This solicitation is for a construction project to build new drainage ditches, culverts, drainage structures, levees, floodwalls, and related work. The work location is in Plaquemines Parish, Louisiana along the New Orleans to Venice hurricane protection levee system. The total value of the work is estimated between $25 million to $100 million. This is a 100% small business set-aside issued by the U.S. Army Corps of Engineers, New Orleans District. Plans and specifications are available electronically on SAM.gov. Interested vendors can register on the website to receive further updates, including confirmation of the bid opening date which has not yet been determined due to right of way issues. The solicitation contemplates award of a firm fixed price contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED 14-028
US Army Corps Of Engineers New Orleans District
New Orleans to Venice, Louisiana
NOV-NF-W-06A.2
First Lift Levee and Drainage Canal Relocation Project, Pointe Celeste to West Pointe a La Hache Plaquemines Parish, Louisiana
Construction Solicitation and Specifications
June 2020
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS, NEW ORLEANS DISTRICT
7400 LEAKE AVENUE
NEW ORLEANS, LA 70118-3651
N
ED 14-028
SOLICITATION: 28 May 2020
FOR: New Orleans to Venice, Louisiana, NOV-NF-W-06A.2, First Lift Levee and Drainage Canal Relocation Project, Pointe Celeste to West Pointe A La Hache, Plaquemines Parish, Louisiana
TO OPEN: *****RIGHT OF WAY IS CURRENTLY NOT AVAILABLE. BID OPENING WILL NOT
BE HELD UNTIL RIGHT OF WAY IS MADE AVAILABLE. ******
I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL OPPORTUNITY
CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION.
Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.
III. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) B-U-N-S number. If you do not already have a D&B B-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.
BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS
SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS
IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)
DESCRIPTION AND MAGNITUDE OF WORK: The work consists of clearing, grubbing, excavation for new drainage ditches, new culvert placements, new drainage structure placement, new Twalls, new levee/ ramp crossings embankment placement for levees in phases, geotextile, turf establishment, surfacing and all other related incidental work.
CAUTION TO BIDDERS:
DUE TO THE ONGOING COVID-19 PANDEMIC, HAND CARRIED BIDS WILL NOT BE ACCEPTED. BID
SHALL BE MAILED TO THE VICKSBURG DISTRICT HEADQUARTERS BUILDING, ROOM 120, 4155
CLAY STREET, VICKSBURG, MISSISSIPPI 39183-3435. BIDS SENT BY COMMERCIAL CARRIER SHALL
BE CLEARLY MARKED ON THE OUTER ENVELOPE AS CONTAINING A “SEALED BID”. BIDS MUST
BE RECEIVED PRIOR TO THE EXACT TIME SET FOR BID OPENING.
NO IN PERSON ATTENDANCE WILL BE ALLOWED FOR THIS BID OPENING
THE BID OPENING MAY BE VIEWED ONLINE AT
https://www.youtube.com/channel/UC8aGwLzGsYAHHISJg31RFOw/live
NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH
THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS
MANUAL", DATED NOVEMBER 2014.
https://www.sam.gov/
SOLICITATION NUMBER: W912P820B0002
TECHNICAL INQUIRIES AND QUESTIONS
ALL QUESTIONS MUST BE SUBMITTED VIA PROJNET.
TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THIS SOLICITATION ARE TO BE
SUBMITTED VIA BIDDER INQUIRY IN PROJNET AT (HTTPS://WWW.PROJNET.ORG) .
BIDDERS ARE ENCOURAGED TO SUBMIT QUESTIONS 5 DAYS PRIOR TO BID OPENING
IN ORDER TO ENSURE ADEQUATE TIME IS ALLOTTED TO FORM AN APPROPRIATE
RESPONSE AND AMEND THE SOLICITATION, IF NECESSARY. TO SUBMIT AND REVIEW
INQUIRY ITEMS, PROSPECTIVE VENDORS WILL NEED TO USE THE BIDDER INQUIRY
KEY PRESENTED BELOW AND FOLLOW THE INSTRUCTIONS LISTED BELOW THE KEY
FOR ACCESS. A PROSPECTIVE VENDOR WHO SUBMITS A COMMENT /QUESTION WILL
RECEIVE AN ACKNOWLEDGEMENT OF THEIR COMMENT/QUESTION VIA EMAIL,
FOLLOWED BY AN ANSWER TO THE COMMENT/QUESTION AFTER IT HAS BEEN
PROCESSED BY OUR TECHNICAL TEAM.
ALL TIMELY QUESTIONS AND APPROVED ANSWERS WILL BE MADE AVAILABLE
THROUGH PROJNET. APPROVED ANSWERS TO ALL TIMELY QUESTIONS WILL ALSO BE
POSTED ON THE FEDBIZOPS IN THE FORM OF A REPORT GENERATED FROM PROJNET
AS SOON AS THE COMMENT/QUESTION ENTERING PERIOD IS OVER AND ALL
ANSWERS ARE ALL FINALIZED.
THE SOLICITATION NUMBER IS: W912P820B0002
THE BIDDER INQUIRY KEY IS: WHA7YG-SZ36K9
SPECIFIC INSTRUCTIONS FOR PROJNET BID INQUIRY ACCESS:
1. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON THE
UPPER RIGHT SIDE OF THE SCREEN.
2. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
3. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
4. EMAIL. ENTER THE EMAIL ADDRESS YOU WOULD LIKE TO USE FOR
COMMUNICATION.
5. CLICK CONTINUE. A PAGE WILL THEN OPEN SAYING THAT A USER ACCOUNT
WAS NOT FOUND AND WILL ASK YOU TO CREATE ONE USING THE PROVIDED
FORM.
6. ENTER YOUR FIRST NAME, LAST NAME, COMPANY, CITY, STATE, PHONE,
EMAIL, SECRET QUESTION, SECRET ANSWER, AND TIME ZONE. MAKE SURE TO
REMEMBER YOUR SECRET QUESTION AND ANSWER AS THEY WILL BE USED
FROM THIS POINT ON TO ACCESS THE PROJNET SYSTEM.
7. CLICK ADD USER. ONCE THIS IS COMPLETED YOU ARE NOW REGISTERED
WITHIN PROJNET AND ARE CURRENTLY LOGGED INTO THE SYSTEM.
SPECIFIC INSTRUCTIONS FOR FUTURE PROJNET BID INQUIRY ACCESS:
1. FOR FUTURE ACCESS TO PROJNET, YOU WILL NOT BE EMAILED ANY TYPE OF
PASSWORD. YOU WILL UTILIZE YOUR SECRET QUESTION AND SECRET ANSWER
TO LOG IN.
2. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON THE
UPPER RIGHT SIDE OF THE SCREEN.
3. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.
4. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.
5. EMAIL. ENTER THE EMAIL ADDRESS YOU USED TO REGISTER PREVIOUSLY IN
PROJNET.
6. CLICK CONTINUE. A PAGE WILL THEN OPEN ASKING YOU TO ENTER THE
ANSWER TO YOUR SECRET QUESTION.
7. ENTER YOUR SECRET ANSWER AND CLICK LOGIN. ONCE THIS IS COMPLETED
YOU ARE NOW LOGGED INTO THE SYSTEM.
PTC-i ED 14-028
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
Solicitation, Offer and Award (SF-1442) 00010 Bidding Schedule 00600 Instructions to Bidders 00700 Contract Clauses
DIVISION 01 - GENERAL REQUIREMENTS
01100 General Provisions 01 32 17.00 20 Network Analysis Schedules (NAS) 01 33 00 Submittal Procedures 01 42 00 Sources for Reference Publications 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) 01 45 04.00 10 Contractor Quality Control 01 55 26.00 12 Traffic Control and Coordination 01 57 20.00 12 Environmental Protection 01 57 23.00 12 Storm Water Pollution Prevention Plan 01 57 23.01 12 Truck Wash-Down Racks 01 78 02.00 10 Closeout Submittals
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 03 – CONCRETE
03 11 14.00 12 Formwork for Concrete 03 15 13.00 12 Expansion Joints and Waterstops in Concrete 03 21 00.00 12 Reinforcing Steel 03 31 00.00 12 Cast-in-Place Structural Concrete
DIVISION 05 - METALS
05 50 03.00 12 Metalwork Fabrication, Machine Work, And Miscellaneous Provisions
05 50 04.01 12 Miscellaneous, Standard Articles, Shop Fabricated Items
PTC-ii ED 14-028
DIVISION 09 - FINISHES
09 97 02.03 12 Painting: Vinyl and Coal Tar Epoxy Systems
DIVISION 31 – EARTHWORK
31 05 19.04 12 Separator Geotextile 31 05 19.05 12 Reinforcement Geotextile 31 11 00.00 12 Clearing and Grubbing 31 23 00.00 12 Excavation 31 23 16.16 12 Structural Excavation and Backfill 31 24 00.00 12 Embankment 31 37 00.02 12 Grouted Riprap 31 41 16.00 12 Steel Sheet Piling 31 62 14.00 12 Pile Load Tests 31 62 17.00 12 Steel Pipe Piles
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 16.00 12 Asphaltic Pavement 32 15 00.00 12 Surfacing 32 31 13 Chain Link Fences and Gates 32 31 16 Access Gates 32 92 19.04 12 Turf Establishment and Maintenance
DIVISION 33 – UTILITIES
33 40 01.00 12 Corrugated Metal Arch Pipe 33 42 16.13 09 Reinforced Concrete Pipe
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 20 14 Bulkheads 35 20 16.26 12 Sluice Gates and Hoists 35 31 19.04 12 Stone Construction
W42HEM925400049
NEW ORLEANS TO VENICE, LOUISIANA, NOV-NF-W-06A.2, FIRST LIFT LEVEE AND DRAINAGE
CANAL RELOCATION PROJECT, POINTE CELESTE TO WEST POINTE A LA HACHE,
PLAQUEMINES PARISH, LOUISIANA
The work consists of clearing, grubbing, excavation for new drainage ditches, new culvert placements, new drainage structure placement, new Twalls, new levee/ ramp crossings embankment placement for levees in phases, geotextile, turf establishment, surfacing and all other related incidental work
The estimated value of the proposed work is between $25,000,000 and $100,000,000.
X
DUSTIN G. CANNADA (601)631-7546
NOTE: In this request for proposal, "bid" and "bidder" mean "offer" and "offeror".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED (RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
SEE SPECIAL NOTICES TO BIDDERS
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
28 May 2020
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by
GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within 10 calendar days and complete it within (1440 calendar days)after receiving award, X Notice to proceed. This performance period is X mandatory, negotiable. ( See Section 0700
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original to perform the work required are due at the place specified in Item 8 BY (TO BE DETERMINED AT A LATER DATE) If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
VICKSBURG CONTRACTING OFC
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE
PAGE
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(601)631-7261 FAX: TEL: TEL: FAX:
W912P820B0002
20B. SIGNATURE
(REV. 4-85) STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) Page 2 (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
SEE SCHEDULE
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE 27. PAYMENT WILL BE MADE BY: 964145
US ARMY CORPS OF ENGRS FINANCE CENTER
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
26. ADMINISTERED BY
U.S. ARMY CORPS OF ENGINEERS
NEW ORLEANS AREA OFFICE
7400 LEAKE AVENUE,
RM 186 NEW ORLEANS, LA 70118
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.
governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(Must be fully completed by offeror) OFFER
Section 00010 - Solicitation Contract Form
SECTION 00010 - BIDDING SCHEDULE
New Orleans to Venice, LA NOV-NF-W- 06a.2, First Lift Levee and Drainage Canal Relocation Project, Pointe Celeste to West Pointe a la Hache
Plaquemines Parish, Louisiana
Item Description Estimated Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB FOR
0002 Traffic Control and Coordination 1 JOB FOR
0003 Truck Wash-Down Racks 1 JOB FOR
0004 Silt Fence
0004AA First 10,700 LF 10,700 LF
0004AB All Over 10,700 LF 2,150 LF
0005 Demolition 1 JOB FOR
0006 Reinforced Concrete Floodwall 1 JOB FOR
0007 Sluice Gate Structure 1 JOB FOR
0008 Steel Handrails 1 JOB FOR
0009 Ladders 3 EA
0010 Separator Geotextile 20,500 SY
0011 Reinforcement Geotextile, 1,000 lbs/in 14,000 SY
0012 Reinforcement Geotextile, 1,300 lbs/in 55,600 SY
0013 Reinforcement Geotextile, 1,875 lbs/in 2,150 SY
0014 Reinforcement Geotextile, 2,000 lbs/in 49,810 SY
0015 Reinforcement Geotextile, 2,250 lbs/in 67,300 SY
0016 Clearing and Grubbing 1 JOB FOR
0017 Drainage Ditches 192,000 CY
0018 Degrading Existing Levees 26,200 CY
0019 Excavation, Structural 16,675 CY
0020 Embankment, Compacted Fill 1,390,000 CY
W912P820B0002 0010-1 ED 14-028
0021 Embankment, Uncompacted Fill 170,000 CY
0022 Sand Fill 45,000 CY
0023 Grouted Riprap 800 CY
0024 Piling, Steel Sheet, Type PZ-22 24,974 SF
0025 Piling, Steel Sheet, Type PZ-27 344 SF
0026 Piling, Steel Sheet, Type PZ-35 2,310 SF
0027 Compression Pile Tests
0027AA First Pile Test 1 EA
0027AB All Over First Pile Test 1 EA
0028 Load Frame and Test Piles 1 JOB FOR
0029 Furnish Steel Pipe Piles 24,188 LF
0030 Drive Steel Pipe Piles 24,188 LF
0031 Asphaltic Pavement 1 JOB FOR
0032 Surfacing
0032AA First 9,450 CY 9,450 CY
0032AB All Over 9,450 CY 1,900 CY
0033 Chain Link Fence 258 LF
0034 Gate, 20 Foot 2 EA
0035 Access Gates 1 JOB FOR
0036 Seeding and Mulching 150 AC
0037++ Lime Soil Amendment 150 TON
0038++ Sulfur Soil Amendment 75 TON
0039 Fertilizer
0039AA First 45,000 LBS 45,000 LBS
0039AB All Over 45,000 LBS 6,750 LBS
0040 Corrugated Metal Arch Pipes 1 JOB FOR
0041 36 Inch RCP Culvert 264 LF
0042 48 Inch RCP Culvert 1,048 LF
0043 Sluice Gates 1 JOB FOR
0044 Portable Actuators 2 EA
0045 Stone 1,015 TON
W912P820B0002 0010-2 ED 14-028
0046 Stone (JLC) 1,730 TON
TOTAL BASE WORK:
OPTIONAL WORK - OW
0047 Separator Geotextile - OW 5,850 SY
0048 Clearing – OW 1 JOB FOR
0049 Embankment, Compacted Fill –
OW
0049AA First 264,000 CY 264,000 CY
0049AB All Over 264,000 CY 40,000 CY
0050 Surfacing – OW 900 CY
0051 Seeding and Mulching - OW 100 AC
0052++ Lime Soil Amendment - OW 100 TON
0053++ Sulfur Soil Amendment - OW 50 TON
0054 Fertilizer – OW
0054AA First 30,000 LBS 30,000 LBS
0054AB All Over 30,000 LBS 4,500 LBS
0055 Stone (JLC) Reset – OW 1 JOB FOR
TOTAL OPTIONAL WORK
TOTAL BASE WORK + OPTIONAL WORK
++Items not subject to the requirements of FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY.
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE
UNIT PRICE AND THE EXTENDED TOTAL OR ESTIMATED AMOUNT FOR ANY
ITEM, ITS BID SHALL BE DECLARED NON-RESPONSIVE AND THEREFORE
INELIGIBLE FOR AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that
W912P820B0002 0010-3 ED 14-028
performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. If implemented, the Government will exercise the optional work no later than 1,340 calendar days after issuance of the Notice to Proceed. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid. If implemented by the Contracting Officer’s Representative, all required work for Phase II (Option Area) construction shall be performed by the Contractor as described herein and as shown on the drawings, at any time during the contract period.
NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5.
NOTE 6: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL WORK.
In the event that OPTIONAL WORK items are exercised under the terms of the contract, the time required for completion of the contract shall be 530 calendar days in addition to the original contract duration of 1,440 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-211-10 – APR 1984)”. The time adjustment given as a result of exercising the option includes all time for completion of the option work, including the time period between the completion of the base work and commencement of the option work.
NOTE 7: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
W912P820B0002 0010-4 ED 14-028
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
EVALUATION OF SUBLINE ITEMS (Dec 2019 - AFARS 5152.211-9000).
Item Nos. 0004, 0027, 0032, 0039, 0049, and 0054 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subline items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBLINE ITEMS (Dec 2019 –
AFARS 5152.211-9001).
This variation in estimated quantities clause is applicable only to item Nos. 0004, 0027, 0032, 0039, 0049, and 0054.
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent subline item or elimination of all work under such a second or subsequent subline item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for item Nos. 0004, 0027, 0032, 0039, 0049, and 0054 is less than 85% of the quantity of the first subline item listed under such item, the Contractor will be paid at the contract unit price for that subline item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause at Federal Acquisition Regulation (FAR) 52.211-18, VARIATION
IN ESTIMATED QUANTITY.
(c) If the actual quantity of work performed under item Nos. 0004, 0027, 0032, 0039, 0049, and 0054 exceeds 115% or is less than 85% of the total estimated quantity of the subline item under that item and/or if the quantity of the work performed under the second subline item or any subsequent subline item under item Nos. NONE exceeds 115% or is less than 85% of the estimated quantity of any such subline item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, VARIATION
IN ESTIMATED QUANTITY.
(End of Clause)
W912P820B0002 0010-5 ED 14-028
Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
- U.S. Department of Labor Veterans’ Employment and Training Service (VETS):
https://www.dol.gov/vets/
- Federal Veteran Employment Information: https://www.fedshirevets.gov/
- Veterans Opportunity to Work (VOW) Program: https://www.benefits.va.gov/vow/
- U.S. Army Warrior Transition Command Employment Index:
https://wct.army.mil/modules/employers/index.html
- Hiring Our Heroes: https://www.uschamberfoundation.org/hiring-our-heroes
(End of special contract requirement)
Analysis for application of PLAs apply to construction solicitations (including task order request for proposals (RFPs)), with performance in the United States, with an anticipated contract value of $25M or greater, and issued after 15 October 2010. Further, with respect to solicitations to establish new MATOCs and Single Award Task Order Contracts (SATOC) issued after 15 October 2010, the following language shall be included at an appropriate location in the solicitation: “Pursuant to FAR 22.503, a PLA maybe considered for certain projects under Task Orders meeting the criteria set forth in Executive Order 13502. Each Task Order may be evaluated on a project by project basis for possible application of a PLA.
W912P820B0002 0010-6 ED 14-028
https://www.dol.gov/vets/ https://www.fedshirevets.gov/ https://www.benefits.va.gov/vow/ https://wct.army.mil/modules/employers/index.html https://www.uschamberfoundation.org/hiring-our-heroes
Section 00100 - Bidding Schedule/Instructions to Bidders
SPECIAL NOTICE
DUE TO THE ONGOING COVID-19 PANDEMIC, HAND CARRIED BIDS WILL NOT BE
ACCEPTED. BID SHALL BE MAILED TO THE VICKSBURG DISTRICT HEADQUARTERS
BUILDING, ROOM 120, 4155 CLAY STREET, VICKSBURG, MISSISSIPPI 39183-3435.
BIDS SENT BY COMMERCIAL CARRIER SHALL BE CLEARLY MARKED ON THE
OUTER ENVELOPE AS CONTAINING A “SEALED BID”. BIDS MUST BE RECEIVED
PRIOR TO THE EXACT TIME SET FOR BID OPENING.
NO IN PERSON ATTENDANCE WILL BE ALLOWED FOR THIS BID OPENING
THE BID OPENING MAY BE VIEWED ONLINE AT
https://www.youtube.com/channel/UC8aGwLzGsYAHHISJg31RFOw/live
1. SEALED BIDS FOR THE WORK DESCRIBED HEREIN WILL BE RECEIVED UNTIL DATE AND
TIME OF BID OPENING.
2. THIS PROCUREMENT IS A TOTAL SMALL BUSINESS SET-ASIDE.
3. YOUR ATTENTION IS DIRECTED TO SECTION 00100-BID SCHEDULE/INSTRUCTIONS TO
BIDDERS CLAUSE ENTITLED “SUBMISSION OF BIDS”. IT IS THE BIDDER’S RESPONSIBILITY TO
ENSURE THAT BIDS SENT BY COMMERCIAL CARRIER ARE CLEARLY IDENTIFIED AS
CONTAINING A SEALED BID ON THE OUTERMOST ENVELOPE. THIS INCLUDES, BUT IS NOT
LIMITED TO, BIDS SENT VIA: FEDERAL EXPRESS, AIRBORNE EXPRESS, EXPRESS COURIER
SERVICES, INC., EXPRESS MAIL - U.S. POSTAL SERVICE, UNITED PARCEL SERVICE AND
PUROLATOR.
4. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE EQUAL OPPORTUNITY CLAUSE
WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
5. NOTE THE AFFIRMATIVE ACTION REQUIREMENT OF THE CONTRACT CLAUSE ENTITLED,
“AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION”, WHICH WILL
APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.
6. SEE SECTION 00 80 00.00 09, SPECIAL CONTRACT REQUIREMENTS, CLAUSE ENTITLED
“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK”.
7. SEE SECTION 01 00 00.00 09, GENERAL CONTRACT REQUIREMENTS CLAUSE, ENTITLED,
“PAYMENT INVOICES” WHICH WILL APPLY TO THE CONTRACT RESULTING FROM THIS
SOLICITATION. THE FEDERAL ACQUISITION REGULATION REQUIRES THAT THE “REMIT TO”
ADDRESS OF THE INVOICE MATCH THE “REMIT TO” ADDRESS ON THE CONTRACT OR A
PROPER NOTICE OF ASSIGNMENT.
8. BIDS WILL NOT BE ACCEPTED NOR SHALL BIDS BE WITHDRAWN TELEGRAPHICALLY OR BY
ELECTRONIC COMMERCE.
9. IN ACCORDANCE WITH THE PROVISIONS OF SUBPART 36.201
(EVALUATION OF CONTRACTOR PERFORMANCE) OF THE FEDERAL ACQUISITION REGULATION
(FAR), CONSTRUCTION CONTRACTOR’SPERFORMANCE SHALL BE EVALUATED THROUGHOUT
THE PERFORMANCE OFTHE CONTRACT. THE UNITED STATES ARMY CORPS OF ENGINEERS
(USACE) FOLLOWS THE PROCEDURES OUTLINED IN ENGINEERINGREGULATION 415-1-17 TO
FULFILL THIS FAR REQUIREMENT. FORCONSTRUCTION CONTRACTS AWARDED AT OR ABOVE
$100,000.00, THEUSACE WILL EVALUATE CONTRACTOR’S PERFORMANCE AND PREPARE
APERFORMANCE REPORT USING THE CONSTRUCTION CONTRACTOR APPRAISALSUPPORT
SYSTEM (CCASS), WHICH IS NOW A WEB-BASED SYSTEM.AFTER AN EVALUATION (INTERIM OR
W912P820B0002 00100-1 ED 14-028
FINAL) IS WRITTEN UP BY THEUSACE, THE CONTRACTOR WILL HAVE THE ABILITY TO ACCESS, REVIEWAND COMMENT ON THE EVALUATION FOR A PERIOD OF 30 DAYS.ACCESSING AND
USING CCASS REQUIRES SPECIFIC SOFTWARE, CALLEDPKI CERTIFICATION, WHICH IS
INSTALLED ON THE USER’S COMPUTER.THE CERTIFICATION IS A DEPARTMENT OF DEFENSE
REQUIREMENT ANDWAS IMPLEMENTED TO PROVIDE SECURITY IN ELECTRONIC
TRANSACTIONS.THE CERTIFICATION SOFTWARE COULD COST APPROXIMATELY $110 - $125
PER CERTIFICATE PER YEAR AND IS PURCHASED FROM AN EXTERNALCERTIFICATE
AUTHORITIES (ECA) VENDOR. CURRENT INFORMATIONABOUT THE PKI CERTIFICATION
PROCESS AND FOR CONTACTING VENDORSCAN BE FOUND ON THE WEB SITE:
http://www.cpars.navy.mil/. IF THE CONTRACTOR WISHES TO PARTICIPATE IN THE PERFORMANCE
EVALUATION PROCESS, ACCESS TO CCASS AND PKI CERTIFICATION IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
10. ELECTRONIC FUNDS TRANSFER (EFT)
PURSUANT TO FAR 52.232-5 AND 52.232-33, ALL PAYMENTS UNDER THIS CONTRACT WILL BE
MADE BY ELECTRONIC FUNDS TRANSFER (EFT). CONTRACTORS ARE REQUIRED TO
COMPLETE FORM:
UFC-DISB-4.
THE FORM BE DOWNLOADED FROM THE U. S. ARMY CORPS OF ENGINEERS FINANCE
CENTER AT: https://www.tam.usace.army.mil/Portals/53/docs/UDC/Admin/Direct_Deposit.pdf
THE “INSTALLATION EROC” FOR THE VICKSBURG CONTRACTING OFFICE IS “B4."
11. BID PACKAGE ATTACHMENTS, REPRESENTATIONS AND CERTIFICATIONS ARE TO BE
COMPLETED AND INCLUDED IN THE BID PACKAGE SUBMITTED BY THE OFFEROR.
12. PRIOR TO BID OPENING, IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION
PART 14.303 (b) MODIFICATION OR WITHDRAWAL OF BIDS, “A BID MAY BE WITHDRAWN IN
PERSON BY A BIDDER OR ITS AUTHORIZED REPRESENTATIVE IF, BEFORE THE EXACT TIME
SET FOR OPENING OF BIDS, THE IDENTITY OF THE PERSONS REQUESTING WITHDRAWAL
IS ESTABLISHED AND THAT PERSON SIGNS A RECEIPT FOR THE BID."
THE FOLLOWING STEPS WILL BE REQUIRED BY THE VICKSBURG CONTRACTING OFFICE:
1) CONTRACTOR MUST PRESENT A LETTER VERIFYING THEY ARE A
REPRESENTATIVE OF THE COMPANY.
2) CONTRACTOR MUST SHOW VALID, GOVERNMENT ISSUED PICTURE ID.
3) VICKSBURG DISTRICT CONTRACTING OFFICE WILL HAVE THE
REPRESENTATIVE SIGN A RECEIPT FOR BID.
W912P820B0002 00100-2 ED 14-028
http://www.cpars.navy.mil/ https://www.tam.usace.army.mil/Portals/53/docs/UDC/Admin/Direct_Deposit.pdf
GENERAL NOTICES
1. AUTHORITY & APPROPRIATION INFORMATION PROGRAM DATA
AUTHORITY:
(a) Original Authorization: Section 203 of the Flood Control Act of 1962, Public Law 87-874 (76 Stat. 1173)
(b) Supplemental Authorization: New Orleans to Venice, LA— Under the Flood Control and Coastal Emergencies (FC&CE) heading, Chapter 3, Title I, Division B of Public Law 109 148 (119 Stat. 2762 – 2763) (3rd FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title II of Public Law 109-234 (120 Stat.
454-455) (4th FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title III of Public Law 110-252 (122 Stat. 2349-2350) (6th FC&CE Supplemental); and under the FC&CE heading, Chapter 3, Title I, Division B of Public Law 110-329 (122 Stat. 3590) (7th FC&CE Supplemental)
APPROPRIATION:
4th and 6th Supplemental appropriations for the Non-Federal Levees. 3rd, 4th, and 6th Supplemental appropriations for New Orleans to Venice, LA
FUNDING CITATION: 96x3125
2. NEGOTIATIONS AFTER SEALED BIDDING.
The Government has the option to reject all bids received in response to the sealed bid advertisement and initiate negotiation. Negotiations will include soliciting offers from each responsible bidder that submits a bid in response to the Invitation for Bids. If, after bid opening, the Contracting Officer determines that negotiations are in the best interest of the Government, the following steps will be followed:
(a) An amendment to the sealed bid advertisement will be issued to each responsible bidder changing the Invitation for Bids Number to Request for
Proposals Number. The amendment will also make any necessary changes to the scope of the work.
(b) A cover letter signed by the negotiator will accompany the amendment explaining the procedures to be followed during negotiations.
3. BID, PERFORMANCE AND PAYMENT BONDS.
A bid bond is required with the bid package and is to be executed on Standard Form SF24. Performance and payment bonds with be required after award. See Section 00700, Contract Clauses 52.228-1, BID GUARANTEE and 52.228-15, PERFORMANCE AND PAYMENT BONDS -- CONSTRUCTION
4. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS.
The right is reserved, as the interest of the Government may require, to revise or amend the specifications and/or drawings prior to the date set for opening bids. Such revisions or amendments, if any, will be announced by amendment or amendments to this Invitation for Bids. Copies of such amendments as may be issued will be furnished to all prospective bidders. If the revision or amendments are of a nature which require material changes in quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the District Engineer will enable bidders to revise their bids. In such case, the amendments will include an announcement of the new date for opening bids.
5. BUSINESS INTEGRITY.
W912P820B0002 00100-3 ED 14-028
The apparent successful bidder as a condition for award of any contract resulting from this solicitation may be required to execute a certificate related to Business Integrity.
6. CONDITIONS AFFECTING THE WORK.
Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Invitation for Bids, the specifications, or related documents.
7. BIDDER'S QUALIFICATIONS.
A determination of contractor responsibility will be made. A determination of non-responsibility may be cause for the rejection of a prospective contractor's bid. In accordance with FAR 9.104-1 - General Standards, before a bid is considered for award, the bidder shall be requested by the Government to submit a statement regarding their previous experience in performing comparable work, their business and technical organization, financial resources, the plant available to be used in performing the work and/or other information necessary to make the determination of contractor responsibility.
8. SITE OF THE WORK.
Bidders are advised that for purpose of applicability of the Davis-Bacon Act and other contract labor standard provisions, "the site of the work" under the contract to be awarded pursuant to this Invitation may not be limited to the physical place(s) where the construction called for in the contract will remain when work on it has been completed. The "site of the work" may include other adjacent or nearby property used by the Contractor or Subcontractors during such construction. For example, fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., will be considered part of the site of the work provided they are dedicated exclusively or nearly so to performance on the contract and are so located in proximity to the actual construction location that it would be reasonable to include them.
9. INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE, AND BONDS.
a. Specifications, Invitation No. W912P820B0002, Bidding Schedule, Pre-award Information/Description of Work/Bid Evaluation, Equipment Schedule, Construction Contract Clauses, and Wage Determination Decisions No. LA20200005 01/03/2020 of the Secretary of Labor, are parts of this Invitation.
b. (1) An offeror (bidder) electing to use individual sureties for either bid guarantees or performance and payment bonds must submit, concurrently with the bonds and required affidavits, a statement of both the business and personal names of the persons and/or brokerages firms through whom the bonds or the guarantees were obtained, together with the address and telephone number of the persons and/or brokerage firms.
(2) Offerors or bidders should note that some individual sureties and brokers of individual sureties have been debarred or suspended from offering themselves or others as sureties to the Government.
Offerors or bidders are responsible for ascertaining the current status of their sureties and brokers.
(3) Failure to provide the required information or the submission of bid guarantees obtained from debarred or suspended sureties or brokers may cause rejection of the offer (bid).
10. DEFINITIONS
(a) The term "head of the agency" or "Secretary" as used herein means the Secretary of the Army; and the term "his duly authorized representative" means the Chief of Engineers, Department of the Army, or an individual or board designated by him.
(b) "Contracting Officer" means a person with the authority to enter into, administer, and/or terminate
W912P820B0002 00100-4 ED 14-028
contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
(c) The agency board of contract appeals having jurisdiction over all appeals from final decisions of the Contracting Officer under the Contract Disputes Act of l978 is the Armed Services Board of Contract Appeals, addressed as follows: Recorder, Armed Services Board of Contract Appeals, Skyline 6, 7th Floor, 5109 Leesburg Pike, Falls Church, Virginia 22041-3208.
(d) "Small business concern" means a concern including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria and size standards in 13 CFR 121.
(1) Size Standards for Construction and Special Trades.
(a) Construction. A concern is small if its average annual receipts for its preceding 3 fiscal years did not exceed $39.5 million.
(b) Dredging. A concern is small if (1) its average annual receipts for its preceding 3 fiscal years did not exceed $30.0 million, and (2) at least 40 percent of the yardage in the contract's plans and specifications is dredged with equipment owned by the concern or obtained from another small business dredging concern.
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
AUG 2018
52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
(a) Definitions. As used in this provision--
Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
W912P820B0002 00100-5 ED 14-028
Registered in the System for Award Management (SAM) means that--
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record ``Active''.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in
SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.
W912P820B0002 00100-6 ED 14-028
http://www.sam.gov/ http://www.sam.gov/ https://www.sam.gov/
(End of Provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT
OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
See Attached See Attached
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
W912P820B0002 00100-7 ED 14-028
Economic Area 113 New Orleans, LA as follows:
Bayou Sauvage, Turtle Bayou, Orleans Parish, Louisiana
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 % ercent of the bid price or $3,000,000.00 whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S Army Corps of Engineers Ellis Screws
CEMVK-CT-C
4155 Clay Street Vicksburg, MS 39183
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the
GAO.
(End of provision)
W912P820B0002 00100-8 ED 14-028
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Stephen Hinkamp Resident Engineer
USACE, CEMVN-CDN
P.O. Box 60627 New Orleans, LA 70160-0267 Ofc.: 504-862-2268 Cell: 504-628-5090:
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far
(End of provision)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any (48 CFR Chapter) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
W912P820B0002 00100-9 ED 14-028
HOMETOWN PLAN
FAR 52.222-23 - NOTICE OF REQUIREMENT FOR AFFIRMATIVE
ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY
(FEBRUARY 1999)
(a) The offeror’s attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation Goals for Female Participation for Each Trade for Each Trade
SMSA Counties MS 19.2% 6.9% SMSA Counties LA 31.0% 6.9% Non-SMSA Counties 27.7% 6.9%
These goals are applicable to all the Contractor’s construction work performed in the covered area. If the Contractor performs construction work in the geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .