A22 . Solicitation W912EK21T0006.pdf

PDF 1 MB Posted

Attached to
Coralville Refuse and Recycling Service
Solicitation number
W912EK21T0006
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

PLEASE RETURN TO:

US Army Corps of Engineers

US Army Corps of Engineers

Coralville

Refuse and Recycling

Service

W912EK21T0006

Attn: Beth Williams

1500 Rock Island Drive

Rock Island, Illinois 61201

Email: elizabeth.a.williams@usace.army.mil

PLEASE INCLUDE THE FOLLOWING INFORMATION:

1. Complete Block 17a on the SF1449 - Enter Name, Address, and Current Phone Number of Person to

Contact Regarding Proposal

2. Complete and sign Blocks 30a, 30b, and 30c on the SF1449

3. Complete Offeror Representations and Certifications (Clause 52.212-3) if your company has not completed the Representations and Certifications located with your company’s SAM record

(https://www.sam.gov).

4. Please fill out the the below information completely and include this cover page with your offer, along with the above items that need to be filled out.

5. Include the Solicitation Number on the outside of your envelope or as subject line if submitting by email pdf format. It is the responsibility of the offeror to verify that their offer has been received and is legible when using a method other than electronic format to submit an offer.

Contractors must be current in their registration in the System for Award Management

(SAM) Database before a Government Contract award can be made.https://www.sam.gov/

Please provide: Taxpayer ID Number: ____________________________

CAGE Code (SAM):_______________________________

Point of Contact: _________________________________

Phone & Email: __________________________________

FOR ADDITIONAL INFORMATION, CONTACT:

Beth Williams - Phone: 309-794-5333 or

Email: elizabeth.a.williams@usace.army.mil

SEE ADDENDUM

(No Collect Calls)

W912EK21T0006 15-Jan-2021

b. TELEPHONE NUMBER

309-794-5333

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 28 Jan 2021

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EK9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ELIZABETH A WILLIAMS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

96514703023483

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 966108 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

CORALVILLE LAKE PROJECT OFFE

CEMVR-OD-C

US ARMY CORPS OF ENGINEERS

2850 PRAIRIE DUCHIEN RD NE

IOWA CITY IA 52240-7820

TEL: 319-338-3543 FAX: 319-354-4466

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$41,500,000

NAICS:

562111

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF75

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

SECTION B

REFUSE AND RECYCLING SERVICES

SCHEDULE OF PRICES

The quantities indicated are estimates only. The contractor will be paid on the basis of actual work performed.

DESCRIPTION OF SERVICES: REFUSE COLLECTION, REMOVAL AND DISPOSAL AND SINGLE-

STREAM RECYCLING (NOTED IN RED) FOR THE CORALVILLE LAKE PROJECT, IOWA CITY,

JOHNSON COUNTY, IOWA IN ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK

STATEMENT.

LINE

ITEM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

BASE YEAR CONTRACT PERIOD:

01 MARCH 2021 THROUGH 28 FEBRUARY 2022

0001A

ADMINISTRATION COMPOUND

(NOVEMBER THROUGH APRIL)

6 MONTH $ $

0001B

ADMINISTRATION COMPOUND (MAY

THROUGH OCTOBER)

6 MONTH $ $

0001C

ADMINISTRATION COMPOUND:

RECYCLING

12 MONTH $ $

0001D DAM COMPLEX: TAILWATER EAST 6 MONTH $ $

0001E DAM COMPLEX: TAILWATER WEST 6 MONTH $ $

0001F

DAM COMPLEX: WEST OVERLOOK

DUMPSTATION

6 MONTH $ $

0001G

DAM COMPLEX: WEST OVERLOOK

DAY USE AREA

6 MONTH $ $

0001H DAM COMPLEX: LINDER POINT 6 MONTH $ $

0001I SUGAR BOTTOM: MAINTENANCE 5 MONTH $ $

LINE

ITEM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

BASE YEAR CONTRACT PERIOD:

01 MARCH 2021 THROUGH 28 FEBRUARY 2022

0001J

SUGAR BOTTOM: MAINTENANCE

RECYCLING

5 MONTH $ $

0001K SUGAR BOTTOM: DUMP STATION 5 MONTH $ $

0001L SANDY BEACH 5 MONTH $ $

0001M

ADDITIONAL SERVICES: DAM

COMPLEX

3 EACH $ $

0001N

ADDITIONAL SERVICES: SUGAR

BOTTOM

3 EACH $ $

0001O

ADDITIONAL SERVICES: SANDY

BEACH

3 EACH $ $

TOTAL FOR BASE YEAR (SUM OF 0001A-0001O) $

DESCRIPTION OF SERVICES: REFUSE COLLECTION, REMOVAL AND DISPOSAL AND SINGLE-

STREAM RECYCLING (NOTED IN RED) FOR THE CORALVILLE LAKE PROJECT, IOWA CITY, JOHNSON

COUNTY, IOWA IN ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT.

LINE

ITEM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

OPTION PERIOD I: 2022

01 MARCH 2022 THROUGH 28 FEBRUARY 2023

010 A

ADMINISTRATION COMPOUND

(NOVEMBER THROUGH APRIL)

6 MONTH $ $

B

ADMINISTRATION COMPOUND (MAY

THROUGH OCTOBER)

6 MONTH $ $

C

ADMINISTRATION COMPOUND:

RECYCLING

12 MONTH $ $

D DAM COMPLEX: TAILWATER EAST 6 MONTH $ $

E DAM COMPLEX: TAILWATER WEST 6 MONTH $ $

F

DAM COMPLEX: WEST OVERLOOK

DUMPSTATION

6 MONTH $ $

G

DAM COMPLEX: WEST OVERLOOK

DAY USE AREA

6 MONTH $ $

H DAM COMPLEX: LINDER POINT 6 MONTH $ $

I SUGAR BOTTOM: MAINTENANCE 5 MONTH $ $

J

SUGAR BOTTOM: MAINTENANCE

RECYCLING

5 MONTH $ $

K SUGAR BOTTOM: DUMP STATION 5 MONTH $ $

L SANDY BEACH 5 MONTH $ $

M

ADDITIONAL SERVICES: DAM

COMPLEX

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

OPTION PERIOD I: 2022

01 MARCH 2022 THROUGH 28 FEBRUARY 2023

N

ADDITIONAL SERVICES: SUGAR

BOTTOM

3 EACH $ $

O

ADDITIONAL SERVICES: SANDY

BEACH

TOTAL FOR ORDERING PERIOD I (SUM OF A- O) $

COUNTY, IOWA IN ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT.

LINE

ITEM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

OPTION PERIOD II: 2023

01 MARCH 2023 THROUGH 29 FEBRUARY 2024

020 A

ADMINISTRATION COMPOUND

(NOVEMBER THROUGH APRIL)

6 MONTH $ $

B

ADMINISTRATION COMPOUND (MAY

THROUGH OCTOBER)

6 MONTH $ $

C

ADMINISTRATION COMPOUND:

RECYCLING

12 MONTH $ $

D DAM COMPLEX: TAILWATER EAST 6 MONTH $ $

E DAM COMPLEX: TAILWATER WEST 6 MONTH $ $

F

DAM COMPLEX: WEST OVERLOOK

DUMPSTATION

6 MONTH $ $

G

DAM COMPLEX: WEST OVERLOOK

DAY USE AREA

6 MONTH $ $

H DAM COMPLEX: LINDER POINT 6 MONTH $ $

I SUGAR BOTTOM: MAINTENANCE 5 MONTH $ $

J

SUGAR BOTTOM: MAINTENANCE

RECYCLING

5 MONTH $ $

K SUGAR BOTTOM: DUMP STATION 5 MONTH $ $

L SANDY BEACH 5 MONTH $ $

M

ADDITIONAL SERVICES: DAM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

OPTION PERIOD II: 2023

01 MARCH 2023 THROUGH 29 FEBRUARY 2024

N

ADDITIONAL SERVICES: SUGAR

BOTTOM

3 EACH $ $

O

ADDITIONAL SERVICES: SANDY

BEACH

TOTAL FOR ORDERING PERIOD II (SUM OF A- O) $

COUNTY, IOWA IN ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT.

LINE

ITEM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

OPTION PERIOD III: 2024

01 MARCH 2024 THROUGH 28 FEBRUARY 2025

030 A

ADMINISTRATION COMPOUND

(NOVEMBER THROUGH APRIL)

6 MONTH $ $

B

ADMINISTRATION COMPOUND (MAY

THROUGH OCTOBER)

6 MONTH $ $

C

ADMINISTRATION COMPOUND:

RECYCLING

12 MONTH $ $

D DAM COMPLEX: TAILWATER EAST 6 MONTH $ $

E DAM COMPLEX: TAILWATER WEST 6 MONTH $ $

F

DAM COMPLEX: WEST OVERLOOK

DUMPSTATION

6 MONTH $ $

G

DAM COMPLEX: WEST OVERLOOK

DAY USE AREA

6 MONTH $ $

H DAM COMPLEX: LINDER POINT 6 MONTH $ $

I SUGAR BOTTOM: MAINTENANCE 5 MONTH $ $

J

SUGAR BOTTOM: MAINTENANCE

RECYCLING

5 MONTH $ $

K SUGAR BOTTOM: DUMP STATION 5 MONTH $ $

L SANDY BEACH 5 MONTH $ $

M

ADDITIONAL SERVICES: DAM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

OPTION PERIOD III: 2024

01 MARCH 2024 THROUGH 28 FEBRUARY 2025

N

ADDITIONAL SERVICES: SUGAR

BOTTOM

3 EACH $ $

O

ADDITIONAL SERVICES: SANDY

BEACH

TOTAL FOR ORDERING PERIOD III (SUM OF A- O) $

COUNTY, IOWA IN ACCORDANCE WITH THE ATTACHED PERFORMANCE WORK STATEMENT.

LINE

ITEM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

OPTION PERIOD IV: 2025

01 MARCH 2025 THROUGH 28 FEBRUARY 2026

040 A

ADMINISTRATION COMPOUND

(NOVEMBER THROUGH APRIL)

6 MONTH $ $

B

ADMINISTRATION COMPOUND (MAY

THROUGH OCTOBER)

6 MONTH $ $

C

ADMINISTRATION COMPOUND:

RECYCLING

12 MONTH $ $

D DAM COMPLEX: TAILWATER EAST 6 MONTH $ $

E DAM COMPLEX: TAILWATER WEST 6 MONTH $ $

F

DAM COMPLEX: WEST OVERLOOK

DUMPSTATION

6 MONTH $ $

G

DAM COMPLEX: WEST OVERLOOK

DAY USE AREA

6 MONTH $ $

H DAM COMPLEX: LINDER POINT 6 MONTH $ $

I SUGAR BOTTOM: MAINTENANCE 5 MONTH $ $

J

SUGAR BOTTOM: MAINTENANCE

RECYCLING

5 MONTH $ $

K SUGAR BOTTOM: DUMP STATION 5 MONTH $ $

L SANDY BEACH 5 MONTH $ $

M

ADDITIONAL SERVICES: DAM

SERVICE AREA QUANTITY UNIT

UNIT

PRICE

TOTAL

AMOUNT

OPTION PERIOD IV: 2025

01 MARCH 2025 THROUGH 28 FEBRUARY 2026

N

ADDITIONAL SERVICES: SUGAR

BOTTOM

3 EACH $ $

O

ADDITIONAL SERVICES: SANDY

BEACH

3 EACH $ $

TOTAL FOR ORDERING PERIOD IV (SUM OF A- O) $

GRAND TOTAL BASE + OPTION YEARS I - IV $ _______________________

MVR.03

QUESTION AND ANSWER

via email

Technical inquiries and questions relating to this solicitation are to be submitted to Beth Williams at elizabeth.a.williams@gmail.com no later than Monday 25 January 2021 at 2:00PM CT.

INSTRUCTIONS: NOTICE TO OFFERORS

CORALVILLE REFUSE AND RECYCLING SERVICE

CORALVILLE LAKE PROJECT, IOWA

1. REQUIRED SAM REGISTRATION: Prior to submitting an offer, vendors must be actively registered in the System for Award Management (SAM) website. Registration instructions may be obtained, and online registration may be accomplished, at www.sam.gov.

2. SCHEDULE OF PRICES (CLINS): Offeror’s must quote on all items and entire quantities contained in the base period and all options to be considered for award. Offers received not complying with the Schedule of Prices will be considered non-responsive and will be rejected.

3. WAGE RATES: Prevailing Wage Rates will apply for any award resulting from this solicitation. See the included Wage Determination, and contract clauses 52.222-41, Service Contract Act of 1965 for details.

4. DOCUMENTS TO RETURN: In order to be considered responsive, offerors shall complete and return all of the following:

Solicitation Cover Sheet, CAGE Code, Point of Contact, Phone Number and E-mail Address.

First page of solicitation, including offeror’s complete mailing address, telephone number, offeror’s name, title, and signature.

Schedule of Prices (CLINs)

Offerors must complete all fill-ins and ensure all return pages are received by the due date and time shown on page one of the solicitation, at the address indicated below.

Please mark the envelope with the Solicitation Number and Project Title. Quotes may also be e-mailed to elizabeth.a.williams@usace.army.mil.

U.S. ARMY CORPS OF ENGINEERS

Attn: Beth Williams

1500 Rock Island Drive

ROCK ISLAND, IL 61204

6. TELEPHONE NUMBER: Offerors must provide on the first page of this solicitation a telephone number at which they can be contacted for a period of one week following the due date of this solicitation. Quotes from people who cannot be contacted by telephone during normal office hours (8:00 a.m. through 4:00 p.m., CST) within the one-week period following closing of this RFQ will be considered non-responsive and will be removed from further consideration.

http://www.sam.gov/

7. LENGTH OF CONTRACT: This solicitation includes a base and one option period. See contract clause 52.217-9, Option to Extend the Term of the Contract.

8. SITE VISIT: Offerors who wish to have a site visit should contact the Coralville Lake Project

Office at 319-338-3543 extension #6306 or e-mail mary.s.bowers@usace.army.mil to schedule an appointment with Natural Resources Specialist/Park Ranger, Mary Sue Bowers.

mailto:mary.s.bowers@usace.army.mil

PERFORMANCE WORK STATEMENT

1. BACKGROUND. The U.S. Army Corps of Engineers Coralville Lake Project is a flood control reservoir in Iowa. A wide variety of recreational facilities are offered, including boat launching ramps, campgrounds, picnic areas and swimming beaches. Coralville Lake is located approximately four miles north of Iowa City, Iowa. The Corps of Engineers contracts many routine tasks to the private sector including Waste Management. Maps showing the recreation areas at Coralville Lake can be found on the internet at:

http://www.mvr.usace.army.mil/Missions/Recreation/CoralvilleLake.aspx . Click on the “Maps and

Resources” link, then select the map of the area you would like to view.

2. REQUIRED INSURANCE. In accordance with the FAR Clause 52.228-5 titled “Insurance- Work on a Government Installation” the Contractor shall obtain and maintain during the period of performance under this contract the following kinds and minimum amounts of insurance*:

Workmen’s Compensation Coverage complying with State Statute**

Employer’s Liability Minimum $100,000

General Liability/Bodily Injury Minimum $500,000 per occurrence

Automobile Liability Minimum $200,000 per person

$500,000 per occurrence

$20,000 property per occurrence

* Reference FAR 28.307-2 Liability, subparagraphs (a), (b) and (c).

** Iowa Insurance Division, telephone 515/281-5705

Iowa Division of Workers Compensation, telephone 800/562-4692

3. QUALITY CONTROL PLAN The Contractor shall provide a Quality Control Plan (QCP) for the performance requirements of this contract and shall provide a written copy of same to the

Contracting Officer (KO) and COR no later than 30 days after contract award. The Contractor shall maintain the QCP throughout the contract performance period, and, at any time upon verbal or written request, shall provide a copy to the KO and COR for review. The QCP shall include an inspection system covering all work tasks stated in the contract to include supplies.

3.1. PERFORMANCE REQUIREMENTS: Acceptable and unacceptable contract performance will be determined between the COR and the On-Site Supervisor. When the performance is considered to be unsatisfactory, the COR will require the Contractor to explain, in writing, the cause of the discrepancy and corrective action to obtain acceptable levels and preclude any reoccurrence of the problem. The Contractor may not be paid for that portion of performance determined to be unsatisfactory by the KO and/or COR.

3.2. PAYMENT DEDUCTION: The Contractor’s performance will be evaluated and shall not exclude common sense considerations as may be applied by the KO and/or COR. If the performance of the required service is unsatisfactory, and poor performance is clearly the fault of the Contractor, monthly payments to the Contractor may be reduced by the KO as deemed appropriate. Deductions may also be taken by the Government for defective individual services not satisfactorily performed and/or not performed. In the event of continued unsatisfactory performance with documentation, where correction and time to cure has been given, the entire contract may be terminated.

http://www.mvr.usace.army.mil/Missions/Recreation/CoralvilleLake.aspx

4. COORDINATION MEETING. As soon as practical after contract award and before start of the services, the Contractor shall meet with the Contracting Officer's Representative (COR). The

Contractor shall also be prepared to submit and discuss at this meeting the following items:

4.1. Insurance Certificate: Contractor must furnish proof of insurance per section C.2;

4.2. Letter Designating On-the-Job Supervisor(s): The name of the person designated by the

Contractor as responsible for inspecting work performed and compliance with contract provisions;

4.3. Contractor’s Quality Control Plan. The quality control program is in place to assure the requirements of the contract are provided as specified in Section C.3;

4.4. Accident Prevention Plan (APP). All work shall be performed in accordance with the

Contractor’s Accident Prevention Plan which shall include applicable safety requirements set forth in the current Corps of Engineers Manual EM 385-1-1 "Safety and Health

Requirements Manual" revised 30 November 2014, or current copy. A link to the most current version will be provided upon request. No on site work shall be performed until the Contractor’s

Accident Prevention Plan and Certificate of Insurance have been submitted and area approved.

4.5. Driver’s License. Contractor shall show a valid driver’s license.

4.6. CPR and First Aid Certificate. Copies of certificates shall be provided for any employees who have received training.

Minutes of the meeting shall be prepared, signed by both the Contractor and the COR and shall become a part of the contract file. There may also be occasions when subsequent conferences will be called to reconfirm understandings.

5. PAYMENT PROCEDURES. Payment for services performed under this contract will be made after satisfactory performance of work described in the Performance Work Statement, Section C.6 and upon receipt of invoice each month.

Invoices shall be submitted to:

Coralville Lake Project Office, 2860 Prairie du Chien Road NE, Iowa City, IA 52240-7820.

Each invoice shall contain the following information:

Contractor’s name & address as it appears on the contract

Contract number

Item Number(s) of work completed

Description of work completed

Quantity of work completed

Unit

Unit prices

Extended totals

Original Signature

6. PERFORMANCE WORK STATEMENT (PWS). Work consists of providing waste management services: refuse collection, removal and disposal; and single- stream recycling collection, removal and disposal. Single-stream, or fully commingled, recycling will allow all paper fibers, specific plastics, aluminum and tin to be mixed together in a single collection container.

Contractor will furnish items such as refuse storage containers, single-stream recycling bins, labor, supplies, fuel and vehicles necessary to collect, transport and properly dispose of refuse and recyclables from the U.S. Army Corps of Engineers, Coralville Lake Project, Johnson County, Iowa. Refer to Technical Exhibit #2 for specific container locations, quantity, pick up schedule and frequency of waste management services. Additional servicing of refuse and recycling containers at the Dam Complex, Sugar Bottom and Sandy Beach may be requested by the Operations Manager or their authorized representative and will not exceed nine per year (a maximum of 3 per area).

6.1. WASTE COLLECTION: Contractor will supply refuse containers in the quantities and cubic yards of capacity at the locations specified in Technical Exhibit #2. Style and condition of all containers must be approved by the Government prior to installation. The Contractor will furnish the vehicles necessary to collect and transport refuse as described in SECTION E:

CONTRACTOR SUPPLIED ITEMS. The surrounding area will be cleaned, each time, to remove all refuse within a 20-foot radius of the container storage site.

6.2. RECYCLING COLLECTION: Contractor will supply single-stream recycling bins in the quantities and cubic yards of capacity at the locations specified in Technical Exhibit #2. Style and condition of all containers must be approved by the Government prior to installation. The

Contractor will furnish the vehicles necessary to collect and transport single-stream recycling as described in SECTION E: CONTRACTOR SUPPLIED ITEMS. The surrounding area will be cleaned, each time, to remove all recycling within a 20-foot radius of the container storage site.

6.3. DISPOSAL: Contents of the refuse containers will be transported to an approved State facility for disposal. Single-stream recyclables will be hauled to a processing center that is capable of handling a fully commingled mixture of materials. All facility charges shall be borne by the successful bidder.

6.4. CONTAINERS LOCATIONS: Containers will be placed in four general areas referred to as:

6.4.1. Administration Compound

6.4.2. Dam Complex

6.4.3. Sugar Bottom

6.4.4. Sandy Beach

6.5. CONTAINER CONDITION: All containers shall be in good condition and maintained to ensure proper lid closure. Containers will be cleaned and treated with odor preventive chemicals as needed not to exceed one time per week. The COR may request that containers be swapped out due to offensive odor or disrepair.

7. LENGTH OF CONTRACT. Award will be for a base period plus four ordering periods as follows:

Base Period: 1 March 2021 – 28 February 2022

Option Period I: 1 March 2022 – 28 February 2023

Option Period II: 1 March 2023 – 29 February 2024

Option Period III: 1 March 2024 – 28 February 2025

Option Period IV: 1 March 2025 – 28 February 2026

Contract will not exceed five years. Option periods may or may not be exercised at the discretion of the Government, not the Contractor.

8. WORK SCHEDULE. Refuse containers shall be emptied on Mondays and Fridays during the specified months; single-stream recycling containers shall be emptied one day per week during the specified months. Changes to this work schedule will be by mutual consent of the Contracting

Officer and the Contractor. The plan must be accepted before work can begin. See Technical Exhibit

#2 for additional details regarding the schedule.

9. ENVIRONMENTAL CONTROLS.

9.1. COMPLIANCE WITH LAWS AND REGULATIONS. The Contractor shall be knowledgeable of, and shall comply with, all applicable federal, state, and local laws, environmental requirements and instructions. The Contractor shall ensure policies and procedures are established that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

9.2. HAZARDOUS MATERIALS. The Contractor is responsible for advising their employees of all Environmental and Hazardous Materials Handling.

9.3. NOTIFICATION OF ENVIRONMENTAL SPILLS. If the Contractor or employee(s) of the

Contractor spill or release any substance into the environment, the Contractor shall immediately report the incident to the COR, or in their absence, the Contracting Officer. The Contractor shall be liable for containment and cleanup of hazardous substances spilled or released into the environmental as a result of their operations.

9.4. CLOSING OF AREAS: National security, major storm damage, floods, high lake pool levels, other natural causes or major construction activities may result in the partial or total closure of contract recreation areas. During such times, it may be necessary for the Government to suspend the Contractors operations on part or all of a contract area and suspend payment or renegotiate the contract bid price. No services will be performed nor shall any payment be made for periods when the entire area is closed to public use.

SECTION D

GOVERNMENT SUPPLIED ITEMS

1. HARD SURFACE SITES. A hard surface (rock, asphalt or concrete) will be provided for all containers at all locations.

2. STORAGE OF EQUIPMENT AND SUPPLIES. When storage of Contractor's equipment and supplies is necessary on U.S. Government property, it will be stored in those areas designated by the

COR. The Government will assume no responsibility or liability for Contractor equipment or supplies stored on Government property. The Contractor will ensure that all fence gates are locked and secured when their property is stored within such enclosures.

3. REMOVAL OF EQUIPMENT AND SUPPLIES. The Contractor shall remove containers from the

Dam Complex areas at the end of each season, and all containers and any waste materials and rubbish from the Coralville Lake site upon completion of the contract period. Disposal of rubbish and removal of containers will be done at the Contractor's expense. Final payment will not be made until this operation is complete.

SECTION E

CONTRACTOR SUPPLIED ITEMS

1. CONTAINERS. All refuse and single-stream recycling containers must be of suitable size and type for the intended purpose as specified in Technical Exhibit #2. All containers used under this contract are subject to inspection both prior to contract award and as deemed necessary by the COR during the performance of this contract. Containers not meeting contract requirements shall be removed from

Government property and replaced with suitable containers at no additional cost to the Government.

Suitability of containers will be determined by the COR.

2. TELEPHONE AND ANSWERING MACHINE. Contractor shall have a telephone with answering machine, cellular phone with voice mail messaging or other approved message recording service/device. During the performance of refuse removal, the Contractor or an employee designated to act for him shall be available to take calls or return calls within one hour between the hours of 7:30 a.m. and 6:00 p.m. Central Standard Time.

3. VEHICLE(S). All vehicles shall be properly licensed, insured and maintained in a safe, clean condition. Vehicles used for pickup and transport shall be equipped with a covered body. The body shall be kept in good repair and shall not be capable of leaking effluent and other materials upon roadways or other public areas. The vehicles should be of sufficient size and/or number to enable the

Contractor to service all areas under any circumstance. Trucks used for hauling will be regularly cleaned and treated with odor preventive chemicals. This will be accomplished a minimum of weekly. Vehicles shall not be stored on government lands.

SECTION F

ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, b ackground checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-15-C-XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mail:

Security Office

U.S. Army Corps of Engineers

Rock Island District

1500 Rock Island Drive

Rock Island, IL 61201

Security Clause 1.

AT Level 1 Training. All Contractor and sub-contractor employees requiring access to non- public or private Government property must complete Anti-Terrorism (AT) Level 1 Training within 30 calendar days after notice to proceed date. AT Level 1 Training is available at the following website:

https://jkodirect.jten.mil/Atlas2/faces/page/login/Login.seam. The required training is under the heading

“JS-US007-14: Level 1 Antiterrorism Awareness Training.” Contractor employees who have a Common

Access Card (CAC) may log in with their CAC. Contractor employees without a CAC shall log into the

“Non-CAC users” link and need to complete the training all at once, as no record of training shall be maintained aside from the certificate that is printed upon completion. All AT Level 1 Training certificates must be submitted to the Contracting Officer within 5 calendar days of completion.

S ecurity Clause 2(b).

For Access and General Protection Policy and Procedures. All Contractors and sub- contractor employees shall comply with installation and facility access guidelines and rules as stated herein.

Contractor workforce must comply with all personal identity verification requirements as directed by

Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy.

In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force

Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the

Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District

Security and Law Enforcement Office by the third party.

The background check will cover, at a minimum, the ten years covering states the employee has lived in, national criminal records check which includes felony and misdemeanor offenses, Department of Motor

Vehicles records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer (KO). Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

(1) Criminal conduct, in particular violent crime and sex offenders;

(2) Habitual use of intoxicating beverages to excess as evidenced by Driving under the influence or public intoxication records; or

(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g. drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project.

Such action in no way relieves the Contractor from performance of the Contract. The Rock Island

District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the Contracting Officer to coordinate obtaining written approval from the

Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a Personnel Change Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.

Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:

1) Employee will be on site a total of 15 days or less, for the duration of the project.

2) Employee is added to the ACL as a short term employee.

3) Employee is escorted while on site. This is defined as being in the line of sight of an identified contractor employee who has a background check on file with the Rock Island

District (as noted on the ACL).

4) Each contractor employee can sponsor only five short term employees at a time.

Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island

District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g.

specialists with a two week period of performance) may work on site with the following conditions:

1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.

2) Foreign national employee will comply with E-verify requirements E-verify paragraph).

3) Approved and identified contractor employee shall escort the foreign national employee at ALL times while on site.

4) Each contractor employee can sponsor only one short term foreign national at a time.

Personnel Change Request Form

Contract # Date

We, , respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long term employee) shall be submitted by close of business on

(insert proposed date):

(Insert signature block)

Security Clause 15.

Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the

E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system.

Documentation of company enrollment in E- verify, via a print screen of the company profile within the

E-verify system, must be submitted to the Security Office no later than 3 business days after the initial

Notice to Proceed.

*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.

http://www.uscis.gov/e-verify)

TECHNICAL EXHIBIT #1

QUALITY ASSURANCE SURVEILLANCE PLAN

Coralville Lake Project

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this PWS. It is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective on the Performance Requirements Summary (PRS) in the maintenance contract.

The QASP provides a systematic method to evaluate the services the contractor is required to furnish.

This QASP is based on the premise the Government desires to maintain a quality standard in operating, maintaining, and repairing facilities and that a service contract to provide the service is the best means of achieving that objective.

The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

In this contract the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.

Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

Performance

Objective Performance Standard

PWS

Para Performance

Threshold

REFUSE

REMOVAL

All specified containers have been emptied according to the schedule of service, and all refuse outside of the container, within a 20 foot radius of the container site has been removed.

6.1 100% of all specified containers have been serviced.

RECYCLING

REMOVAL ll specified containers have been emptied according to the schedule of service, and all recycling outside of the container, within a 20 foot radius of the container site has been removed

6.2 100% of all specified containers have been serviced.

SURVEILLANCE: The Contracting Officer’s Representative (COR) will receive complaints from

Government personnel and pass them to the contractor's quality control inspector (QCI) for correction. The appointed COR for this requirement is:

Mary Sue Bowers

M ary.s.bowers@usace.army.mil

(319) 338-3543 ext. 6306

STANDARD: The Contractor shall perform all work required in a satisfactory manner in accordance with the appropriate PWS paragraph.

PROCEDURES: The Government COR will inspect all work tasks required to ensure contractor compliance with the appropriate paragraphs of the Performance Work Statement (PWS) each time the service(s) is performed. The COR will record results of inspection, noting the date and time of inspection. If inspection indicates unacceptable performance, the COR will notify the contract manager or QCI of the deficiencies for correction. The Contractor shall be given one week after notification to correct the unacceptable performance.

mailto:ary.s.bowers@usace.army.mil

TECHNICAL EXHIBIT #2

REFUSE COLLECTION, REMOVAL AND DISPOSAL PROGRAM

SPECIFICATIONS

Location

Administration Compound

Schedule of

Services

Containers

Quantity / Size

Frequency of

Pick Up

Nov - Apr 1 / 8 cu. yd. Every Friday

Administration Compound May - Oct 1 / 8 cu. yd.

Monday &

Friday

Dam Complex: Tailwater East May 1 - Oct 21 1 / 6 cu. yd.

Monday &

Friday

Dam Complex: Tailwater

West May 1 - Oct 21 1 / 6 cu. yd.

Monday &

Friday

Dam Complex: West Overlook

Dump Station May 1 - Oct 21

1 or multiple / 16

cu. yd.

Monday &

Friday

Dam Complex: West Overlook

Day Use Area May 1 - Oct 21 1 / 4 cu. yd.

Monday &

Friday

Dam Complex: Linder Point May 1 - Oct 21 1 / 4 cu. yd.

Monday &

Friday

Sugar Bottom: Maintenance May - Sep 1 / 4 cu. yd.

Monday &

Friday

Sugar Bottom: Dumpstation May - Sep 1 or multiple / 48

cu. yd.

Monday &

Friday

Sandy Beach Campground May - Sep 1 / 6 cu. yd.

Monday &

Friday

SINGLE-STREAM RECYCLING COLLECTION, REMOVAL AND

DISPOSAL PROGRAM SPECIFICATIONS

Location Schedule of

Services

Containers

Quantity / Size

Frequency of

Pick Up

Administration Compound Mar - Feb 1 / 4 cu. yd. Once / Week

Sugar Bottom: Maintenance Mar - Feb 1 / 4 cu. yd. Once / Week

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-13 System for Award Management Maintenance OCT 2018

52.204-16 Commercial and Government Entity Code Reporting AUG 2020

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

NOV 2015

52.217-5 Evaluation Of Options JUL 1990

52.223-1 Biobased Product Certification MAY 2012

52.223-2 Affirmative Procurement of Biobased Products Under

Service and Construction Contracts

SEP 2013

52.225-25 Prohibition on Contracting with Entities Engaging in

Certain Activities or Transactions Relating to Iran--

Representation and Certifications.

JUN 2020

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.237-1 Site Visit APR 1984

52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.246-1 Contractor Inspection Requirements APR 1984

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower

Rights

SEP 2013

252.203-7005 Representation Relating to Compensation of Former

DoD Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

DEC 2019

252.243-7001 Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (AUG 2020)

(a) Definitions. As used in this provision--

Commercial and Government Entity (CAGE) code means—

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense

Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the

NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph

(c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.

(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:

Immediate owner CAGE code:

Immediate owner legal name: ___

(Do not use a ``doing business as'' name)

Is the immediate owner owned or controlled by another entity?:

[ ___ ] Yes or [ ___ ] No.

(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:

Highest-level owner CAGE code:

Highest-level owner legal name:

(Do not use a ``doing business as'' name)

(End of provision)

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX

LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing

Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that--

(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a

Federal law within the preceding 24 months.

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JUN 2020)

(a) North American Industry Classification System (NAICS) code and small business size standard. The

NAICS code(s) and small business size standard(s) for this acquisition appear elsewhere in the solicitation.

However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of offers;

(3) The name, address, and telephone number of the offeror;

(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) "Remit to" address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.

(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.

(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.

(f) Late submissions, modifications, revisions, and withdrawals of offers:

(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated

Government office on the date that offers or revisions are due.

(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .