A22- Plan Set Clock Tower Back Entry Repair.pdf
PDF 1 MB Posted
- Attached to
- Clock Tower Back Entry Stairs Removal and Replacement Federal contract opportunity
- Solicitation number
- W912EK20R0020
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EK20R0020 Amendment 0001.pdf | ||
| A22- W912EK20R0020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A N
S I
D
C
U s e rs \b e c d c d s \D e s k to p \C lo c k T o w e r
B a c k S ta ir s
-2
\G -B
S D x x x -C
A D
S
H E
E T
-0
-0
-S -1
.d g n
:1
:4
P
M b e c d c d s
D
A T
E n g in e e ri n g S h e e t_
S e e d d .d g
SCALE : 3/4"=1'-0" 0 1' 2' 3'
A1
PLAN - NORTH STAIRS
S-301
C1
S-301
A1
S -3
A
S -3
C
S-101
L O
A D
IN
G D
O C
K A
N D S
T A
IR
S P
L A
N
TOWER BASEMENT
STAIRS TO CLOCK
LANDING AND STAIRS
PRECAST OR CAST-IN-PLACE
REMOVE AND REPLACE WITH
PRECAST OR CAST-IN-PLACE SLAB
REMOVE AND REPLACE WITH
PRECAST OR CAST-IN-PLACE COLUMNS
REMOVE AND REPLACE WITH
TOWER 1ST FLOOR
STAIRS TO CLOCK
MAIN BUILDING
EXPANSION JOINT
FIRST FLOOR ENTRANCE
CAST-IN-PLACE STAIRS
WITH PRECAST OR
REMOVE AND REPLACE
MAIN BUILDING WALL
EXPANSION JOINT
"8 51'-2
GENERAL NOTES
C A
S T -I
N -P
L A
C E P
R E
C A
S T O
P T
IO
N S
N
HIT HY-200-R DESIGN BASIS
USE ADHESIVE ANCHORS
SLAB AND SUSPENDED SLAB
12" EMBEDMENT INTO EXISTING
DOWELS AT 12" O.C.
" EPOXY COATED4
3Ø
PRESACT OR CAST-IN-PLACE TREAD
"SLAB TREAD". REPLACE WITH
SAW CUT AND REMOVE EXISTING
REMOVE AND REINSTALL HANDRAILS
BETWEEN REINSTALLED HANDRAILS
INSTALL NEW SAFETY CHAIN / RAIL
14. FIELD VERIFY DIMENSIONS PRIOR TO STARTING WORK
BUILDING MASONARY DURING WORK
13. PRECAUTIONS WILL BE TAKEN TO PROTECT MAIN
WHERE NO FILL EXISTS
MATERIALS UNDER STAIRS, ADD COMPACTED SAND FILL
12. CONDITIONS UNDER STAIRS IS UNKNOWN. MATCH FILL
11. STEPS WILL HAVE FOUR EACH EPOXY COATED #4 BARS
SIMILAR IN APPEARANCE TO THE MAIN BUILDING
STONES WITH CUT, CHAT SAW FINISH DOLOMITE STONE
10. REPOINT ALL STONE JOINTS, REMOVE AND REPLACE BROKEN
SYSTEM AS IT IS TO BE REINSTALLED
BE CAREFUL TO SAVE ALL PARTS OF EXISTING RAILING9.
THAT MEETS OR EXCEEDS ASTM C920
VERTICAL JOINTS SHALL BE SEALED WITH JOINT SEALANT8.
TO THE DIRECTION OF TRAFFIC
ON EACH STEP PLACE A BROOM FINISH PERPENDICULAR 7.
CONCRETE AND COLUMNS AND EXISTING MAIN BUILDING
1/2 " WATER IMPERMIABLE EXPANSION JOINT BETWEEN NEW6.
STRENGTH OF 60 KSI
" WITH A MINIMUM YIELD 4
3 ALL DOWELS WILL BE Ø5.
STRENGTH OF 60 KSI AND EPOXY COATED
ALL REINFORCEMENT WILL HAVE A MINIMUM YIELD4.
IT IS BATCHED
ON-SITE. NO WATER TO BE ADDED TO CONCRETE AFTER
NECESSARY IF USING AN APPROVED SUPERPLASTICIZER
SLUMP SHOULD BE BETWEEN 2 - 4 " AND MAY GO TO 8" IF
FLY ASH REPLACEMENT, AND AIR-ENTRAINED (5 TO 8%).
PORTLAND CEMENT, MAY HAVE UP TO 20% CLASS C
CONCRETE TO BE ASTM C150 TYPE II LOW ALKALINE3.
STRENGTH OF 4500 PSI AT 28 DAYS.
ALL CONCRETE WILL HAVE A MINIMUM COMPRESSIVE2.
LOAD ON SLAB
SLAB TO SUPPORT 250 PSF LIVE LOAD AND 150 PSF DEAD1.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
SHEET ID
A
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S I
D
C
U s e rs \b e c d c d s \D e s k to p \C lo c k T o w e r
B a c k S ta ir s
-2
\G -B
S D x x x -C
A D
S
H E
E T
-0
-0
-S -2
.d g n
:2
:4
P
M b e c d c d s
D
A T g in e e ri n g S h e e t_
S e e d d .d
S-201
C A
S T -I
N -P
L A
C E P
R E
C A
S T O
P T
IO
N S
E L E
V A
T
IO
N
A1
ELEVATION
SCALE : 3/4"=1'-0" 0 1' 2' 3'
"16 921'-3
5'-8""2 18'-0"8
56'-6
"2 18'-4
WITH LIME MORTAR
REPOINT JOINTS
GENERAL NOTES
MATERIALS AND START OF WORK.
FIELD VERIFY DIMENSIONS PRIOR TO PURCHASING1.
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
SHEET ID
A
B
C
D
E
F
S I
D
C
U s e rs \b e c d c d s \D e s k to p \C lo c k T o w e r
B a c k S ta ir s
-2
\G -B
S D x x x -C
A D
S
H E
E T
-0
-0
-S -3
A .d g n
:2
:0
P
M b e c d c d s
D
A T g in e e ri n g S h e e t_
S e e d d .d
S
C T
IO
N S
C A
S T -I
N -P
L A
C E O
P T
IO
N
S-301A
GENERAL NOTES
0 1' 2' 4'SCALE : 1/2"=1'-0"A1
NORTH CROSS SECTION
0 1' 2' 4'SCALE : 1/2"=1'-0"A6
EAST LOWER STAIRS SECTION
0 1' 2' 4'SCALE : 1/2"=1'-0" D6
EAST UPPER STAIRS SECTION
0 1' 2' 4'SCALE : 1/2"=1'-0"
MAINTAIN UNIFORM STEPS
NOTCH TOP TREAD TO
MIN. 2" COVER REQD.
AT 12" O.C. EACH WAY
#5 EPOXY COATED BAR
SLAB
TOP OF
BASEMENT
LANDING TO
GRADE
STAIRS ON
COVER REQUIRED
EACH WAY MIN. 3"
4" BAR AT 16" O.C.
11"
1'-0"
11"
6'-5"
4'-0"
BASEMENT LANDING
EXPANSION JOINT
EXPANSION JOINT
EXISTING DRAINAGE DURING PROJECT
PREVENT DEBRIS FROM ENTERING
8'-1"
1'-0" 1'-0"
"8 75'-7
TREADS
FILL
COMPACTED
UNDER EXISTING TREADS
UNKNOWN CONDITIONS
SETBACK
APPROX. 2"
7'-9"
"8 75'-7
MAINTAIN UNIFORM STEPS
NOTCH TOP TREAD TO
TREADS
STAIRS ON GRADE
MIN. 3" COVER REQUIRED
#4 BAR AT 16" O.C. EACH WAY
"2 18'-4
1'-2"
1'-2"
WALL GEOMETRY
ASSUMED EXISTING
12" EMBEDMENT
" AT 12" O.C.4
3WITH DOWELS Ø
TIE SLAB TO BUILDING SLAB
HEIGHT OF THE SLAB
SHALL BE THE FULL
COLUMNS. MATERIAL
MATERIAL AROUND
PLACE EXPANSION
AFTER REMOVAL OF STONES.
FOR FILL. FILLING OF VOID WILL BE DETERMINED
ASSUME 2 CUBIC YARDS OF SAND MAY BE REQUIRED
UNKNOWN CONDITION OF MATERIAL UNDER STONES.
D1
SOUTH CROSS SECTION
EXISTING STONES
SHOWN FOR CLARITY
REINFORCMENT NOT
HEIGHT OF THE SLAB
SHALL BE THE FULL
COLUMNS. MATERIAL
MATERIAL AROUND
PLACE EXPANSION
COLUMN PLACMENT
EXPANSION MATERIAL AROUND COLUMNS AND
SAW CUT EXISTING SLAB TO PROVIDE ROOM FOR 3.
SUPPLY AND PLACE SAND AS NEEDED FOR FILL2.
PRECAST TREADS
COMPACTED SAND FILL USED TO SUPPORT MIDDLE OF1.
EXPANSION JOINT
EXISTING DRAINAGE DURING PROJECT
PREVENT DEBRIS FROM ENTERING
EXISTING DRAINAGE DURING PROJECT
PREVENT DEBRIS FROM ENTERING
STONES.
DETERMINED AFTER REMOVAL OF
FOR FILL. FILLING OF VOID WILL BE
YARD OF SAND MAY BE REQUIRED
UNDER STONES. ASSUME 1 CUBIC
UNKNOWN CONDITION OF MATERIAL
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
SHEET ID
A
B
C
D
E
F
S I
D
C
U s e rs \b e c d c d s \D e s k to p \C lo c k T o w e r
B a c k S ta ir s
-2
\G -B
S D x x x -C
A D
S
H E
E T
-0
-0
-S -3
B .d g n
:3
:4
P
M b e c d c d s
D
A T g in e e ri n g S h e e t_
S e e d d .d
S
C T
IO
N S
S-301B
GENERAL NOTES
0 1' 2' 4'SCALE : 1/2"=1'-0"A1
NORTH CROSS SECTION
0 1' 2' 4'SCALE : 1/2"=1'-0"A6
EAST LOWER STAIRS SECTION
0 1' 2' 4'SCALE : 1/2"=1'-0" D6
EAST UPPER STAIRS SECTION
0 1' 2' 4'SCALE : 1/2"=1'-0"
MIN. 2" COVER REQD.
AT 12" O.C. EACH WAY
#5 EPOXY COATED BAR
SLAB
TOP OF
BASEMENT
LANDING TO
COVER REQUIRED
EACH WAY MIN. 3"
4" BAR AT 16" O.C.
MIN 3" COVER REQUIRED
AT 12" O.C. EACH WAY
#5 EPOXY COATED BAR
TOP MIN. REINFORCEMENT
BASEMENT LANDING
EXPANSION JOINT
EXPANSION JOINT
EXISTING DRAINAGE DURING PROJECT
PREVENT DEBRIS FROM ENTERING
MAINTAIN UNIFORM STEPS
NOTCH TOP TREAD TO
TREADS
TREAD SUPPORTS
EXISTING STONE
P R
E C
A S
T O
P T
IO
N
SAND FILL
COMPACTED
1'-2"
11"
1'-2"
11"
SAND FILL
COMPACTED
CONCRETE
OR CAST-IN-PLACE
CMU RUNNING BOND
EITHER STONE OR
TREAD SUPPORTS
UNDER EXISTING TREADS
UNKNOWN CONDITIONS
SLABS & COLUMNS
EMBEDMENT INTO
" DOWELS 6"4
3Ø
"2 18'-4
1'-2"
SETBACK
APPROX. 2"
TREAD SUPPORTS
CAST-IN-PLACE
STONE, CMU, OR
12" EMBEDMENT
" AT 12" O.C.4
3WITH DOWELS Ø
TIE SLAB TO BUILDING SLAB
1'-0"1'-0"
8'-1"
HEIGHT OF THE SLAB
SHALL BE THE FULL
COLUMNS. MATERIAL
MATERIAL AROUND
PLACE EXPANSION
WITH 2 INCH MIN. COVER
(4) EPOXY COATED #4 BARS
EACH STEP SHALL HAVE
WITH 3 INCH MIN. COVER
(4) EPOXY COATED #4 BARS
EACH STEP SHALL HAVE
D1
SOUTH CROSS SECTION
AFTER REMOVAL OF STONES.
FOR FILL. FILLING OF VOID WILL BE DETERMINED
ASSUME 2 CUBIC YARDS OF SAND MAY BE REQUIRED
UNKNOWN CONDITION OF MATERIAL UNDER STONES.
HEIGHT OF THE SLAB
SHALL BE THE FULL
COLUMNS. MATERIAL
MATERIAL AROUND
PLACE EXPANSION
WITH 2 INCH MIN. COVER
(4) EPOXY COATED #4 BARS
EACH STEP SHALL HAVE
EXISTING DRAINAGE DURING PROJECT
PREVENT DEBRIS FROM ENTERING
EXISTING DRAINAGE DURING PROJECT
PREVENT DEBRIS FROM ENTERING
SUPPLY AND PLACE SAND AS NEEDED FOR FILL3.
PRECAST TREADS
COMPACTED SAND FILL USED TO SUPPORT MIDDLE OF2.
WITH SIMILAR IN APPEARANCE
REPAIR OR REPLACE DAMAGED EXISTING STONES2.
END SUPPORT
PRESENT OR STONES ARE NOT USABLE FOR TREAD
CMU RUNNING BOND USED ONLY IF STONES ARE NOT1.
STONES.
DETERMINED AFTER REMOVAL OF
FOR FILL. FILLING OF VOID WILL BE
YARD OF SAND MAY BE REQUIRED
UNDER STONES. ASSUME 1 CUBIC
UNKNOWN CONDITION OF MATERIAL
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
SHEET ID
A
B
C
D
E
F
S I
D
C
U s e rs \b e c d c d s \D e s k to p \C lo c k T o w e r
B a c k S ta ir s
-2
\G -B
S D x x x -C
A D
S
H E
E T
-0
-0
-S -5
.d g n
:3
:5
P
M b e c d c d s
D
A T g in e e ri n g S h e e t_
S e e d d .d
A1
COLUMN DOWEL DETAIL
S-501
GENERAL NOTES
C A
S T -I
N -P
L A
C E P
R E
C A
S T O
P T
IO
N S
C O
L U
M N
S
0 6" 1' 2'SCALE : 1 1/2"=1'-0"
"2
#5 BARS
12" O.C.
#4 STIRRUPS
" HOLE FOR DOWELS8
7Ø
COLUMN AND SLABS
EMBEDMENT INTO
" DOWELS 6"4
3Ø
"4
BA
F1
SECTION A-A
F4
SECTION B-B
FOR DOWELS
" HOLE8
7Ø
COLUMN AND SLABS
EMBEDMENT INTO
" DOWELS 6"4
3Ø
TOP OF SLAB
#4 STIRRUPS
#5 BARS#5 BARS
0 6" 1' 2'SCALE : 1 1/2"=1'-0"
NORTH SIDE VIEW WES SIDE VIEW NORTH SIDE VIEW WESTSIDE VIEW
TOP OF SLAB
3"
A4
COLUMN REINFORCMENT DETAIL
3" COVER REQUIRED4.
USE HILTI HIT-HY-200R ADHESIVE OR EQUIVALENT3.
POST CASTING
" HOLES FOR DOWELS WHEN INSTALLED8
7 DRILL AND CLEAN Ø2.
STRENGTH OF 60 KSI
" WITH A MINIMUM YIELD4
3 ALL DOWELS WILL BE Ø1.
HEIGHT OF THE SLAB
SHALL BE THE FULL
COLUMNS. MATERIAL
MATERIAL AROUND
PLACE EXPANSION
HEIGHT OF THE SLAB
SHALL BE THE FULL
COLUMNS. MATERIAL
MATERIAL AROUND
PLACE EXPANSION
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K D
A T
E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
P R
O J E
C T C
O D
E
SHEET ID
A
B
C
D
E
F
| G-BSDxxx-CAD_SHEET 2020-06-03-S-101 |
| G-BSDxxx-CAD_SHEET 2020-06-03-S-201 |
| G-BSDxxx-CAD_SHEET 2020-06-03-S-301A |
| G-BSDxxx-CAD_SHEET 2020-06-03-S-301B |
| G-BSDxxx-CAD_SHEET 2020-06-03-S-501 |
File details come from the government source that posted it. Updated .