- Solicitation number
- W91QVN-20-R-0087
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN-20-R-0087 P00001.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| ESTIMATED QUANTITIES 1ST OPTION YEAR.DOCX | DOCX document | |
| ESTIMATED QUANTITIES 3RD OPTION YEAR.DOCX | DOCX document | |
| ESTIMATED QUANTITIES 2ND OPTION YEAR.DOCX | DOCX document | |
| Attachment A.xls | XLS spreadsheet | |
| ESTIMATED QUANTITIES 4TH OPTION YEAR.DOCX | DOCX document | |
| DTR Attachment G-1 through G-7.pdf | ||
| ESTIMATED QUANTITIES BASE YEAR.DOCX | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FORCOMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
1. REQUISITION NUMBER PAGE 1 OF 123
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
W91QVN20R0087 09-Jun-2020
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SSG HOPKINS, MARVIN
EDWARD
b. TELEPHONE NUMBER (No Collect Calls)
315-755-3498
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 09 Jul 2020
9. ISSUED BY CODE W91QVN 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
411TH CONTRACTING SUPPORT BRIGADE, KOREA
SERVICES DIV, UNIT #15289
APO AP 96271
SMALL BUSINESS
HUBZONE SMALL
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
NAICS:
UNITED STATES
TEL:
FAX:
11. DELIVERY FOR FOB DESTINA- 12. DISCOUNT TERMS
TION UNLESS BLOCK IS
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
13a. THIS CONTRACT IS A
EDWOSB
8(A)
13b. RATING
488991
SIZE STANDARD:
$30,000,000
MARKED
SEE SCHEDULE
15. DELIVER TO
CAMP HUMPHREYS AREA 3
CAMP HUMPHREYS AREA 3
W6XH USALRCTR CAMP HUMPHREYS
APO AP 96271
KOREA,SOUTH
TEL: FAX:
17a.CONTRACTOR/ CODE
OFFEROR
CODE W582LA
FACILITY
CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
16. ADMINISTERED BY
18a. PAYMENT WILL BE MADE BY
14. METHOD OF SOLICITATION
RFQ IFB
X RFP
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/ SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Gov t. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
29. AWARD OF CONTRACT: REF.
OFFER DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAMEAND TITLEOF SIGNER
(TYPE OR PRINT)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
TEL:
EMAIL:
(TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
X
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
36. PAYMENT
COMPLETE PARTIAL FINAL
37. CHECK NUMBER
PARTIAL FINAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
W91QVN20R0087
Section SF 1449 - CONTINUATION SHEET
NOTICE TO OFFERORS
All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States
(U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or
Technical Representative status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the
ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea as a local source, must submit adequate verification in its initial proposal or quote, that it has the requisite authorization and capacity to compete for the requirement as a local source, and to perform the contract as a local source. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror qualifies as a local source shall be determined by the Contracting Officer.
PERFORMANCE WORK STATEMENT (PWS)
PACKING, CONTAINERIZATION AND LOCAL DRAYAGE OF DIRECT PROCUREMENT METHOD (DPM)
PERSONAL PROPERTY SHIPMENTS IN CAMP HUMPHREYS
Part 1
General Information
1. GENERAL: This is a non-personnel services contract to provide transportation of personal property shipment to and from Camp Humphreys. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the
Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform transportation of personal property shipment packing, pick up, and delivery as defined in this Performance Work
Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: Direct Procurement Method (DPM) HHG moving Contract Service is required for personal property shipments involved with Local Move to/from Government quarters or private housing and vacating local economy housing. This DPM contract service of packing, containerization and local move of personal property shipments (HHG/UB) is based on the procedures set forth in Appendix G and Chapter 404, DTR 4500.9-R, Part IV
(Personal Property) for DoD members and civilian employees required by JTR.
1.3 Objectives: This is a non-personnel services contract for packing, containerization and local drayage of direct procurement method (DPM) personal property shipments in Camp Humphreys.
1.4 Scope: The contractor shall furnish all personnel, equipment, facilities, supplies, services and materials, except as specified herein as government-furnished, for the preparation of personal property of Department of Defense
(DOD) personnel for shipment and/or storage and related services through the DPM. Work to be performed shall be those services in the Schedules awarded to the contractor as outlined in individual Contract Line Item Number
(CLIN) items. Tasks by type of move are reflected in Table G-1. Task/Type of Move Matrix, showing which tasks normally apply to each type of move. Specific requirements for each task are described below. If specific instructions or requirements are not provided, commercial standards of services and best business practices are acceptable.
Table G-1. Task/Type of Move Matrix
Task
Local
Move
Outbound
Household
Goods
Outbound
Un-accompanied Baggage
Inbound
Household
Goods
Inbound Un-accompanied
Baggage
Pre-move Survey X X
Weighing X X X X
Time Requirements X X X X X
Preparation, Packing, Loading, and Containerization
Tagging, Inventorying, and Packing List
X X X
Appliance Servicing and Un-servicing
X X X X X
Containers and Vehicles X X X X X
Marking Exterior Shipping Containers
X X
Storage X X
Unpacking/Unloading and Loss and Damage Reports
X X
Documentation X X X X X
Reports X X X X
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4)
12-month option years. The Period of Performance reads as follows:
Base Year 01 October 2020 – 30 September 2021
Option Year I 01 October 2021 – 30 September 2022
Option Year II 01 October 2022 – 30 September 2023
Option Year III 01 October 2023 – 30 September 2024
Option Year IV 01 October 2024 – 30 September 2025
1.6 General Information
1.6.1 Quality Assurance: The government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.2 Recognized Holidays: The contractor is not required to perform services on ROK legal holidays
US Government legal holidays
(1) 1 January (New Year)
(2) 3rd Monday, January (Dr. King’s Birthday)
(3) 3rd Monday, February (President’s Day)
(4) Last Monday, May (Memorial Day)
(5) 4 July (Independence Day)
(6) 1st Monday, September (Labor Day)
(7) 2nd Monday, October (Columbus Day)
(8) 11 November (Veteran’s Day)
(9) 4th Thursday, November (Thanksgiving Day)
(10) 25 December (Christmas Day)
ROK legal holidays
(1) 1 January (New Year)
(2) Lunar New Year (31 December, 1 and 2 January on the Lunar Calendar)
(3) 1 March (Independence Movement Day)
(4) 1 May (Labor Day)
(5) 5 May (Children's Day)
(6) Buddha's Birthday (8 April on the lunar calendar)
(7) 6 June (Memorial Day)
(8) 17 July (Constitution Day)
(9) 15 August (Liberation Day)
(10) Chu-Suk (14, 15, and 16 August on the Lunar Calendar)
(11) 3 October (National Foundation Day)
(12) 9 October (Hangul Proclamation Day)
(13) 25 December (Christmas Day)
NOTE: Any holidays that are declared by Presidential Executive Order shall be observed in the same manner as the holidays listed above. If the area in which contract personnel is scheduled to work is closed due to the holiday declared by an Executive Order and the employee is not required to report in, payment will not be made for those hours.
Closures of the installation due to inclement weather or other such acts of nature shall be handled in the same manner.
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 8:00 a.m. –
5:00 p.m., Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor shall not be reimbursed when the government facility is closed for the above reasons. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at the Government quarters or private housing and vacating local economy housing of DoD and civilian personnel.
1.6.6 Type of Contract: The government will award a Requirements Type Contract.
1.6.7 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use.
1.6.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal
Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other
Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor shall apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.9 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10 Key Personnel: The follow personnel are considered key personnel by the government: contract manager.
The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 am – 5:00 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below:
1.6.10.1 Contract Manager and Alternate,
1.6.10.1.1 The Contract Manager and Alternate must have 10 or more years transportation personal property shipments service experience; and familiarity with Defense Department Data Sources
1.6.11 Identification of Contractor Employees: All contractor personnel attending meetings, answering
Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They shall also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor personnel will be required to obtain and wear badges in the performance of this service.
1.6.12 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information
(e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the
Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.13 SAFETY REQUIREMENTS: In performing work under this contract, the contractor shall:
1.6.13.1 Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
1.6.13.2 Perform work in a safe manner as required by OSHA 2206, General Industry, Occupational Safety and Health
Standards (29 CFR 1910) and Korea Environmental Governing Standards by US Force Korea.
1.6.13.3 Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.
1.6.13.4 Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
1.6.13.5 Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
1.6.13.6 Record and report promptly (within one hour) to the contracting officer or COR, all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.
1.6.13.7 In the event of an accident or mishap, take reasonable and prudent action to establish control of the accident or mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident and mishap investigative authority through the contracting officer.
1.6.13.8 If the government elects to conduct an investigation of the accident or mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
1.6.13.9 Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.
1.6.14 CONTRACTOR PERSONNEL
1.6.14.1. Contract Manager: the contractor shall provide a contract manager and alternate contract manager
(responsible in the absence of the contract manager) who shall be responsible for the performance of the services.
The names of the contract manager and alternate(s) shall be provided to the KO in writing prior to the beginning of the first performance period. The contract manager and alternate(s) must be able to read, write, speak, and understand English.
1.6.14.1.1 The contract manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract.
1.6.14.1.2 The contract manager or alternate shall be available during normal duty hours within two (2) hours to meet on the installation with government personnel (designated by the KO) to discuss problems. After normal duty hours the manager or alternate shall be available within four (4) hours.
1.6.15 Contractor Employees: the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the KO as a potential threat to the health, safety, security, general wellbeing or operational mission of the installation and its population. The contractor will furnish adequate supervision, labor, materials, supplies, and equipment necessary to perform all services contemplated under this contract. The contractor’s office will be staffed at all times during normal working hours with personnel authorized to book shipments and arrange for services under the contract. All contractors will have available an English reading, speaking, and writing employee at all times during packing and unpacking services.
1.6.15.1 Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.
1.6.15.2 The contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor shall not employ any person who is an employee of the Department of Army, either military or civilian, unless such person seeks and receives approval according to
DOD 5500-7-R Joint Ethics Regulation.
1.6.15.3 The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.
1.6.16 Base Passes: The contractor shall be responsible to arrange for base passes and necessary vehicle permits required for entry onto this installation prior to performing any work under this contract. The COR will not be responsible for providing escorts for the contractor.
1.6.16.1 The contractor shall assume responsibility for obtaining necessary base passes and vehicle permits for contractor personnel and equipment with 30 after before contract start date. The government leaves to the discretion of the follow on contractor to determine how to successfully transition in its full work force into operations. The contractor shall ensure successful transition to full performance of work by the conclusion of the phase-in period. If unable to meet any task timeline, you will notify the KO and COR.
1.6.17 Antiterrorism (AT) and Operations Security (OPSEC):
1.6.17.1. Access and General Protection/Security Policy and Procedures: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility, or area. The contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or
Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the
Government may require changes in contractor security matters or processes.
1.6.17.2. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor san all associated sub-contractors employees shall comply with adjudication standards and procedures using the National
Crime Information Center Interstate Identification Index (NCIS-III) and Terrorist Screening Databases (TSDB) (Army
Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation, facility access and local security policies and procedures (provided by government representative), or at OCONUS locations, in accordance with status of forces agreements and other theater regulation.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER (KO). A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the
Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. UNSERVICING. The removal of household appliances in order to transport them to another location.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the
2.1.12. WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative
AFARS Army Federal Acquisition Regulation Supplement
AR Army Regulation
CCE Contracting Center of Excellence
CFR Code of Federal Regulations
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative
COTR Contracting Officer's Technical Representative
COTS Commercial Off the Shelf DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DMDC Defense Manpower Data Center
DOD Department of Defense
FAR Federal Acquisition Regulation
HIPAA Health Insurance Portability and Accountability Act of 1996
KO Contracting Officer OCI Organizational Conflict of Interest
OCONUS Outside Continental United States (includes Alaska and Hawaii)
ODC Other Direct Costs
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
NCWT Net Hundred Weight
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan QC Quality Control
QCP Quality Control Plan
TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Equipment: The Government will provide Government Owned Containers (GOCs).
3.2 Documents:
3.2.1 DD Form 1299, Application for Shipment and/or Storage of Personal Property, with special orders customs forms
3.2.2 DD Form 1384, Transportation Control and Movement Document(TCMD)
3.2.3 Government Owned Container Control Record Form
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 3 of this PWS.
4.2 Materials: The contractor will provide boxes, cartons, mattress cartons and/or plastic bags (plastic bags may only be used when a direct delivery address has been designated by the origin PPSO), tape, labels, packing lists, filler material, paper pads, wrapping, and any other type material to ensure proper packing for damage free movement. All materials will be new or in sound condition. All previous markings pertaining to any previous shipment will be completely obliterated and all material will be free of any substance injurious to the articles being packed and to the customer. New material will be used for packing mattresses, box springs, linens, bedding, and clothing. Plastic mattress shipping bags will not be used for shipments being consigned to long term NTS.
4.3 Documentation and Reports: Contractor will ensure that all documentation performed by the contractor will be accurate and legible. All invoices submitted for billing to the ordering officer will be complete and display a detailed and accurate account of services performed.
4.4 Quality Control and Assurance:
4.4.1 Quality Control: The contractor will establish a complete quality control program to assure the requirements of the contract are provided as specified. One copy of the contractor's quality control plan will be provided to the contracting officer as part of the proposal submission (CDRL 0001).
4.4.2 Quality Assurance: The contractor will provide monthly metrics measuring the Service Delivery Summary
Performance Threshold (CDRL 0012). These statistics will be used in the monthly evaluation of the contractor and also as a part of the annual performance report.
4.5 CONUS to OCONUS UB shipments using Air Mobility Command (AMC) aerial ports. The carrier will provide the actual weight and cube of each shipment after pickup to the ordering officer prior to the PPGBL/BL being produced. Information must be provided within two days after pickup.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS:
5.1. Basic Services. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform transportation of personal property shipment packing, pick up, and delivery as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this
5.1.1 Pre-move Survey: The contractor shall determine the nature of personal property offered for shipment either by physical inspection or telephone survey with the member/employee. The survey shall be conducted at a time and date mutually agreed upon between the contractor and the member/employee. Any pack/pickup date changes shall be coordinated with the ordering officer.
5.1.2 Weighing:
5.1.2.1 The gross, tare, and net weight of all shipments shall be determined through the use of Government scales or
Contractor’s scale properly certified by Korean Government Authority. Personnel designated to operate the scales shall be licensed or otherwise qualified as weigh masters if required by the state, commonwealth, or district. When a metric scale is utilized, the contractor shall use 1 kilogram per 2.2 pounds for conversion.
5.1.2.2 The contractor shall submit weight tickets, reflecting gross, tare, and net weight, in duplicate, properly certified IAW federal, state, and commonwealth or district regulations to the ordering officer with documentation
(Contract Data Requirements List (CDRL) 0002).
5.1.2.3 When scales are not available or their use is not practical, the application of a constructive weight of seven pounds per cubic foot shall be used provided prior written approval is obtained from the ordering officer. (See
Paragraph (Para) 1.6.2.4 for constructive weight of Professional Books, Papers, and Equipment (PBP&E), (also known as PRO or PRO-Gear).
5.1.2.4 When PBP&E are included as part of the shipment, the weight of each item individually described on the inventory shall be entered on the same line of the inventory next to the description. The total weight of such articles shall be annotated separately on the inventory and packing list. The PBP&E weight may be obtained using bathroom or platform type scales. If it is not possible or practical for the contractor to weigh the items at the time of packing and pickup, and there is no cube indicated on the inventory, a constructive weight of 40 pounds per cubic foot shall be used for PBP&E.
5.1.2.5 The weight tickets shall contain the name and address of the weighing station, the date, name of contractor, van or trailer number, name of member/employee, call number assigned by the ordering officer, and signature of the weigh master.
5.1.2.6 For inbound personal property, the contractor shall bill on the origin net weights obtained from the Personal
Property Government Bill of Lading/Bill of Lading (PPGBL/BL) or other movement document and need not submit a weight certificate, unless a reweigh is ordered. When a reweigh is ordered, the contractor shall bill on the reweigh weight.
5.1.2.7 If the PPGBL/BL, movement document, or container does not reflect the net weight for inbound shipments or if the PPGBL/BL is unavailable at the destination, the contractor shall bill on the origin gross weights obtained from the PPGBL/BL, or other available sources, such as containers or supporting documentation. The contractor is required to use all means available (containers, supporting documentation) to obtain a net weight prior to submitting the bill. If the bill is submitted on the origin gross weight, the contractor is paid for the gross weight based on the net weight bid price.
5.1.2.8 The contractor shall perform reweigh services when ordered. The reweigh shall normally be requested at the time the delivery order is placed and shall be performed IAW instructions set forth in Para A.2.a. When so advised by the ordering officer, a designated representative of the ordering officer or the member/employee shall be permitted to accompany, in a separate conveyance, the contractor to witness the reweigh. This would be at no extra charge and the contractor would not provide the separate conveyance.
5.1.2.9 When a reweigh is ordered, the contractor shall furnish the ordering officer weight tickets in duplicate within seven workdays of completion of the service.
5.1.2.10 When the weighing of a shipment at origin is witnessed by the Personal Property Shipping Office (PPSO), the back of all copies of the weight ticket shall be annotated with the statement “weight observed” and verified by the signature of the PPSO. The number 7 copy of the PPGBL/BL (property received copy) shall be similarly annotated prior to mailing to the destination PPSO. When computer generated PGBL/BLs are used, the copy going to the destination PPSO shall be annotated.
5.1.2.11 Billing Procedures. For overseas activities, excluding Hawaii and Alaska, shipments are payable on the actual net weight shipped.
5.1.2.12 Actual pieces, weight, and cube of UB shipments shall be provided to the Transportation Office (TO)/PPSO prior to the issuance of the PPGBL/BL.
5.1.3 Time Requirements:
5.1.3.1 This contract begins October 1, 2020, and ends September 30, 2025, both dates inclusive. Any work ordered before, and not completed by the expiration date shall be governed by the terms of this contract. The Government will not place new orders under this contract that require that performance commence more than 15 days after the expiration date. The Government may place orders required for the completion of services (for shipments in the contractor's possession) for 180 days past the expiration date. The ordering officer will normally give the contractor notice to commence services ordered herein at least 1 full workday prior to the date specified. Oral orders will be confirmed in writing within 2 workdays following order acceptance by the contractor. The contractor will be available to receive orders between the hours 0800 and 1700. Upon request, the contractor will provide information as to whether the service will be performed between the hours of 0800 to 1200 hours or between the hours of 1200 to 1700 hours, based upon the best information available.
5.1.3.2 The contractor will not begin pickup or delivery services at a customer’s residence before 0800 hours or after
1700 hours without prior approval of the ordering officer and the customer. The contractor will not begin any service that will not allow completion by 2100 hours without approval by the ordering officer and the customer by
1630 hours of the scheduled date. When services cannot be completed on the scheduled date, the contractor will notify the ordering officer and the customer. In case of an approved suspension of operations, the contractor will assure his/her return the next workday at 0800 hours to complete the services.
5.1.3.3 If containerization is ordered at the contractor’s facility, the HHG or UB will be picked up on the date and within the hours specified. Unless a longer period is authorized by the ordering office, the maximum containerization time allowed at the contractor’s facility will be 3 workdays following the specified pickup date for
HHG and 2 workdays following the specified pickup date for UB.
5.1.3.4 The contractor will accept from commercial carriers and pickup from commercial, air, water, and military terminals inbound shipments of HHG or UB. The contractor will notify the ordering officer upon arrival of a shipment but not later than 1200 hours of the next workday. Delivery will be affected within 3 workdays following the date of the contractor’s arrival notification unless otherwise specified. For shipments in storage, the contractor will affect delivery to the residence within 3 workdays following notification for delivery by the ordering officer
(e.g., if the ordering officer calls on Monday, the personal property will be delivered on or before Thursday). The contractor will not deviate from the specified delivery date unless approved by the ordering officer.
5.1.4 Preparation, Packing, Loading and Containerization:
5.1.4.1 Personal property shall be prepared, packed, loaded, and containerized for all types of shipments destined for the CONUS or Outside CONUS (OCONUS). It is the contractor’s responsibility to coordinate with the ordering officer container size and configuration for each mode of shipment prior to packing containers.
5.1.4.2 The contractor shall perform all preparation and packing in a manner requiring the least cubic measurement, producing packages that withstand normal movement without damage to the container or contents and at a minimum of weight. All shipments shall be protected from the elements (rain, snow or sun) and theft at all times.
5.1.4.2.1 Items of unusual nature may require disassembly service by a third party. The contractor shall not arrange for third party servicing without the authorization of the ordering officer. The charges for third party service shall be billed by the contractor as a separate charge on the invoice and supported with two copies of the third party
Company’s invoice. Examples of such items are: Shranks, wall units, grandfather clocks, and grand pianos.
5.1.4.2.2 The contractor shall not be required to disassemble swing sets, outdoor recreation equipment, television and radio antennas, and similar articles. The member/employee shall disassemble these items. Items disassembled by the member/employee shall be shown in the remarks section of the inventory as Disassembled by the Owner
(DBO).
5.1.4.2.3 Customer-Packed Items: The contractor will inspect and repack items already packed by the customer, with the exception of Attachment G3, Schedule I, Item 0006, Outbound Service-Unaccompanied Baggage Packed by Customer and Item 0007, Outbound Service-Unaccompanied Baggage Packed By Customer-Consolidated
Shipments/Government Facility. The carrier assumes liability for whatever they pack. The carrier has the right to inspect all items and will use the appropriate carton(s) to pack all items (e.g., clothes in wardrobe boxes) thereby affording items the proper protection. PPSOs will ensure that items are shipped in sealed cartons for stacking in trucks/crates and to avoid pilferage. Therefore, one of two things must occur:
a. The carrier pack all contents in cartons and then stack empty plastic totes or tubs separately for onward movement, or
b. The customer provides an already-packed tote/tub and the carrier then inspect it and decide to do one of the following:
- Empty the tote/tub and place its contents in a carton, or
- Ship the tote/tub as is with contents. (it will be the carrier’s responsibility to place the tote/tub in a proper carton or container for safe movement; tape may not be placed directly on the tote/tub).
The above decision is at the carrier’s discretion. Members/employees cannot insist that the contents must remain in the tote/tub, since the carrier assumes liability for the tote/tub and the contents.
5.1.4.2.4 Trunks and Footlockers: Trunks and footlockers may contain a properly packed quantity of HHG that is reasonable for the construction and condition of the container.
5.1.4.3 When the ordering officer authorizes tailgating, the load will not extend beyond the surface of the tailgate or beyond the surface of the vehicle. The tailgated items will be protected from inclement weather by a suitable covering.
5.1.4.4 Containerization: Containerization of outbound HHG and UB will be done at the member’s/employee’s residence, unless otherwise authorized by the ordering officer. The contractor will perform all exterior containerization services as prescribed in Paragraph 1.6.7 for the type of articles, destination, and method of shipment designated by the ordering officer.
5.1.4.4.1 Firearms: When firearms are included in containerized shipments, they will be placed in the number one container in such a manner to permit easy withdrawal for inspection. Make, model, caliber or gauge, and serial number of the firearm will be listed on the inventory form (See Paragraph 1.6.5.3)
5.1.4.4.2 Boats: Boats may include, but are not limited to, the following: canoes, skiffs, light rowboats, kayaks, and sailboats. The contractor will be required to accept a boat and/or boat trailer less than 14 feet in length or over 14 feet in length (member only) but less than 500 pounds in weight from a customer. Employees are limited to domestic shipment of boats and their associated trailer that can be transported in a moving van (e.g., canoe, kayak, rowboat, outboard/inboard motorboat [14 feet or less]). Components and boat accessories that will not fit into an
American Society for Testing and Materials, (ASTM) D4169-14, Standard Practice for Performance Testing of
Shipping Containers and Systems or Military Surface Deployment and Distribution Command (SDDC) Pamphlet
55-12, Transportation and Travel Commercial Containers for Department of Defense Household Goods Shipments, container will be containerized IAW ASTM 6251/D6251M-11, Standard Specification for Wood-Cleated
Panelboard Shipping Boxes. The customer will be responsible for any special crating or materials needed to move the boat by DPM.
5.1.4.5 Security Seals: All exterior HHG/UB containers and boxes, including overflow and oversize boxes and rug tubes/cartons, will be sealed with accountable seals at the member’s/employee’s residence, unless otherwise authorized by the ordering officer. Sealing will be completed prior to any movement and the seal (control) numbers entered on the inventory, cross-referencing the container number. Two seals, as a minimum, for UB, will be used per box and seals will secure the access overlap top and ends. If only two seals out of a set of four are used, the seals not used will be destroyed at the time of sealing or given to the customer. Four seals, as a minimum, on HHG, will be used per box and seals will secure the access overlap door and side panels.
5.1.4.6 Removal of Debris: Packing and loading at the origin will include, as a minimum, removing from the member’s/employee’s residence all empty contractor-provided containers, packing materials, and other debris accumulated incident to packing and loading unless specifically waived by the customer in writing.
5.1.5 Tagging, Inventorying and Packing list: The contractor, in coordination with the customer, will prepare an accurate, legible, HHG/UB descriptive inventory similar to Figure G1-1, Household Goods Descriptive Inventory.
The contractor will count and examine all goods tendered for shipments, receipt for them, and make written exception for any goods not in apparent good order. All tagging will be accomplished prior to the removal of goods from the residence.
5.1.5.1 Inventory Identification: Each carton will be marked to indicate the general content and member’s/ employees’ last name. Each carton will be tagged and inventoried as a separate inventory line item. Identify the cartons by type and cube with an indication of general contents, such as, linens, pots and pans, mirror carton, 3.5 cubic feet.
5.1.5.2 Inventory Symbols: The “Exception Symbols” and “Location Symbols,” as shown in Figure G1-1, will be used to describe locations and exceptions. Locations and exceptions will be true and accurate. The omission of exception symbols will indicate good condition except for normal wear. Describe in as much detail as possible items of furniture; for example, television sets will be identified as being either “color” (C) or “black and white” (B&W) and console or portable. The contractor will annotate on the inventory item(s) such as TVs, stereo components, computer hardware, VCRs, video cameras, by make, model, and serial number when these are visible on the outside of the item.
5.1.5.3 Each privately owned firearm will be annotated on the inventory by make, model, caliber or gauge, and serial number.
5.1.5.4 For PBP&E, ensure that the term “PRO-GEAR (PRO)” is used to identify such articles on the inventory, together with the cube and weight of the individual carton; a line entry item for each container, such as, carton PRO
3 cubic ft., 53 lbs. These items identified by the customer will be separated from other items of the shipment, weighed separately, and placed in separate boxes or cartons to provide safe transportation. The symbol PRO will be used. The total weight of the packed professional items will be recorded on the last page of the inventory and on the packing list for outbound HHG and UB shipments.
5.1.5.5 Items disassembled by the contractor will be shown in the remarks section of the inventory as Contractor
Disassembled (CD). Items disassembled by the customer will be shown in the remarks section of the inventory as
DBO. When an article is packed in an original container furnished by the customer, the inventory will indicate the type of article and will be shown as Contractor Packed (CP).
5.1.5.6 Motorcycles, mopeds, and motor scooters will be inventoried as one line item, listing their serial number, make, year, model, and odometer reading. For international shipments, ensure one copy of the title and/or registration is attached to all copies of the PPGBL/BL/Commercial Bill of Lading/Transportation Control and
Movement Document (TCMD).
NOTE: Motorcycles and mopeds that do not conform to vehicle emissions standards and motor vehicle safety standards of the destination country cannot be shipped as part of a HHG shipment.
5.1.5.7 When the ordering officer permits the contractor to partially containerize a shipment at the warehouse, each item removed from the residence will be annotated on the inventory as Containerized Warehouse (CW).
5.1.5.8 Inventory Form: The inventory form will bear the signature of the customer, and date signed, together with the signature of the contractor’s representative and date signed certifying to its accuracy and completeness.
5.1.5.9 The contractor will prepare the inventory in five copies for outbound HHG and UB shipments and in three copies for local drayage moves. The original and all copies will be legible and will bear the name and complete mailing address of the contractor. The original inventory will be furnished to the ordering officer, the contractor will retain one copy, and one copy will be given to the customer (CDRL 0003, Household Goods Descriptive Inventory).
For HHG and UB, the contractor will place in a waterproof envelope secured to the No. 1 container: one copy of the inventory; one copy of the DD Form 1299, Application for the Shipment and/or Storage of Personal Property
(Figure G-2), and if an overseas shipment, one copy of the member’s/employee’s orders and custom’s document.
Additionally, for HHG, the contractor will place an envelope containing the following documents in an easily accessible location inside the No. 1 container: one copy of the packing list and Exception Sheet for shipments released from Non-temporary Storage (NTS). For unaccompanied baggage shipments, the contractor will place one copy of the member’s/employee’s orders inside the carton prior to sealing. The customer will be required to furnish all necessary copies of his or her orders.
5.1.5.10 Annotate the receiving document or inventory to show any overage, shortage, and damage found, including visible damage to external shipping containers and condition of security seals each time custody of the property changes from a storage contractor (warehouseman) to the contractor or from one contractor or carrier to another.
When available, use the same inventory prepared at origin to verify delivery and condition of the articles at destination.
5.