A22_Solicitation_Specifications_Final.pdf
PDF 20 MB Posted
- Solicitation number
- W912EK26RA003
About this file
This is a solicitation document for a U.S. Army Corps of Engineers Indefinite Delivery/Indefinite Quantity (IDIQ) contract for hydraulic dredging operations on the Illinois Waterway between River Mile 0.0 and 291.0. The contract covers five ordering periods from February 2026 through December 2030, with estimated dredging quantities of 125,000 cubic yards for the first increment and 50,000 cubic yards for subsequent increments per ordering period. The solicitation includes comprehensive requirements for dredging equipment, placement sites, environmental controls, safety procedures, and quality control, with a total contract maximum of $25,000,000 and a minimum order requirement of $50,000.
The contract includes detailed pricing for multiple activities such as mobilization/demobilization, dredging, transportation between sites, non-effective pay time, and standby hours. The dredging will be conducted using hydraulic cutterhead dredges with a minimum 16-inch and maximum 18-inch discharge diameter. The contractor must provide land-based and marine equipment, manage environmental protections, handle dredged material placement, and comply with extensive safety and reporting requirements. The Rock Island District will issue task orders specifying exact dredging locations, with work expected to maintain navigation channel depths and remove sediment accumulations along the Illinois Waterway.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_Attachment_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.: W912EK26RA003
US Army Corps of Engineers Rock Island District
ILLINOIS WATERWAY
HYDRAULIC DREDGING INDEFINITE
DELIVERY/INDEFINITE QUANTITY
(IDIQ)
RIVER MILE 0.0 TO RIVER MILE 291.0
Construction Solicitation and Specifications
DECEMBER 2025
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16 CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04 CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 HYDRAULIC DREDGING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SCHEDULE OF PRICES
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ORDERING PERIOD NO. 1
(28 February 2026 through 31 December 2026)
0001 Mobilization and Demobilization 1 JOB XXXXXXXX $
0002 Dredging
0002AA First 125,000 CY 125,000 CY $ $
0002AB Over 125,000 CY 50,000 CY $ $
0003 Transportation of Plant Between Dredging Sites
150 MI $ $
0004 Non-Effective Pay Time
0004AA First 250 Hours 250 HR $ $
0004AB Over 250 Hours 75 HR $ $
0005 Standby
0005AA First 120 Hours 120 HR $ $
0005AB Over 120 Hours 72 HR $ $
ORDERING PERIOD NO. 2
(01 January 2027 through 31 December 2027)
0101 Mobilization and Demobilization 1 JOB XXXXXXXX $
0102 Dredging
0102AA First 125,000 CY 125,000 CY $ $
0102AB Over 125,000 CY 50,000 CY $ $
0103 Transportation of Plant Between Dredging Sites
150 MI $ $
0104 Non-Effective Pay Time
0104AA First 250 Hours 250 HR $ $
0104AB Over 250 Hours 75 HR $ $
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 1
SCHEDULE OF PRICES (continued)
0105 Standby
0105AA First 120 Hours 120 HR $ $
0105AB Over 120 Hours 72 HR $ $
ORDERING PERIOD NO. 3
(01 January 2028 through 31
December 2028) 0201 Mobilization and Demobilization 1 JOB XXXXXXXX $
0202 Dredging
0202AA First 125,000 CY 125,000 CY $ $
0202AB Over 125,000 CY 50,000 CY $ $
0203 Transportation of Plant Between Dredging Sites
150 MI $ $
0204 Non-Effective Pay Time
0204AA First 250 Hours 250 HR $ $
0204AB Over 250 Hours 75 HR $ $
0205 Standby
0205AA First 120 Hours 120 HR $ $
0205AB Over 120 Hours 72 HR $ $
ORDERING PERIOD NO. 4
(01 January 2029 through 31
December 2029) 0301 Mobilization and Demobilization 1 JOB XXXXXXXX $
0302 Dredging
0302AA First 125,000 CY 125,000 CY $ $
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 2
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 3
0302AB Over 125,000 CY 50,000 CY $ $
0303 Transportation of Plant Between Dredging Sites
150 MI $ $
0304 Non-Effective Pay Time
0304AA First 250 Hours 250 HR $ $
0304AB Over 250 Hours 75 HR $ $
0305 Standby
0305AA First 120 Hours 120 HR $ $
0305AB Over 120 Hours 72 HR $ $
ORDERING PERIOD NO. 5
(01 January 2030 through 31
December 2030) 0401 Mobilization and Demobilization 1 JOB XXXXXXXX $
0402 Dredging
0402AA First 125,000 CY 125,000 CY $ $
0402AB Over 125,000 CY 50,000 CY $ $
0403 Transportation of Plant Between Dredging Sites
150 MI $ $
0404 Non-Effective Pay Time
0404AA First 250 Hours 250 HR $ $
0404AB Over 250 Hours 75 HR $ $
0405 Standby
0405AA First 120 Hours 120 HR $ $
0405AB Over 120 Hours 72 HR $ $
$ TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 1 THROUGH NO. 5
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 4
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 5
HR = HOURS JOB = LUMP SUM MI = MILES CY=CUBIC YARDS
PLEASE ENSURE UNIT PRICES AND AMOUNT LINES FOR ALL ITEMS
HAVE BEEN COMPLETED.
**Wage Rates will be incorporated at the Task order level for each county in which the work is to be performed**
Quantities shown are based on historic annual dredging and are aggregates of Task Orders in each Ordering Period. First and Over quantities are cumulative for each Ordering Period.
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY OF WORK
1.2 PROJECT LOCATION
1.2.1 Rivers
1.2.2 River Mile Locations
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY OF WORK
The work includes, but is not limited to, preparation of dredged material placement sites; open channel, access, and small boat harbor hydraulic dredging; relocation of navigation channel markers; dredged material placement on bankline and/or in upland sites; dewatering upland sites; and site restoration.
1.2 PROJECT LOCATION
1.2.1 Rivers
The work is located on the Illinois Waterway 9 foot Federal Navigation Project, including associated small boat harbors, for two Corps of Engineer Districts, and as indicated and will be specified per Task Order awarded.
1.2.2 River Mile Locations
Locations between Illinois Waterway Miles 0.0 to 291.0
a. Illinois River Miles between 80.2 and 291.0 for the Rock Island District;
b. Illinois River Miles between 0.0 to 80.2 for the St. Louis District.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 11 00 Page 2
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
1.4 COORDINATION WITH OTHERS
1.5 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
1.5.1 General Security Requirements and Guidance
1.5.2 Physical Security and Access Control Requirements
1.5.3 E-Verify Program
1.6 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES
1.7 SPECIAL SAFETY REQUIREMENTS
1.8 LOCATION OF PARKING, STAGING, AND STORAGE AREAS
1.9 ELECTRICAL POWER LINES
1.10 BARRICADES AND WARNING SIGNS
1.11 AVAILABILITY AND USE OF UTILITY SERVICES
1.12 REQUIREMENTS FOR NAVIGATION
1.13 COUNCIL FOR DREDGING AND MARINE CONSTRUCTION SAFETY (CDMCS)
1.14 CONTINUITY OF WORK
1.15 DREDGING PRODUCTION SCHEDULE
1.16 SHOALING
PART 2 PRODUCTS
PART 3 EXECUTION
ATTACHMENTS:
ATTACHMENT A - Personnel Change Request Form
SECTION 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.106 Working Over or Near Water
IWNC Illinois Waterway Navigation Charts - From Mississippi River at Grafton, Illinois to Lake Michigan at Chicago and Calumet Harbors
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation.
Submittals not having a "G" designation are for information only. When used, a code following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Company Enrollment In E-Verify; G SL
Form I-9; G SL
**NOTE: To protect the privacy of Contractor personnel security information, submit with a cover page containing the Contract Number, Contract Title, and the Contractor's Point of Contact information in a sealed envelope/container and mail to:
ATTN: Security and Law Enforcement Office (CEMVR-SL) U.S. Army Corps of Engineers Rock Island District P.O. Box 2004 Rock Island, IL 61204-2004
Background Checks; G, SL
SECTION 01 14 00 Page 2
1.3 ADDITIONAL COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
In addition to the requirements of FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK, comply with the following requirements:
a. Mechanical dredging is prohibited.
b. The limits of work for the hydraulic dredging will be defined per Task Order. The work will include, but not be limited to, pre-dredging soundings verification, preparation of Government-provided dredge material placement sites, dredging, placement of dredged materials at said sites, and other dredging related activities. Not all placement sites are accessible by land.
c. The Government reserves the right to advertise and award additional Contracts. The Government also reserves the right to dredge with Government plant. Material moved by other Contract or by Government plant will not be measured for payment under this Contract.
The decision of the Contracting Officer to employ plant under separate Contract or Government plant will be final and not subject to the disputes clause.
d. Verify the existence of pipelines/utilities at each dredging location prior to commencing work. Identify any pipelines or other utilities (facilities) in the vicinity of the Contractor's work and ensure that adequate measures are taken to avoid any damage to or disruption of those facilities. Any damage to or disruption of those facilities will be repaired or replaced at no additional cost to the Government.
e. Ensure full compliance with other Federal, State, and local laws as necessary.
f. Adhere to all conditions defined in permits and certifications in attachments referenced in Section 01 30 00 ADMINISTRATIVE REQUIREMENTS.
g. Only work within the authorized work limits defined by each task order. If work occurs outside the authorized limits, to include misplaced dredged material or within "no work" zones, immediately cease work and contact the Contracting Officer.
h. Clearing, grubbing, or site disturbances needing restoration are not allowed in the scope of work for this project. If the Contractor believes it is necessary to complete their work, contact the Contracting Officer to seek direction on how to proceed.
1.4 COORDINATION WITH OTHERS
Schedule and coordinate operations affecting other Contractors, Government personnel, utilities, and/or property occurring within the work limits.
Accomplish with lead time sufficient for coordination of all involved parties as necessary for timely completion of each Contract feature. At a minimum, establish coordination with each of the following point(s) of contact, as required:
a. Area Engineer Eastern Area Office U.S. Army Corps of Engineers
SECTION 01 14 00 Page 3
4808 N. Sheridan Road Peoria, IL 61614 Telephone No.: 309-637-1321 (Collect calls not accepted.)
b. Operations Division, Technical Support U.S. Army Corps of Engineers 1500 Clock Tower Drive Rock Island, Illinois 61201 Telephone No.: 309-794-5240 (Collect calls not accepted.)
c. Construction Branch U.S. Army Corps of Engineers 1500 Rock Island Drive Rock Island, IL 61201 Telephone No.: 309-794-5763 (Collect calls not accepted.)
1.5 ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
1.5.1 General Security Requirements and Guidance
The security requirements described below apply to Contractor personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this Contract. Address questions regarding security matters to the Contracting Officer. Contractor personnel are critical to the overall security and safety of USACE installations, facilities, and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; applicable Contractor personnel must complete initial training within 30 days after receiving Notice to Proceed. Notify the Contracting Officer within five business days of completing the training. Include documentation of the names of Contractor personnel trained and which training has been completed; maintain training records as part of Contract files; and be prepared to provide copies of training certificates to the Contracting Officer. Contractor personnel and vehicles are subject to search when entering Federal installations. Comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (RAMs), and Health Protection Condition (HPCON) measures. Meet performance requirements during elevated FPCON and/or HPCON levels in accordance with USACE plans and procedures. This includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by FAR 52.243-4 CHANGES, if the FPCON or HPCON levels change at any individual facility or installation, the Government may implement security changes that affect Contractor personnel. Ensure that Contractor personnel are aware of their security responsibilities, including site-specific requirements identified in local policies or procedures.
1.5.2 Physical Security and Access Control Requirements
a. Overview: Contractor personnel requiring physical access to a USACE facility must comply with the access control procedures of that location. Contractor personnel requiring unescorted access to meet Contract performance requirements will be vetted by the USACE Rock Island District Security and Law Enforcement Office (CEMVR-SL) using the National Crime Information Center Interstate Identification Index
SECTION 01 14 00 Page 4
(NCIC-III) and Terrorist Screening Database (TSDB). Contractor personnel must comply with personal identity verification requirements as specified. Contractor personnel who do not meet requirements for unescorted access to Government installations must coordinate escorted access with the Contracting Officer. Contractor personnel who receive keys, access cards, or lock combinations that provide access to Government-owned property must comply with USACE key and lock control procedures.
b. Definition: For the purposes of this Contract, USACE facilities are defined as any USACE owned or leased property for which entry is controlled and limited to authorized USACE employees, Contractors, and official visitors.
c. Procedures:
(1) Contractor personnel may have unescorted access within controlled areas upon completion of an adjudication of fitness by CEMVR-SL and entry onto an access control list (ACL) for the facility/project. Submit background checks conducted by a bonded third party within the last six months of Notice to Proceed and authorize reports to be provided to CEMVR-SL by the third party.
Background checks must consist of a check of NCIC-III and TSDB when available. Individuals may be denied access to Rock Island District controlled facilities and/or property if the results of the third party NCIC-III equivalent background check gives an indication that a person may present a threat to the good order, discipline, safety, or security of the facility. This information includes, but is not limited to a person who has:
(a) The background investigation contains criminal arrest information about the individual that causes the senior commander to determine that the person presents a threat to the good order, discipline, or health and safety on the installation.
(b) A claimed identity that cannot be verified based on the reasonable belief that the person submitted fraudulent identity information in the attempt to gain access.
(c) Current arrest warrant in NCIC, regardless of the offense or violation.
(d) Current bar from entry or access to another Federal installation or facility.
(e) Conviction of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, or drug possession with intent to sell or distribute.
(f) Conviction for espionage, sabotage, sedition, treason, terrorism, or murder.
(g) Being registered as a sex offender.
(h) Felony conviction within the last 10 years regardless of the offense or violation.
SECTION 01 14 00 Page 5
(i) Felony conviction for a firearms or explosives violation regardless of when the conviction occurred.
(j) Engaged in acts or activities designed to overthrow the U.S.
Government by force.
(k) Been identified as known to be, or is suspected of being, a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity.
(2) Short term Contractor personnel working at the USACE facility or project for less than 15 calendar days may be escorted at the USACE facility by a USACE employee or other Contractor personnel that is on the ACL for the facility or project. Names and dates of work for short term Contractor personnel must be submitted to CEMVR-SL via e-mail at cemvr-sl@usace.army.mil to be added to the ACL for the period they will be working at the facility.
d. In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of CEMVR-SL personnel.
Cooperate and ensure that Contractor personnel provides documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the Contract. USACE Rock Island District retains the right to deny Contractor personnel from working on a USACE Rock Island District Contract based on final background investigation results.
e. Contractor personnel denied access based upon derogatory information from the NCIC-III or equivalent check may apply to the District Commander for a waiver. To obtain a waiver, Contractor personnel must:
(1) Obtain a certified copy of their complete criminal history including arrests and convictions.
(2) Obtain a letter of support from their USACE sponsor. The letter must indicate that the sponsor requests that the person be granted unescorted access to accomplish a specific purpose as well as the anticipated frequency and duration of such visits. If Contractor personnel is terminated, the sponsor must inform the CEMVR-SL so that unescorted access is no longer authorized.
(3) Submit a letter requesting the access denial be waived, to the USACE sponsor who will submit it to the District Commander. The letter must include offenses, including an explanation of why the conduct should not result in denial of access. Other factors that the sponsor or requesting individual should address are the:
(a) Nature and seriousness of the conduct;
(b) Specific circumstances surrounding the conduct;
(c) Length of time elapsed since the conduct;
(d) Age of the person at the time of the incident or conduct;
(e) Proof of efforts toward rehabilitation; and
SECTION 01 14 00 Page 6
(f) Current mailing address or email address for Army communications.
(4) The USACE sponsor will review the person's information for completeness and determine whether to endorse the request for a waiver.
(5) If the USACE sponsor endorses the waiver letter, the sponsor will provide a letter of recommendation for the person. The letter must address the relevant conduct that caused the denial and indicate why the conduct should not prohibit the person from being granted unescorted access. The USACE sponsor will submit the letters to the District Commander.
(6) The District Commander will render a determination in line with good order, discipline, and health and safety of the facility.
The District Commander will provide a copy of the determination to the person.
(7) The results of the District Commander's decision will be provided to the CEMVR-SL to update the Access Control List for the project.
(8) Persons who had a waiver request denied may request reconsideration from the District Commander one year after the date of the Commander's decision. Persons may request reconsideration earlier if they can present significant information that was not available at the time of the original request or show that the basis for the original denial was overturned, rescinded, or expired.
f. If an unexpected change in personnel is required due to sudden absence of critical path Contractor personnel, immediately contact the Contracting Officer to coordinate obtaining written approval from CEMVR-SL for new or additional Contractor personnel to be brought on-site prior to background check acceptance. Submit ATTACHMENT A - Personnel Change Request Form to receive written authorization from CEMVR-SL prior to bringing new Contractor personnel on-site. Ensure that a background check is sent to CEMVR-SL no later than 10 days from written notice of approval. USACE Rock Island District reserves the right to terminate access of Contractor personnel upon review of the background check. The Contractor will be notified immediately of any such Government decision.
g. If an unforeseen change in work site conditions, which may require a Contract Modification, causes the immediate addition of Contractor personnel, submit ATTACHMENT A - Personnel Change Request Form to receive written authorization from CEMVR-SL prior to bringing new personnel on-site. Ensure that a background check is sent to CEMVR-SL no later than 10 days from written notice of approval. USACE Rock Island District reserves the right to terminate access of Contractor personnel upon review of the background check. The Contractor will be notified immediately of any such Government decision.
1.5.3 E-Verify Program
Comply with FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION and Subpart
22.18 and submit Company Enrollment in E-Verify at:
https://www.e-verify.gov/
SECTION 01 14 00 Page 7 to meet the Contract employment eligibility requirements. Cooperate with Federal and State agencies responsible for enforcing labor requirements including eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i) FEDERAL AND STATE LABOR REQUIREMENTS - POLICY. Submit an initial list of verified/eligible candidates within three business days after Notice to Proceed. When Contracts are with individuals, the individuals must complete a Form I-9, Employment Eligibility Verification, and submit it as part of the official Contract file.
1.6 ACTIVITY REGULATIONS FOR CONTRACTOR ACCESS AND USE OF PREMISES
Follow current Army Security Regulations concerning strict visitor control and preservation of Government assets. Immediately report security concerns to the Contracting Officer.
Work may be affected by the following Force Protection Conditions levels:
FPCON NORMAL
Applies when there is no discernible terrorist activity. Routine security posture.
FPCON ALPHA
When there is a general threat of possible threat activity against personnel and the installation, or both. There will be a limited impact on normal operations.
FPCON BRAVO
When there is an increased or more predictable threat. There will be an impact on normal operations, but it will not cause undue hardship to personnel, substantially affect operational capabilities, or cause aggravated relations with local authorities and civilians.
FPCON CHARLIE
When an incident occurs, or intelligence is received indicating imminent terrorist action. If this lasts for more than a short period it will probably create hardships for personnel and affect the peacetime activities of units and personnel.
FPCON DELTA
When a terrorist attack has occurred, or intelligence indicates likely terrorist action against a specific location. This is normally declared as a localized warning and requires implementation of mandatory security measures. This cannot be sustained for an extended period without causing significant hardships for personnel and affecting the peacetime activities of units and personal.
FPCON NORMAL through FPCON BRAVO will not affect the work. FPCON CHARLIE and FPCON DELTA will affect the work. FPCON CHARLIE will subject the Contractor to a higher degree of inspection and may not be able to work on-site for short periods of time as decreed by the USACE Rock Island
SECTION 01 14 00 Page 8
District Security Officer. FPCON DELTA, as determined by the USACE Rock Island District Security and Law Enforcement Office, will close the site down and the Contractor will not be able to work on the site.
1.7 SPECIAL SAFETY REQUIREMENTS
Remove Contractor personnel from the job site who disregards safety regulations or displays unsafe attitudes and actions, as directed, and in accordance with EM 385-1-1 .
Work over or near water must be in accordance with 29 CFR 1926.106 and EM 385-1-1 Chapter 19 (19-8.e).
a. Provide Contractor personnel working over or near water, where the danger of drowning exists, with U.S. Coast Guard-approved life jackets or buoyant work vests.
b. Prior to and after each use, inspect buoyant work vests or life preservers for defects which would alter their strength or buoyancy.
Do not use defective units.
c. Furnish ring buoys in accordance with EM 385-1-1 and refer to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, paragraph "LIFESAVING AND
SAFETY SKIFFS".
d. Provide at least one lifesaving skiff immediately available at a location where Contractor personnel are working over or near water.
Refer to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, paragraph
"LIFESAVING AND SAFETY SKIFFS".
When operating mechanized equipment on a floating/marine plant, provide positive and acceptable means of preventing this equipment from moving or falling into the water. This includes front end-loaders, bulldozers, trucks (both on- and off-road), backhoes, track hoes, and similar equipment. If intending to use such equipment on a floating plant, then develop an Activity Hazard Analysis (AHA) for this feature of work.
Include a detailed explanation of the type or types of physical barriers, curbs, structures, and facilities to be incorporated to protect the operator and prevent the equipment from entering the water. Nonstructural warning devices may be considered for situations where the use of structural barriers is impracticable. Thoroughly address the procedure and submit the AHA to the Government prior to commencing work.
1.8 LOCATION OF PARKING, STAGING, AND STORAGE AREAS
Floating plant staging is allowed within the project area. Do not block the navigation channel during staging. Land based staging is allowed at designated placement sites. Land access for vehicle parking may or may not be available. Coordinate the Contractor's parking, staging, and storage areas with the Contracting Officer for each issued Task Order.
1.9 ELECTRICAL POWER LINES
Prior to mobilization, if the work will be adjacent to power lines, provide appropriate danger signs where equipment scheduled for use is capable of contacting such lines. To confirm the location of underground lines, contact the appropriate council listed in Section 01 30 00 ADMINISTRATIVE REQUIREMENTS paragraph "ONE CALL SYSTEM FOR EXCAVATORS".
SECTION 01 14 00 Page 9
Either have aerial power lines temporarily shut off and prevent the lines from being energized, or maintain clearances required by EM 385-1-1 . Do not proceed working into dangerous areas without assigning additional Contractor personnel to watch the movements of other personnel and equipment. Ensure that designated clearances are maintained.
1.10 BARRICADES AND WARNING SIGNS
Provide and maintain barricades, danger and warning signs, and, if applicable, suitable and efficient lighting at all points of entry to the area(s) that will be closed to public travel or access. Separate payment will not be made for costs incurred for providing barricade and warning signs. Costs must be considered as a subsidiary obligation and included in the mobilization costs.
1.11 AVAILABILITY AND USE OF UTILITY SERVICES
The Government will not make utility services available to the Contractor.
Provide own utility services and maintain within the construction area a minimum field-type sanitary facility approved by the Contracting Officer.
1.12 REQUIREMENTS FOR NAVIGATION
Movement of floating plant must be in accordance with IWNC and EM 385-1-1 .
The areas 600 feet above and 150 feet below USACE navigational dams are posted and designated as restricted. Movement of any vessel, boat, or other floating item(s) in these areas is prohibited except by, or under the direction of, the Lockmaster. For any moving vessel, boat, or floating plant within the restricted area(s), furnish two working screws, as applicable. Provide the vessel, boat, or floating plant with a minimum 800 horsepower motor(s).
1.13 COUNCIL FOR DREDGING AND MARINE CONSTRUCTION SAFETY (CDMCS)
a. Participate in the CDMCS, website: http://cdmcs.org/ . Contractors not participating in the CDMCS, must follow procedures in accordance with
EM 385-1-1 .
b. If the Contractor is a currently accepted participant in the Dredging Contractors of America (DCA)/(CDMCS), as determined by the DCA/USACE Joint Committee, and holds a current valid Certificate of Compliance for both the Contractor Program and the Dredge(s) to be used to perform the work as required, include this information with the Accident Prevention Plan (APP):
(1) Make the Contractor's current Safety Management System (SMS) documentation available for review upon request;
(2) Submit the current valid Company Certificate of Compliance for SMS;
(3) Submit the current dredge(s) Certificate of Compliance based on third party audit; and
(4) Submit site-specific addenda to the SMS as specified.
1.14 CONTINUITY OF WORK
Payment will not be made for work completed in any area designated by the Contracting Officer until the full depth required is secured in the whole
SECTION 01 14 00 Page 10 of such area, unless prevented by ledge rock. Payment will not be made for excavation in any area not adjacent to, and in prolongation of, areas where full depth has been secured except by decision of the Contracting Officer. Should any nonadjacent area be excavated to full depth during the operations, payment for all work will be deferred until the required depth has been excavated as specified and indicated. If an interim survey is deemed in the best interest of the Government, an interim survey may be performed by the Government and partial payment for completed work may be applicable. The Contractor may request an interim survey for partial payment be performed by the Government during a Task Order. There is no guarantee the Government will be able to perform the interim survey when requested. Government survey will be the basis for measurement and payment. The Contractor may be required to suspend dredging at any time when, for any reason, the gages or ranges cannot be seen or properly followed.
1.15 DREDGING PRODUCTION SCHEDULE
Schedule operations in order to perform a minimum of 4,000 cubic yards per day of channel maintenance dredging or 20,000 cubic yards per week and a minimum of 1,000 cubic yards per day of small boat harbor dredging.
Operations shall be 24 hours per day, 7 days per week, including holidays, except as otherwise specified. Notify the Contracting Officer of the means, methods, and schedule to regain lost production.
Durations for task orders will be calculated based on adding the time for volume to be dredged, time for transportation between sites, and time for set up, break down, and reconfigurations of pipe as follows:
a. Time for Volume Dredged Dredge volume / 4,000CY per day, rounded up to the nearest day
b. Time for Transportation Between Sites River miles / 4mph + 3 hours per lockage, rounded up to the nearest day
c. Time for set up, break down, and reconfigurations For pipeline needs of 0 feet to 5,000 feet of length:
2 days for set up, 2 days for break down For pipeline needs of over 5,000 feet of length:
3 days for set up, 3 days for break down For pipeline reconfiguration, if applicable:
2 days for reconfiguration
For example: 57,000CY cut. 2,500 feet of pipeline required, one reconfiguration required, 100 river miles of transport, one lockage.
57,000CY / 4,000 CY/Day = 14.25 days round to 15 days 2,500 feet of pipeline = 2 days setup + 2 days breakdown = 4 days One reconfiguration = 2 days 100RM / 4mph = 25 hours + 3 hours lockage = 28 hours round to 2 days.
Total = 15 + 4 + 2 + 2 = 23 days for task order
The first dredging task order following issuance of mobilization will not include days for setup as those will be incidental to mobilization.
Potential dredging locations, potential placement locations, and dredging statistical information are attached, see Section 01 30 00 ADMINISTRATIVE REQUIREMENTS. The river miles for these dredging locations and dredge material placement sites will be provided per Task Order. These
SECTION 01 14 00 Page 11 computation sheets are compiled from historical data; they are not a warranty or representation as to which specific areas will require dredging, the quantities to be dredged, or the placement sites which will be used under this Contract.
1.16 SHOALING
If shoaling occurs in any section previously accepted, notify the Contracting Officer before the Task Order is completed. The Government will survey the shoal at its discretion. Redredging may be required if:
a. It is agreed by the Contracting Officer that shoaling has occurred;
b. Shoaling occurred due to natural processes; and
c. A Task Order price is agreed upon by both the Contractor and the Contracting Officer.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 14 00 Page 12
ATTACHMENT A TO SECTION 01 14 00
PERSONNEL CHANGE REQUEST FORM
Contract No. ____________________ Date _______________
We, ____________________, respectfully request to add / replace (circle one) personnel to the jobsite due to the following situation:
Personnel to be conditionally added to the ACL (escorted by):
Background checks (if required for a long term employee) must be submitted by the close of business on (Insert proposed date): _________________________
(Insert signature block)
SECTION 01 14 00 Page 13
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
1.2 JOB PAYMENT ITEMS
1.2.1 Mobilization and Demobilization
1.2.1.1 Payment
1.2.1.2 Unit of Measure
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Dredging
1.3.1.1 Payment
1.3.1.2 Measurement
1.3.1.3 Unit of Measure
1.3.2 Transportation Of Plant Between Dredging Sites
1.3.2.1 Payment
1.3.2.2 Measurement
1.3.2.3 Unit of Measure
1.3.3 Non-Effective Pay Time
1.3.3.1 Payment
1.3.3.2 Measurement
1.3.3.3 Unit of Measure
1.3.4 Standby
1.3.4.1 Payment
1.3.4.2 Measurement
1.3.4.3 Unit of Measure
1.4 CONTRACT MAXIMUM AND MINIMUM
1.4.1 Maximum
1.4.2 Minimum
1.5 ADJUSTMENT TO FUEL PRICE
1.5.1 Basis of Adjustment
1.5.2 Contract Line Items Subject to AFP
1.5.3 Example
PART 2 PRODUCTS
PART 3 EXECUTION
SECTION 01 20 00 Page 1
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Mobilization And Demobilization; G, ODT
1.2 JOB PAYMENT ITEMS
Payment items for the work of this Contract for which Contract job payments will be made are listed in the SCHEDULE OF PRICES and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job payment item, to be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed to constitute full compensation for furnishing all materials and for performing all work in a complete and acceptable manner. Furnish plant, equipment, tools, supplies, labor, supervision, incidental materials, quality control, and environmental protection for performing all work necessary to dredge, transport, and place dredged materials while meeting safety requirements.
Except as otherwise specified, all costs associated with incidental work will be included in the Schedule of Prices Bid Item with which that incidental work is most closely associated.
1.2.1 Mobilization and Demobilization
Submit a list of equipment and the value representing this mobilization and demobilization for approval.
1.2.1.1 Payment
Payment under this line item includes furnishing all materials, equipment, and labor and performing all operations necessary for mobilization and demobilization of the Contractor's plant, attendant plant, equipment, and personnel. Mobilization includes transport of all the Contractor's plant, attendant plant, equipment, and personnel from the Contractor's home base to River Mile 157.5 (Peoria Lock and Dam) in a condition and state of readiness to immediately initiate dredging operations. Mobilization will be considered complete when the plant is proven to be fully operational at the first dredging task order site. Setup of plant at first dredging task order site is incidental to mobilization and will not be included in that task order duration. Should the first Task Order of a given dredging season direct the Contractor to proceed to a dredging site other than River Mile 157.5, payment will be made under CLIN(s) Transportation of Plant Between Dredging Sites only to the extent that the distance between
SECTION 01 20 00 Page 2 the Contractor's home base and the initial dredging site is greater than the distance from the Contractor's home base to River Mile 157.5. For demobilization, payment will be made under CLIN Transportation of Plant Between Dredging Sites only to the extent that the distance between the Contractor's home base and the final dredging site is greater than the distance from the Contractor's home base to River Mile 157.5. Performance and payment bonds are incidental to the Mobilization and Demobilization bid item. This includes, but is not limited to: mobilization, all work required in preparing the dredging plant and equipment for shipment and incidentals to the mobilization site; demobilization to consist of all work required to prepare plant for return trip, and incidentals.
Bid Item No. 0001, "Ordering Period No. 1, Mobilization and Demobilization;"
Bid Item No. 0101, "Ordering Period No. 2, Mobilization and Demobilization;"
Bid Item No. 0201, "Ordering Period No. 3, Mobilization and Demobilization;"
Bid Item No. 0301, "Ordering Period No. 4, Mobilization and Demobilization;" and
Bid Item No. 0401, "Ordering Period No. 5, Mobilization and Demobilization;" as applicable.
1.2.1.2 Unit of Measure
Unit of measure: job.
1.3 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this Contract on which the Contract unit price payments to be made are listed in the SCHEDULE OF PRICES and described below. The unit price and payment made for each item listed to constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, surveys, and for performing all work required for each of the unit price items.
1.3.1 Dredging
1.3.1.1 Payment
Payment will be made for work including, but not limited to, placement site preparation; setup of pipeline; setup of pumps and return water pipes and hoses; hydraulic dredging; relocation of navigation channel markers, if necessary; satisfactory placement of material in the placement site;
operation of return water pumps; non-use of return water pumps and appurtenances; reconfigurations of pipeline; breakdown of pipeline; and other operations incidental thereto. See specification 35 20 23 for detail on dredge and land based plant. All items not specified to be measured under the remaining payment items will be considered incidental to dredging.
Bid Item No. 0002AA, "Ordering Period No. 1, Dredging, First 125,000
CY;"
SECTION 01 20 00 Page 3
Bid Item No. 0002AB, "Ordering Period No. 1, Dredging, Over 125,000 CY;"
Bid Item No. 0102AA, "Ordering Period No. 2, Dredging, First 125,000
CY;"
Bid Item No. 0102AB, "Ordering Period No. 2, Dredging, Over 125,000 CY;"
Bid Item No. 0202AA, "Ordering Period No. 3, Dredging, First 125,000
CY;"
Bid Item No. 0202AB, "Ordering Period No. 3, Dredging, Over 125,000 CY;"
Bid Item No. 0302AA, "Ordering Period No. 4, Dredging, First 125,000
CY;"
Bid Item No. 0302AB, "Ordering Period No. 4, Dredging, Over 125,000 CY;"
Bid Item No. 0402AA, "Ordering Period No. 5, Dredging, First 125,000 CY;" and
Bid Item No. 0402AB, "Ordering Period No. 5, Dredging, Over 125,000 CY;" as applicable.
1.3.1.2 Measurement
Dredging will be measured and paid for by the cubic yard of material removed above the project depth within the allowable tolerance specified and within the limits of the dredge site. Material not removed from the dredge site, but within the specified tolerances will not be included for measurement and payment as computed by the Government. For additional measurement information see Section 35 20 23 HYDRAULIC DREDGING, paragraphs "DETERMINATION OF QUANTITIES FOR CHANNEL DREDGING" and "PROJECT
DEPTH, QUANTITY, OVERDEPTH, SIDE SLOPES, AND INFILL".
1.3.1.3 Unit of Measure
Unit of measure: cubic yard.
1.3.2 Transportation Of Plant Between Dredging Sites
1.3.2.1 Payment
Payment for all costs associated with moving between assignments, includes, but not limited to, moving between assignments in upstream or downstream direction, and performing required operations incidental thereto, including cleaning up land based staging sites used in the prosecution of the work.
Bid Item No. 0003, "Ordering Period No. 1, Transportation Of Plant Between Dredging Sites;"
Bid Item No. 0103, "Ordering Period No. 2, Transportation Of Plant Between Dredging Sites;"
Bid Item No. 0203, "Ordering Period No. 3, Transportation Of Plant Between Dredging Sites;"
Bid Item No. 0303, "Ordering Period No. 4, Transportation Of Plant
SECTION 01 20 00 Page 4
Between Dredging Sites;" and
Bid Item No. 0403, "Ordering Period No. 5, Transportation Of Plant Between Dredging Sites;" as applicable.
1.3.2.2 Measurement
River miles are defined as the distance on the marked navigation mid channel sailing line as detailed on the Illinois Waterway Navigation Charts (current edition). River Miles will be computed from the navigation charts. They will be computed from the marked navigation channel at a point directly perpendicular to the center of the entire current dredge cut to the marked navigation channel at a point directly perpendicular to the center of the entire next dredge cut, and rounded to the nearest tenth of a mile. Under this Contract, payments will not be made when the distance traveled between assignments is 2 miles or less. The dredge and attendant plant will not be given priority over the other waterway users for lockages through the locks. Observation of normal queuing procedures is required unless otherwise permitted by the lockmaster. Prepare the tow for efficient and safe lockage. Ensure that all equipment is secured for moving between dredging sites. No separate payment will be made for delays while transiting between sites. Movement between sites is considered as a single movement regardless of the number of trips made between the start point and the end point. The distance for transportation of plant will be measured from the previous Task Order dredge or mooring site or the Contractor's current location to the next Task Order dredge or mooring site, whichever is less.
1.3.2.3 Unit of Measure
Unit of measure: miles.
1.3.3 Non-Effective Pay Time
1.3.3.1 Payment
Payment for all costs associated Non-Effective Pay Time includes, but is not limited to: time lost due to passing vessels and associated pipe breaks and reconnections; actual time lost in moving swing anchors; adding or removing floating or shore pipeline; actual time lost in removal of debris from pipeline, dredge pump, suction, and cutterhead cleanouts, including back-flushing pump or suction, and adjusting spill pipe, including associated bulldozer work.
Bid Item No. 0004AA, "Ordering Period No. 1, Non-Effective Pay Time, First 250 Hours;"
Bid Item No. 0004AB, "Ordering Period No. 1, Non-Effective Pay Time, Over 250 Hours;"
Bid Item No. 0104AA, "Ordering Period No. 2, Non-Effective Pay Time, First 250 Hours;"
Bid Item No. 0104AB, "Ordering Period No. 2, Non-Effective Pay Time, Over 250 Hours;"
Bid Item No. 0204AA, "Ordering Period No. 3, Non-Effective Pay Time, First 250 Hours;"
SECTION 01 20 00 Page 5
Bid Item No. 0204AB, "Ordering Period No. 3, Non-Effective Pay Time, Over 250 Hours;"
Bid Item No. 0304AA, "Ordering Period No. 4, Non-Effective Pay Time, First 250 Hours;"
Bid Item No. 0304AB, "Ordering Period No. 4, Non-Effective Pay Time, Over 250 Hours;"
Bid Item No. 0404AA, "Ordering Period No. 5, Non-Effective Pay Time, First 250 Hours;" and
Bid Item No. 0404AB, "Ordering Period No. 5, Non-Effective Pay Time, Over 250 Hours;" as applicable.
1.3.3.2 Measurement
Non-effective pay time will be calculated to the nearest tenth of an hour during each 24-hour period. The time will be taken from the daily report of operations which will be compiled from the dredge operator's shift logs. Ensure that the dredge operator's shift logs precisely shows the time of each shut down and start-up of the dredge pump and the exact reason for the shutdown. The shutdown of the dredge pump is defined as the disengagement of the pump clutch, or cessation of rotation of the pump by its prime mover. Time required for pump priming after engagement will not be part of non-effective pay time. Submit the dredge operator's shift logs to the Contracting Officer with the daily report of operations. The Contractor and the Contracting Officer initial the operator's logs and the daily report.
1.3.3.3 Unit of Measure
Unit of measure: nearest tenth of an hour.
1.3.4 Standby
1.3.4.1 Payment
Payment for all costs associated with standby, standby status is in accordance with Section 35 20 23 HYDRAULIC DREDGING paragraph STANDBY, will be made for:
Bid Item No. 0005AA, "Ordering Period No. 1, Standby, First 120 Hours;"
Bid Item No. 0005AB, "Ordering Period No. 1, Standby, Over 120 Hours;"
Bid Item No. 0105AA, "Ordering Period No. 2, Standby, First 120 Hours;"
Bid Item No. 0105AB, "Ordering Period No. 2, Standby, Over 120 Hours;"
Bid Item No. 0205AA, "Ordering Period No. 3, Standby, First 120 Hours;"
Bid Item No. 0205AB, "Ordering Period No. 3, Standby, Over 120 Hours;"
Bid Item No. 0305AA, "Ordering Period No. 4, Standby, First 120 Hours;"
Bid Item No. 0305AB, "Ordering Period No. 4, Standby, Over 120 Hours;"
SECTION 01 20 00 Page 6
Bid Item No. 0405AA, "Ordering Period No. 5, Standby, First 120 Hours;"
and
Bid Item No. 0405AB, "Ordering Period No. 5, Standby, Over 120 Hours;"
as applicable.
1.3.4.2 Measurement
Standby will be calculated by the nearest hour. Measurement will begin when the Contractor's entire plant is moored at the standby location and ends upon issuance of a Task Order to initiate work or a written notice by the Contracting Officer releasing plant from standby.
1.3.4.3 Unit of Measure
Unit of measure: nearest hour.
1.4 CONTRACT MAXIMUM AND MINIMUM
1.4.1 Maximum
Task orders will not exceed a cumulative amount of $25,000,000 for the length of the Contract, as set forth in Clause 52.216-22(b) INDEFINITE
QUANTITY.
1.4.2 Minimum
The Government is obligated to order no less than $50,000 of work specified in the Schedule of Prices for the ordering periods and any exercised subsequent ordering period, as set forth in Clause 52.216-22
INDEFINITE QUANTITY.
1.5 ADJUSTMENT TO FUEL PRICE
This paragraph prescribes the adjustments that will be made to the unit price(s) for certain Contract Line Items in the event of changes (either upward or downward) in diesel fuel prices. The Contracting Officer will calculate the Adjustment to Fuel Price (AFP) for the affected Contract line item unit prices on an individual task order basis. These adjustments are premised on the assumptions set forth in this clause and will be applied uniformly regardless of the Contractor's actual cost experience in performing the work under this Contract.
For purposes of this adjustment, the Contracting Officer will use a Base Fuel Index (BFI). The BFI will be the published price (in dollars/gallon) in effect for Diesel Fuel (all types) for the Midwest (PADD 2) Region as established by the Energy Information Administration (EIA) on 02 June 2025. This information is published at https://www.eia.gov/petroleum/gasdiesel/ . The index is currently updated on a weekly basis.
A Current Fuel Index (CFI) in dollars per gallon will be established at issuance of each task order. The CFI will be the published price in effect for Diesel Fuel (all types) for the Midwest (PADD 2) Region as established by the Energy Information Administration (EIA) in effect on the first calendar day of the month during which the task order is issued by the Contracting Officer. The AFP (addition or subtraction) to the unit price for a given line item will be computed by application of the following formula:
SECTION 01 20 00 Page 7
AFP = ((BUP*% Fuel Cost) / (BFI - 0.513))*(CFI-BFI)
Where:
" AFP = Adjustment to Fuel Price " BUP = Bid Unit Price, the unit prices for each applicable Contract line item " CFI = Current Fuel Index (in dollars per gallon) " BFI = Base Fuel Index (in dollars per gallon) = $3.388 on 02 June 2025 " % Fuel Cost = presumed percentage of bid item cost attributable to fuel for a given Contract Line Item subject to adjustment under this clause as indicated in the table below (this percentage IS NOT subject to adjustment as a result of the Contractor's actual cost experience) " 0.513 = the presumed fuel tax rate (in dollars per gallon)
1.5.1 Basis of Adjustment
The AFP will be calculated and applied to (added or subtracted from the price of) each unit of each Contract Line Item Number (CLIN) identified in the table below, that will be used in a given task order. The adjustments to the unit prices for a given task order will be used for the life of that task order, including any modifications or adjustments to it. The adjustments will be rounded to the nearest cent; prices of elements within the formula will be rounded to the nearest tenth of a cent (three decimal places). CLINS not listed in the table below are not subject to adjustment for changes in fuel price under this or any other clause of the Contract.
1.5.2 Contract Line Items Subject to AFP
CONTRACT LINE ITEM UNIT PERCENT FUEL
COST
Dredging CY 20
Transportation of Plant Between Dredging Sites MI 15
In the event the Energy Information Administration (EIA)…
This is the start of the file's text. The full file is on GovTribe.