testing on soils, concrete, or other project work unless specifically directed by the Contracting Officer. The Government reserves the right to perform quality assurance testing to evaluate the condition of the project work.

2.9 Quality Assurance:

The government shall evaluate the Contractor’s performance under this contract in accordance with the Performance Requirement Summary (PRS). Additionally, the Government will use a Quality Assurance Surveillance Plan (QASP), in the inspection of the services. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

The Government my perform quality assurance testing to evaluate the condition of the project work.

2.10 Quality Assurance Surveillance Plan:

The Government shall monitor the Contractor's performance under this contract in accordance with the Government's QASP. The QASP for work defined herein is in Appendix A of this contract.

2.11 Government Inspection:

All work to be performed under this contract shall conform to the requirements of this contract and shall be approved by the KO. The presence or absence of Government personnel shall not relieve the Contractor of responsibility for the proper execution of the work in accordance with this contract.

PART 3 SPECIAL REQUIREMENTS

3.1 Required Submittals:

The approving authority for submittals and deliverables rests with the KO and his/her Authorized Representative(s). The Contractor shall be responsible for ensuring that all submittals and deliverables follow the contract requirements. All plans and product data submittals, certificates, and samples required herein must be approved by the KO prior to the start of mobilization on site. Warranties and recycling certification must be submitted at the completion of the work.

3.2 Personnel Requirements:

The Contractor is responsible to employ only competent and satisfactory personnel and provide a sufficient number of employees to perform the required services efficiently. The Contractor shall be responsible for complying with local, state, federal codes, legislation procedures, and regulations affecting work in their professional area.

3.3 Equipment Requirements:

Electrical Equipment - All electrical extension cords shall be properly sized for the equipment load and placed away from vehicular or pedestrian traffic. All connections between the extension cords and related equipment (e.g., tools, machine, or addition extension cords) shall be tightly fastened with no exposed electrical contacts. All extension cords shall have and use proper electrical grounding. Power tools and/or extension cords used in damp areas shall be plugged into a Ground Fault Circuit Interrupter (GFCI) switch to immediately shutdown when a short to ground is detected.

3.4 Open Flame Permit:

The Contractor shall receive a Flame Permit from the Rock Island Arsenal prior to any open flame activities. The contractor shall call the Rock Island Police at 309-794-6116 to schedule the fire department to provide a flame permit.

3.5 Government Furnished Materials:

Cold water and electricity will be provided from existing outlets. Contractor is required to provide restroom facility.

3.6 Warranty:

Furnish workmanship and defective material warranty for the work performed for a period not less than 1 year from the date of Government acceptance of the work;

issued directly to the Government. The Contractor is required to include provisions that if the system shows evidence of workmanship and defective material within the 1-year warranty that the Contractor is required to repair or replace the defective materials and correction of the defective workmanship is the responsibility of the contractor. The contractor will submit Provide 1 year performance warrant to the Contracting Officer as described in section 3.1 Required Submittals.

PART 4 PERFORMANCE REQUIREMENTS

4.1 LOCATION

The repair work area is at Clock Tower Annex (Building 217) on the Rock Island Arsenal address is 1500 Rock Island Drive Rock Island Il 61201. Work will be performed specifically on the east side of the building.

4.2 PART 2 - PRECONSTRUCTION SITE WORK

4.2.1 Access, Work Limits, and Staging:

Coordinate project access, work area limits, the location of the staging area, pedestrian and vehicle detours, closures to building doors, on site water and power supply, and other site logistical issues with the Contracting Officer prior to project construction.

4.2.2 Coordination:

Coordinate with the Contracting Officer for the location of existing utilities prior to the start of project construction.

4.2.3 Erosion Control:

Provide and install erosion socks for erosion control around the indicated four (4) storm sewer inlets and maintain during project construction.

4.3 PART 3 - GENERAL

4.3.1 Submittals:

a. Waste spill contingent plan

b. Aggregate base weight tickets

c. Concrete ready-mix delivery tickets

d. Seed mix

e. Hazardous waste/material documentation

f. Provide 1 year Warranty

4.4. PART 4 - PRODUCTS

4.4.1. Aggregate Base:

Illinois DOT Gradation CA6 or Iowa DOT Gradation 11

4.4.2 Concrete:

Air-entrained ready-mix concrete (5% to 7%) with a compressive (f’c) strength of 4,000 psi. Design slump to be no greater than 4 inches. Water-cement ratio to be no greater than 0.5.

4.4.2. Tie Bars:

Grade 60, #4 deformed steel bars, epoxy coated, 24” long,

4.5. PART 5 - EXECUTION

4.5.1. Demolition: Demolish, excavate, and dispose of existing concrete pavement, sidewalk, slab, and subgrade as indicated on the Drawings. Base and subgrade removal to extend 12” wider than the new concrete width as shown on the Drawings. Stockpile removed base and subgrade materials for reuse as backfill.

Coordinate stockpile locations with the Contracting Officer. Properly dispose of concrete and all other excess waste and soil materials offsite. No soil materials are to be removed from the project site without approval from the Contracting Officer. Coordinate proper disposal with the Contracting Officer.

(i) Remove estimated 67 square yards (SY) of existing 6” concrete pavement plus 6” of existing base and subgrade.

(ii) Remove estimated 298 SY of existing 4” concrete sidewalk plus 6” of existing base and subgrade.

4.5.2. Stripping: Strip 4” of sod and topsoil as indicated on Drawings and properly deliver to the Rock Island Arsenal. Coordinate exact stripping extents and proper disposal location with the Contracting Officer.

4.5.3. Subgrade Preparation: Prepare, compact, and test subgrade as follows and as indicated on the Drawings prior to placement of aggregate base.

(i) Lightly scarify existing subgrade soils and compact soils with a minimum of 3 passes of a wheeled or track-mounted piece of equipment with a ground-contact pressure of at least 5 pounds per square inch (psi). Appropriately sized plate compactors, padfoot rollers, or a similar type of equipment may be used with approval from the Contracting Officer.

(ii) Where soft, wet, or unstable subgrade materials are present, coordinate the repair with the Contracting Officer. Repairs may include scarification, moisture conditioning and re-compaction, removal of unstable material and replacement with aggregate base, or a similar method with approval from the Contracting Officer.

(iii) Test subgrade in the presence of the Contracting Officer. Testing may be performed by proof rolling the subgrade with appropriately sized equipment or by a similar method with approval from the Contracting Officer.

(iv) Finished subgrade is to be compact, smooth, and level to within 1 inch of the design elevation.

4.5.4. Aggregate Base: Place and compact aggregate base as follows and as indicated on the Drawings prior to placement of concrete pavement, sidewalk, and slab.

(i) Aggregate base to be Illinois DOT Gradation CA6 or Iowa DOT Gradation 11. The Contractor shall submit weight tickets.

(ii) Spread aggregate base evenly over the prepared subgrade in a single lift.

(iii) Moisture condition aggregate base material to near its optimum value prior to compaction.

(iv) Compact aggregate base with appropriately sized plate compactors, smooth drum rollers, or by a similar method with approval from the Contracting Officer.

(v) Finished aggregate base to be compact, smooth, and level within ½ inch of the design elevation with thickness to be within ½ inch of the design thickness.

4.5.5. Reinforcement: Install tie bars as indicated on the Drawings. Tie bars to be Grade 60, #4 deformed steel bars, epoxy coated, 24” long, and spaced 30” on center at the mid-depth of concrete as indicated. Use appropriate chairs, wire ties, or other approved methods to properly position and secure the tie bars so that they are parallel to the concrete surface.

4.5.6. Isolation Joints and Tack Coat: Install isolation joint filler and sealant between existing and new concrete and apply tack coat to vertical surfaces of existing asphalt pavement that will abut new concrete as indicated on the Drawings.

4.5.7. Concrete Placement: Place concrete for new pavement, sidewalk, and slab as follows and as indicated on the Drawings. **Contractor must self-perform all concrete flatwork placement, finishing, and curing, as the prime contractor.**

(i) Concrete to be an air-entrained ready-mix concrete (5% to 7%) with a compressive (f’c) strength of 4,000 psi. Design slump to be no greater than 4 inches. Water-cement ratio to be no greater than 0.5.

(ii) Place concrete from the ready-mix truck as close to the placement location as practical or deliver concrete with buggies, wheelbarrows, or a similar type method with approval from the Contracting Officer.

(iii) Do not add water to the concrete at the site without approval from the Contracting Officer.

(iv) Place concrete in hot weather in accordance with ACI 305.1. The temperature of placed concrete is not to exceed 90 degrees F, except where an approved retarder is used. Cool the mixing water and/or aggregates as needed to maintain a satisfactory placing temperature.

In no case is the temperature to exceed 95 degrees F during concrete placement.

(v) Final concrete thickness to be within ½ inch of the design thickness.

(vi) Apply a light broom surface finish and a white pigmented membrane-forming curing compound to the concrete surface in accordance with ASTM C309, Type 2.

(vii) Do not drive any vehicles or equipment on newly placed concrete for at least 28 calendar days after placement. New concrete may be opened to pedestrian traffic only after 7 days if compressive strength test results show the concrete has reached at least 3,000 psi. The Contractor is not required to perform compressive strength tests.

4.5.8. Joints: Saw cut contraction and construction joints with spacing as indicated on

Drawings. Saw cutting of joints is to be completed within 6 to 18 hours after concrete placement, depending on the concrete and weather conditions. Do not saw cut joints prior to the sufficient curing of the concrete to avoid raveling and other damaging effects.

4.5.9. Backer Rod and Sealant: Install backer rod and apply sealant at the joints as indicated on the Drawings. Backer rod to be closed cell polyethylene, compressible, non-shrink material that is 20 to 30% larger in diameter than the nominal width of the joint. Sealant to be in accordance with ASTM C920, Type S or M, Grade P. Sealant color is to match the color of the concrete.

4.5.10. Backfilling and Placement of Topsoil: Backfill along the edges of the new pavement, sidewalk, and slab with stockpiled base and subgrade materials. Place backfill in maximum 4” lifts and compact with equipment approved by the Contracting Officer. Place 3” of commercial supplied topsoil over the stripped and disturbed project areas and compact.

4.5.11. Seeding and Turf Establishment: Prepare topsoil over the stripped and disturbed project areas for hydro-seed in accordance with Illinois Department of

Transportation (ILDOT) Standard Specifications for Road and Bridge Construction (January 1, 2022), Section 250, Seeding. Use Class 1 or 1A Seed Mixture (ILDOT 250.07). Seed to be from a commercial supplier. Water seeded areas as required by temperature and wind conditions to establish turf. Turf establishment will be accepted as satisfactory in accordance with ILDOT, Section 250.07, Table 1, Note 7. Mow seeded areas to limit grass height to no greater than 4 inches and conduct weed control until accepted.

4.5.12. Site Restoration: Conduct site restoration. Site restoration to include the removal of construction equipment and materials from the project site and the restoration of the project site to pre-project or better conditions.

PART 5 ENVIRONMENTAL PROTECTION REQUIREMENTS

5.1 General Environmental Protection Requirements:

Environmental pollution and damage are defined as the presence of chemical, physical, or biological elements or agents that adversely affect human health or welfare; unfavorably alter ecological balances of importance to life; or degrade the environment for aesthetic, cultural or historical purposes. Environmental protection is the prevention and/or control of pollution that develops during execution of this contract. The control of environmental pollution and damage requires consideration of air, water, soil, and land resources; and includes management of visual aesthetics; noise; solid, chemical, and liquid waste; radiant energy and radioactive materials; and other pollutants.

5.2 Permits or Licenses:

The Contractor shall, without additional expenses to the Government, be responsible for obtaining all necessary licenses and permits. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s negligence and shall take proper safety and health precautions to protect the work, the workers, the public and the property of others. In addition, the Contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work.

5.3 Hazardous/Carcinogenic Materials:

The Contractor, its employees, or subcontractors or their employees shall not bring, produce, use, or store on the job site any hazardous or carcinogenic products without prior written approval by the Government. All hazardous and/or carcinogenic waste transported or generated on-site at any Government facility by the Contractor must be properly disposed of off the site by the Contractor as required by law and at no cost to the Government.

The Contractor shall provide the Government with complete and legible copies of all regulatory notices, violations, citations, etc. received by the Contractor that pertain directly or indirectly to the fulfillment of this contract.

5.4 VOC Requirements:

The Contractor shall use on the job site only chemicals and cleaning products which are effective to fulfill the requirements described herein, have the least adverse impact on the environment, that do not exceed the national Volatile Organic Chemical (VOC) limitations rule(s) published by the U.S. Environmental Protection Agency (EPA) and comply with all applicable regulatory requirements.

5.5 Hazardous Waste:

The Contractor shall initiate Hazardous Waste Management training and enforcement programs to ensure employees are aware that the domestic drains and storm drains shall not be used to dispose of gasoline, paint, thinner, solvents, concentrated cleaning agents, and other toxic material.

The Contractor is responsible for collecting, accumulating, recycling, and/or offsite disposal of its hazardous and toxic waste off the Government’s site in compliance with Federal, state, county and local laws governing hazardous waste storage and disposal.

The Contractor shall provide the KO and the COR with documentation of hazardous materials or wastes that are accumulated, handled, generated, or disposed of by the Contractor’s operations. The documentation shall demonstrate the adequacy of the handling and disposal operations used by the Contractor and will demonstrate that the Contractor activities will not result in contamination of Government property. The Contractor shall provide this documentation upon request during periodic environmental inspections of the Contractor’s premises.

The Government shall be copied on all correspondence with regulatory agencies concerning the Contractor’s compliance with environmental regulations.

If the Contractor generates hazardous waste in an amount that makes it subject to state and EPA hazardous waste requirements, the Contractor shall apply for a Hazardous Waste Generator Identification Number. Hazardous waste shall be shipped off the Government site using the Contractor’s Hazardous Waste Generator Identification Number documented on a complete and properly signed Uniform Hazardous Waste Manifest. The Contractor shall be required to submit an Annual Hazardous Waste Report to the State of which the work is completed.

The Contractor shall at the start of the contract, implement a written hazardous waste spill contingent plan listing material used, spill prevention procedures, containment equipment and procedures to be used in the event of spill, personnel protective equipment requirements, notification procedures, in accordance with the Resource Conservation and Recovery Act (RCRA) and the Occupational Safety and Health Administration (OSHA) regulations.

PART 6 SAFETY REQUIREMENTS

6.1 General Safety Requirements:

All work under this contract shall comply with the latest version of the US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and the Occupational Safety and Health Act (OSHA) standards in effect on the date of the solicitation. No separate payment will be made for compliance with EM 385-1-1, nor for compliance with any of the other safety-related requirements.

6.2 Safety Regulatory Compliance:

The Contractor and each of its employees shall comply with all applicable local, state, and federal rules, regulations, and practices.

6.3 Contractor Negligence:

The Contractor shall also be responsible for all injury to persons or damages to property that occurs as a result of the Contractor’s negligence and shall take proper safety and health precautions to protect the work, the workers, the public, and the property of others.

6.4 Responsibility:

The Contractor shall perform all its activities pursuant to this contract in a safe manner. The Contractor shall assume responsibility on the job site for the actions of all its personnel and Subcontractor(s) who are associated with performance on this contract.

6.5 Personal Protective Equipment:

The Contractor shall provide and ensure that all its personnel at the job site properly wear all applicable safety devices and apparel. These devices and apparel shall be provided by the Contractor at no cost to the Government.

Personnel shall have the appropriate personal protection equipment, such as eye protection, gloves, boots, and clothing as mandated by OSHA, Federal, State, and Local standards.

6.6 Government Safety Inspection:

The Government shall have the right to inspect all areas for safety violations at its discretion, direct the Contractor to make immediate improvement of conditions and/or procedures, and/or stop the work if other hazards are deemed to exist.

6.7 Work Stoppage:

In the event the Government should elect to stop work because of an existing safety hazard on the job site after the Contractor has been notified and provided ample time to correct the safety hazard. The Contractor shall bear all costs for eliminating the hazard(s) and shall not be granted compensation for the work stoppage. The Contractor shall be responsible for all additional expenses incurred.

6.8 Vehicle Operation:

The operation of the Contractor’s vehicles by the Contractor’s employees on or about Government property shall conform to regulations and safe driving practices.

6.9 Equipment and Tool Inspection:

The Contractor shall inspect all powered equipment daily before operations for signs of wear as well as potential safety hazards. The Contractor shall immediately remove from service on the job sites all equipment including extension cords which are potentially unsafe, damaged, inoperable and/or do not meet the manufacturers operational specifications.

6.10 Safety Data Sheets:

The Contractor shall obtain Safety Data Sheets (SDS) for all materials or supplies as required by Federal, State, or Local regulations and policies and have them available at the job site during performance of the work.

PART 7 SECURITY REQUIREMENTS

General Security Requirements and Guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements.

Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures.

The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Antiterrorism (AT) Level I Training: All contract personnel requiring routine access to Army installations, facilities, and controlled access areas, or requiring network access shall complete initial and annual refresher AT Level I awareness training. Online AT Level I awareness training is available at https://jko.jten.mil/ (website subject to change).

For Access and General Protection Policy and Procedures. All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall follow RIA installation policy and procedures in place of the background check conducted by a bonded third party for off Island Government property access, which will include but is not limited to completing the NCIC III background check conducted by the Rock Island Arsenal. (Details for Rock Island Arsenal Access can be found at: http://www.usagria.army.mil/AccessRequests/).

Address to the Visitor Center to have the background checks completed is:

Visitor Center 23 Prospect Ct

Rock Island Arsenal, IL

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

Training requirements for the protection of sensitive information: All contract personnel with access to critical information (as identified in the RA's OPSEC Program) shall complete initial and annual refresher OPSEC Level I Awareness training, which is available at the following websites: https://www.iad.gov/ioss/, or http://www.cdse.edu/catalog/operations-security.html (websites subject to change). All contract personnel with access to Controlled Unclassified Information (CUI) shall complete initial and annual refresher CUI training in accordance with applicable Army policy.

Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

****Add the following to the bottom of the security clause section in each contract*****

To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-15- C-XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mailed to:

U.S. Army Corps of Engineers Rock Island District

Security Office 1500 Rock Island Drive

Rock Island, IL 61201

APPENDIX A

QUALITY ASSURANCE SURVEILLANCE

PLAN (QASP) INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing the Performance Work Statement (PWS) for Pavement, Sidewalk, and Slab Replacement. It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the contract.

The QASP provides a systematic method to evaluate the services the contractor is required to furnish. The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). A performance-based approach enables the contractor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

The contractor, and not the government, is responsible for the quality of all work performed.

The role of the Government is quality assurance to ensure contract standards are achieved.

SURVEILLANCE

The Contracting Officer’s Representative (COR) is designated in writing by the Contracting Officer (KO) to act as his or her authorized representative to assist in administering a contract.

The Government COR will evaluate the services required by the PWS to ensure compliance.

Any Government employee who observes unacceptable services, either incomplete or not performed, should immediately contact the COR, who will document the complaint and forward it to the contractor for correction. The contractor will be given two hours after notification to correct unacceptable performance.

W912EK23Q0028

CLOCK TOWER ANNEX

PAVEMENT, SIDEWALK, AND SLAB

REPLACEMENT US ARMY CORPS OF

ENGINEERS,

ROCK ISLAND ARSENAL, ROCK ISLAND, IL 61201

Required Service

Performance Standard

Acceptable Quality Level

Method of Surveillance

Impact on Contractor Payments

Concrete & Soil Removal

Check Removal meets Spec sections

4.5.1 and 4.5.2

Material is stockpiled or removed from project site.

Visual - Measure

Deduct 10% of pay for each documented event of unsatisfactory performance

Compaction, Aggregate, Reinforcement, & Form Layout

Check Compaction meets Spec sections

4.5.3 and 4.5.4

Materials meet Spec.

Installation is tight and solid

Visual - Measure

Deduct 10% of pay for each documented event of unsatisfactory performance

Concrete Work

Check Concrete Work meets Spec sections 4.5.5, 4.5.6, 4.5.7, 4.5.8, and 4.5.9

Materials meet Spec. Concrete work, reinforcement, and joints installed per Drawings

Visual - Measure - Concrete Delivery

Tickets

Deduct 10% of pay for each documented event of unsatisfactory performance

Topsoil, Seeding, & Site Restoration

Check Backfill, Seeding, Turf Establishment, and Site Restoration meets Spec sections 4.5.10, 4.5.11, and 4.5.12

Proper drainage, turf establishment, and restoration of the job site to pre-project or better conditions.

Visual

Deduct 10% of pay for each documented event of unsatisfactory performance

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Clocktower Annex Sidewalk Replacement

FFP

FOB: Destination

PSC CD: Z2LB

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment

NOV 2021

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.212-1 Instructions to Offerors--Commercial Products and Commercial Services

MAR 2023

52.212-3 Alt I (Dev) Offeror Representations and Certifications - Commercial Products and Commercial Services (Deviation 2023-O0002) Alternate I

OCT 2014

52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services

DEC 2022

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021

52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-22 Previous Contracts And Compliance Reports FEB 1999 52.225-9 Buy American--Construction Materials OCT 2022 52.225-10 Notice of Buy American Requirement--Construction

Materials

MAY 2014

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

JAN 2023

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

(i) Technical Capability:

a. Contractor must provide proof of a minimum of 10 years experience performing concrete flatwork placement, finishing, and curing expectance.

b. Contractor must provide proof of ACI Certification of Contrete Flatwork Finisher.

(ii) Price

In order to be considered for award, you must provide proof of the Technical Capabilities listed above and found acceptable; then the Government will award based on lowest price.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAR 2023)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .